CN102213102A - Method for righting toppled brackets of large-inclined-angle working surface - Google Patents

Method for righting toppled brackets of large-inclined-angle working surface Download PDF

Info

Publication number
CN102213102A
CN102213102A CN2011101508830A CN201110150883A CN102213102A CN 102213102 A CN102213102 A CN 102213102A CN 2011101508830 A CN2011101508830 A CN 2011101508830A CN 201110150883 A CN201110150883 A CN 201110150883A CN 102213102 A CN102213102 A CN 102213102A
Authority
CN
China
Prior art keywords
toppled
working surface
support
brackets
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101508830A
Other languages
Chinese (zh)
Other versions
CN102213102B (en
Inventor
马立强
曹新奇
张东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2011101508830A priority Critical patent/CN102213102B/en
Publication of CN102213102A publication Critical patent/CN102213102A/en
Application granted granted Critical
Publication of CN102213102B publication Critical patent/CN102213102B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a method for righting toppled brackets of a large-inclined-angle working surface. The method comprises the following steps of: in a toppling range, starting from the first toppled bracket which is inclined upwards along the working surface, inserting anchor rods in a centralized mode into a coal seam bottom plate on a coal wall side, which is inclined upwards along the working surface, of each toppled bracket, so as to form an anchor rod group; arranging a hydraulic oil cylinder at an exposed position of the anchor rod group, wherein one end of a cylinder body of the hydraulic oil cylinder is fixed at an exposed end of the anchor rod group, and one end of a piston rod is connected with the corresponding toppled bracket by an anchor chain; and righting the toppled brackets one by one by using the hydraulic oil cylinder until all toppled brackets are in a normal state. By using the anchor rods which are inserted into the bottom plate on the coal wall side of the working surface as an external force device, influence on a normal bracket above the toppled brackets during the righting of the toppled brackets is eliminated; and by using the hydraulic oil cylinder with sufficient power as the external force device, operation is simple, the anchor chain is only required to be fixed on the bracket to be righted during the righting of the toppled brackets every time, a security coefficient is high, and the complexity of operation of a plurality of single columns or jacks is reduced.

