CN102251529A - Self-balancing siphon drainage method by using side slope declining drill hole - Google Patents
Self-balancing siphon drainage method by using side slope declining drill hole Download PDFInfo
- Publication number
- CN102251529A CN102251529A CN2011101470212A CN201110147021A CN102251529A CN 102251529 A CN102251529 A CN 102251529A CN 2011101470212 A CN2011101470212 A CN 2011101470212A CN 201110147021 A CN201110147021 A CN 201110147021A CN 102251529 A CN102251529 A CN 102251529A
- Authority
- CN
- China
- Prior art keywords
- hole
- side slope
- siphon drainage
- slope
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
Abstract
The invention discloses a self-balancing siphon drainage method by using a side slope declining drill hole. A siphon drainage pipe is introduced to the deep part of a side slope through a downward declining hole, a relative height difference between the opening and the bottom of the declining hole is kept less than 9m, and the siphon drainage pipe is introduced to a certain position of a slope surface from the bottom of the declining hole so that a water inlet and a water outlet of the siphon drainage pipe have the same elevation, and water is drained in real time when the water level of a slope body is raised. By adopting the self-balancing siphon drainage method provided by the invention, the condition of draining water at the deep part of the side slope can be realized, the problem of drainage treatment of big landslides can be solved, the low construction cost for maintaining side slope stabilization can be ensured, the earth and stone excavation is unneeded in the treatment process, the implementation process of treatment engineering is simple and easy to operate, drainage measures are favorable in reliability and strong in adaptability, and the power and the frequent management maintenance are unnecessary in the drainage process.
Description
Technical field
The present invention relates to a kind of deep water discharge technology of side slope, relate in particular to a kind of side slope punishment method that is applicable to that sloping body deformability destruction is influenced by groundwater effect.
Background technology
The landslide disaster that slope deformation destruction forms causes great loss usually for engineering construction and lives and properties.Most landslides are subjected to precipitation affects obvious, are the stability that has reduced side slope because rainfall causes the groundwater table rising.Particularly contain rubble cohesive soil side slope, its stability and WATER LEVEL CHANGES relation is very close.It is the cumulative process of a rainfall that slope body groundwater table rises, one time the heavy showers process generally can not cause sloping body groundwater table significantly to rise, but when the rainfall in early stage accumulates, the slope ground saturation ratio is high and higher groundwater table arranged, with this understanding, the groundwater table of the further lifting of heavy showers process slope body will cause that slope failure produces the landslide.If drainage measure can in time be discharged underground water in sloping body groundwater table uphill process, just can effectively prevent the landslide, reduce the generation of geological disaster.
The arterial drainage measure of current side slope has: underdrainage hole, horizontal drainage channel, collecting well draw water, surface drainage ditch and weeper drain etc., the subject matter that these drainage measures exist has: (1) drainage measure is higher to the draining environmental requirement of sloping body, many side slopes often lack favourable geomorphologic conditions, cause the validity of drainage measure to be difficult to guarantee; (2) top drainage and superficial part draining are to improving the weak effect of slope stability; (3) underdrainage hole expense is higher, the construction technology complexity; (4) collecting well draws water needs power and regular administration.
Summary of the invention
The objective of the invention is at the deficiencies in the prior art, a kind of side slope inclined drill self-balancing siphon drainage method is provided.
The objective of the invention is to be achieved through the following technical solutions: a kind of side slope inclined drill self-balancing siphon drainage method, this method is: siphon drainage pipe enters the deep of side slope by the inclined hole that has a down dip, relative relief is less than 9m at the bottom of the aperture of maintenance inclined hole and the hole, from drawing siphon drainage pipe at the bottom of the hole of inclined hole to domatic certain position, make the water inlet of siphon drainage pipe identical with the delivery port elevation, when slope body water level rises, draining in real time.
The invention has the beneficial effects as follows: use side slope inclined drill self-balancing siphon drainage method of the present invention, can realize the draining of side slope deep, solve the draining governing problem of major landslip, the construction costs of guaranteeing to keep stability of slope is low, governance process does not relate to earthwork evacuation, and operation is simple to administer project implementing process, the good reliability of drainage measure, compliance is strong, and drainage procedure need not power and regular management maintenance.
