CN102236057A - Method for testing release device supporting lightning arrester - Google Patents
Method for testing release device supporting lightning arrester Download PDFInfo
- Publication number
- CN102236057A CN102236057A CN2011100082417A CN201110008241A CN102236057A CN 102236057 A CN102236057 A CN 102236057A CN 2011100082417 A CN2011100082417 A CN 2011100082417A CN 201110008241 A CN201110008241 A CN 201110008241A CN 102236057 A CN102236057 A CN 102236057A
- Authority
- CN
- China
- Prior art keywords
- test
- test product
- lightning arrester
- product
- release unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 183
- 238000000034 method Methods 0.000 title abstract description 5
- 238000010998 test method Methods 0.000 claims abstract description 18
- 238000009413 insulation Methods 0.000 claims abstract description 9
- 230000007935 neutral effect Effects 0.000 claims description 6
- 125000004122 cyclic group Chemical group 0.000 claims description 5
- 238000009835 boiling Methods 0.000 claims description 3
- 230000002950 deficient Effects 0.000 claims description 3
- 230000007613 environmental effect Effects 0.000 claims description 3
- 238000009863 impact test Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 230000001351 cycling effect Effects 0.000 abstract 1
- 238000010561 standard procedure Methods 0.000 abstract 1
- 239000002131 composite material Substances 0.000 description 4
- 229910044991 metal oxide Inorganic materials 0.000 description 4
- 150000004706 metal oxides Chemical class 0.000 description 4
- 238000011056 performance test Methods 0.000 description 4
- 238000004880 explosion Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000007599 discharging Methods 0.000 description 2
- 239000012212 insulator Substances 0.000 description 2
- 230000007257 malfunction Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 229910000743 fusible alloy Inorganic materials 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Thermistors And Varistors (AREA)
Abstract
The invention relates to a method for testing a release device supporting a lightning arrester, which is a standard method for testing the release device supporting the lightning arrester to make up imperfection of requirement on the testing method and the test procedure in the conventional release device standard by combining actual operation conditions and massive tests. In the testing method, the test projects and test procedures are requested clearly, the release device sample is subjected to a mechanical test and a seal test in sequence according to the actual operation conditions of the release device, or is subjected to a temperature tolerance cycling test or a sheath insulation tolerance test, an impact current tolerance test, a small power frequency current tolerance test and an action load test according to the requirement of manufacturers, and the release device sample can be evaluated to be qualified only when simultaneously meeting all the test requirements.
Description
Technical field
The present invention relates to the supporting method of testing of a kind of lightning arrester with the release unit performance.
Background technology
The lightning arrester auxiliary products of release unit as lightning arrester, the use of connecting with lightning arrester generally is directly installed on the arrester ground side, isolates lightning arrester and earth potential.
The mounting means of release unit and supporting lightning arrester can be divided into: integral type and accessories type.
When lightning arrester normally moves, release unit should have the tolerance identical with lightning arrester, and can reliably be failure to actuate, have only when the lightning arrester fault, thereby lightning arrester and system are isolated in the release unit action, anti-locking system sustained fault, and provide visual identification, so that replace the lightning arrester of fault as early as possible.
Only be that rush of current and operating duty resistance test verify that performance that it reliably is failure to actuate and ampere-time characteristic verify the performance that it can action message to the testing requirements of release unit among act.std GB11032-2000, GB/T7327-2008 and the IEC60099-4:2009.But find that in actual motion the release unit that can satisfy these standard-requireds still can't well cooperate with lightning arrester, the situation of release unit tripping or malfunction usually occurs.Applicant of the present invention is in order to test the supporting performance with release unit of lightning arrester, the deficiency that the release unit standard that has by a large amount of release unit performance tests and on-the-spot running status research summary exists on testing requirements, test method and test routine, this illustrates that existing release unit standard-required and test method can't guarantee effectively that the performance of release unit is qualified.
