CN102222517A - Cluster harddisk automation test method and system - Google Patents

Cluster harddisk automation test method and system Download PDF

Info

Publication number
CN102222517A
CN102222517A CN2010101485660A CN201010148566A CN102222517A CN 102222517 A CN102222517 A CN 102222517A CN 2010101485660 A CN2010101485660 A CN 2010101485660A CN 201010148566 A CN201010148566 A CN 201010148566A CN 102222517 A CN102222517 A CN 102222517A
Authority
CN
China
Prior art keywords
test
rank
module
hard disk
testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010101485660A
Other languages
Chinese (zh)
Other versions
CN102222517B (en
Inventor
陈兴平
张晓文
陈万福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunda Computer Technology Kunshan Co Ltd
Mitac International Corp
Original Assignee
Kunda Computer Technology Kunshan Co Ltd
Mitac International Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunda Computer Technology Kunshan Co Ltd, Mitac International Corp filed Critical Kunda Computer Technology Kunshan Co Ltd
Priority to CN201010148566.0A priority Critical patent/CN102222517B/en
Publication of CN102222517A publication Critical patent/CN102222517A/en
Application granted granted Critical
Publication of CN102222517B publication Critical patent/CN102222517B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a cluster harddisk automation test method and a cluster harddisk automation test system; a cluster harddisk is tested by a zero-step scheduling module, a first-step monitoring module and a second-step test module which are structurized in a three-step way; the cluster harddisk test system comprises a test server and a test work station, and the test scheduling is carried out to the harddisk by the modules with three-step structuralization, so as to carry out function test under different rotating speeds of a fan and generate an analysis result and a report, thus achieving the purposes of reducing labor time and test errors.