Description of drawings
Fig. 1 is the implementation schematic diagram of side slope inclined drill self-balancing siphon drainage method of the present invention;
Among the figure: standpipe 5, control groundwater table 6 at the bottom of equalization of discharge pipe 1, gutter 2, inclined drill 3, potential slide plane 4, the hole.
The specific embodiment
Principle of the present invention is the deep that siphon drainage pipe is entered side slope by the inclined hole that has a down dip, relative relief is less than 9m at the bottom of the aperture of maintenance inclined hole and the hole, from drawing siphon drainage pipe at the bottom of the hole of inclined hole to domatic certain position, make the water inlet of siphon drainage pipe identical with the delivery port elevation, when slope body water level rises, draining in real time.
The technical scheme that adopts of dealing with problems comprises the combination of two aspects: (1) utilizes downward-sloping boring to enter sloping body deep, guarantee aperture and hole by the inclination angle of regulating inclined drill at the bottom of relative relief less than 9m; (2) utilize the standpipe of gutter water inlet and delivery port to make up a kind of self-balancing siphonic system, groundwater table rising whenever sloping body, discharge sloping body underground water in real time by siphonage is long-term, realize dynamic all the time the water level of water level in the hole of sloping body near delivery port.
Side slope inclined drill self-balancing siphon drainage method of the present invention, concrete enforcement may further comprise the steps:
(1) investigation and analysis slope project geological conditions, grasp the stability features and the Rock-soil Mass Structure feature of side slope, understand supply, runoff and the discharge regime of slope underground water, the relation of analysis of slope stability and groundwater effect is confirmed the influence of WATER LEVEL CHANGES to Landslide Stability.Carry out the slope project geological prospecting, analyze the position of definite potential slide plane 4 that may come down.
(2) carry out the layout design of inclined drill 3.According to the scale on potential landslide, arrange 1 ~ 3 row's inclined drill self-balancing siphon drainage pipe along the side slope vertical section, the spacing of wells can be determined according to concrete hydrogeological conditions on the cross section, about the general desirable 10m of the cross section spacing of wells.In the drilling process, the actual sloping body geologic structure that discloses of foundation is suitably adjusted the degree of depth of boring, making boring enter potential slide plane below 4 as far as possible.
(3), determine the position of standpipe 5 at the bottom of the installing hole according to the position of potential slide plane 4.Generally speaking, should make that the mouth of pipe of standpipe 5 is lower than potential slide plane at the bottom of the hole.The mouth of pipe elevation of standpipe 5, the delivery port elevation of definite equalization of discharge pipe 1 in view of the above at the bottom of the mensuration hole.Connect equalization of discharge pipes 1 with gutter 2, and the other end of gutter 2 is inserted at the bottom of the hole of inclined drill 3 in the standpipe 5.
(4) realize initial siphonic process.Equalization of discharge pipe 1 external vacuum pump, bleeding makes gutter 2 be in temporary vacuum, realizes initial siphonic process.When groundwater table is higher, also can in boring, water filling realize initial siphonic process.
(5) slope underground water position control procedure.When the groundwater table of inclined drill 3 is higher than the delivery port of equalization of discharge pipe 1, siphonic process takes place, utilize siphonage to discharge the underground water of boring 3, realize the groundwater table decreasing of inclined drill 3, groundwater table up to boring 3 is identical with the delivery port water level of equalization of discharge pipe 1, reach the control groundwater table 6 of goal-setting, siphonic process temporarily stops.All keep fixed level in the pipe of standpipe 5 at the bottom of equalization of discharge pipe 1 and the hole at this moment.After rainfall was next time risen sloping body groundwater table, the groundwater table of inclined drill 3 can be higher than the delivery port water level of equalization of discharge pipe 1 again, and siphonic process repeats once more, makes sloping body be in lower groundwater table state all the time.