Summary of the invention
Purpose of the present invention, just provide a kind of supporting method of testing of lightning arrester that is applicable to the release unit performance, the situation of release unit tripping or malfunction can not occur by the release unit of this method of testing, satisfy the existing operating mode of installing the supporting performance requirement of lightning arrester with release unit.
When carrying out performance test with release unit to lightning arrester is supporting, tackle same type release unit in certain sequence step successively carry out, lightning arrester is supporting should not to move under continuous running voltage and during various superpotential with release unit, the ability that should have the tolerance various dash currents identical with lightning arrester, so should judge the mounting means confirmed test object of test product and supporting lightning arrester earlier, then apparently sound test product is optionally carried out mechanical robustness testing, leakage test or overcoat insulation resistance test or tolerable temperature cyclic test, then the test product by above examination is carried out dash current resistance test and the tolerance of little power current, ensuing test should embody release unit can be in time when (the power frequency fault current occurring) in supporting lightning arrester fault, accurately, action message, release unit should have good ampere-time characteristic, so last reply release unit carries out the acting characteristic test, after treating that above-mentioned a series of pilot project is finished, could estimate off-test to the type release unit performance.
Realize the foregoing invention purpose, the concrete steps of method of testing of the present invention are as follows successively:
The various test methods of the following stated are correspondingly carried out according to standard GB11032-2000 " interchange gapless metal-oxide lighting arrester ", JB/T8952-2005 " AC system composite sheath gapless metal-oxide lighting arrester " and DL/T864-2004 " nominal voltage be higher than 1000V exchange overhead transmission line use guide rule with composite insulator ", each test product all satisfies national standard and requires then to enter next step by test, otherwise judge that test product is all defective by the gross, end of test (EOT);
Step 1: prepare test, judge the mounting means of test product and supporting usefulness lightning arrester, if integral type then test product should be with and supportingly finish all pilot projects together with lightning arrester, if accessories type, then test product can be finished all pilot projects separately, prepares 15 test product numberings and is followed successively by T1~T15;
Step 2: check test product T1~T15 outward appearance, should be intact, otherwise off-test;
Step 3: the test product T1~T5 by above two steps is done mechanical robustness testing: install and normal user demand for satisfying, release unit should be able to satisfy national standard and require then to enter step 4 test routine continuation examination by axial 500N tension and normal direction 30Nm antitorque two aspects test;
Step 4: the test product T1~T5 by above three steps is done leakage test: test product is put into boiling water boil 42h, satisfy national standard and require then to enter step 7;
Step 5: the test product T6~T10 by step 1 and step 2 is made overcoat insulation resistance test: the overcoat insulation withstand voltage of release unit should satisfy national standard and require then to enter step 7 greater than the internal clearance sparking voltage;
Step 6: the test product T11~T15 by step 1 and step 2 is made the tolerable temperature cyclic test: examination sun direct projection and release unit overcoat tolerance performance under the environmental difference throughout the year, satisfy the national standard requirement and then enter step 7;
Step 7: to do the test of dash current resistance characteristics by step 4, five, test product T1~T15 of six: release unit should require identical with its matching used lightning arrester of institute, comprise tolerance 4/10us great current impact test, the test of 2ms rectangular impulse current and operating duty cycle test, test product all should reliably be failure to actuate, otherwise off-test;
Step 8: the test product T1~T15 by step 7 is done little power current resistance test; As power current effective value 20mA/2h resistance test, otherwise off-test;
Step 9: the test product T1~T15 by step 8 is done the acting characteristic test, and draw the ampere-second curve: the data of ampere-time characteristic curve should different symmetrical initial current levels be drawn by 3 of the test product of flowing through; To the system with effectively earthed neutral electric current is 20A, 200A and 800A power current effective value ± 10%, is 100mA, 1A and 20A power current effective value ± 10% to the electric current of system with non-effectively earthed neutral; To in three kinds of current values each, should test five test products at least;
Step 10: the performance of estimating above test product: if test according to above nine steps, test product can provide the effectively permanent obvious proof that breaks away from, then the test product performance is qualified, if the proof that test product can not be clear and definite, then should measure the electric current that flows through test product when test product applied 1.2 times/1min power-frequency voltage with the maximum rated voltage of the supporting lightning arrester of test product,, prove equally that then the test product performance is qualified if this electric current is no more than the 1mA effective value, simultaneously, off-test.