Description

Gather together hard disk automated testing method and system thereof
[technical field]
The invention relates to a kind of hard disk automated testing method and system thereof of gathering together, particularly relevant for a kind of hard disk automatization test system of gathering together with method and utilization the method formation of the structurized hard disk automatic test of gathering together of three-layered.
[background technology]
The data-interface of hard disc of computer is mainly ATA (Advanced Technology Attachment) or SATA (Serial Advanced Technology Attachment) and SCSI (small computer system interface Small Computer System Interface or SAS, Serial Attached SCSI), when computing machine is loaded onto hard disk, should use the test of carrying out hard disk corresponding to the instrument of data-interface, for example use the SCSI testing tool that the SCSI hard disk is tested.
SCSI released in early days in the 1980's, became standard in 1986 and use till today, in storage device such as hard drives, SCSI hard disk widely workstation level personal computer and server uses, because its rotating speed is fast, and it is lower to take the CPU calculation resources during data transmission.Scsi interface is then by the unique digital address of setting, or title SCSI ID, distinguishes all devices.All devices on the SCSI bus, all necessary SCSI of setting in advance ID (normally see through wire jumper, or change-over switch).When computing machine is loaded onto SCSI bus, just need test each device on these SCSI, for example carry out test events such as reading speed, spot speed, random access time, average reading speed and CPU usage.For example, more to export test before SCSI hard drives (hereinafter to be referred as the SCSI hard disk) is made and to be dispatched from the factory through the maximum under different self temperature and environment temperature into (IO) ability (speed), reaction time and CPU usage etc.; The data-interface that other are different also has similar testing requirement.
For another example, when if the SCSI hard disk is arranged (array SCSI HD) with array, the fan rotation can cause the frame of SCSI hard disk array to produce vibrations, therefore, the SCSI hard disk needs to carry out earlier the rotation vibration test (Rotational Vibration test) of hard disk in the frame under different rotation speeds of the fan, under the frame vibrations that fan rotation (and rotation of other adjacent hard disk) is caused, still can allow the access usefulness of hard disk with the mechanism design of guaranteeing frame within zone of reasonableness; When test, must use rotation speed of the fan model (fan speed pattern) that each SCSI hard disk is tested, (test loop) is quite complicated for test loop, and what spent is chronic.More, if the SCSI hard disk is during with the arrangement of gathering together (Clustered SCSI HD), operating personnel's operating difficulties degree is more grown up with multiple.
On prior art, disclose US2008/0074107 as U.S. Patent Publication No. and disclose the use button controller, test to select that the hard disk array is selected hard disk, yet this test needs more manually test in regular turn.And for example 495085 pairs of Taiwan patents disclose the methods that disk array is tested, as Fig. 1, for a plurality of disks (81a, 81b, 81c ... 81n) be connected to control circuit substrate 83 via the bus winding displacement, be connected to computer system 82 by control circuit substrate 83, the control circuit of control circuit substrate 83 can detect disk function (contain temperature height, each disk quality, signal whether normal etc.), to increase the convenience in the assembling.Use on the rank of advancing for other, and as Fig. 1 and Fig. 2, is provided with a plurality of test procedures (821a, 821b, 821c in computer system 82 ... 821n), via the bus winding displacement to disk (81a, 81b, 81c ... 81n) detect; Yet these method of testing all need be tested by the selected respectively disc driver of operating personnel, monitoring and record, is still the work of suitable labor intensive.
In the detection of taking robotization, Taiwan patent I230857 discloses and uses high-order operating system with the automatic test motherboard, as Fig. 3, server 911 is equipped with high-order operating system, high-order operating system then contains various test procedures and batch file, server 911 is connected in computing machine 912 to be measured via multiplexer 921, and motherboard 9121 to be measured is installed in the computing machine 912 to be measured, and each computing machine 912 to be measured has a floppy disk 9122, hard disk 9123 and a network card 9124.During operation, select motherboard 9121 test events to be measured by operating personnel, test finish after, test result is delivered to server stores.This method of testing can be carried out once man-to-man test to computing machine 912 motherboards 9121 out of the ordinary by high-order operating system, but then still needs a large amount of artificial if be applied to the test repeatedly of hard disk array.Taiwan patent I303765 then discloses and uses a plurality of impact dampers to receive disk array detection and temporary disk array detection data respectively, selects one of them impact damper by outlet selector again, will detect data transmission and carry out record to computing machine; Though yet this kind method can be handled once the test of a plurality of hard disks, for the test of a plurality of patterns repeatedly, need more times impact damper, reduce partly manually though have, the impact damper and the hardware of volume are online, more apparent complexity.