Description

A kind of large inclination working surface steady of falling frame method
Technical field
The present invention relates to a kind of large inclination working surface steady of falling frame method, be particularly useful for inclination alpha and be the steady that 20 ° ~ 35 ° large inclination working surface hydraulic support is toppled over, also be applicable to the steady that inclination alpha is toppled over less than 20 ° of inclination angle working surface hydraulic supports.
Background technology
In inclination alpha was 20 ° ~ 35 ° large inclination working surface comprehensive mechanization process for stoping, owing to be subjected to the big influence in inclination angle, frame very easily took place down in work plane, and this not only has a strong impact on the ordinary production of work plane, and deals with unusual difficult.Therefore, working face equipment anti-down, anti-skidding and the treatment measures behind the frame of falling are the difficult problems of the normal exploitation of puzzlement large inclination working surface always
At present, China's coal-mine mainly adopts following method to carry out steady in large inclination working surface when falling the frame: 1, utilize several hydraulic single props to withstand on to fall the appropriate location of support, force steady, support is aligned; 2, utilize anti-down jack steady, jack one end is fixed on the normal support in top, the other end is fastened by chain and is being held up under the front-axle beam of support, reaches the purpose of transferring frame, steady by the tension jack; 3, utilize anti-down jack and individual prop associating steady.
Above-mentioned steady way can obtain certain effect when solving single support tilt, but operation is loaded down with trivial details, efficient is low, can not thoroughly solve large inclination working surface steady problem, be mainly reflected in: 1, utilizing individual prop, anti-down jack to transfer the frame steady all is to finish between frame, depend on the stability state of the normal support in top to a great extent, security reliability is poor; 2, the number of hydraulic prop, jack needs is difficult to determine that safety factor is low that poor operability can't be promoted the use of.
Summary of the invention
Technical problem: the objective of the invention is to overcome the weak point in the prior art, provide a kind of method simple, safe and reliable, the steady of falling frame method takes place in the large inclination working surface that efficient is high.
Technical scheme: the large inclination working surface steady of falling frame method of the present invention:
A. in the scope of falling the frame, topple over support along upwards first of work plane tendency and begin, topple over support at each and concentrate to squeeze in along work plane tendency rib side upwards toward seat earth and be no less than 5 anchor pole, formation anchor pole group;
B. in anchor pole group's exposed junction position hydraulic jack is installed, cylinder body one end of hydraulic jack is fixed on anchor pole group's the exposed junction, and piston rod one end is connected with the support of toppling over of opposite position by anchor chain;
C. topple over support from first, the pulling force by hydraulic jack is pulled upwardly toppling over set cap by force, in the process of pull-up, the side guard board that to topple on the support is opened, utilize side guard board thrust to raise to topple over support,, regain side guard board until toppling over after support moves the position to;
D. repeating step b, c topple over support to each one by one by hydraulic jack and set upright, and topple over support until setting upright all, take off hydraulic jack.
Described anchor pole group is 2 ~ 4m to the distance of toppling over support of opposite position; Described anchor pole is that length is not less than the Bolt with Full Screw Threads and Equal Strength that 2.2m, diameter are not less than 18mm; The pulling force of described hydraulic jack is that 500kN, piston stroke are 2.0m.
Beneficial effect: utilize toward the base plate of working face wall side and beat the origin of force of anchor pole as external force means, when having eliminated steady to the influence of the normal support in top; As external force means, not only simple to operate by the hydraulic jack of power abundance, each steady only need be fixed on anchor chain on the support that will set upright and get final product, and the safety factor height, has reduced the complexity of operating many individual props or jack.This method is workable, and is safe and reliable, and steady efficient height is effective, has practicality widely.
Description of drawings
Fig. 1 is a position view of the present invention;
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Among the figure: 1-working face wall side base plate, 2-anchor pole group exposed junction, the 3-anchor pole, the 4-hydraulic jack, the 5-anchor chain, 6-topples over support.
The specific embodiment
As shown in Figure 1 and Figure 2, at first in inclination alpha is 20 ° ~ 35 ° the large inclination working surface scope of falling the frame, topple over support 6 beginnings along upwards first of work plane tendency, topple over support 6 at each and squeeze into the anchor pole 3 that is no less than 5 along concentrating in the past seat earth 1 of work plane tendency rib side upwards, anchor pole 3 is a Bolt with Full Screw Threads and Equal Strength, its length is not less than 2.2m, diameter is not less than 18mm, make the anchor pole of beating 3 form the anchor pole groups, the anchor pole group is 2 ~ 4m to the distance of toppling over support of opposite position.And then at beating anchor pole group exposed junction 2 positions installation hydraulic jack 4, the pulling force of hydraulic jack 4 is that 500kN, piston stroke are 2.0m.Cylinder body one end of hydraulic jack 4 is fixed on the anchor pole group exposed junction 2, and piston rod one end is connected with the support 6 of toppling over of opposite position by anchor chain 5.Topple over support 6 from first, the pulling force by hydraulic jack 4 is pulled upwardly toppling over support 6 back timbers by force, in the process of pull-up, the side guard board that to topple on the support 6 is opened, utilize side guard board thrust to raise to topple over support 6,, regain side guard board until toppling over after support 6 moves the position to.What change the permanent position of hydraulic jack 4 successively and connect the relevant position topples over support 6, goes round and begins again, and one by one each is toppled over support 6 and sets upright, and topples over support 6 until setting upright all, takes off hydraulic jack 4.

Claims (4)

1. the large inclination working surface steady of falling frame method is characterized in that:
A. in the scope of falling the frame, topple over support (6) beginning along upwards first of work plane tendency, topple over support (6) at each and squeeze into the anchor pole (3) that is no less than 5, form the anchor pole group along concentrating in the past seat earth (1) of work plane tendency rib side upwards;
B. in anchor pole group's exposed junction (2) position hydraulic jack (4) is installed, cylinder body one end of hydraulic jack (4) is fixed on anchor pole group's the exposed junction (2), and piston rod one end is connected with the support (6) of toppling over of opposite position by anchor chain (5);
C. topple over support (6) from first, pulling force by hydraulic jack (4) is pulled upwardly toppling over support (6) back timber by force, in the process of pull-up, the side guard board that to topple on the support (6) is opened, utilize side guard board thrust to raise and topple over support (6), until toppling over after support (6) moves the position to, regain side guard board;
D. repeating step b, c topple over support (6) to each one by one by hydraulic jack (4) and set upright, and topple over support (6) until setting upright all, take off hydraulic jack (4).
2. as the right 1 described large inclination working surface steady of falling frame method, it is characterized in that: described anchor pole group is 2 ~ 4m to the distance of toppling over support (6) of opposite position.
3. as the right 1 described large inclination working surface steady of falling frame method, it is characterized in that: described anchor pole (3) is not less than the Bolt with Full Screw Threads and Equal Strength that 2.2m, diameter are not less than 18mm for length.
4. as the right 1 described large inclination working surface steady of falling frame method, it is characterized in that: the pulling force of described hydraulic jack (4) is that 500kN, piston stroke are 2.0m.
CN2011101508830A 2011-06-07 2011-06-07 Method for righting toppled brackets of large-inclined-angle working surface Expired - Fee Related CN102213102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101508830A CN102213102B (en) 2011-06-07 2011-06-07 Method for righting toppled brackets of large-inclined-angle working surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101508830A CN102213102B (en) 2011-06-07 2011-06-07 Method for righting toppled brackets of large-inclined-angle working surface

