CN102237654A CN2011101863264A CN201110186326A CN102237654A CN 102237654 A CN102237654 A CN 102237654A CN 2011101863264 A CN2011101863264 A CN 2011101863264A CN 201110186326 A CN201110186326 A CN 201110186326A CN 102237654 A CN102237654 A CN 102237654A
Authority
CN
China
Prior art keywords
wire jumper
string
insulator
hanging point
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101863264A
Other languages
Chinese (zh)
Other versions
CN102237654B (en
Inventor
李岩
刘治稳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201110186326.4A priority Critical patent/CN102237654B/en
Publication of CN102237654A publication Critical patent/CN102237654A/en
Application granted granted Critical
Publication of CN102237654B publication Critical patent/CN102237654B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to the technical field of power transmission line construction and overhaul and discloses a tool and method for replacing a jumper string at the double angle hanging point. A fixture 1 of the tool is a U-shaped board, two sides of the U-shaped board are respectively integrated with one right angle folded plate, the two right angle folded plates are symmetrical and are provided with a connecting hole which is used to connect an annular screw 3, the annular screw 3 penetrates through the connecting hole and is fixed with the fixture through a nut, and the ring of the annular screw 3 is connected with a cyclic pulley 5. According to the method, the fixture 1 is installed on a double angle hanging point 4 of a tower pole and is fixed through the annular screw 3 and the cyclic pulley 5 is hung on the annular screw 3 for replacing the jumper string insulator. By utilizing the tool and the method provided by the invention, the deformation of a cross arm angle iron can be avoided, people on the tower can finish the binding of the insulators on the cross arm without coming off from the power transmission line, thus the working procedure is simplified, the working efficiency and the safety factor of high-attitude working can be improved; and meanwhile, the structure of the tool is simple, the tool is convenient to use, the process and manufacture are simple and convenient and the production cost is lower, so that the tool is easy to promote and apply.