As previously mentioned, when carrying out the array hard disk test, especially on the frame of server, be equiped with the hard disk of gathering together, when gathering together hard disk test, (test loop) is quite complicated for test loop, and therefore as how test plan (testing plan) is carried out in robotization, automatically detection record, and further produce analytical statement, then for urgently required.
[summary of the invention]
Because above-mentioned prior art problem, one of fundamental purpose of the present invention is providing a kind of hard disk automated testing method of gathering together exactly, solves the test difficulty of the hard disk of gathering together with the three-layered structuring; This method is tested the hard disk of gathering together by the three-layered structuring of the 0th rank arranging module, the 1st rank monitoring module and the 2nd rank test module, and it comprises the following step:
S1: set the 0th rank arranging module, planning hard disk test matrix (testing matrix), this test matrix include test loop (testing loop) and test scheduling (testing schedule);
S2: the 0th rank arranging module drives the 1st rank monitoring module and carries out this test matrix according to test matrix;
S3: the 1st rank monitoring module starts the 2nd rank test module, carries out the hard disk functional test, and this functional test can be SCSI tool box (SCSI Toolbox) test or I/O test (IO testing) at the SCSI hard disk; For the SCSI hard disk of gathering together, further can carry out functional test under with different rotation speeds of the fan at the fan of each SCSI hard disk of frame;
S4: the 1st rank monitoring module is monitored the 2nd rank test module, whether finishes the hard disk functional test of gathering together;
S5: if finish functional test, then captured the data of the 2nd rank test module test screen picture by the 1st rank monitoring module, data are sent to the 0th rank arranging module, the 0th rank arranging module writes archives with data; Wherein, the test screen picture that produces including but not limited to the testing software of the test screen picture of the 2nd rank test module or use of the data of test screen picture;
S6: repeat S3 to S5 up to all hard disks of gathering together, complete according to test matrix;
S7: the 0th rank analytical statement module is finished archives with the data that the 1st rank monitoring module transmits, and these archives are analyzed;
S8: the result that the 0th rank analytical statement module will be analyzed produces listing file, exports this listing file.
Another fundamental purpose of the present invention is providing a kind of hard disk automated system of gathering together exactly, and this system comprises: one or more measurement unit, a testing server and the testing workstation of being subjected to; Wherein be subjected to measurement unit to can be the fan (fan) of small computer system interface (SCSI) hard disk and frame (rack); Wherein, testing server is equiped with the 0th rank arranging module, and testing workstation is equiped with the 1st rank monitoring module and the 2nd rank test module; Testing workstation is connected with testing server, can receive the 0th rank arranging module fill order of this testing server, and can carry out the 1st rank monitoring module, the 1st rank test module can be monitored the 2nd rank test module, and the result of the 1st rank monitoring module is sent to this testing server storage; Testing workstation is connected with being subjected to measurement unit, can carry out the 2nd rank test module and carry out functional test to being subjected to measurement unit.
Further object of the present invention is providing a kind of hard disk automated system of gathering together exactly, and the testing server of this system includes the 0th rank arranging module, in order to setting harddisk test scheduling; Testing server further comprises the 0th rank analytical statement module, in order to functional test information, analyzes and make form.
Another object of the present invention is providing a kind of hard disk automated system of gathering together exactly, the testing workstation of this system is installed the 1st rank monitoring module, further include figure user interface gui software program, this gui software program can be the AutoIT software program, can utilize the gui software program that the 2nd rank test module is controlled, and the result or the screen-picture of the 2nd rank test module test captured relevant information.
Another object of the present invention is providing a kind of hard disk automated system of gathering together exactly, and the testing workstation of this system is installed the 2nd rank test module, comprises at least: I/O test software programs or test kit any; For the SCSI hard disk of gathering together, wherein the I/O test software programs can be the Iometer software program, the SCSI hard disk is carried out the I/O test.
From the above, according to the present invention gather together hard disk automated testing method and system thereof, it can have one or more following advantage:
(1) this hard disk automated testing method of gathering together has the structurized method of testing of three-layered, can to be subjected to measurement unit test scheduling planning, supervision and control and fechtable test result and according to the test scheduling test, more can produce and analyze and form, reach with automatic test and reduce labor hour and reduce the target that test errors takes place the result of test.
(2) this hard disk automatization test system of gathering together has testing server and testing workstation, be equiped with the 0th rank arranging module, the 1st rank test module, the 2nd rank test module, can be to the hard disk of gather together (or array), automatically carry out different rotation speed of the fan circulation I/O tests or test kit test, reach and reduce labor hour and reduce the target that test errors takes place.
