CN102275117B - Oilstone jig for ultra-finishing of bearing grooves - Google Patents

Oilstone jig for ultra-finishing of bearing grooves Download PDF

Info

Publication number
CN102275117B
CN102275117B CN 201010198059 CN201010198059A CN102275117B CN 102275117 B CN102275117 B CN 102275117B CN 201010198059 CN201010198059 CN 201010198059 CN 201010198059 A CN201010198059 A CN 201010198059A CN 102275117 B CN102275117 B CN 102275117B
Authority
CN
China
Prior art keywords
oilstone
hole
swing
head body
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010198059
Other languages
Chinese (zh)
Other versions
CN102275117A (en
Inventor
黄宗响
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyuan University of Technology
Original Assignee
Zhongyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyuan University of Technology filed Critical Zhongyuan University of Technology
Priority to CN 201010198059 priority Critical patent/CN102275117B/en
Publication of CN102275117A publication Critical patent/CN102275117A/en
Application granted granted Critical
Publication of CN102275117B publication Critical patent/CN102275117B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)

Abstract

一种用于轴承沟道超精研的油石夹具,该油石夹具包括摆头本体、油石安装孔和摆杆,摆头本体中沿其轴向设有阶梯孔,摆杆一端通过该阶梯孔与摆头本体相连接,摆头本体与摆杆之间设有转动副,摆头本体上设有两个油石安装孔,该两个油石安装孔呈“八”字型设于摆头本体轴线两侧,油石固定安装于油石安装孔内。本发明用于轴承沟道超精研的油石夹具的摆头本体中设有两个安装油石的位置,可以实现粗超和精超两个工步,简化机床结构;提高加工效率。摆动头体的孔与摆杆端部的轴之间为间隙配合,同时,摆杆轴的长度稍大于摆动头体中安装孔的长度,便于调整摆动头体的位置。

Figure 201010198059

A whetstone jig used for superfinishing of bearing grooves, the whetstone jig includes a swing head body, a whetstone installation hole and a swing rod, a stepped hole is arranged in the swing head body along its axial direction, and one end of the swing rod passes through the step hole and The body of the oscillating head is connected with each other, and there is a rotating pair between the body of the oscillating head and the oscillating rod. There are two mounting holes for oil stones on the body of the oscillating head. On the side, the oil stone is fixedly installed in the oil stone installation hole. The present invention is used for the superfinishing of the bearing groove. The main body of the oilstone jig is provided with two positions for installing the oilstone, which can realize two working steps of rough grinding and fine grinding, simplify the structure of the machine tool, and improve the processing efficiency. There is clearance fit between the hole of the swing head body and the shaft at the end of the swing rod. Simultaneously, the length of the swing rod shaft is slightly greater than the length of the installation hole in the swing head body, which is convenient for adjusting the position of the swing head body.

Figure 201010198059

Description

用于轴承沟道超精研的油石夹具Oilstone jig for ultra-finishing of bearing grooves

技术领域 technical field

本发明涉及机械加工设备,特别涉及轴承沟道精研设备,具体是一种用于轴承沟道超精研的油石夹具。 The invention relates to mechanical processing equipment, in particular to a bearing groove finishing equipment, in particular to an oil stone fixture for superfinishing of a bearing groove.