Description

A kind of double angle hanging point is changed the instrument and the method for wire jumper string
Technical field
The present invention relates to the technical field of power transmission sequence maintenance, relate in particular to instrument and method that a kind of double angle hanging point is changed the wire jumper string.
Background technology
At present, the single loop strain tower adopts mostly does the font tower, the drainage wire jumper string hanging point of this tower adopts double angle as shown in Figure 1 mostly, and the replacing method of this insulator wire jumper string adopts the palm cucurbit to change at present mostly, adopts the palm cucurbit to change some problems of depositing in practice.
Change the problem that exists with the palm cucurbit:
1, change the operation of need rolling off the production line of insulator wire jumper string with the palm cucurbit, drainage insulator wire jumper string is different with the insulator on the lead not to have tension force effect poor stability, and operating personnel's balanced capacity on line is poor, inefficiency.
2, the wire jumper insulator string that will prevent dust is changed compound wire jumper insulator string, also needs with about the rope ladder, and also there is potential safety hazard in inefficiency.
3, cooperate the lifting of steel wire cover with the palm cucurbit, easily cause the distortion of hanging point angle bar, zinc pull-up to fall, influence the whole stressed and erosion resistance of cross-arm.
4, because drainage thread does not have the tension force promptly can be with the insulator pull-up with the circulation coaster, overlap fixed block with steel wire, because the steel wire cover is respectively reserved the grafting length of 300mm by the security regulations two ends, the stressed back of the inconvenience that is fastened and steel wire loop easily elongation is caused apart from the insulator hanging point far away, can't colligation on the cross-arm in the effective range of lifting, though there is imagination seldom to use at present.
Summary of the invention
Based on change the problem that the wire jumper insulator string exists in real work, the invention provides a kind of double angle hanging point and change the instrument and the method for wire jumper string, personnel's manufactured without inserting winding can be finished more changing jobs of insulator in changing wire jumper insulator string process, improved operating speed, reduced task difficulty, the operating efficiency of changing the wire jumper insulator string is increased substantially.
For achieving the above object, the present invention adopts following technical scheme:
A kind of double angle hanging point is changed the instrument of wire jumper string, comprise: jig, fixedly jackscrew, ring-type screw, hanging point angle bar, circulation coaster, described jig is " U " letter stencil, " U " letter stencil both sides constitute one with the right angle flap respectively, two right angle flap symmetries, and be provided with the connecting hole with the ring-type screw, the ring-type screw passes connecting hole and jig is fixed by nut, and the annulus of ring-type screw links to each other with circulation coaster 5.
A kind of double angle hanging point is changed the method for wire jumper string, and its step is as follows:
1, the double angle hanging point being installed and being changed the wire jumper string tool, is that the jig that the double angle hanging point is changed the wire jumper string tool is installed on the tower bar double angle hanging point, fixes with jackscrew, and fixes with the ring-type screw of an end band; Hang the circulation coaster on the screw ring of the ring-type screw that the jig bottom connects, make the circulation coaster near apart from double angle hanging point distance;
2, the cross-arm maintainer will tear the endless rope colligation open on second porcelain vase of wire jumper insulator string on the tower;
3, colligation finishes, and the cooperation personnel spur rope under the tower, and insulator is not stressed, and personnel take the insulator top that links to each other with hanging point on the tower, and the wire jumper insulator string is fallen on the lead cross-arm together with drainage thread;
4, personnel remove the wire jumper insulator string bottom that links to each other with drainage thread down on the tower to lead cross-arm place, and the wire jumper insulator string of removing is fallen earthward;
5, the new wire jumper insulator string of changing is installed, move the wire jumper insulator string of newly changing to the cross-arm place with the endless rope colligation, load onto the wire jumper insulator string bottom that links to each other with drainage thread, spur endless rope subsequently and move insulator to ground wire cross-arm hanging point place, wire jumper insulator string top loaded onto with the hanging point bulb be connected, finish the replacing of drainage insulator wire jumper string.
A kind of double angle hanging point is changed the method for wire jumper string, the described wire jumper insulator string and the wire jumper insulator string that draws high new replacing that falls dismounting, or adopt and carry out simultaneously, the wire jumper insulator string colligation that to newly change on the ground is good, utilize the wire jumper insulator string weight of the dismounting of falling, the wire jumper insulator string that cooperates manpower newly to change is raised to lead cross-arm place, and the wire jumper insulator string of pulling down is fallen earthward.
Because adopt aforesaid technical scheme, the present invention has following superiority:
1) application of the present invention, cross-arm angle bar force way when having changed the insulator replacing, stressed to change face into stressed with former single-point centralized load, avoided the distortion of cross-arm angle bar, guaranteed the cross-arm overall mechanical strength, improve safety factor of workers, improved the safe operation of electrical network.
2) adopt the application of operational method of the present invention and instrument, substituted the operational method that former steel wire rope sling is hung the palm cucurbit, overcome with the steel wire cover difficulty inconvenient and that need roll off the production line because of colligation position distance is installed.