The invention has the beneficial effects as follows; the supporting performance test way of perfect lightning arrester with release unit; it is supporting with the deficiency on the release unit performance test methods at lightning arrester to have remedied existing standard; sound lightning arrester is supporting to have very strong directive function with the release unit testing standard to setting up, thereby has played the effect that well escorts to improving supporting lightning arrester, protection of arrester equipment and Operation of Electric Systems reliability.
Description of drawings
Fig. 1 is that lightning arrester is supporting with release unit method of testing process flow diagram;
Fig. 2 is one of supporting structural representation of using the heat explosion type disconnector of lightning arrester;
Fig. 3 is two of the supporting structural representation with the heat explosion type disconnector of lightning arrester
Fig. 4 is one of supporting structural representation of using the hot melten type disconnector of lightning arrester;
Fig. 5 is two of the supporting structural representation with the hot melten type disconnector of lightning arrester.
Among the figure: the 1-resistors in parallel; The 2-discharging gap; 3-thermal explosion pipe; The 21-resistor disc; The 22-discharging gap; 23-low-melting alloy pad; The 24-preloading spring.
Embodiment
As Fig. 2 to Fig. 5 is the supporting structural representation with two kinds of release units of lightning arrester of the present invention.
The supporting release unit method of testing embodiment that uses of lightning arrester of the present invention is shown in the process flow diagram of Fig. 1, and the concrete steps of method of testing are as follows successively:
The various test methods of the following stated are carried out according to standard GB 11032-2000 " interchange gapless metal-oxide lighting arrester ", JB/T8952-2005 " AC system composite sheath gapless metal-oxide lighting arrester " and DL/T864-2004 " nominal voltage be higher than 1000V exchange overhead transmission line use guide rule with composite insulator ", each test product all satisfies national standard and requires then to enter next step by test, otherwise judge that tentatively test product is all defective by the gross, end of test (EOT);
Step 1: prepare test, judge the mounting means of test product and supporting usefulness lightning arrester, if integral type then test product should be with and supportingly finish all pilot projects together with lightning arrester, if accessories type, then test product can be finished all pilot projects separately, prepares 15 test product numberings and is followed successively by T1~T15;
Step 2: check test product T1~T15 outward appearance, should be intact, otherwise off-test;
Step 3: the test product T1~T5 by above two steps is done mechanical robustness testing: install and normal user demand for satisfying, release unit should be able to be by axial 500N tension and normal direction 30Nm antitorque two aspects test, unless have obvious deformation not satisfy the national standard requirement, otherwise enter step 4;
Step 4: the test product T1~T5 by above three steps is done leakage test: test product is put into boiling water boil 42h, unless there is obvious leakage not satisfy the national standard requirement, otherwise enter step 7;
Step 5: the test product T6~T10 by step 1 and step 2 is made overcoat insulation resistance test.The overcoat insulation withstand voltage of release unit should be greater than the internal clearance sparking voltage;
Step 6: the test product T11~T15 by step 1 and step 2 is made the tolerable temperature cyclic test: examination sun direct projection and throughout the year under the environmental difference release unit overcoat tolerate performance;
Step 7: to do the test of dash current resistance characteristics by step 4, five, test product T1~T15 of six: release unit should require identical with its matching used lightning arrester of institute, comprise tolerance 4/10us great current impact test, the test of 2ms rectangular impulse current and operating duty cycle test, test product all should reliably be failure to actuate, otherwise off-test;
Step 8: the test product T1~T15 by step 7 is done little power current resistance test.As power current effective value 20mA/2h resistance test, otherwise off-test;
Step 9: the test product by step 8 is numbered T1~T15 does the acting characteristic test, and draw the ampere-second curve: the data of ampere-time characteristic curve should different symmetrical initial current levels be drawn by 3 of the test product of flowing through; To the system with effectively earthed neutral electric current is 20A, 200A and 800A power current effective value ± 10%, is 100mA, 1A and 20A power current effective value ± 10% to the electric current of system with non-effectively earthed neutral; To in three kinds of current values each, should test five test products at least;
Step 10: the performance of estimating above test product: if test according to above nine steps, test product can provide the effectively permanent obvious proof that breaks away from, then the test product performance is qualified, if the proof that test product can not be clear and definite, then should measure the electric current that flows through test product when test product applied 1.2 times/1min power-frequency voltage with the maximum rated voltage of the supporting lightning arrester of test product,, prove equally that then the test product performance is qualified if this electric current is no more than the 1mA effective value, simultaneously, off-test.
