CN102225581A - 一种空心板梁芯模的伞形钢骨架支撑装置 - Google Patents
一种空心板梁芯模的伞形钢骨架支撑装置 Download PDFInfo
- Publication number
- CN102225581A CN102225581A CN2011101110062A CN201110111006A CN102225581A CN 102225581 A CN102225581 A CN 102225581A CN 2011101110062 A CN2011101110062 A CN 2011101110062A CN 201110111006 A CN201110111006 A CN 201110111006A CN 102225581 A CN102225581 A CN 102225581A
- Authority
- CN
- China
- Prior art keywords
- umbrella
- main shaft
- hollow slab
- screw thread
- steel skeleton
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
本发明公开了一种空心板梁芯模的伞形钢骨架支撑装置,解决了现有的空心板梁在成形时存在质量缺陷的技术问题。包括包括主轴(1)、伞面钢板(2)和钢筋支撑杆(3),在主轴(1)的左段轴身上设置有正向丝扣,在主轴(1)的右段轴身上设置有反向丝扣,在主轴(1)的左段轴身上活动设置有伞面螺帽(6),在主轴(1)的右段轴身上活动设置有伞底螺帽(5),在伞面螺帽(6)的两外侧面上分别设置有伞顶内铰链(7),在伞底螺帽(5)的两外侧面上分别设置有伞底铰链(4),钢筋支撑杆(3)的一端与伞顶外铰链(8)铰接在一起,钢筋支撑杆(3)的另一端与伞底铰链(4)铰接在一起。本发明节约了成本,很好地保证了预制梁板的成型质量。
Description
技术领域
本发明涉及一种用于公路空心板梁内模的伞形钢骨架支撑装置,配合木板做空心板梁加工时用的芯模。
背景技术
现有技术的高速公路空心板梁的内模制作方法是采用充气胶囊,由于胶囊容易上浮,位置不易控制,胶囊安装速度慢,重复利用率低,另外由于胶囊容易损坏而漏气,使空心板梁在成形上存在质量缺陷。
发明内容
本发明提供了一种空心板梁芯模的伞形钢骨架支撑装置,解决了现有的空心板梁在成形时存在质量缺陷的技术问题。
本发明是通过以下方案解决以上问题的:
一种空心板梁芯模的伞形钢骨架支撑装置,包括主轴、伞面钢板和钢筋支撑杆,在主轴的左段轴身上设置有正向丝扣,在主轴的右段轴身上设置有反向丝扣,在设置有正向丝扣的主轴的左段轴身上活动设置有伞面螺帽,在设置有反向丝扣的主轴的右段轴身上活动设置有伞底螺帽,在伞面螺帽的相对称的两外侧面上分别设置有伞顶内铰链,在伞底螺帽的相对称的两外侧面上分别设置有伞底铰链,伞面钢板的内侧端与伞顶内铰链铰接在一起,伞面钢板的外侧端固定设置有伞顶外铰链,钢筋支撑杆的一端与伞顶外铰链铰接在一起,钢筋支撑杆的另一端与伞底铰链铰接在一起。
在所述的主轴的一端设置有旋转手柄。
本发明提供的一种用于高速公路空心板梁内模的伞形钢骨架支撑,配合木板做内模,解决公路空心板梁芯模易上浮、易损坏、安装速度慢、重复利用率低等缺点,提高了施工效率,节约了成本,很好地保证了预制梁板的生产质量。
附图说明
图1是本发明的结构示意图
图2是本发明的伞面的结构示意图。
具体实施例
一种空心板梁芯模的伞形钢骨架支撑装置,包括主轴1、伞面钢板2和钢筋支撑杆3,在主轴1的左段轴身上设置有正向丝扣,在主轴1的右段轴身上设置有反向丝扣,在设置有正向丝扣的主轴1的左段轴身上活动设置有伞面螺帽6,在设置有反向丝扣的主轴1的右段轴身上活动设置有伞底螺帽5,在伞面螺帽6的相对称的两外侧面上分别设置有伞顶内铰链7,在伞底螺帽5的相对称的两外侧面上分别设置有伞底铰链4,伞面钢板2的内侧端与伞顶内铰链7铰接在一起,伞面钢板2的外侧端固定设置有伞顶外铰链8,钢筋支撑杆3的一端与伞顶外铰链8铰接在一起,钢筋支撑杆3的另一端与伞底铰链4铰接在一起。在所述的主轴1的一端设置有旋转手柄。