For purpose of the present invention, structural attitude and function thereof are had further understanding, conjunction with figs. is described in detail as follows now:
[description of drawings]
Fig. 1 is existing hard disk test system synoptic diagram;
Fig. 2 separates figure for the piece of existing hard disk test system;
Fig. 3 is the measurement system diagram of existing automated computer motherboard;
Fig. 4 is the present invention's hard disk automatization test system synoptic diagram of gathering together;
Fig. 5 separates figure for the gather together piece of hard disk automatization test system first embodiment of the present invention;
Fig. 6 is the gather together process flow diagram of hard disk automatization test system first embodiment of the present invention;
Fig. 7 separates figure for the gather together piece of hard disk automatization test system second embodiment of the present invention;
Fig. 8 is the gather together process flow diagram of hard disk automatization test system second embodiment of the present invention;
Fig. 9 is the present invention's hard disk automatization test system round-robin process flow diagram of gathering together;
Figure 10 is the present invention's hard disk automated testing method process flow diagram of gathering together; And
Figure 11 uses the screen-picture example figure of IO testing software and the scope example of acquisition screen-picture data for the present invention's hard disk automatization test system of gathering together.
[embodiment]
See also Fig. 4, it is the present invention's hard disk automatization test system synoptic diagram of gathering together.Among the figure, the hard disk automatization test system 1 of gathering together, comprise: one or several are subjected to measurement unit, several are arranged with array by measurement unit, be subjected to the kind of measurement unit 21a~21n to comprise hard disk 21a~21n at least, also can comprise fan 24a~24n, hard disk 21a~21n and fan 24a~24n are installed in the frame 22 (rack), disk output/inbound port 23a~23n (I/O port) is arranged on hard disk 21a~21n, disk output/inbound port 23a~23n uses winding displacement (bus) to be connected, and be connected on the control interface circuit 18, fan 24a~24n also is connected on the control interface circuit 18 in addition; One testing server 31 has screen 33 and can show various information and test pictures, and testing server 31 is equiped with the 0th rank arranging module 34 (do not go up in figure and show); One testing workstation 11, be equiped with the 1st rank monitoring module 14 (do not go up and show) and the 2nd rank test module 15 (do not go up and show) in figure in figure, first of testing workstation 11 is exported/is gone into port 12 and uses winding displacement to be connected with control interface circuit 18, its ways of connecting is not limited, and can use IP communication connection etc. yet; Testing workstation 11 is exported/is gone into port 13 via second and uses the output of winding displacements and testing server 31/go into port 32 to be connected, and its ways of connecting is not limited, and can use IP communication connection etc. yet.Wherein, but testing workstation 11 is provided with the medium (go up in figure and show) of storage data, as internal memory, hard disk or disk etc., in order to store the result's who tests data data.
For different application, testing server 31 can connect one or a plurality of testing workstation 11, carries out one or more groups test by 31 pairs one of testing server or a plurality of testing workstation 11, is utilization widely.
The test mode of different pieces of information interface or testing tool difference below are explanation with small computer system interface (SCSI) hard disk only, but not as limit.When being used in the small computer system interface of gathering together (SCSI) hard disk test, as Fig. 4, the hard disk automatization test system 1 of gathering together, comprise: one or several are subjected to measurement unit, several are subjected to measurement unit is that array is arranged, and is subjected to the kind of measurement unit 21a~21n to comprise SCSI hard disk 21a~21n, and fan 24a~24n, SCSI hard disk 21a~21n and fan 24a~24n are installed in the frame 22 (rack), utilize testing server 31 and testing workstation 11 to test
See also Figure 10, it is the hard disk automated testing method process flow diagram of gathering together of the present invention, and the structurized method of testing of its three-layered is:
Step S1: set the 0th rank arranging module 34, planning hard disk 21a~21n test matrix, this test matrix include test loop and test scheduling, if be applied to gather together the SCSI hard disk test, test matrix such as table one and table two;
Table one: SCSI hard disk IO (Iometer) functional test matrix
SCSI?a SCSI?b SCSI?c SCSI?d
Fan?a?on
Fan?b?on
Fan?c?on
Fan?d?on
Fan?a~d?on
Table two: SCSI hard disk tool box (Toolbox) test matrix
SCSI?a SCSI?b SCSI?c SCSI?d
Fan?a~d?on
Fan?a~d?speed 100% 100% 100% 100%
Fan?a~d?speed 80% 80% 80% 80%
Fan?a~d?speed 60% 60% 60% 60%
Step S2: the 0th rank arranging module 34 drives the 1st rank monitoring module 14 and carries out this test matrix according to test matrix;
Step S3: the 1st rank monitoring module 14 starts the 2nd rank test module 15, carries out the hard disk functional test, and this functional test can be test kit (if the SCSI hard disk then uses SCSI tool box (SCSI Toolbox)) test or uses I/O test software programs 16; Further can be under different rotation speeds of the fan (for example adjust fan 24a~24n) and carry out functional test;