背景技术 Background technique

轴承的轴承沟道(沟道)超精研加工工艺是生产企业普遍采用的一种沟道(沟道)终加工技术,由于其加工精度要求高对油石和加工工艺都提出了较高的要求。目前广泛应用的是一序两步法超精即轴承沟道(沟道)超精研分为粗超和精超两个工步,分别有两个超精头和两块油石,分别用两套驱动机构控制进行超精研加工。因而,机床结构复杂,加工效率低下。中国实用新型专利“超精加工圆锥、圆柱轴承沟道的超精头”(申请日2004年3月22日,授权公告日2005年3月16日,授权公告号CN 2685002Y)公开了一种超精头,其中虽然有两块压板可安装两个油石,但是两个油石各自需要一个驱动装置,而且该超精头中油石只能作直线运动,因此只能用于母线为直线的圆锥、圆柱轴承沟道的精研,不能用于母线为圆弧线的深沟球轴承沟道的加工。 The ultra-finishing processing technology of the bearing groove (channel) of the bearing is a kind of final processing technology of the groove (channel) generally adopted by the manufacturing enterprises. Due to its high processing accuracy requirements, higher requirements are put forward for the oil stone and the processing technology. . At present, the one-sequence two-step superfinishing method is widely used, that is, the superfinishing of the bearing groove (channel) is divided into two steps of rough superfinishing and fine superfinishing. There are two superfinishing heads and two oilstones respectively, and two A set of driving mechanism controls for super-finishing processing. Therefore, the structure of the machine tool is complex and the processing efficiency is low. Chinese utility model patent "Superfinishing head for superfinishing conical and cylindrical bearing channels" (application date March 22, 2004, authorization announcement date March 16, 2005, authorization announcement number CN 2685002Y) discloses a super Fine head, although there are two pressure plates to install two oil stones, but each of the two oil stones needs a driving device, and the oil stone in this ultra-fine head can only move in a straight line, so it can only be used for cones and cylinders whose generatrix is a straight line The fine grinding of the bearing groove cannot be used for the processing of the deep groove ball bearing groove whose generatrix is an arc line.

发明内容 Contents of the invention

本发明的目的在于提供一种用于轴承沟道超精研的油石夹具,所述的这种用于轴承沟道超精研的油石夹具要解决现有技术中轴承沟道精研时需要两个超精头、两套控制机构,导致机床结构复杂的技术问题。 The object of the present invention is to provide a kind of oilstone jig used for super-finishing of bearing grooves. The described oilstone jig for super-finishing of bearing grooves needs two One ultra-precision head and two sets of control mechanisms lead to technical problems with complex machine tool structures.

本发明的目的是通过以下技术方案实现的:该油石夹具包括摆头本体、油石安装孔和摆杆,摆头本体中沿其轴向设有阶梯孔,摆杆一端通过该阶梯孔与摆头本体相连接,摆头本体与摆杆之间设有转动副,摆头本体上设有两个油石安装孔,该两个油石安装孔呈“八”字型设于摆头本体轴线两侧,该两个油石安装孔轴线之间的夹角大小取值为5°~15°,油石固定安装于油石安装孔内,在摆杆一端设有轴,轴与摆头本体中的阶梯孔相配合,轴的外径略小于阶梯孔小端内径,轴的长度比阶梯孔小端的长度略大,轴的末端设有螺纹孔与螺钉连接,该螺钉的外径大于阶梯孔小端直径、小于阶梯孔大端直径。 The object of the present invention is achieved through the following technical solutions: the whetstone fixture includes a swing head body, a whetstone installation hole and a swing rod, a stepped hole is arranged in the swing head body along its axial direction, and one end of the swing rod passes through the step hole and the swing head The main body is connected, and there is a rotating joint between the swing head body and the swing rod. There are two oil stone installation holes on the swing head body. The two oil stone installation holes are located on both sides of the axis of the swing head body in the shape of "eight". The included angle between the axes of the two oil stone installation holes is 5°~15°. The oil stone is fixedly installed in the oil stone installation hole. There is a shaft at one end of the swing rod, and the shaft matches the stepped hole in the swing head body. , the outer diameter of the shaft is slightly smaller than the inner diameter of the small end of the stepped hole, and the length of the shaft is slightly larger than the length of the small end of the stepped hole.

在油石安装孔侧壁设有螺纹孔,油石通过紧定螺钉固定于油石安装孔内。 A threaded hole is provided on the side wall of the oilstone installation hole, and the oilstone is fixed in the oilstone installation hole by set screws.

阶梯孔小端面与螺钉之间设有垫片。 Gaskets are arranged between the small end faces of the stepped holes and the screws.