3) with palm cucurbit operational method, need the circulation coaster to cooperate endless rope equally, also need to transmit steel wire cover and palm cucurbit with endless rope, use this instrument can shorten the distance of circulation coaster apart from the string hanging point that dangles, personnel's manufactured without inserting winding promptly can be finished the colligation to insulator on the realization tower on cross-arm, overcome with steel wire cover difficulty inconvenient and that need roll off the production line because of colligation position distance has been installed, adopt this operational method to simplify working procedure, reduced construction tool, improved the coefficient of safety of operating efficiency and work high above the ground, reduce the transport difficulty of poor transport area instrument, reduced labour intensity.
4) the present invention not only be fit to shown in figure one downward the installing and using in double-angle iron hanging point plane, also be applicable to shown in figure two double-angle iron hanging point plane installing and using up.
5) adopt this method not to be only applicable to dust-proof insulator and change dust-proof insulator, also be suitable for common insulator replacing dust-proof insulator and dust-proof insulator replacing and meet insulator.
6) tool construction of the present invention is simple, and is easy to use, and processing and fabricating is easy, and production cost is lower, is easy to apply.
Description of drawings
Fig. 1 connects the hanging point double angle towards last structure chart for the instrument of changing drainage wire jumper string;
Fig. 2 connects the prone structure chart of hanging point double angle for the instrument of changing drainage wire jumper string;
Fig. 3 changes the operation schematic diagram of wire jumper string tool for the double angle hanging point;
Fig. 4 is the schematic diagram of double angle drainage wire jumper string;
Among the figure: 1. be jig, 2. for fixing jackscrew, 3. for the ring-type screw, 4. for the double angle hanging point, 5. be circulation coaster, 6. wire jumper string, 7. ground wire cross-arm, 8. drainage thread, 9. strain tower one end lead, 10. lead cross-arm, 11. corner blocks, 12. wire jumper string tops, 13. wire jumper string bottoms.
Embodiment
Shown in Fig. 1,2,3,4, a kind of double angle hanging point is changed the instrument of wire jumper string, comprise: jig 1, fixedly jackscrew 2, ring-type screw, hanging point angle bar, circulation coaster 5, described jig 1 is " U " letter stencil, " U " letter stencil both sides constitute one with the right angle flap respectively, two right angle flap symmetries, and be provided with connecting hole with ring-type screw 3, ring-type screw 3 passes connecting hole and jig is fixed by nut, and the annulus of ring-type screw 3 links to each other with circulation coaster 5.
A kind of double angle hanging point is changed the method for wire jumper string, and its step is as follows:
1, the double angle hanging point being installed and being changed the wire jumper string tool, is that the jig 1 that the double angle hanging point is changed the wire jumper string tool is installed on the tower bar double angle hanging point 4, fixing with jackscrew 2, and fixes with the ring-type screw 3 of an end band; Hang circulation coaster 5 on the screw ring of the ring-type screw 3 that jig 1 bottom connects, make the circulation coaster near apart from double angle hanging point 4 distances;
2, the cross-arm maintainer will tear the endless rope colligation open on second porcelain vase of wire jumper insulator string on the tower;
3, colligation finishes, and the cooperation personnel spur rope under the tower, and insulator is not stressed, and personnel take the insulator top 12 that links to each other with hanging point on the tower, and the wire jumper insulator string is fallen on the lead cross-arm 10 together with drainage thread 8;
4, personnel remove the bottom 13 that the wire jumper insulator string links to each other with drainage thread 8 down on the tower to lead cross-arm 10 places, and the wire jumper insulator string of removing is fallen earthward;
5, the new wire jumper insulator string of changing is installed, move the wire jumper insulator string of newly changing to the cross-arm place with the endless rope colligation, the bottom 13 of loading onto the wire jumper insulator string links to each other with drainage thread, spur endless rope subsequently and move insulator to ground wire cross-arm hanging point place, wire jumper insulator string top 12 loaded onto with the hanging point bulb be connected, finish the replacing of drainage wire jumper insulator string.
A kind of double angle hanging point is changed the method for wire jumper string, the described wire jumper insulator string and the wire jumper insulator string that draws high new replacing that falls dismounting, or adopt and carry out simultaneously, the wire jumper insulator string colligation that to newly change on the ground is good, utilize the wire jumper insulator string weight of the dismounting of falling, the wire jumper insulator string that cooperates manpower newly to change is raised to lead cross-arm 10 places, and the wire jumper insulator string of pulling down is fallen earthward.
Concrete operations are as follows: carry on a shoulder pole jig 1 on the double-angle iron hanging point 4 with being installed in, fixing with jackscrew 2, screw 3 with ring-type is fixing, circulation coaster 5 is hung on ring-type screw 3 rings, on the tower personnel with the endless rope colligation on second porcelain vase of wire jumper insulator string, the cooperation personnel do not stress insulator by corner block 11 pulling ropes under the tower; Personnel take the wire jumper insulator string top 12 that links to each other with hanging point on the tower, the wire jumper insulator string is fallen on the cross-arm together with drainage thread 8, personnel remove the wire jumper insulator string bottom 13 that links to each other with drainage thread down on the tower to the cross-arm place, insulator is fallen earthward, the wire jumper insulator string that to newly change is then moved lead cross-arm 10 places to the endless rope colligation and is loaded onto wire jumper insulator string bottom 13 and link to each other with drainage thread 8, and drainage thread 8 links to each other with strain tower one end lead 9; Spur the wire jumper insulator string that endless rope will newly change subsequently and carry on a shoulder pole 7 hanging point places with moving to, the replacing of promptly finishing insulator is loaded onto on wire jumper insulator string top 12 and hanging point.Also can bind new replacing insulator in the bottom, utilize the gravity of the wire jumper insulator string of pulling down to cooperate manpower during the line of fall, the wire jumper insulator string of pulling down is fallen earthward, move the wire jumper insulator string of newly changing to lead cross-arm 10 places, carry out the installation of drainage wire jumper string by as above method.