Step S4: the 1st rank monitoring module 14 monitoring the 2nd rank test module 15, whether finish hard disk 21a~21n functional test;
Step S5: if finish functional test, then utilize the gui software program to capture the data or the test result of the 2nd rank test module 15 test screen pictures, data are sent to the 0th rank arranging module 34 by the 1st rank monitoring module 14; The 0th rank arranging module 34 writes archives with data, as notepaper archives (note pad); The data of acquisition are not then limited with the mode that writes archives;
Step S6: repeat S3 to S5 up to all hard disk 21a~21n, complete according to test matrix.
Further, the hard disk automated testing method of gathering together of the present invention can increase the following step again:
Step S7: the 0th rank analytical statement module 35 is finished the notepaper archives with the data that the 1st rank monitoring module 14 transmits, and these notepaper archives are analyzed;
Step S8: the result that the 0th rank analytical statement module 35 will be analyzed produces listing file, exports this listing file.
<the first embodiment 〉
This first embodiment is the present invention's hard disk automatization test system of gathering together, be applied to the SCSI hard disk automatic test of gathering together of small computer system interface (SCSI), piece is separated figure such as Fig. 5, the 0th rank arranging module 34 of testing server 31 can be sent test instruction according to the test scheduling, but the fill order of the 1st rank monitoring module 14 acceptance test servers 31 of testing workstation 11, and can carry out the 1st rank monitoring module 14, the 1st rank monitoring module 14 sends specific measurement unit (the SCSI hard disk 21a~21n) test instruction that is subjected to, drive the 2nd rank test module 15 of testing workstation 11, in the 2nd rank test module 15 IO test software programs 16 is arranged, can (SCSI hard disk 21a~21n) carries out the IO functional test to being subjected to measurement unit; In the present embodiment, IO test software programs 16 is used the Iometer software program, its test event and picture such as Figure 11, whether test result can show I/O speed, read data rate, I/O average reaction time, maximum reaction time, CPU usage and test finishes etc.
The 1st rank test module 14 can be monitored the 2nd rank test module 15, and the result of the 1st rank monitoring module 14 monitoring is sent to testing server 31.At present embodiment, the 1st rank monitoring module 14 that testing workstation 11 is installed includes the gui software program, at present embodiment, the gui software program is used the AutoIT software program, the screen-picture data that AutoIT software program fechtable Iometer software program is carried out, whether the data of acquisition data shown in Figure 11 square frame are as the numbering of SCSI hard disk, I/O speed numerical value, read data rate numerical value, I/O average reaction time numerical value, maximum reaction time numerical value, CPU usage numerical value and test and finish etc.
Wherein, the Iometer software program is issued on February 17th, 1998 by Intel Corporation and Intel Developers Forum (IDF), can be to system's amount of commenting single or that gather together.
Wherein, the AutoIT software program is free common program, can be in order to write and to generate shell script with similar BASIC, can be used for operating automatically in window GUI (the user interface figure user interface) window, utilize that the AutoIT software program can be used in combination the simulation thump, mouse moves and window/control operation waits and realizes automatically working.
The SCSI hard disk automated testing method step S1 as described in Figure 10 that present embodiment uses is to step S6, at this repeated description no longer.Present embodiment test flow chart such as Fig. 6, test (square 401) is preceding beginning, at first be subjected to the test matrix (square 402) of measurement unit 21a~21n by the 0th rank arranging module 34 planning earlier, this test matrix includes the condition of test, the circulation of test and the scheduling of test; After beginning test (square 401), start the 0th rank arranging module 34 (square 403), carry out test loop (square 411) and the program (square 412) of carrying out each SCSI hard disk by the 1st rank monitoring module 14, and drive the 2nd rank test module 15; The 2nd rank test module 15 is carried out test software programs (square 421) (as Iometer), measurement unit 21a~the 21n that is subjected to be measured is carried out functional test (square 422a~422n) respectively, the 1st rank monitoring module 14 monitoring (the square 423a~423n) that whether finished by the test loop of measurement unit 21a~21n, and by the 1st rank monitoring module 14 execution gui software programs (square 413) (present embodiment uses the AutoIT software program), the numerical value in acquisition Iometer screen-picture particular data district, and be sent in the data file of testing server 31 (square 414), finish test (square 404).
<the second embodiment 〉