The present invention compares existing release unit code test requirement and test method, mechanical test, leakage test, overcoat insulation resistance test, tolerable temperature cyclic test and the requirement of little power current resistance test have been increased, entire test is divided into ten steps, perfect release unit performance evaluation way, have only when same group of release unit test product require just can be evaluated as by above test procedure simultaneously qualified.
In addition, stipulated the sequencing of release unit test product test, carried out the release unit performance certification test of reliably being failure to actuate earlier, after carry out release unit action message performance certification test, the test product performance result of appraisal are had fundamental influence.
Claims (1)
1. the supporting method of testing with release unit of a lightning arrester comprises following steps successively:
The various test methods of the following stated are all undertaken by corresponding national standards, and each test product all satisfies national standard and requires then to enter next step by test, otherwise judges that test product is all defective by the gross, end of test (EOT);
Step 1: prepare test, judge the mounting means of test product and supporting usefulness lightning arrester, if integral type then test product should be with and supportingly finish all pilot projects together with lightning arrester, if accessories type, then test product can be finished all pilot projects separately, prepares 15 test products, and numbering is followed successively by T1~T15;
Step 2: check test product T1~T15 outward appearance, should be intact, otherwise off-test;
Step 3: the test product T1~T5 by above two steps is done mechanical robustness testing: install and normal user demand for satisfying, release unit should be able to be by axial 500N tension and normal direction 30Nm antitorque two aspects test;
Step 4: the test product T1~T5 by step 3 is done leakage test: test product is put into boiling water boil 42h, satisfy national standard and require then to enter step 7;
Step 5: the test product T6~T10 by step 1 and step 2 is made overcoat insulation resistance test: the overcoat insulation withstand voltage of release unit should satisfy national standard and require then to enter step 7 greater than the internal clearance sparking voltage;
Step 6: the test product T11~T15 by step 1 and step 2 is made the tolerable temperature cyclic test: examination sun direct projection and release unit overcoat tolerance performance under the environmental difference throughout the year, satisfy the national standard requirement and then enter step 7;
Step 7: to do the test of dash current resistance characteristics by step 4, five, test product T1~T15 of six: release unit should require identical with its matching used lightning arrester of institute, comprise tolerance 4/10us great current impact test, the test of 2ms rectangular impulse current and operating duty cycle test, test product all should reliably be failure to actuate, otherwise off-test;
Step 8: the test product T1~T15 by step 7 is done little power current resistance test;
Step 9: the test product T1~T15 by step 8 is done the acting characteristic test, and draw the ampere-second curve: the data of ampere-time characteristic curve should different symmetrical initial current levels be drawn by 3 of the test product of flowing through; To the system with effectively earthed neutral electric current is 20A, 200A and 800A power current effective value ± 10%, is 100mA, 1A and 20A power current effective value ± 10% to the electric current of system with non-effectively earthed neutral; To in three kinds of current values each, should test five test products at least;