主轴1用φ25毫米的钢筋制作,每根长60厘米,两端各30厘米的范围分别车正、反丝扣。伞面钢板2用10毫米厚的钢板做成扇形的六块,六块拼装成中空的圆形。将伞面螺帽6拧进主轴1的正丝扣中,将伞底螺帽5拧进主轴1的反丝扣中。
将钢筋支撑杆3与伞面钢板2及伞底螺帽5进行连接。以伞底螺帽5连接为例:在伞底螺帽5上焊接两块3厘米×3厘米的5毫米厚的小钢板,钢板中间钻孔;钢筋支撑杆3用φ10毫米的钢筋两端砸平,中间钻孔;用销子或螺丝杆将钢筋支撑杆3和伞底螺帽5上的钢板联结,使钢筋支撑杆3可以以销子为轴相对于伞底螺帽5转动。钢筋支撑杆3与伞面钢板2的联结方法也如此进行。
在主轴1如方向盘的手柄,使方向盘的中轴和主轴1用销子连接,转动方向盘手柄可以带动伞面的主轴1转动。
为防止内模和混凝土粘连,在内模外裹一层塑料薄膜,将内模和混凝土隔离开。
等混凝土达到设计或规范要求的拆模强度后,就可以开始拆除内模。先用方向盘手柄与主轴1连接,转动方向盘使伞面2收起,缓慢抽出。内模随即散落,然后抽出。
Claims (2)
1.一种空心板梁芯模的伞形钢骨架支撑装置,包括主轴(1)、伞面钢板(2)和钢筋支撑杆(3),其特征在于,在主轴(1)的左段轴身上设置有正向丝扣,在主轴(1)的右段轴身上设置有反向丝扣,在设置有正向丝扣的主轴(1)的左段轴身上活动设置有伞面螺帽(6),在设置有反向丝扣的主轴(1)的右段轴身上活动设置有伞底螺帽(5),在伞面螺帽(6)的相对称的两外侧面上分别设置有伞顶内铰链(7),在伞底螺帽(5)的相对称的两外侧面上分别设置有伞底铰链(4),伞面钢板(2)的内侧端与伞顶内铰链(7)铰接在一起,伞面钢板(2)的外侧端固定设置有伞顶外铰链(8),钢筋支撑杆(3)的一端与伞顶外铰链(8)铰接在一起,钢筋支撑杆(3)的另一端与伞底铰链(4)铰接在一起。
2.根据权利要求1所述的一种空心板梁芯模的伞形钢骨架支撑装置,其特征在于,在所述的主轴(1)的一端设置有旋转手柄。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101110062A CN102225581A (zh) | 2011-04-29 | 2011-04-29 | 一种空心板梁芯模的伞形钢骨架支撑装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101110062A CN102225581A (zh) | 2011-04-29 | 2011-04-29 | 一种空心板梁芯模的伞形钢骨架支撑装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102225581A true CN102225581A (zh) | 2011-10-26 |
Family
ID=44806598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101110062A Pending CN102225581A (zh) | 2011-04-29 | 2011-04-29 | 一种空心板梁芯模的伞形钢骨架支撑装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102225581A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105881796A (zh) * | 2016-03-18 | 2016-08-24 | 福建首聪世豪实业有限公司 | 包裹式制管模芯组件 |
CN106696076A (zh) * | 2016-12-19 | 2017-05-24 | 中交路桥建设有限公司 | 一种先张法预制空心板内模支撑方法 |
CN107042575A (zh) * | 2016-02-05 | 2017-08-15 | 包头市市政公用工程有限责任公司 | 一种伞形骨架支撑装配式芯模及预制件制造方法 |
CN109252456A (zh) * | 2018-10-31 | 2019-01-22 | 中国冶集团有限公司 | 基于挂篮悬浇工艺的连续刚构桥箱梁内模调节装置 |
CN111571777A (zh) * | 2020-06-22 | 2020-08-25 | 中冶建工集团有限公司 | 一种空心梁板内模支撑装置 |