Present embodiment is another embodiment of hard disk automatization test system of gathering together of the present invention, be applied to the SCSI hard disk automatic test of gathering together of small computer system interface (SCSI), piece is separated figure such as Fig. 7, testing server 31 is equiped with the 0th rank arranging module 34 and the 0th rank analytical statement module 35, the 0th rank arranging module 34 can be sent test instruction according to the test scheduling, but the fill order of the 1st rank monitoring module 14 acceptance test servers 31 of testing workstation 11, and can carry out the 1st rank monitoring module 14, the 1st rank monitoring module 14 sends specific measurement unit (SCSI hard disk 21a~21n and the fan 24a~24n) test instruction that is subjected to, drive the 2nd rank test module 15 of testing workstation 11, IO test software programs 16a~16n and SCSI toolkit programs 17a~17n (in figure go up show) are arranged in the 2nd rank test module 15, can (SCSI hard disk 21a~21n and fan 24a~24n) carry out the IO functional test under the different rotation speeds of the fan to being subjected to measurement unit; In the present embodiment, IO test software programs 16a~16n uses the Iometer software program, its test event and picture such as Figure 11, whether test result can show I/O speed, read data rate, I/O average reaction time, maximum reaction time, CPU usage and test finishes etc.
The 1st rank test module 14 can be monitored the 2nd rank test module 15, and the result of the 1st rank monitoring module 14 monitoring is sent to testing server 31.At present embodiment, the 1st rank monitoring module 14 that testing workstation 11 is installed includes the gui software program, at present embodiment, the gui software program is used AutoIT software program 141, the screen-picture data that AutoIT software program fechtable Iometer software program is carried out, the data of acquisition data shown in Figure 11 square frame.
The SCSI hard disk automated testing method step S1 as described in Figure 10 that present embodiment uses is to step S8, at this repeated description no longer.Test flow chart such as Fig. 8, beginning test (square 501) preceding, at first be subjected to the test matrixs (square 502) of measurement unit 21a~21n by the planning earlier of the 0th rank arranging module 34, this test matrix includes the condition of test, the circulation of test and the scheduling of test; After beginning test (square 501), start the 0th rank arranging module 34 (square 503), carry out test loop (square 511) and the program (square 512) of carrying out each SCSI hard disk by the 1st rank monitoring module 14, and drive the 2nd rank test module 15; The 2nd rank test module 15 execution test software programs 16a~16n (present embodiment uses Iometer) and test software programs 17a~17n (present embodiment uses the SCSI tool box) (going up demonstration in figure) (square 521a~521n), be subjected to measurement unit (SCSI hard disk 21a~21n and fan 24a~24n) carry out functional test (square 522a~522n) simultaneously to be measured, the monitoring of the 1st rank monitoring module 14 is subjected to measurement unit, and (whether the test loop of SCSI hard disk 21a~21n and fan 24a~24n) finishes (square 523a~523n), and by the 1st rank monitoring module 14 execution user interface gui software programs (square 513) (present embodiment uses the AutoIT software program), the numerical value in acquisition Iometer screen-picture particular data district, and be sent in the data file of testing server 31 (square 514), (the functional test results analysis of SCSI hard disk 21a~21n and fan 24a~24n) also produces form (square 504), finishes test (square 505) to be subjected to measurement unit by the 0th rank analytical statement module 35 again.
The test plan of present embodiment and test loop explanation are as Fig. 9, among the figure, after the test beginning (square 701), whether the notepaper archives (note pad) of checking SCSI toolkit programs, test condition (test scheduling), IO test software programs and the instruction of control rotation speed of the fan earlier exist (square 702), if it is above-mentioned when having any not exist, then stop to carry out (square 721),, then prepare deposit data folders (square 703) in testing server 31 if above-mentioned when all existing; At the 0th rank test arranging module 34 setting rotating speed of fan (square 704), this can preestablish in the notepaper archives, and sets up rotation speed of the fan matrix to be tested (square 705); Selected rotation speed of the fan test condition (square 706 and square 707) reaches in the 1st rank monitoring module 14 and selects screen-pictures acquisition points (present embodiment is selected screen-picture acquisition point on the AutoIT software program, as Figure 11); Begin to carry out the test (square 710~square 718) of fan 24a under the test condition~24n rotation and SCSI hard disk 21a~21n, data that the access screen-picture captured after this group test was finished and the SCSI hard disk test (square 719) that stops this group; Select next to organize the test (square 709) of SCSI hard disk 21a~21n by test plan, finish, then carry out the test rotation speed of the fan (square 706) of next group up to whole tests of this condition; After whole tests are finished, reset the back rotation speed of the fan (square 720) of former setting.
The test of SCSI hard disk 21a~21n (square 710~square 718) is described as follows: start SCSI toolkit programs (square 710) at first earlier; With whole measurement unit (SCSI hard disk 21a~21n) all choose (square 711) that are subjected to; To testing be subjected to measurement unit (SCSI hard disk 21a~21n and fan 24a~24n one of them) then cancellation select (deselect) (square 712, remove to select the measurement unit that is subjected in the present test), form except the hard disk of all testing hard disk just and all be in the test environment of the state of running up; Set required test parameter, begin to carry out the test (square 713 and square 714) of SCSI toolkit programs; After the test of SCSI toolkit programs is finished, start IO test software programs (square 715), select test topology (testing topology) (square 716) by IO test software programs (present embodiment uses Iometer), select SCSI hard disk (21a~21n) (square 717) to be tested by the test scheduling; Carry out IO test software programs test (square 718).

