CN102220810A - Method for connecting wooden members with concrete members of eaves of antique buildings - Google Patents

Method for connecting wooden members with concrete members of eaves of antique buildings Download PDF

Info

Publication number
CN102220810A
CN102220810A CN 201110088393 CN201110088393A CN102220810A CN 102220810 A CN102220810 A CN 102220810A CN 201110088393 CN201110088393 CN 201110088393 CN 201110088393 A CN201110088393 A CN 201110088393A CN 102220810 A CN102220810 A CN 102220810A
Authority
CN
China
Prior art keywords
eaves
rafters
eave
roof boarding
many
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110088393
Other languages
Chinese (zh)
Other versions
CN102220810B (en
Inventor
王超华
宋连兴
郑用正
高飞
冯云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Original Assignee
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd filed Critical TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority to CN 201110088393 priority Critical patent/CN102220810B/en
Publication of CN102220810A publication Critical patent/CN102220810A/en
Application granted granted Critical
Publication of CN102220810B publication Critical patent/CN102220810B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for connecting wooden members with concrete members of eaves of antique buildings. The method comprises the following steps: supporting a frame body to serve as temporary support; laying and installing a plurality of eave rafters on the temporary support at intervals in sequence along the longitudinal direction; installing small eave edgings on eaves of the eave rafters; laying and installing bottom roof boarding on the eave rafters at the sides of the inner side walls of the small eave edgings and then connecting one side walls of the bottom roof boarding with the inner side walls of the small eave edgings; laying and installing a plurality of fly rafters on the bottom roof boarding and the small eave edgings at intervals in sequence along the longitudinal direction; installing a gate baffle board between every two adjacent fly rafters along the longitudinal direction; installing big eave edgings at the top of the eaves of the fly rafters; laying and installing top roof boarding on the fly rafters at the inner sides of the big eave edgings and then connecting one side walls of the top roof boarding with the inner side walls of the big eave edgings; and pouring an overhanging eaves board and a concrete beam. The method has the following advantages: the construction period can be effectively shortened and the construction cost can be saved.

