CN102209183B - system and method for monitoring program making process and cost - Google Patents

system and method for monitoring program making process and cost Download PDF

Info

Publication number
CN102209183B
CN102209183B CN201010135249.5A CN201010135249A CN102209183B CN 102209183 B CN102209183 B CN 102209183B CN 201010135249 A CN201010135249 A CN 201010135249A CN 102209183 B CN102209183 B CN 102209183B
Authority
CN
China
Prior art keywords
program
control device
information
task
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010135249.5A
Other languages
Chinese (zh)
Other versions
CN102209183A (en
Inventor
曹志强
刘磊
刘希伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Digital Video Beijing Ltd
Original Assignee
China Digital Video Beijing Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Digital Video Beijing Ltd filed Critical China Digital Video Beijing Ltd
Priority to CN201010135249.5A priority Critical patent/CN102209183B/en
Publication of CN102209183A publication Critical patent/CN102209183A/en
Application granted granted Critical
Publication of CN102209183B publication Critical patent/CN102209183B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention, which belongs to the production technical field of a TV station program, discloses a system and a method for monitoring a program making process and a program making cost. In the prior art, because the completion situation of a program making task and cost information of the program making can not be known timely, a potential safety hazard exists and costs of finished programs can not be checked. According to the monitoring method provided in the invention, a selected topic is established by a topic selection device, and the established selected topic is sent to a control device; a production program task /production program tasks is/ are sent to a or a plurality of production devices by the control device according to the content of the selected topic; After the production device /the production devices receive/ receives the task/ the tasks, a program is produced; and result information of program production and cost information of program production are feedbacked to the control device; and the task completion state/ states and cost information are updated by the control device according to the information feedbacked by the production device/devices. According to the invention, information of a program making flow can be grasped timely, and the check on the program cost can be realized easily.