Claims (3)

1. a double angle hanging point is changed the instrument of wire jumper string, it is characterized in that: comprising: jig (1), fixedly jackscrew (2), ring-type screw (3), hanging point angle bar (4), circulation coaster (5), described jig (1) is " U " letter stencil, " U " letter stencil both sides constitute one with the right angle flap respectively, two right angle flap symmetries, and be provided with connecting hole with ring-type screw (3), ring-type screw (3) passes connecting hole and jig is fixed by nut, and the annulus of ring-type screw (3) links to each other with circulation coaster (5).
2. a kind of double angle hanging point of instrument is changed the method for wire jumper string according to claim 1, and it is characterized in that: its step is as follows:
1, the double angle hanging point being installed and being changed the wire jumper string tool, is that the jig (1) that the double angle hanging point is changed the wire jumper string tool is installed on the tower bar double angle hanging point (4), fixes with fixing jackscrew (2), and fixes with the ring-type screw (3) of an end band; Hang circulation coaster (5) on the screw ring of the ring-type screw (3) that jig (1) bottom connects, make circulation coaster (5) near apart from double angle hanging point (4) distance;
2, on the tower cross-arm maintainer with the endless rope colligation on second porcelain vase will tearing wire jumper string (6) insulator open;
3, colligation finishes, and the cooperation personnel spur rope under the tower, and wire jumper string (6) insulator is not stressed, and personnel take the wire jumper insulator string top (12) that links to each other with hanging point on the tower, and wire jumper string (6) insulator is fallen on the lead cross-arm (10) together with drainage thread;
4, personnel locate to remove the wire jumper insulator string bottom (13) that links to each other with drainage thread to lead cross-arm (10) down on the tower, and the wire jumper insulator string of removing is fallen earthward;
5, the new wire jumper insulator string of changing is installed, move wire jumper string (6) insulator of newly changing to the cross-arm place with the endless rope colligation, load onto the wire jumper insulator string bottom (13) that links to each other with drainage thread, spurring endless rope subsequently moves wire jumper string (6) insulator to ground wire cross-arm hanging point (7) and locates, wire jumper insulator string top (12) loaded onto with the hanging point bulb be connected, finish the replacing of drainage wire jumper insulator string.
3. a kind of double angle hanging point as claimed in claim 2 is changed the method for wire jumper string, it is characterized in that: described wire jumper string (6) insulator and the wire jumper insulator string that draws high new replacing that falls dismounting, adopt and carry out simultaneously, wire jumper string (6) the insulator colligation that to newly change on the ground is good, utilize wire jumper string (6) the insulator weight of the dismounting of falling, wire jumper string (6) insulator that cooperates manpower newly to change is raised to lead cross-arm (10) and locates, and wire jumper string (6) insulator of pulling down is fallen earthward.
CN201110186326.4A 2011-07-05 2011-07-05 Method for replacing jumper string using tool at double angle hanging point Expired - Fee Related CN102237654B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110186326.4A CN102237654B (en) 2011-07-05 2011-07-05 Method for replacing jumper string using tool at double angle hanging point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110186326.4A CN102237654B (en) 2011-07-05 2011-07-05 Method for replacing jumper string using tool at double angle hanging point

Publications (2)

Publication Number Publication Date
CN102237654A true CN102237654A (en) 2011-11-09
CN102237654B CN102237654B (en) 2014-04-16