Description

A kind of building in the style of the ancients eaves pollard system member and concrete component method of attachment
Technical field
The present invention relates to pseudo-classic architecture element structure field, relate in particular to a kind of building in the style of the ancients eaves pollard system member and concrete component method of attachment.
Background technology
China's architectural history calls ancient building to the building before the Qing Dynasty, and along with progress of science and technology and development of productivity, New Building Materials such as steel, cement combine with wood structure.Not only do not lose ancient architecture beautiful design, of tremendous momentum characteristic, and more can strengthen the corrosion resistance of building, the application life of improving building.
Learn the patent of having authorized by retrieval:
1 application number is that the Chinese patent of CN200620012011.2 discloses " emulation splicing and inserting combined type Chinese classical architecture model ".Model is divided into chassis and stylobate part, room body part, roof parts; Chassis and stylobate partly have xumizuo, pave floor with bricks, stones etc. ground, Fu, stub, capital stone, breast board, embrace drum, baluster column, the vertical band structure unit of step, the room body partly has post, beam, a tree, used in making timber for boats, purlin, plate, rafter, flying-rafter, bucket arch, wing angle, door and window, doorframe, window frame, wall construction unit, and roof parts has watt, ridge, cover beast, celestial being beast, the beastly element of construction of ridge; The moulding of various element of construction and member wherein all imitate the actual form of the actual building of Chinese classical, adopt tenon fourth of the twelve Earthly Branches form overlap joint between each member.The utility model is novel, the visual angle uniqueness, and it can make the customer learn traditional architecture culture knowledge, and obtains graceful aesthetic pleasure, can inspire intelligence again, and the exercise manipulative ability has practical value and amusement function.But what this patent related to is the Chinese classical architecture model.
4 application numbers are that the Chinese patent of CN200710198567.4 discloses " novel energy-conserving emission reduction pseudo-classic architecture and job practices thereof ".The present invention relates to a kind of novel energy-conserving emission reduction pseudo-classic architecture and job practices thereof, it is applicable to various building in the style of the ancientss, it is characterized in that it is by volume roof, the hard mountain of canopy formula 1, gable and hip roof roof 2, body of wall, flat roof eaves cap, the tassel door, covered corridor 3, formations such as screen wall 4 and courtyard wall 5, it is on complete basis according to the appearance that has building in the style of the ancients now, adopt lightweight steel construction as purlin, a tree, used in making timber for boats, beam, rafter, post, the support structure skeleton or the supporting rod of body of wall and roof tile, and the various novel purlin that adopts steel sheet or modern architecture materials such as aluminium alloy plate or GRC or glass fiber reinforced plastic to make, a tree, used in making timber for boats, post, structures such as body of wall material and roof tile, parts; Carry out batch production production (comprising paint, colored drawing), assembled on site, substitute existing wooden beam, post, rafter and with soil fire watt etc. traditional building materials modelled after an antique, and the construction technology that falls behind, with reach energy-saving and emission-reduction, cleaning construction and installation, improve work efficiency, reduction of erection time, the purpose that reduces cost.This patent disclosure be building in the style of the ancients and the job practices thereof that includes quadrangle, gable and hip roof roof, covered corridor, screen wall and courtyard wall.
5. application number is that the Chinese patent of CN200920148924.0 discloses " disjunctor eave-rafter flying-rafter modelled after an antique ".A kind of disjunctor eave-rafter flying-rafter modelled after an antique of the utility model, it belongs to the building in the style of the ancients field of components, wherein this disjunctor eave-rafter flying-rafter is made of some eave-rafters, some flying-rafters, Dalian eaves and Xiao Lian eaves one, constitute by a Xiao Lian eaves one between described each eave-rafter and each flying-rafter, top constitutes by a Dalian eaves one between described each eave-rafter, and described Dalian eaves and Xiao Lian eaves shape are long strip-board shape.The utility model disjunctor eave-rafter modelled after an antique flying-rafter is simple and compact for structure, easy construction simple and environmental protection and saving.This patent disclosure be disjunctor eave-rafter modelled after an antique, flying-rafter, size to be connected eaves be designed to an overall structure and fix by welding with steel roof truss, be not suitable for the structure that building in the style of the ancients eaves pollard system member is connected with concrete component.