Claims (15)

1. the hard disk automated testing method of gathering together by the three-layered structuring of one the 0th rank arranging module, one the 1st rank monitoring module and one the 2nd rank test module, is tested the hard disk of gathering together, and it is characterized in that it comprises the following step:
S1: set the 0th rank arranging module, a test matrix of planning hard disk;
S2: make the 0th rank arranging module according to this test matrix, drive the 1st rank monitoring module and carry out this test matrix;
S3: make the 1st rank monitoring module start the 2nd rank test module, carry out the functional test of hard disk;
S4: make the 1st rank monitoring module monitor the 2nd rank test module, whether finish the functional test of hard disk;
S5: if finish functional test, then captured the data of the 2nd rank test module test screen picture by the 1st rank monitoring module, data are sent to the 0th rank arranging module, the 0th rank arranging module writes archives with data; And
S6: repeat S3 to S5 up to all hard disks, complete according to this test matrix.
2. the hard disk automated testing method of gathering together as claimed in claim 1 further comprises one the 0th rank analytical statement module, it is characterized in that, after step S6 finishes, further comprises:
S7: the 0th rank analytical statement module is finished archives with the data that the 1st rank monitoring module transmits, and these archives are analyzed;
S8: the result that the 0th rank analytical statement module will be analyzed produces a listing file, exports this listing file.
3. the hard disk automated testing method of gathering together as claimed in claim 1 is characterized in that, the 2nd rank test module of step S3 is carried out the functional test of hard disk, comprises at least: any test or its combined test of I/O test, test kit test.
4. hard disk automatization test system of gathering together is characterized in that it comprises:
The one or more measurement unit that is subjected to, this is subjected to the kind of measurement unit to comprise hard disk at least;
One testing server is equiped with one the 0th rank arranging module; And
One testing workstation is equiped with one the 1st rank monitoring module and one the 2nd rank test module; This testing workstation is connected with this testing server, in order to receive the 0th rank arranging module fill order of this testing server, and in order to carry out the 1st rank monitoring module, the 1st rank test module is in order to monitoring the 2nd rank test module, and the monitored results of the 1st rank monitoring module is sent to this testing server; This testing workstation is connected by measurement unit again with this, be subjected to measurement unit to carry out functional test in order to carry out the 2nd rank test module to this.
5. the hard disk automatization test system of gathering together as claimed in claim 4 is characterized in that, the 0th rank arranging module that this testing server is installed includes a hard disk test scheduling.
6. the hard disk automatization test system of gathering together as claimed in claim 4 is characterized in that, the 1st rank monitoring module that this testing workstation is installed in order to capturing the functional test information of the 2nd rank test module, and is sent to this testing server.
7. the hard disk automatization test system of gathering together as claimed in claim 4, it is characterized in that, this testing server further includes one the 0th rank analytical statement module, in order to collect the functional test information that this testing workstation transmits, analyzes and make a form.
8. the hard disk automatization test system of gathering together as claimed in claim 4 is characterized in that, the 1st rank monitoring module that this testing workstation is installed includes a user interface software program.
9. the hard disk automatization test system of gathering together as claimed in claim 4 is characterized in that, the 2nd rank test module that this testing workstation is installed comprises at least: an I/O test software programs or a test kit.
10. the hard disk automatization test system of gathering together as claimed in claim 4 is characterized in that, this is subjected to the kind of measurement unit further to comprise a fan, rotates with this fan of control test, to adjust the functional test that this rotation speed of the fan carries out hard disk.
11. the hard disk automatization test system of gathering together as claimed in claim 10 is characterized in that, the 0th rank arranging module that testing server is installed includes the scheduling of the rotation speed of the fan test of a hard disk functional test and a hard disk.
12. the hard disk automatization test system of gathering together as claimed in claim 10 is characterized in that, the 1st rank monitoring module that this testing workstation is installed in order to capturing the functional test information of the 2nd rank test module, and is sent to this testing server.
13. the hard disk automatization test system of gathering together as claimed in claim 10, it is characterized in that, this testing server further comprises one the 0th rank analytical statement module, in order to collect the functional test information that this testing workstation transmits, analyzes and make a form.
14. the hard disk automatization test system of gathering together as claimed in claim 10 is characterized in that, the 1st rank monitoring module that this testing workstation is installed includes a user interface software program.
15. the hard disk automatization test system of gathering together as claimed in claim 10 is characterized in that this testing workstation is installed the 2nd rank test module and comprised at least: an I/O test software programs or a test kit.
CN201010148566.0A 2010-04-16 2010-04-16 Cluster harddisk automation test method and system Expired - Fee Related CN102222517B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010148566.0A CN102222517B (en) 2010-04-16 2010-04-16 Cluster harddisk automation test method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010148566.0A CN102222517B (en) 2010-04-16 2010-04-16 Cluster harddisk automation test method and system