Publications (2)

Publication Number Publication Date
CN102213102A true CN102213102A (en) 2011-10-12
CN102213102B CN102213102B (en) 2013-04-24

Family

ID=44744608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101508830A Expired - Fee Related CN102213102B (en) 2011-06-07 2011-06-07 Method for righting toppled brackets of large-inclined-angle working surface

Country Status (1)

Country Link
CN (1) CN102213102B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536314A (en) * 2011-12-20 2012-07-04 中国矿业大学 Method for quickly lifting bottom on soft bottom combined mining working surface with large inclination angle
CN110529115A (en) * 2019-09-12 2019-12-03 大同煤矿集团有限责任公司 A kind of coal-mining method for coping with roof cracking and riding

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1073501A (en) * 1991-12-19 1993-06-23 新汶矿务局 Hydraulic expansion type anchor stock is prevented the roof fall of coal face wall caving
CN201187308Y (en) * 2008-05-06 2009-01-28 中国科学院武汉岩土力学研究所 Gob-side entry driving support for large-inclination thick coal seam with small coal pillars
CN201401183Y (en) * 2009-04-29 2010-02-10 宝钢集团新疆八一钢铁有限公司 Face-end support antiskid device of large inclined angle fully-mechanized caving face

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1073501A (en) * 1991-12-19 1993-06-23 新汶矿务局 Hydraulic expansion type anchor stock is prevented the roof fall of coal face wall caving
CN201187308Y (en) * 2008-05-06 2009-01-28 中国科学院武汉岩土力学研究所 Gob-side entry driving support for large-inclination thick coal seam with small coal pillars
CN201401183Y (en) * 2009-04-29 2010-02-10 宝钢集团新疆八一钢铁有限公司 Face-end support antiskid device of large inclined angle fully-mechanized caving face

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冯宇峰等,1: "大倾角综采工作面的防倒滑技术浅析", 《矿山机械》, no. 19, 31 December 2010 (2010-12-31), pages 17 - 20 *
胡学群,1: "大倾角综采工作面液压支架的防倒、防滑探究", 《科技信息(学术研究)》, no. 34, 5 December 2008 (2008-12-05), pages 285 - 286 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536314A (en) * 2011-12-20 2012-07-04 中国矿业大学 Method for quickly lifting bottom on soft bottom combined mining working surface with large inclination angle
CN102536314B (en) * 2011-12-20 2014-01-15 中国矿业大学 Method for quickly lifting bottom on soft bottom combined mining working surface with large inclination angle
CN110529115A (en) * 2019-09-12 2019-12-03 大同煤矿集团有限责任公司 A kind of coal-mining method for coping with roof cracking and riding
CN110529115B (en) * 2019-09-12 2021-07-13 晋能控股煤业集团有限公司 Coal mining method for coping with roof crushing and support inclination

Also Published As

Publication number Publication date
CN102213102B (en) 2013-04-24

Similar Documents

Publication Publication Date Title
CN102444416B (en) Fully mechanized mining face hydraulic support beam-type retracting device
CN202202313U (en) Lifting platform
CN201090230Y (en) Fission top beam flexible support
CN113653523B (en) Triangular-area wide temporary support device and support method for quickly withdrawing hydraulic support
CN101975072B (en) Recovery method of common combined mining working face hydraulic support
CN102213102B (en) Method for righting toppled brackets of large-inclined-angle working surface
CN201915983U (en) Hydraulic support
CN201953390U (en) Hydraulic walking advance support equipment
CN103032091A (en) Self-moving hydraulic support
CN201121525Y (en) Single-bottom multi-beam hydraulic support
CN201013397Y (en) High-dipping fully-mechanized mining hydraulic support
CN110130392A (en) A kind of clip pile platform and embodiments thereof for single pile embedding in rock
CN203546718U (en) Recoverable anchor rod device
CN108529514B (en) The continuous jacking system of spiral bolt-type and its elevating method for offshore platform
CN113833421B (en) Device capable of realizing automatic screwing and unscrewing of coal mine tunnel drilling machine and control method
CN201420239Y (en) Hydraulic locking mechanism
CN203879522U (en) Expansion shell type anchor rod
CN206844612U (en) A kind of coal mine underground construction scaffold
CN202215273U (en) Front-arranged single oscillating bar type end hydraulic support
CN205225304U (en) Novel multistage pressure stock that lets
CN204804865U (en) From moving formula hydraulic support erection equipment
CN212105926U (en) Stepping self-moving type advance support bracket set
CN202730818U (en) Shed supporting mechanism installed on loader-digger
CN202441432U (en) Mining hydraulic pushing and sliding device
CN105134273A (en) Electric hydraulic control device and control method for gob-side entry retaining gob multifunctional supporting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20150607

EXPY Termination of patent right or utility model