6 application numbers are that the Chinese patent of CN90206293.X discloses " the concrete member of assembly type cornice sets of brackets on top of the columns formula cornice ".The utility model provides the reinforced concrete member of assembly type cornice sets of brackets on top of the columns formula cornice.This cornice member is made up of flying-rafter, sets of brackets on top of the columns, eaves board, rafter cover plate and triangle parting bead.Its structure is novel, moulding is unique, can be widely used in various office building, auditoriums, hotels and China Democratic National Construction Association and garden engineering etc. in the town and country construction.This patent disclosure be the assembly type cornice sets of brackets on top of the columns formula cornice member of reinforced concrete structure.
7 application numbers are that the Chinese patent of CN200610200665.2 discloses " archaized architecture and job practices thereof ".A kind of archaized architecture and job practices thereof, at the eaves position semicircular tile is arranged from up to down, pan tile, roof panel, cornice, eave-rafter, column cap, its column cap is by top-down eaves purlin, eaves board and eave beam combine, its roof panel and column cap are inner for being cast in concrete structure together, there are two step steps at cornice position, concrete roof plate bottom surface, on the step of outer end, fix wooden cornice, fix wooden eave-rafter on the inner step, the pre-buried band iron of at least two row is arranged in each step, pre-buried band iron connecting bolt bar, this shank of bolt passes wooden cornice or wooden eave-rafter, by nut wooden cornice and wooden eave-rafter are fixed on concrete roof plate cornice bottom, above-mentioned nut outside shutoff glue ash; A circle rough ground is fixed by expansion bolt in concrete column cap outside, and the wooden box of column cap shape is buckled on the rough ground, is fixed together by nail and rough ground.Building in the style of the ancients of the present invention adopts concrete and carpentery workshop combining form at cornice and column cap position, and simulated effect is good, and the duration is short.This patent disclosure at the eaves position semicircular tile, pan tile, roof panel, cornice, eave-rafter, column cap are arranged from up to down, its column cap is combined by top-down eaves purlin, eaves board and eave beam, the cornice of this patent, eave-rafter are separately fixed on the two step steps at cornice position, concrete roof plate bottom surface by pre-buried band iron connecting bolt bar, therefore fixing that cornice, the eave-rafter of this patent are final do not connect into an integral body, is not very firm.
Summary of the invention
The objective of the invention is to overcome the deficiency of prior art, provide that a kind of structure construction is convenient, comprehensive cost is low, a kind of building in the style of the ancients eaves pollard system member and the concrete component method of attachment of good endurance.
A kind of building in the style of the ancients eaves pollard system member of the present invention and concrete component method of attachment, it may further comprise the steps:
(1) at first installs support body, as interim support;
(2) in described interim support, longitudinally lay many eave-rafters of installation successively at interval;
(3) the Xiao Lian eaves for preparing is mounted on the eaves head of many eave-rafters;
(4) the bottom roof boarding laying for preparing is installed on the many eave-rafters of inside wall one side that is positioned at the Xiao Lian eaves, the side sidewall with the bottom roof boarding links to each other with the inside wall of Xiao Lian eaves then;
(5) on described bottom roof boarding and Xiao Lian eaves, longitudinally lay many flying-rafters of installation successively at interval;
(6) the lock plate washer longitudinally is installed to block two gaps between the adjacent flying-rafter rafter body between per two adjacent flying-rafter rafter bodies;
(7) the Dalian eaves for preparing is mounted on the rafter crown portion of described many flying-rafters;
(8) the top roof boarding laying for preparing is installed on the many flying-rafters that are positioned at eaves inboard, Dalian, then roof boarding one side sidewall in top is linked to each other with the inside wall of Dalian eaves;
(9) concrete Guttr board reinforcing bar is installed on the roof boarding of top, bottom being positioned at, is laid the reinforcing bar of template and installation concrete beam in the interim support of the rafter tail of the opposite side of roof boarding, the rafter tail of many eave-rafters, many flying-rafters and top roof boarding opposite side;