Step 10: the performance of estimating above test product: if test according to above nine steps, test product can provide the effectively permanent obvious proof that breaks away from, then the test product performance is qualified, if the proof that test product can not be clear and definite, then should measure the electric current that flows through test product when test product applied 1.2 times/1min power-frequency voltage with the maximum rated voltage of the supporting lightning arrester of test product,, prove equally that then the test product performance is qualified if this electric current is no more than the 1mA effective value, simultaneously, off-test.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201110008241 CN102236057B (en) | 2011-01-14 | 2011-01-14 | Method for testing release device supporting lightning arrester |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201110008241 CN102236057B (en) | 2011-01-14 | 2011-01-14 | Method for testing release device supporting lightning arrester |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102236057A true CN102236057A (en) | 2011-11-09 |
| CN102236057B CN102236057B (en) | 2013-04-03 |
Family
ID=44886901
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201110008241 Active CN102236057B (en) | 2011-01-14 | 2011-01-14 | Method for testing release device supporting lightning arrester |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102236057B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107356867A (en) * | 2017-07-14 | 2017-11-17 | 武汉市合众电气设备制造有限公司 | Ampere-second characteristic test system for arrester disconnector |
| CN109061404A (en) * | 2018-06-25 | 2018-12-21 | 国网湖南省电力有限公司 | Internal clearance lightning arrester discharge pipe is along face ablation test device and test method |
| CN111812458A (en) * | 2020-05-21 | 2020-10-23 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Test method for transient overvoltage limit withstand characteristics of DC transfer switch arresters |
| CN113960395A (en) * | 2021-10-19 | 2022-01-21 | 广东电网有限责任公司 | Method and device for evaluating temperature tolerance of valve plate of lightning arrester |
| CN114814427A (en) * | 2022-04-26 | 2022-07-29 | 中国电建集团河南工程有限公司 | Method for testing grading difference coordination and ampere-second characteristics of direct current system device of power plant |
| CN115700389A (en) * | 2022-10-27 | 2023-02-07 | 国网冀北电力有限公司电力科学研究院 | A type test method for key components of a mechanical DC circuit breaker |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007173029A (en) * | 2005-12-22 | 2007-07-05 | Hitachi Plant Technologies Ltd | Relay test method and test equipment |
| CN200950428Y (en) * | 2006-09-25 | 2007-09-19 | 深圳市银星电力电子有限公司 | Novel frequency division shunting separator |
| CN201084649Y (en) * | 2007-11-19 | 2008-07-09 | 何排枝 | A disengaging gear for on arrester |
| CN101294999A (en) * | 2008-06-06 | 2008-10-29 | 中国电力科学研究院 | A combined action test device for AC and DC arresters |
| JP2009115687A (en) * | 2007-11-08 | 2009-05-28 | Toshiba Corp | Lightning arrester discharge test device and lightning arrester discharge test method |
-
2011
- 2011-01-14 CN CN 201110008241 patent/CN102236057B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007173029A (en) * | 2005-12-22 | 2007-07-05 | Hitachi Plant Technologies Ltd | Relay test method and test equipment |
| CN200950428Y (en) * | 2006-09-25 | 2007-09-19 | 深圳市银星电力电子有限公司 | Novel frequency division shunting separator |
| JP2009115687A (en) * | 2007-11-08 | 2009-05-28 | Toshiba Corp | Lightning arrester discharge test device and lightning arrester discharge test method |
| CN201084649Y (en) * | 2007-11-19 | 2008-07-09 | 何排枝 | A disengaging gear for on arrester |
| CN101294999A (en) * | 2008-06-06 | 2008-10-29 | 中国电力科学研究院 | A combined action test device for AC and DC arresters |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107356867A (en) * | 2017-07-14 | 2017-11-17 | 武汉市合众电气设备制造有限公司 | Ampere-second characteristic test system for arrester disconnector |
| CN107356867B (en) * | 2017-07-14 | 2019-12-13 | 武汉市合众电气设备制造有限公司 | Ampere-second characteristic test system for lightning arrester disconnector |
| CN109061404A (en) * | 2018-06-25 | 2018-12-21 | 国网湖南省电力有限公司 | Internal clearance lightning arrester discharge pipe is along face ablation test device and test method |
| CN109061404B (en) * | 2018-06-25 | 2021-09-03 | 国网湖南省电力有限公司 | Method for testing surface ablation of discharge tube of inner gap lightning arrester |
| CN111812458A (en) * | 2020-05-21 | 2020-10-23 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Test method for transient overvoltage limit withstand characteristics of DC transfer switch arresters |