Family

ID=44888023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110186326.4A Expired - Fee Related CN102237654B (en) 2011-07-05 2011-07-05 Method for replacing jumper string using tool at double angle hanging point

Country Status (1)

Country Link
CN (1) CN102237654B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089056A (en) * 2013-01-31 2013-05-08 辽宁省电力有限公司鞍山供电公司 Installation metal tool and using method of tangent suspension tower changing single hanging point to double hanging points
CN105514874A (en) * 2016-02-24 2016-04-20 国网河北省电力公司衡水供电分公司 Lifting tool for mounting and demounting straight-line ceramic insulator and method using lifting tool to mount and demount insulator

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2775284B2 (en) * 1989-03-23 1998-07-16 旭テック株式会社 Wire fixing bracket
CN201398032Y (en) * 2008-11-11 2010-02-03 河南省电力公司平顶山供电公司 Hanging ring fixing device for hanging angle iron pulley of iron tower
CN201674159U (en) * 2010-05-07 2010-12-15 安徽省电力公司宿州供电公司 Double angle-iron hanging-point insulator string electrification exchange tool
CN202197048U (en) * 2011-07-05 2012-04-18 河南省电力公司洛阳供电公司 Double angle steel hanging point lifting and connecting tool for tower use

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2775284B2 (en) * 1989-03-23 1998-07-16 旭テック株式会社 Wire fixing bracket
CN201398032Y (en) * 2008-11-11 2010-02-03 河南省电力公司平顶山供电公司 Hanging ring fixing device for hanging angle iron pulley of iron tower
CN201674159U (en) * 2010-05-07 2010-12-15 安徽省电力公司宿州供电公司 Double angle-iron hanging-point insulator string electrification exchange tool
CN202197048U (en) * 2011-07-05 2012-04-18 河南省电力公司洛阳供电公司 Double angle steel hanging point lifting and connecting tool for tower use

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089056A (en) * 2013-01-31 2013-05-08 辽宁省电力有限公司鞍山供电公司 Installation metal tool and using method of tangent suspension tower changing single hanging point to double hanging points
CN105514874A (en) * 2016-02-24 2016-04-20 国网河北省电力公司衡水供电分公司 Lifting tool for mounting and demounting straight-line ceramic insulator and method using lifting tool to mount and demount insulator

Also Published As

Publication number Publication date
CN102237654B (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN105129627B (en) The folding suspension arm assembly that electric pole is supported
CN102444086A (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN102409838B (en) Moveable operating platform and method for constructing suspended ceiling of roof by using same
CN102882153B (en) Phase replacing insulator string method in charged for replacement circuit many times towers
CN106081836A (en) Vertical shaft head rope and tail rope replacing options
CN104495632A (en) Expanded type suspension rope lifting and hoisting system
CN102237654A (en) Tool and method for replacing jumper string at double angle hanging point
CN202094562U (en) Suspension type synchronous hoisting system for pipe type bus
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN202917897U (en) Cable hoisting horizontal pulley
CN104022459A (en) 10 KV distribution line pole-mounted wire suspension device
CN203976242U (en) A kind of generator unit stator associating hanging apparatus
CN201332246Y (en) Large-tonnage conducting wire lifter
CN104129730B (en) A kind of transformer and JP cabinet dismounting suspender
CN202657877U (en) Circuit equipment construction lifting frame
CN202906291U (en) Operation rope ladder hanging equipment
CN203423430U (en) Insulator maintenance device
CN203850726U (en) Wire lifter on 10 kV power distribution telegraph pole
CN103010965A (en) Special tool of 110kVGW4-type for hoisting switch blades and porcelain bottles
CN202787930U (en) Hanging basket for high-place operations
CN202706642U (en) Annular concrete pole tower provided with anti-dropping device
CN103738861A (en) Integral hoisting method for A type column of steel pipe of ultra-high voltage transformer station
CN205419563U (en) A lift by crane translation device that condenser was changed on was used for pylon
CN204150923U (en) A kind of track lifting appliance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20160705