(10) cast pour concrete Guttr board in the space that described Dalian eaves, top roof boarding surround is at the concrete of the opposite side fluid concrete beam of the rafter tail of the rafter tail of the opposite side of described bottom roof boarding, many eave-rafters, many flying-rafters and top roof boarding;
(11) on the eaves of described Dalian, longitudinally lay watt mouth.
Advantage of the present invention: many eave-rafters and Duo Gen flying-rafter and size eaves, lock plate washer, watt mouth be owing to be single woodwork all, institute's limit processing at the construction field (site), limit installation.Easy and simple to handle, speed of application is fast, effectively reduction of erection time and save operating expenses.Do not lose the characteristics of ancient architecture beautiful design, and the job practices of modern architecture and ancient building are respectively got its advantage, carried out good combination.
Description of drawings
Accompanying drawing is for adopting the structural representation of a kind of building in the style of the ancients eaves pollard system member of the present invention and concrete component method of attachment.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the present invention is done to describe in detail.
A kind of building in the style of the ancients eaves pollard system member of the present invention and concrete component method of attachment, it may further comprise the steps: (1) at first installs support body, as interim support; (2) in described interim support, longitudinally lay many eave-rafter 1-3 of installation successively at interval; (3) the Xiao Lian eaves 3 for preparing is mounted on the eaves head 1-2 of many eave-rafters; (4) bottom roof boarding 7 layings that prepare are installed on the many eave-rafter 1-3 that are positioned at Xiao Lian eaves 3 inside walls one side, the side sidewall with bottom roof boarding 7 links to each other with the inside wall of Xiao Lian eaves 3 then; (5) on described bottom roof boarding 7 and Xiao Lian eaves 3, longitudinally lay many flying-rafters of installation successively at interval; (6) between per two adjacent flying-rafter rafter body 5-3, lock plate washer 6 longitudinally is installed to block two gaps between the adjacent flying-rafter rafter body; (7) the Dalian eaves 8 for preparing is mounted on the rafter head 5-2 top of described many flying-rafters; (8) the top roof boarding 7-1 laying for preparing is installed on the many flying-rafters that are positioned at Dalian eaves 8 inboards, then roof boarding 7-1 one side sidewall in top is linked to each other with the inside wall of Dalian eaves 8; (9) reinforcing bar of concrete Guttr board 9 is installed on the roof boarding of top, in the interim support of the rafter tail 5-1 of the opposite side that is positioned at bottom roof boarding 7, the rafter tail 1-1 of many eave-rafters, many flying-rafters and top roof boarding 7-1 opposite side, is laid template and the reinforcing bar of concrete beam 2 is installed; (10) cast pour concrete Guttr board 9 in the space that described Dalian eaves, top roof boarding surround is at the concrete of the opposite side fluid concrete beam 2 of the rafter tail of the rafter tail of the opposite side of described bottom roof boarding, many eave-rafters, many flying-rafters and top roof boarding; (11) on described Dalian eaves 8, longitudinally lay watt mouth 10.
Described bottom roof boarding 7, top roof boarding 7-1, Xiao Lian eaves 3, eave-rafter 1-3, flying-rafter, Dalian eaves 8 are woodwork.Connected mode between each woodwork can be for carrying out fixedly connected with iron nail.Can certainly adopt existing other method.
Save formwork and mould dismounting work when concrete Guttr board 9 is built in the method, saved material and duration, helped environmental protection and saving.
Comprise between described step (8) and step (10) that preferably the rafter tail 1-1 with described many eave-rafters is connected every a determining deviation with the reinforcing bar 12 that has hook, so that the rafter tail 1-1 of the many eave-rafters in completing steps (10) back is connected every a determining deviation by the reinforcing bar 12 that has hook with concrete beam 2.Can make connection more firm like this.
Preferably between comprising between described step (8) and the step (10), adopt the many reinforcing bars that have hook 12 that are provided with at interval to link to each other with top roof boarding 7-1, many eave-rafter 1-3, many flying-rafters and bottom roof boarding 7.Can make connection more firm like this.
Comprise between described step (8) and step (10) that preferably the long side sidewall with described Dalian eaves 8 connects spike 11 every a determining deviation, so that Dalian, completing steps (10) back eaves 8 links to each other by spike 11 every a determining deviation with the plate termination of concrete Guttr board.Can make connection more firm like this.
Embodiment 1