Claims (2)
1. side slope inclined drill self-balancing siphon drainage method, it is characterized in that, this method is: siphon drainage pipe enters the deep of side slope by the inclined hole that has a down dip, relative relief is less than 9m at the bottom of the aperture of maintenance inclined hole and the hole, from drawing siphon drainage pipe at the bottom of the hole of inclined hole to domatic certain position, make the water inlet of siphon drainage pipe identical with the delivery port elevation, when sloping body water level rises, draining in real time.
2. according to the described side slope inclined drill of claim 1 self-balancing siphon drainage method, it is characterized in that this method specifically may further comprise the steps:
(1) investigation and analysis slope project geological conditions, grasp the stability features and the Rock-soil Mass Structure feature of side slope, understand supply, runoff and the discharge regime of slope underground water, the relation of analysis of slope stability and groundwater effect is confirmed the influence of WATER LEVEL CHANGES to Landslide Stability; Carry out the slope project geological prospecting, analyze the position of definite potential slide plane 4 that may come down;
(2) carry out the layout design of inclined drill 3: according to the scale on potential landslide, arrange 1 ~ 3 row's inclined drill self-balancing siphon drainage pipe along the side slope vertical section, the spacing of wells can be determined according to concrete hydrogeological conditions on the cross section, about the general desirable 10m of the cross section spacing of wells; In the drilling process, the actual sloping body geologic structure that discloses of foundation is suitably adjusted the degree of depth of boring, making boring enter potential slide plane below 4 as far as possible;
(3) according to the position of potential slide plane 4, determine the position of standpipe 5 at the bottom of the installing hole: generally speaking, should make that the mouth of pipe of standpipe 5 is lower than potential slide plane at the bottom of the hole; The mouth of pipe elevation of standpipe 5, the delivery port elevation of definite equalization of discharge pipe 1 in view of the above at the bottom of the mensuration hole; Connect equalization of discharge pipes 1 with gutter 2, and the other end of gutter 2 is inserted at the bottom of the hole of inclined drill 3 in the standpipe 5;
(4) realize initial siphonic process: equalization of discharge pipe 1 external vacuum pump, bleeding makes gutter 2 be in temporary vacuum, realizes initial siphonic process; When groundwater table is higher, also can in boring, water filling realize initial siphonic process;
(5) slope underground water position control procedure: when the groundwater table of inclined drill 3 is higher than the delivery port of equalization of discharge pipe 1, siphonic process takes place, utilize siphonage to discharge the underground water of boring 3, realize the groundwater table decreasing of inclined drill 3, groundwater table up to boring 3 is identical with the delivery port water level of equalization of discharge pipe 1, reach the control groundwater table 6 of goal-setting, siphonic process temporarily stops; All keep fixed level in the pipe of standpipe 5 at the bottom of equalization of discharge pipe 1 and the hole at this moment; After rainfall was next time risen sloping body groundwater table, the groundwater table of inclined drill 3 can be higher than the delivery port water level of equalization of discharge pipe 1 again, and siphonic process repeats once more, makes sloping body be in lower groundwater table state all the time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101470212A CN102251529A (en) | 2011-06-02 | 2011-06-02 | Self-balancing siphon drainage method by using side slope declining drill hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101470212A CN102251529A (en) | 2011-06-02 | 2011-06-02 | Self-balancing siphon drainage method by using side slope declining drill hole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102251529A true CN102251529A (en) | 2011-11-23 |