CN114717956A (zh) * | 2022-04-01 | 2022-07-08 | 贵州大通路桥工程建设有限公司 | 一种桥梁墩柱横隔板施工伞形支撑体系 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2355628Y (zh) * | 1998-12-31 | 1999-12-29 | 邹建悉 | 缩折凳 |
US6626414B1 (en) * | 1999-06-25 | 2003-09-30 | Gds Group Limited | Concrete casting sliding corner system |
CN2598469Y (zh) * | 2003-01-20 | 2004-01-14 | 孙宏博 | 新型可折叠挂物架 |
CN2795275Y (zh) * | 2005-06-20 | 2006-07-12 | 张全领 | 用于桥梁的箱梁钢内模 |
CN201086346Y (zh) * | 2007-07-30 | 2008-07-16 | 中铁二局股份有限公司 | 一种箱梁预制液压内模 |
CN201512741U (zh) * | 2009-10-21 | 2010-06-23 | 中国航空港建设第八工程总队 | 一种机场道面混凝土模板可调支撑 |
CN201749645U (zh) * | 2010-06-13 | 2011-02-16 | 上海工程技术大学 | 一种伞状展板 |
CN201753439U (zh) * | 2010-07-19 | 2011-03-02 | 山东铁鹰建设工程有限公司 | 可调节式公路先张法空心板梁内模 |
CN202039298U (zh) * | 2011-04-29 | 2011-11-16 | 中铁十九局集团第一工程有限公司 | 一种空心板梁芯模的伞形钢骨架支撑装置 |
-
2011
- 2011-04-29 CN CN2011101110062A patent/CN102225581A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2355628Y (zh) * | 1998-12-31 | 1999-12-29 | 邹建悉 | 缩折凳 |
US6626414B1 (en) * | 1999-06-25 | 2003-09-30 | Gds Group Limited | Concrete casting sliding corner system |
CN2598469Y (zh) * | 2003-01-20 | 2004-01-14 | 孙宏博 | 新型可折叠挂物架 |
CN2795275Y (zh) * | 2005-06-20 | 2006-07-12 | 张全领 | 用于桥梁的箱梁钢内模 |
CN201086346Y (zh) * | 2007-07-30 | 2008-07-16 | 中铁二局股份有限公司 | 一种箱梁预制液压内模 |
CN201512741U (zh) * | 2009-10-21 | 2010-06-23 | 中国航空港建设第八工程总队 | 一种机场道面混凝土模板可调支撑 |
CN201749645U (zh) * | 2010-06-13 | 2011-02-16 | 上海工程技术大学 | 一种伞状展板 |
CN201753439U (zh) * | 2010-07-19 | 2011-03-02 | 山东铁鹰建设工程有限公司 | 可调节式公路先张法空心板梁内模 |
CN202039298U (zh) * | 2011-04-29 | 2011-11-16 | 中铁十九局集团第一工程有限公司 | 一种空心板梁芯模的伞形钢骨架支撑装置 |
Non-Patent Citations (3)
Title |
---|
刘彦生: "公路桥预制空心板梁活络式抽芯内模技术", 《施工技术》 * |
刘忠友: "伞形内模及翻板底模在杭州湾大桥墩身预制中的应用", 《第十八届全国桥梁学术会议论文集(上册)》 * |
陈惠春等: "综合支模法设计与施工", 《低温建筑技术》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107042575A (zh) * | 2016-02-05 | 2017-08-15 | 包头市市政公用工程有限责任公司 | 一种伞形骨架支撑装配式芯模及预制件制造方法 |