Carry out building in the style of the ancients eaves pollard system member and be connected construction with concrete component:
(1) at first installs support body, as interim support;
(2) in described interim support, longitudinally lay many eave-rafters of installation successively at interval;
(3) the Xiao Lian eaves for preparing is mounted on the eaves head of many eave-rafters;
(4) the bottom roof boarding laying for preparing is installed on the many eave-rafters of inside wall one side that is positioned at the Xiao Lian eaves, the side sidewall with bottom roof boarding 7 links to each other with the inside wall of Xiao Lian eaves then;
(5) on described bottom roof boarding and Xiao Lian eaves, longitudinally lay many flying-rafters of installation successively at interval;
(6) the lock plate washer longitudinally is installed to block two gaps between the adjacent flying-rafter rafter body between per two adjacent flying-rafter rafter bodies;
(7) the Dalian eaves for preparing is mounted on the rafter crown portion of described many flying-rafters;
(8) the top roof boarding laying for preparing is installed on the many flying-rafters that are positioned at eaves inboard, Dalian, then roof boarding one side sidewall in top is linked to each other with the inside wall of Dalian eaves;
(9) will adopt the many reinforcing bars that have hook 12 that are provided with at interval to link to each other between top roof boarding, many eave-rafters, many flying-rafters and the bottom roof boarding;
(10) concrete Guttr board reinforcing bar is installed on the roof boarding of top, bottom being positioned at, is laid the reinforcing bar of template and installation concrete beam in the interim support of the rafter tail of the opposite side of roof boarding, the rafter tail of many eave-rafters, many flying-rafters and top roof boarding opposite side;
(11) cast pour concrete Guttr board in the space that described Dalian eaves, top roof boarding surround is at the concrete of the opposite side fluid concrete beam of the rafter tail of the rafter tail of the opposite side of described bottom roof boarding, many eave-rafters, many flying-rafters and top roof boarding;
(12) on the eaves of described Dalian, longitudinally lay watt mouth.
Adopt this method to compare duration shortening 10 days with conventional construction method, operating expenses saves 1%, and good looking appearance.
Embodiment 2
Carry out building in the style of the ancients eaves pollard system member and be connected construction with concrete component:
(1) at first installs support body, as interim support;
(2) in described interim support, longitudinally lay many eave-rafters of installation successively at interval;
(3) the Xiao Lian eaves for preparing is mounted on the eaves head of many eave-rafters;
(4) the bottom roof boarding laying for preparing is installed on the many eave-rafters of inside wall one side that is positioned at the Xiao Lian eaves, the side sidewall with bottom roof boarding 7 links to each other with the inside wall of Xiao Lian eaves then;
(5) on described bottom roof boarding and Xiao Lian eaves, longitudinally lay many flying-rafters of installation successively at interval;
(6) the lock plate washer longitudinally is installed to block two gaps between the adjacent flying-rafter rafter body between per two adjacent flying-rafter rafter bodies;
(7) the Dalian eaves for preparing is mounted on the rafter crown portion of described many flying-rafters;
(8) the top roof boarding laying for preparing is installed on the many flying-rafters that are positioned at eaves inboard, Dalian, then roof boarding one side sidewall in top is linked to each other with the inside wall of Dalian eaves;
(9) the rafter tail with described many eave-rafters is connected every a determining deviation by the reinforcing bar that has hook with concrete beam; To adopt the many reinforcing bars that have hook that are provided with at interval to link to each other between top roof boarding, many eave-rafters, many flying-rafters and the bottom roof boarding simultaneously; One long side sidewall of described Dalian eaves is connected spike every a determining deviation;
(10) concrete Guttr board reinforcing bar is installed on the roof boarding of top, bottom being positioned at, is laid the reinforcing bar of template and installation concrete beam in the interim support of the rafter tail of the opposite side of roof boarding, the rafter tail of many eave-rafters, many flying-rafters and top roof boarding opposite side;
(11) cast pour concrete Guttr board in the space that described Dalian eaves, top roof boarding surround is at the concrete of the opposite side fluid concrete beam of the rafter tail of the rafter tail of the opposite side of described bottom roof boarding, many eave-rafters, many flying-rafters and top roof boarding;
(12) on the eaves of described Dalian, longitudinally lay watt mouth.
Adopt this method to compare duration shortening 15 days with conventional construction method, operating expenses saves 1.5%, and good looking appearance.