Family
ID=44979073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101470212A Pending CN102251529A (en) | 2011-06-02 | 2011-06-02 | Self-balancing siphon drainage method by using side slope declining drill hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102251529A (en) |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102536318A (en) * | 2011-12-28 | 2012-07-04 | 浙江大学 | Level linear highway tunnel with drainage system |
CN102535491A (en) * | 2012-02-21 | 2012-07-04 | 浙江大学 | Embedded water permeable plate water collection siphon drainage method for side slope ground water interception |
CN102635402A (en) * | 2012-04-11 | 2012-08-15 | 浙江大学 | Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole |
CN102966090A (en) * | 2012-12-14 | 2013-03-13 | 北京科技大学 | System for automatically draining water on side slope and method therefor |
CN103290853A (en) * | 2013-05-21 | 2013-09-11 | 中南大学 | Slide-resistant pile capable of monitoring side-slope underground water level |
CN103741704A (en) * | 2014-01-06 | 2014-04-23 | 化工部长沙设计研究院 | Water-filling type siphon drainage device applicable to radioactive well |
CN104196047A (en) * | 2014-09-15 | 2014-12-10 | 浙江大学 | Power-free reverse-water-pressurizing self-recovery slope high-lift siphon drainage system and drainage method |
CN104727319A (en) * | 2015-04-07 | 2015-06-24 | 兰州理工大学 | Slope self-drainage anchor rod and construction method |
CN105821830A (en) * | 2016-05-05 | 2016-08-03 | 浙江大学 | Permeation increase siphon drainage system for low-permeability soil slope |
CN106759242A (en) * | 2017-02-17 | 2017-05-31 | 福建省地质工程勘察院 | The method for designing and arrangement and method for construction of a kind of white-out slope underground water |
CN107246019A (en) * | 2017-06-30 | 2017-10-13 | 浙江大学 | A kind of slope underground water drilling self-starting drainage by suction system and method |
CN108301395A (en) * | 2018-04-13 | 2018-07-20 | 范雲鹤 | A kind of slope drainage system and method |
CN108547662A (en) * | 2018-04-13 | 2018-09-18 | 范雲鹤 | A kind of tunnel drainage system and method |
CN108547661A (en) * | 2018-04-13 | 2018-09-18 | 范雲鹤 | A kind of tunnel drainage system and method for reverse pressure water renewable type |
CN108561180A (en) * | 2018-01-12 | 2018-09-21 | 浙江大学 | A kind of longitudinal drainage system and method for disposition tunnel floor pore gas flow |
CN108708392A (en) * | 2018-05-31 | 2018-10-26 | 浙江省交通运输科学研究院 | Automatically keep the wall system of level of ground water |
CN110281051A (en) * | 2019-06-28 | 2019-09-27 | 重庆建工集团股份有限公司 | Batter post boring method |
CN110578553A (en) * | 2019-09-17 | 2019-12-17 | 中国十九冶集团有限公司 | Siphon type reverse slope drainage system and drainage method |
CN111794204A (en) * | 2020-07-16 | 2020-10-20 | 招商局重庆交通科研设计院有限公司 | Automatic drainage structure in side slope based on rainfall |
CN111794238A (en) * | 2020-07-20 | 2020-10-20 | 中铁二院工程集团有限责任公司 | Grouting structure for filling soluble crystals and construction method |
WO2021097939A1 (en) * | 2019-11-23 | 2021-05-27 | 桐乡市倍特科技有限公司 | Coastal slope drainage system |
CN114575359A (en) * | 2022-03-17 | 2022-06-03 | 中钢集团马鞍山矿山研究总院股份有限公司 | Weak-permeability soil layer slope groundwater disaster treatment method |
CN114934486A (en) * | 2022-06-09 | 2022-08-23 | 黄河建工集团有限公司 | Grid type dredging device for hydraulic engineering |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2593203A1 (en) * | 1986-01-20 | 1987-07-24 | Hydro Geo | DEEP DRAINAGE BY SIPHONNAGE OF WATER CAPTURED BY DRAINS |
DE19938922A1 (en) * | 1999-08-17 | 2001-03-01 | Bauer Spezialtiefbau | Purification of groundwater containing pollutants, using chemical reaction and adsorption container |