本发明和已有技术相比,其效果是积极和明显的。本用于轴承沟道超精研的油石夹具的摆头本体中设有两个安装油石的位置,可以实现粗超和精超两个工步,简化机床结构;提高加工效率;同时,由于摆杆带动摆头本体从而带动安装于其上的油石绕被加工轴承圆弧沟道中心线作往复摆动,因此该夹具可用于深沟球轴承沟道的精研加工。摆动头体的孔与摆杆端部的轴之间为间隙配合,同时,摆杆轴的长度稍大于摆动头体中安装孔的长度,便于调整摆动头体的位置。 Compared with the prior art, the present invention has positive and obvious effects. There are two positions for installing the oilstone in the body of the oilstone jig used for superfinishing of the bearing groove, which can realize two working steps of rough superfinishing and fine superfinishing, simplify the structure of the machine tool and improve the processing efficiency; at the same time, due to the pendulum The rod drives the body of the swing head, thereby driving the oilstone mounted on it to swing back and forth around the center line of the arc groove of the bearing being processed, so the fixture can be used for the finishing process of the groove of the deep groove ball bearing. There is clearance fit between the hole of the swing head body and the shaft at the end of the swing rod, and at the same time, the length of the swing rod shaft is slightly greater than the length of the installation hole in the swing head body, which is convenient for adjusting the position of the swing head body.

附图说明 Description of drawings

图1是本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.

图2是本发明中摆头与摆杆装配结构示意图。 Fig. 2 is a schematic diagram of the assembly structure of the swing head and the swing rod in the present invention.

图3 是本发明中摆头本体结构示意图。 Fig. 3 is a schematic diagram of the structure of the swing head body in the present invention.

图4是本发明中摆杆结构示意图。 Fig. 4 is a schematic diagram of the structure of the swing rod in the present invention.

图5是本发明工作示意图。 Fig. 5 is a working diagram of the present invention.

具体实施方式 Detailed ways

下面结合附图通过实施例对本发明作进一步详细说明。 The present invention will be described in further detail below through embodiments in conjunction with the accompanying drawings.

如图1、图2、图3、图4和图5所示,在本实施例中,该油石夹具包括摆头本体1、油石安装孔2和摆杆3,摆头本体1中沿其轴向设有阶梯孔4,摆杆3一端通过该阶梯孔与摆头本体相连接,摆头本体1与摆杆3之间设有转动副,在摆杆3一端设有轴31,轴31与摆头本体中的阶梯孔4相配合,轴31的外径略小于阶梯孔4小端内径,使阶梯孔4与轴31之间为间隙配合,构成转动副,轴31的长度比阶梯孔4小端的长度略大,轴31的末端设有螺纹孔32与螺钉7连接,该螺钉7的外径大于阶梯孔小端直径、小于阶梯孔大端直径,这样在摆杆3与轴31的阶梯面与摆头本体阶梯孔的左端面之间可设置垫片8,而轴31的端部与螺钉7连接,螺钉7与阶梯孔的右端面之间留有间隙,可确保摆头本体可绕摆杆自由转动。摆头本体1上设有两个油石安装孔2,该两个油石安装孔2呈“八”字型设于摆头本体1轴线两侧,即两个油石安装孔2呈“八”字型设于摆头本体阶梯孔的轴线两侧,该两个油石安装孔2轴线之间的夹角大小与所加工的轴承沟道的直径相适应,该夹角取值为5°~15°,轴承沟道直径大则选择较大的夹角,油石5固定安装于油石安装孔2内,在油石安装孔2侧壁设有螺纹孔21,油石5通过紧定螺钉6固定于油石安装孔内。 As shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, in the present embodiment, the whetstone fixture includes a swing head body 1, a whetstone installation hole 2 and a swing rod 3, and the swing head body 1 along its axis A stepped hole 4 is provided to one end of the swing rod 3, and one end of the swing rod 3 is connected with the swing head body through the step hole. The stepped hole 4 in the swing head body matches, and the outer diameter of the shaft 31 is slightly smaller than the inner diameter of the small end of the stepped hole 4, so that there is a gap fit between the stepped hole 4 and the shaft 31 to form a revolving pair. The length of the shaft 31 is longer than the stepped hole 4 The length of the small end is slightly larger, and the end of the shaft 31 is provided with a threaded hole 32 to be connected with the screw 7. The outer diameter of the screw 7 is greater than the diameter of the small end of the stepped hole and smaller than the diameter of the large end of the stepped hole. A spacer 8 can be arranged between the left end faces of the stepped holes of the main body, and the end of the shaft 31 is connected with the screw 7, and there is a gap between the screw 7 and the right end face of the stepped holes to ensure that the swing head body can rotate freely around the swing rod . There are two oil stone installation holes 2 on the swing head body 1, and the two oil stone installation holes 2 are arranged in the shape of "eight" on both sides of the axis of the swing head body 1, that is, the two oil stone installation holes 2 are in the shape of "eight". It is located on both sides of the axis of the stepped hole of the swing head body. The angle between the two axes of the two oilstone installation holes is suitable for the diameter of the bearing channel to be processed. The value of the angle is 5°~15°. If the diameter of the bearing channel is large, choose a larger included angle. The oil stone 5 is fixedly installed in the oil stone installation hole 2. There is a threaded hole 21 on the side wall of the oil stone installation hole 2. The oil stone 5 is fixed in the oil stone installation hole by the set screw 6. .