Claims (4)

1. building in the style of the ancients eaves pollard system member and concrete component method of attachment is characterized in that it may further comprise the steps:
(1) at first installs support body, as interim support;
(2) in described interim support, longitudinally lay many eave-rafters of installation successively at interval;
(3) the Xiao Lian eaves for preparing is mounted on the eaves head of many eave-rafters;
(4) the bottom roof boarding laying for preparing is installed on the many eave-rafters of inside wall one side that is positioned at the Xiao Lian eaves, the side sidewall with the bottom roof boarding links to each other with the inside wall of Xiao Lian eaves then;
(5) on described bottom roof boarding and Xiao Lian eaves, longitudinally lay many flying-rafters of installation successively at interval;
(6) the lock plate washer longitudinally is installed to block two gaps between the adjacent flying-rafter rafter body between per two adjacent flying-rafter rafter bodies;
(7) the Dalian eaves for preparing is mounted on the rafter crown portion of described many flying-rafters;
(8) the top roof boarding laying for preparing is installed on the many flying-rafters that are positioned at eaves inboard, Dalian, then roof boarding one side sidewall in top is linked to each other with the inside wall of Dalian eaves;
(9) concrete Guttr board reinforcing bar is installed on the roof boarding of top, bottom being positioned at, is laid the reinforcing bar of template and installation concrete beam in the interim support of the rafter tail of the opposite side of roof boarding, the rafter tail of many eave-rafters, many flying-rafters and top roof boarding opposite side;
(10) cast pour concrete Guttr board in the space that described Dalian eaves, top roof boarding surround is at the concrete of the opposite side fluid concrete beam of the rafter tail of the rafter tail of the opposite side of described bottom roof boarding, many eave-rafters, many flying-rafters and top roof boarding;
(11) on the eaves of described Dalian, longitudinally lay watt mouth.
2. building in the style of the ancients eaves pollard system member according to claim 1 and concrete component method of attachment is characterized in that: comprise between described step (8) and the step (10) that the rafter tail with described many eave-rafters is connected every a determining deviation with the reinforcing bar that has hook.
3. building in the style of the ancients eaves pollard system member according to claim 1 and concrete component method of attachment is characterized in that: adopt the many reinforcing bars that have hook that are provided with at interval to link to each other between comprising top roof boarding, many eave-rafters, many flying-rafters and bottom roof boarding between described step (8) and the step (10).
4. building in the style of the ancients eaves pollard system member according to claim 1 and concrete component method of attachment is characterized in that: comprise that between described step (8) and step (10) the long side sidewall with described Dalian eaves connects spike every a determining deviation.
CN 201110088393 2011-04-08 2011-04-08 Method for connecting wooden members with concrete members of eaves of antique buildings Expired - Fee Related CN102220810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110088393 CN102220810B (en) 2011-04-08 2011-04-08 Method for connecting wooden members with concrete members of eaves of antique buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110088393 CN102220810B (en) 2011-04-08 2011-04-08 Method for connecting wooden members with concrete members of eaves of antique buildings