CN1303974A (en) * | 1999-12-17 | 2001-07-18 | 胡鸣群 | Drainage method and drain pipe using said method |
CN101353892A (en) * | 2007-07-24 | 2009-01-28 | 章致一 | Three-dimensional space water drainage method and structure of gravitational field |
-
2011
- 2011-06-02 CN CN2011101470212A patent/CN102251529A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2593203A1 (en) * | 1986-01-20 | 1987-07-24 | Hydro Geo | DEEP DRAINAGE BY SIPHONNAGE OF WATER CAPTURED BY DRAINS |
DE19938922A1 (en) * | 1999-08-17 | 2001-03-01 | Bauer Spezialtiefbau | Purification of groundwater containing pollutants, using chemical reaction and adsorption container |
CN1303974A (en) * | 1999-12-17 | 2001-07-18 | 胡鸣群 | Drainage method and drain pipe using said method |
CN101353892A (en) * | 2007-07-24 | 2009-01-28 | 章致一 | Three-dimensional space water drainage method and structure of gravitational field |
Non-Patent Citations (3)
Title |
---|
《中国西部科技》 20050630 舒群等 虹吸法排除滑坡体中的深层地下水 10-12、108 2 , * |
《中国铁道科学》 19990930 张永防等 虹吸排水应用技术的研究 52-60 1 第20卷, 第3期 * |
《中国铁道科学》 19990930 张永防等 虹吸排水应用技术的研究 52-60 2 第20卷, 第3期 * |
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102536318A (en) * | 2011-12-28 | 2012-07-04 | 浙江大学 | Level linear highway tunnel with drainage system |
CN102535491A (en) * | 2012-02-21 | 2012-07-04 | 浙江大学 | Embedded water permeable plate water collection siphon drainage method for side slope ground water interception |
CN102635402A (en) * | 2012-04-11 | 2012-08-15 | 浙江大学 | Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole |
CN102966090B (en) * | 2012-12-14 | 2014-07-02 | 北京科技大学 | System for automatically draining water on side slope and method therefor |
CN102966090A (en) * | 2012-12-14 | 2013-03-13 | 北京科技大学 | System for automatically draining water on side slope and method therefor |
CN103290853A (en) * | 2013-05-21 | 2013-09-11 | 中南大学 | Slide-resistant pile capable of monitoring side-slope underground water level |
CN103741704A (en) * | 2014-01-06 | 2014-04-23 | 化工部长沙设计研究院 | Water-filling type siphon drainage device applicable to radioactive well |
CN103741704B (en) * | 2014-01-06 | 2016-03-09 | 化工部长沙设计研究院 | A kind of radial Water siphon drainage device |
CN104196047A (en) * | 2014-09-15 | 2014-12-10 | 浙江大学 | Power-free reverse-water-pressurizing self-recovery slope high-lift siphon drainage system and drainage method |
CN104196047B (en) * | 2014-09-15 | 2015-10-14 | 浙江大学 | A kind of high-lift siphon drainge system of self-recoverage side slope and water discharge method of exempting from the reverse setting-out of power |
CN104727319A (en) * | 2015-04-07 | 2015-06-24 | 兰州理工大学 | Slope self-drainage anchor rod and construction method |
CN104727319B (en) * | 2015-04-07 | 2016-05-11 | 兰州理工大学 | A kind of side slope is from drainage anchor rod and construction method |
CN105821830B (en) * | 2016-05-05 | 2018-03-23 | 浙江大学 | A kind of anatonosis siphon drainge system for hypotonicity slight slope |
CN105821830A (en) * | 2016-05-05 | 2016-08-03 | 浙江大学 | Permeation increase siphon drainage system for low-permeability soil slope |
CN106759242B (en) * | 2017-02-17 | 2018-06-29 | 福建省地质工程勘察院 | A kind of construction method of white-out slope underground water system |
CN106759242A (en) * | 2017-02-17 | 2017-05-31 | 福建省地质工程勘察院 | The method for designing and arrangement and method for construction of a kind of white-out slope underground water |
CN107246019A (en) * | 2017-06-30 | 2017-10-13 | 浙江大学 | A kind of slope underground water drilling self-starting drainage by suction system and method |
CN108561180A (en) * | 2018-01-12 | 2018-09-21 | 浙江大学 | A kind of longitudinal drainage system and method for disposition tunnel floor pore gas flow |
CN108547662B (en) * | 2018-04-13 | 2019-11-08 | 东阳市君泰建筑工程有限公司 | A kind of tunnel drainage system and method |
CN108547661A (en) * | 2018-04-13 | 2018-09-18 | 范雲鹤 | A kind of tunnel drainage system and method for reverse pressure water renewable type |