如图5所示,工作时由摆杆3带动摆头本体1,从而带动安装于摆头本体中的油石5一起绕被加工工件9沟道中心线往复摆动,以实现对工件沟道的超精研加工。 As shown in Figure 5, when working, the swing rod 3 drives the swing head body 1, thereby driving the oil stone 5 installed in the swing head body to swing back and forth around the center line of the processed workpiece 9 grooves, so as to realize the overshoot of the workpiece groove. Refined processing.

除了上述方案之外,摆头本体可通过精密轴承与摆杆相连接;油石安装孔上端内侧可略向外倾斜,这样便于安装油石。 In addition to the above solutions, the body of the swing head can be connected with the swing rod through precision bearings; the inner side of the upper end of the oilstone installation hole can be slightly inclined outward, which is convenient for installing the oilstone.

Claims (3)

1. oilstone anchor clamps that are used for the super lappingout of bearing channel, it is characterized in that: these oilstone anchor clamps comprise the yaw body, oilstone installing hole and fork, be axially arranged with shoulder hole along it in the yaw body, fork one end is connected with the yaw body by this shoulder hole, be provided with revolute pair between yaw body and the fork, the yaw body is provided with two oilstone installing holes, these two oilstone installing holes are " eight " font and are located at yaw body axis both sides, corner dimension value between these two oilstone installing hole axis is 5 ° ~ 15 °, oilstone is fixedly installed in the oilstone installing hole, be provided with axle at fork one end, axle matches with shoulder hole in the yaw body, the external diameter of axle is slightly less than shoulder hole small end internal diameter, the length of axle is more bigger than the length of shoulder hole small end, the tip of the axis is provided with screwed hole and is connected with screw, and the external diameter of this screw is greater than the shoulder hole end diameter, less than the shoulder hole outside diameter.
2. oilstone anchor clamps for the super lappingout of bearing channel as claimed in claim 1, it is characterized in that: be provided with screwed hole at oilstone installing hole sidewall, oilstone is fixed in the oilstone installing hole by holding screw.
3. the oilstone anchor clamps for the super lappingout of bearing channel as claimed in claim 2 is characterized in that: be provided with pad between shoulder hole small end face and the screw.
CN 201010198059 2010-06-11 2010-06-11 Oilstone jig for ultra-finishing of bearing grooves Expired - Fee Related CN102275117B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010198059 CN102275117B (en) 2010-06-11 2010-06-11 Oilstone jig for ultra-finishing of bearing grooves

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010198059 CN102275117B (en) 2010-06-11 2010-06-11 Oilstone jig for ultra-finishing of bearing grooves