Publications (2)

Publication Number Publication Date
CN102222517A true CN102222517A (en) 2011-10-19
CN102222517B CN102222517B (en) 2014-06-11

Family

ID=44779048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010148566.0A Expired - Fee Related CN102222517B (en) 2010-04-16 2010-04-16 Cluster harddisk automation test method and system

Country Status (1)

Country Link
CN (1) CN102222517B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104484254A (en) * 2014-12-30 2015-04-01 浪潮电子信息产业股份有限公司 Method for testing influence of internal vibration of high-density cabinet on I/O (Input/Output) performance
US9501766B2 (en) 2012-06-29 2016-11-22 International Business Machines Corporation Generating a storage drive qualification test plan
CN107832176A (en) * 2017-11-16 2018-03-23 郑州云海信息技术有限公司 Hard disk pressure automatic test approach and system under a kind of Windows
CN109614306A (en) * 2018-12-12 2019-04-12 广东浪潮大数据研究有限公司 Hard disk performance detection method, device, equipment and computer readable storage medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010004557A1 (en) * 2008-07-07 2010-01-14 Quali Systems Ltd System and method for automatic hardware and software sequencing of computer-aided design (cad) functionality testing

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010004557A1 (en) * 2008-07-07 2010-01-14 Quali Systems Ltd System and method for automatic hardware and software sequencing of computer-aided design (cad) functionality testing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9501766B2 (en) 2012-06-29 2016-11-22 International Business Machines Corporation Generating a storage drive qualification test plan
CN104484254A (en) * 2014-12-30 2015-04-01 浪潮电子信息产业股份有限公司 Method for testing influence of internal vibration of high-density cabinet on I/O (Input/Output) performance
CN107832176A (en) * 2017-11-16 2018-03-23 郑州云海信息技术有限公司 Hard disk pressure automatic test approach and system under a kind of Windows
CN109614306A (en) * 2018-12-12 2019-04-12 广东浪潮大数据研究有限公司 Hard disk performance detection method, device, equipment and computer readable storage medium

Also Published As

Publication number Publication date
CN102222517B (en) 2014-06-11

Similar Documents

Publication Publication Date Title
CN102568522B (en) The method of testing of hard disk performance and device
US10515000B2 (en) Systems and methods for performance testing cloud applications from multiple different geographic locations
EP2843537B1 (en) Method and systems for simulating a workload of a storage system
CN108595306B (en) Service performance testing method for mixed cloud
CN104331373A (en) Monkey test system and method
CN103578568A (en) Method and apparatus for testing performances of solid state disks
EP2686771B1 (en) Usability testing
CN103810074A (en) System-on-chip and corresponding monitoring method
CN102710454A (en) Automatic test system and automatic test method
TWI566090B (en) Debugging firmware / software to produce tracking systems and methods, recording media and computer program products
CN105074671A (en) Method and system for detecting concurrency programming errors in kernel modules and device drivers
CN107066370A (en) A kind of automatic monitoring and the instrument and method for collecting faulty hard disk daily record
CN105223889A (en) A kind of method being applicable to the automatic monitoring PMC RAID card daily record of producing line
CN102222517B (en) Cluster harddisk automation test method and system
CN102087855A (en) Rotating vibration test system and method of storage equipment
CN111258830B (en) Server power consumption comparison test system and method
CN101776915B (en) Cross-platform station automatic monitoring system testing method based on concurrency simulating tools
CN113110960A (en) Automatic tuning test method and system based on hard disk performance
US20060005080A1 (en) Event logging and analysis in a software system
CN111274078A (en) Method, system and device for testing performance of hard disk
TW201128388A (en) Automatic testing method for clustered hard disks and system thereof
CN101098359B (en) Time sharing test approach for tester
CN101883019A (en) Test method for verifying video application of storage server
CN106708445B (en) Link selecting method and device
CN116244133A (en) Hard disk test management method, system, terminal and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20160416