CN105881796A (zh) * | 2016-03-18 | 2016-08-24 | 福建首聪世豪实业有限公司 | 包裹式制管模芯组件 |
CN106696076A (zh) * | 2016-12-19 | 2017-05-24 | 中交路桥建设有限公司 | 一种先张法预制空心板内模支撑方法 |
CN109252456A (zh) * | 2018-10-31 | 2019-01-22 | 中国冶集团有限公司 | 基于挂篮悬浇工艺的连续刚构桥箱梁内模调节装置 |
CN109252456B (zh) * | 2018-10-31 | 2020-10-20 | 中国一冶集团有限公司 | 基于挂篮悬浇工艺的连续刚构桥箱梁内模调节装置 |
CN111571777A (zh) * | 2020-06-22 | 2020-08-25 | 中冶建工集团有限公司 | 一种空心梁板内模支撑装置 |
CN114717956A (zh) * | 2022-04-01 | 2022-07-08 | 贵州大通路桥工程建设有限公司 | 一种桥梁墩柱横隔板施工伞形支撑体系 |
CN114717956B (zh) * | 2022-04-01 | 2024-08-30 | 贵州大通路桥工程建设有限公司 | 一种桥梁墩柱横隔板施工伞形支撑体系 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102225581A (zh) | 一种空心板梁芯模的伞形钢骨架支撑装置 | |
CN106545086B (zh) | 一种钢筋再生块体混凝土梁-柱节点及其施工方法 | |
CN104746422A (zh) | 一种桥梁预制空心墩柱后浇连接结构及施工方法 | |
CN102767141B (zh) | 利用钢筋混凝土薄壁作永久性模板的巨型盖梁施工方法 | |
CN102433962A (zh) | 方套方中空夹层碳纤维钢骨-钢管混凝土组合柱 | |
CN105298020A (zh) | 一种半预制圆钢管再生混合混凝土柱及其制备方法 | |
CN202347446U (zh) | 钢筋混凝土连续梁零号块施工支撑结构 | |
CN101435250A (zh) | 预制普通混凝土管约束型再生混凝土芯复合柱及制作方法 | |
CN103711067A (zh) | 一种少支架横向拼装波形钢腹板组合箱梁及施工方法 | |
CN203795291U (zh) | 无支座单壁墩预应力混凝土连续刚构桥梁 | |
CN204097864U (zh) | 一种桥梁预制空心墩柱后浇连接结构 | |
CN200999409Y (zh) | 一种预制薄板现浇叠合空心楼板 | |
CN101424114A (zh) | 普通混凝土与再生混凝土分层叠合梁及其制作方法 | |
CN110485636A (zh) | 一种空腔框架柱及其成型方法 | |
CN202039298U (zh) | 一种空心板梁芯模的伞形钢骨架支撑装置 | |
CN204546737U (zh) | 一种可伸缩的折叠式钢支架 | |
CN206467580U (zh) | 一种加固桥墩 | |
CN206736708U (zh) | 一种frp管与半预制半现浇再生混凝土预应力叠合桥墩 | |
CN103321141B (zh) | 一种钢筋混凝土圆柱式桥墩及其施工方法 | |
CN105386442A (zh) | 外包frp预应力再生混凝土管桩 | |
CN205777063U (zh) | 一种用于多层、高层或超高层建筑的剪力墙板 | |
CN103072194B (zh) | 一种预制钢筋混凝土防撞护栏模具 | |
CN207933879U (zh) | 一种分段式拼接的桥墩结构 | |
CN204551172U (zh) | 一种装配式钢筋混凝土空心预制路面 | |
CN202170474U (zh) | 支座体系混合式结合梁斜拉桥 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20111026 |