Publications (2)

Publication Number Publication Date
CN102220810A true CN102220810A (en) 2011-10-19
CN102220810B CN102220810B (en) 2012-07-04

Family

ID=44777497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110088393 Expired - Fee Related CN102220810B (en) 2011-04-08 2011-04-08 Method for connecting wooden members with concrete members of eaves of antique buildings

Country Status (1)

Country Link
CN (1) CN102220810B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587493A (en) * 2012-02-14 2012-07-18 李建民 Chinese style archaizing constructions poured by pure reinforced concrete and construction method thereof
CN102767284A (en) * 2012-08-08 2012-11-07 张家口市第一建筑工程有限公司 Semi-prefabricating construction process for concrete thin-wall lower return eave
CN106049766A (en) * 2016-05-30 2016-10-26 中国建筑第八工程局有限公司 Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure
CN107816173A (en) * 2017-11-04 2018-03-20 北京房修建筑工程有限公司 Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN109138150A (en) * 2018-10-22 2019-01-04 绍兴市园林建设有限公司 A kind of archaized building structure and its manufacturing method
CN116927433A (en) * 2023-09-01 2023-10-24 中亿丰建设集团股份有限公司 Concrete wood combined prop angle construction and installation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2586052A1 (en) * 1985-08-06 1987-02-13 Bac Maisons Pierre Method for decorating a residential unit and residences obtained according to this method
DE29711625U1 (en) * 1997-07-03 1997-09-04 Holzbau Moser oHG, 09634 Hirschfeld Roof structure
DE29911498U1 (en) * 1999-05-10 1999-09-16 Puren-Schaumstoff GmbH, 88662 Überlingen Rafters
CN1884734A (en) * 2006-07-06 2006-12-27 北京城建亚泰建设工程有限公司 Archaized architecture and its construction method
CN101463639A (en) * 2009-01-14 2009-06-24 张明华 Heat insulating cold-proof thermal-insulating roof of house and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2586052A1 (en) * 1985-08-06 1987-02-13 Bac Maisons Pierre Method for decorating a residential unit and residences obtained according to this method
DE29711625U1 (en) * 1997-07-03 1997-09-04 Holzbau Moser oHG, 09634 Hirschfeld Roof structure
DE29911498U1 (en) * 1999-05-10 1999-09-16 Puren-Schaumstoff GmbH, 88662 Überlingen Rafters
CN1884734A (en) * 2006-07-06 2006-12-27 北京城建亚泰建设工程有限公司 Archaized architecture and its construction method
CN101463639A (en) * 2009-01-14 2009-06-24 张明华 Heat insulating cold-proof thermal-insulating roof of house and construction method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587493A (en) * 2012-02-14 2012-07-18 李建民 Chinese style archaizing constructions poured by pure reinforced concrete and construction method thereof
CN102587493B (en) * 2012-02-14 2015-12-02 李建民 A kind of Chinese style archaized architecture of clean steel reinforced concrete cast and construction method thereof
CN102767284A (en) * 2012-08-08 2012-11-07 张家口市第一建筑工程有限公司 Semi-prefabricating construction process for concrete thin-wall lower return eave
CN106049766A (en) * 2016-05-30 2016-10-26 中国建筑第八工程局有限公司 Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure
CN106049766B (en) * 2016-05-30 2018-06-29 中国建筑第八工程局有限公司 The combination eaves system and its construction method of large span steel structure and sets of brackets on top of the columns timber structure
CN107816173A (en) * 2017-11-04 2018-03-20 北京房修建筑工程有限公司 Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN107816173B (en) * 2017-11-04 2019-09-10 北京房修一建筑工程有限公司 Pseudo-classic architecture wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN109138150A (en) * 2018-10-22 2019-01-04 绍兴市园林建设有限公司 A kind of archaized building structure and its manufacturing method
CN116927433A (en) * 2023-09-01 2023-10-24 中亿丰建设集团股份有限公司 Concrete wood combined prop angle construction and installation method

Also Published As

Publication number Publication date
CN102220810B (en) 2012-07-04

Similar Documents

Publication Publication Date Title
KR100902642B1 (en) sperm
CN102220810B (en) Method for connecting wooden members with concrete members of eaves of antique buildings
CN101457546A (en) Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN202324688U (en) Disaster relief placement mobile house
CN103195214B (en) Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof
CN202017292U (en) Connecting structure for wooden element and concrete element of pseudo-classic building eave
CN107217815A (en) A kind of resistance to compression, safety-type assembling type steel structure elevator
CN209227828U (en) Prefabricated combination formula assembly wall
CN101858143B (en) Mold pipe building construction technology
CN101649649A (en) One-time forming construction process for concrete building structures and decoration
KR20120011580A (en) Hanok roof structure
CN204343563U (en) The building in the style of the ancients cornice node that a kind of wooden construction is combined with concrete structure
CN206189921U (en) Archaistic building
CN201486366U (en) Antique festoon gate
CN205688583U (en) The support framework structure of building unit, basic architecture unit, building unit and apply its commercialization to build
CN104389396B (en) Pseudo-classic architecture eaves lower decoration and heat-insulation system
CN201474329U (en) Assembling type antique hexagonal pavilion
CN204174967U (en) Pavilion
CN204212304U (en) A kind of fan-shaped imitative shell roofing
CN209179267U (en) Chinese style classicism timber structure curtain wall
CN207513006U (en) A kind of compound Side fascia
CN205329955U (en) Assembled cellular concrete material dormer structure
CN116927433B (en) Concrete wood combined prop angle construction and installation method
CN203846784U (en) Installation structure of windowed wall of power plant
CN206428913U (en) A kind of building in the style of the ancients eaves structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20170408