| CN113960395A (en) * | 2021-10-19 | 2022-01-21 | 广东电网有限责任公司 | Method and device for evaluating temperature tolerance of valve plate of lightning arrester |
| CN114814427A (en) * | 2022-04-26 | 2022-07-29 | 中国电建集团河南工程有限公司 | Method for testing grading difference coordination and ampere-second characteristics of direct current system device of power plant |
| CN114814427B (en) * | 2022-04-26 | 2024-11-01 | 中国电建集团河南工程有限公司 | Method for testing level difference matching and ampere-second characteristics of direct current system device of power plant |
| CN115700389A (en) * | 2022-10-27 | 2023-02-07 | 国网冀北电力有限公司电力科学研究院 | A type test method for key components of a mechanical DC circuit breaker |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102236057B (en) | 2013-04-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102236057B (en) | Method for testing release device supporting lightning arrester | |
| Kulkarni et al. | Incipient fault location algorithm for underground cables | |
| CN103424669B (en) | A kind of selection method utilizing fault feeder zero-sequence current matrix principal component analysis (PCA) first principal component | |
| CN106501668B (en) | A traditional distribution network single-phase disconnection fault line selection method | |
| CN109001592B (en) | A Transient-based Single-phase Grounding Fault Line Selection Method for Resonant Grounding Systems | |
| CN103424668A (en) | Arc light ground fault continuous route selection method utilizing principal component analysis of zero-sequence current of feeder line and evidence theoretical integration | |
| CN105445585B (en) | The method for diagnosing faults and system of power grid primary circuit | |
| Badrzadeh et al. | Transients in wind power plants—Part II: Case studies | |
| CN112986858A (en) | Ground fault judgment method based on zero sequence wavelet decomposition calculation | |
| CN101673937B (en) | Surge interference identification method during differential protection and differential protection method | |
| CN112649694B (en) | A method for determining single-phase ground faults in small current grounding systems | |
| CN107677919B (en) | Double-end-quantity-based disconnection fault identification method for high-voltage alternating current line | |
| CN104253420B (en) | A kind of distance protecting method for the multiple-circuit on same tower that do not replace | |
| CN110703149B (en) | A method and system for detecting vibration and sound of transformer operating state using character spacing | |
| CN111650477A (en) | Line selection method for single-phase grounding fault in distribution network with parallel multi-circuit neutral point ungrounded | |
| CN105388415A (en) | Two-segment-time-scale-based breaking TRV capability evaluation method of circuit breaker | |
| CN111780867A (en) | A vibration-acoustic detection method and system for transformer operating state optimized by Frobenius mode | |
| Zhang et al. | A segmented network method based faulted line selection strategy for single-phase earth fault in small current grounding distribution network | |
| CN108051693A (en) | A kind of method of the raising earth fault judgment accuracy based on TAS devices | |
| Pinzón et al. | Fault-Induced Delayed Voltage Recovery Assessment based on Dynamic Voltage Indices | |
| CN217443482U (en) | Photovoltaic power station direct current side cable fault detection system and equipment | |
| CN118713018A (en) | A new protection method for receiving-end AC system with immune inverter characteristics | |
| CN104578008B (en) | A kind of zero-sequence direction component faulty action preventing method | |
| CN105322512B (en) | A kind of micro-capacitance sensor guard method based on self study | |
| CN102279346B (en) | Fault line selection method of low current grounding system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Patentee after: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd. Address before: 510080 Guangdong city of Guangzhou Province Dongfeng East Road, No. 8 Guangdong water Kong EPRI high pressure Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Corp. |