CN108547662A (en) * | 2018-04-13 | 2018-09-18 | 范雲鹤 | A kind of tunnel drainage system and method |
CN108301395A (en) * | 2018-04-13 | 2018-07-20 | 范雲鹤 | A kind of slope drainage system and method |
CN108708392A (en) * | 2018-05-31 | 2018-10-26 | 浙江省交通运输科学研究院 | Automatically keep the wall system of level of ground water |
CN110281051A (en) * | 2019-06-28 | 2019-09-27 | 重庆建工集团股份有限公司 | Batter post boring method |
CN110578553A (en) * | 2019-09-17 | 2019-12-17 | 中国十九冶集团有限公司 | Siphon type reverse slope drainage system and drainage method |
WO2021097939A1 (en) * | 2019-11-23 | 2021-05-27 | 桐乡市倍特科技有限公司 | Coastal slope drainage system |
CN111794204A (en) * | 2020-07-16 | 2020-10-20 | 招商局重庆交通科研设计院有限公司 | Automatic drainage structure in side slope based on rainfall |
CN111794238A (en) * | 2020-07-20 | 2020-10-20 | 中铁二院工程集团有限责任公司 | Grouting structure for filling soluble crystals and construction method |
CN111794238B (en) * | 2020-07-20 | 2021-05-04 | 中铁二院工程集团有限责任公司 | Grouting structure for filling soluble crystals and construction method |
CN114575359A (en) * | 2022-03-17 | 2022-06-03 | 中钢集团马鞍山矿山研究总院股份有限公司 | Weak-permeability soil layer slope groundwater disaster treatment method |
WO2023173569A1 (en) * | 2022-03-17 | 2023-09-21 | 中钢集团马鞍山矿山研究总院股份有限公司 | Method for treating underground water disaster of weak-permeability soil layer slope |
CN114934486A (en) * | 2022-06-09 | 2022-08-23 | 黄河建工集团有限公司 | Grid type dredging device for hydraulic engineering |
CN114934486B (en) * | 2022-06-09 | 2023-08-29 | 黄河建工集团有限公司 | Grid type dredging device for hydraulic engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102251529A (en) | Self-balancing siphon drainage method by using side slope declining drill hole | |
US10577770B2 (en) | Self-starting negative pressure drainage system for draining groundwater in slope and construction method thereof | |
CN208072351U (en) | A kind of siphoning installation of discharge slope underground water | |
CN202031070U (en) | Side slope shallow drainage system | |
CN108457285B (en) | Ultra-deep pit-in-pit open type dewatering construction method | |
CN102296580A (en) | Slope shallow drainage system | |
CN208533546U (en) | A kind of series-parallel underground stereo drainage system suitable for side landslide engineering | |
CN101575857B (en) | Landslide inflatable drainage treatment method | |
CN103883796A (en) | Hand digging type pipe jacking construction device and method for sediment and sludge areas | |
CN102535491A (en) | Embedded water permeable plate water collection siphon drainage method for side slope ground water interception | |
CN102535384A (en) | In-trench water-stone separation siphoning-drainage debris flow control method | |
CN209585066U (en) | A kind of Mine production slope drainage system | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN207987907U (en) | A kind of reservoir landslide intelligence dewatering well | |
CN105603892A (en) | Water nail drainage system for railway roadbed slope and construction method of system | |
CN109610486A (en) | A kind of high slope Permeable interlayer trapping method | |
CN105672370A (en) | Water pressure control system for underground engineering | |
CN203757177U (en) | Mud sand sludge area manual pipe jacking construction device | |
CN205501985U (en) | Prevent blockking up side slope groundwater and draw row device | |
CN101353892B (en) | Three-dimensional space water drainage method and structure of gravitational field | |
CN205934875U (en) | Hydraulic tunnel relay formula counter -slope drainage arrangement structure | |
CN205348204U (en) | Light well point precipitation system | |
CN105064384B (en) | Vacuum tube well precipitation system | |
CN213448534U (en) | Sealing and lowering combined pressure-bearing water control system | |
CN203320494U (en) | High dam spillway foundation drainage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20111123 |