Publications (2)

Publication Number Publication Date
CN102275117A CN102275117A (en) 2011-12-14
CN102275117B true CN102275117B (en) 2013-10-09

Family

ID=45101012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010198059 Expired - Fee Related CN102275117B (en) 2010-06-11 2010-06-11 Oilstone jig for ultra-finishing of bearing grooves

Country Status (1)

Country Link
CN (1) CN102275117B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107309745A (en) * 2016-08-27 2017-11-03 南通山口精工机电有限公司 A kind of superfinishing oilstone clamping device
CN106272027B (en) * 2016-08-31 2018-06-26 中航工业哈尔滨轴承有限公司 A kind of lappingout processing method of bearing ring angled end-face
CN109108737A (en) * 2018-08-28 2019-01-01 海目星激光智能装备(江苏)有限公司 A kind of grinding method of workbench right-angle surface and parallel surface

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2734401Y (en) * 2004-09-30 2005-10-19 洛阳轴承集团有限公司 Spatial swing links mechanism of full-automatic spherical surface roller super precise machine
CN201198114Y (en) * 2008-05-13 2009-02-25 中国第一重型机械集团公司 Drill machine honing apparatus

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000326195A (en) * 1999-05-24 2000-11-28 Toyo Advanced Technologies Co Ltd Grinding method for annular groove
RU2282527C2 (en) * 2004-09-16 2006-08-27 Общество с ограниченной ответственностью научно-производственное предприятие нестандартных изделий машиностроения (ООО НПП НИМ) Finishing method
CN201711841U (en) * 2010-06-11 2011-01-19 中原工学院 Oilstone clamp for super-finishing of bearing groove

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2734401Y (en) * 2004-09-30 2005-10-19 洛阳轴承集团有限公司 Spatial swing links mechanism of full-automatic spherical surface roller super precise machine
CN201198114Y (en) * 2008-05-13 2009-02-25 中国第一重型机械集团公司 Drill machine honing apparatus

Also Published As

Publication number Publication date
CN102275117A (en) 2011-12-14

Similar Documents

Publication Publication Date Title
CN102513915A (en) Processing method of precision cylindrical part
CN102500541B (en) Step adjusting device of linear eccentricity of eccentric shaft
CN109158638B (en) Mechanical low-frequency vibration drilling device
CN102275117B (en) Oilstone jig for ultra-finishing of bearing grooves
CN105500091A (en) Feeding device of rotary rolling table and application of feeding device
CN205380527U (en) Speed reducer cycloid wheel processing special grinding machine of robot
CN105328567A (en) Structure of adjustable high-speed precise roller grinding head and manufacturing method of structure
CN201711841U (en) Oilstone clamp for super-finishing of bearing groove
CN107570754A (en) One kind bores not rounded hole processing device
CN106425994A (en) Differential type bearing dismounting device
CN1631615A (en) Grinding Process and Special Fixture for the Inner Hole of Rotary Arm Bearing
CN104454328A (en) Motor plunger component and machining method thereof
CN203297606U (en) Energy-saving type piston pin with diamond-like coating
CN205309690U (en) Knurling machine
CN204277780U (en) Cylindrical grinder magnetic force fills by grinder
CN107855834A (en) A kind of rolling bearing type magnetorheological finishing device of high-precision ceramic balls
CN204487301U (en) Boring machine circular deep hole machine processing grinding tool
CN207167742U (en) A kind of cigarette machine and its loudspeaker nozzle adjusting device for travel
CN207127562U (en) Cube shaped part connects mouth finishing fixture
CN205057768U (en) Plane roll extrusion grinder
CN104625638A (en) Driving shaft of hydraulic pump and machining method thereof
CN104454753B (en) Modified motor spindle component and its processing method
CN204843075U (en) a drill bit
CN204253273U (en) Motor piston assemblies
CN103521834A (en) Adjustable and replaceable tool bit module

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131009

Termination date: 20160611

CF01 Termination of patent right due to non-payment of annual fee