Description

Supervisory control system and the method for a kind of program making process and cost
Technical field
The invention belongs to station synchronization production technical field, be specifically related to a kind of supervisory control system and the method for program making process and cost.
Background technology
In station synchronization manufacturing process, Subject Selection personnel, in planning first phase program, can create the selected topic according to factors such as program source, types, issue the relevant collection of material task of including to acceptance system, acquisition system, manufacturing system etc. simultaneously.After task issues, because task reception staff is the people who belongs to different departments from practical operation personnel etc., be often dispersed in even strange land of different rooms and floor, traditional communication mode often can not be reacted the actual implementation status of task timely.Subject Selection personnel are issuing after task, and compiling single member needs scheduling programs, and programme needs broadcasting list to broadcasting after completing.Owing to cannot recognizing in time the performance of task, whether unclear actual no the ging wrong of program making meeting, can change, and therefore usually compiling a large amount of repeated works repeatedly of monocycle festival-gathering generation.And ageing very strong program tends to, because execution information can not be grasped to have influence on completely to be compiled list and broadcast, therefore produce in a large number without the single program directly broadcasting of volume.Because programme and actual broadcast are recorded inconsistently, thereby there is hidden danger in fail safe.
In addition, because the information of links in program making process is all disperseed, therefore cause carrying out cost accounting to final finished product program, program exchange is had a negative impact.
Summary of the invention
For the defect existing in prior art, the object of this invention is to provide a kind of supervisory control system and the method for program making process and cost.This system and method can solve the problem that executing state cannot be monitored and program making cost accounting information dispersion lacks of task in program making process.
To achieve these goals, the technical solution used in the present invention is as follows:
A supervisory control system for program making process and cost, comprising:
Titles selector, for creating the selected topic;
Control device, issues program making task for the selected topic creating according to titles selector;
Generating apparatus, generates program for the task of issuing according to control device, and program is generated to object information and program manufacturing cost information feeds back to control device;
Described control device is also for receiving after the information that generating apparatus returns, more new task completion status information and cost information.
The supervisory control system of program making process as above and cost, wherein, generating apparatus comprises the device of including for including program, for gathering the harvester of program, and producing device for programming.Receive if include device the task of including, start to include program according to the task of including, after having included, will include object information and include cost information immediate feedback to control device, if harvester receives acquisition tasks, start to gather program according to acquisition tasks, after collection completes by collection result information and the immediate feedback of acquisition cost information to control device, if producing device receives making task, start to programme according to making task, after completing, will make object information and the immediate feedback of cost of manufacture information to control device.
The supervisory control system of program making process as above and cost, wherein, generating apparatus immediately program is generated to object information after program generates and program manufacturing cost information feeds back to control device.
A method for supervising for program making process and cost, comprises the following steps:
Create the selected topic and the selected topic of establishment is sent to control device;
Control device sends to one or more generating apparatus the program task that generates according to content topic;
Generating apparatus receives after task, generates program, and program is generated to object information and program manufacturing cost information feeds back to control device;
Control device is according to more new task completion status and cost information of generating apparatus feedack.
The method for supervising of program making process as above and cost, wherein, the mode of generating apparatus generation program comprises to be included, gathers and makes.
The method for supervising of program making process as above and cost wherein, immediately generates program object information and program manufacturing cost information feeds back to control device after program generates.
System and method of the present invention, in program making process, by setting up the mode of tasks carrying situation and cost information immediate feedback mechanism, can trigger next step flow process without compartment of terrain, make Subject Selection personnel and compile single member and grasp in time programming process information, arranged rational work.Meanwhile, by the unified management of cost information, the cost of whole program making links is very clear, can realize easily the cost of program is adjusted.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of supervisory control system in embodiment;
Fig. 2 is structure and the data flow diagram of supervisory control system in embodiment;
Fig. 3 is the flow chart of method for supervising in embodiment;
Fig. 4 is the structure chart of data object in embodiment.
Embodiment
Below in conjunction with embodiment and accompanying drawing, describe the present invention.
The present invention is mainly used in station synchronization production field, and Fig. 1 is the structured flowchart of a kind of execution mode of supervisory control system of the present invention.This system comprises titles selector 11, the control device 12 being connected with titles selector 11, and the generating apparatus 13 being connected with control device 12.
Titles selector 11 is for creating the selected topic, and the selected topic creating is sent to control device 12.Titles selector 11 can need to arrange multiple according to system.Control device 12 issues program making task for the selected topic creating according to titles selector 11 to generating apparatus 13.Generating apparatus 13 generates program for issuing according to control device 12 of task, and the cost information of the object information immediately program being generated and program generation feeds back to control device 12.Control device 12 is receiving after the information that generating apparatus 13 returns, the cost information that more the completion status information of new task and program generate.
Generating apparatus 13 comprises multiple devices, and the different modes generating according to program is set.In present embodiment, generating apparatus 13 comprises includes device 131, harvester 132 and producing device 133.Include device 131 for including program, harvester 132 is for gathering program, and producing device 133 is for programming.Other modes that generating apparatus 13 can generate according to program are expanded.
In said system, control device 12 is core apparatus, and unified interface is externally provided, and other install according to interface specification calling interface.Like this, control device 12 can access other devices easily, convenient expansion.Control device 12 is collected all titles selectors 11 and is selected a topic, and according to the selected topic, program generation task is handed down to include, gather, the generating apparatus 13 such as making, by unified to control device 12 various generating apparatus 13 feedacks, more new task completes object information and cost information again.
Fig. 2 is an example of system shown in Figure 1.Control device 12 with include device 131, harvester 132 and producing device 133 and be connected.Control device 12 is selected a topic according to titles selector 11, and task is handed down to and includes device 131, harvester 132 and/or producing device 133.Include, collection and/or producing device receive after task, generate program, and object information and cost information fed back to control device 12.
Fig. 3 is the method flow diagram that adopts system shown in Figure 1 monitor programme manufacturing process and cost of manufacture.The method comprises the following steps:
(1) create the selected topic and the selected topic of establishment is sent to control device.
(2) control device sends to one or more generating apparatus the program task that generates according to content topic.
(3) generating apparatus receives after task, generates program, and generation object information and manufacturing cost information are fed back to control device.
The mode of generating apparatus generation program comprises to be included, gathers and makes, and correspondence is included device, harvester and producing device respectively.Receive if include device the task of including, start to include program according to the task of including, after having included, will include object information and include cost information immediate feedback to control device.If harvester receives acquisition tasks, start to gather program according to acquisition tasks, after collection completes by collection result information and the immediate feedback of acquisition cost information to control device.If producing device receives making task, start to programme according to making task, after completing, will make object information and the immediate feedback of cost of manufacture information to control device.
(4) control device is according to more new task completion status and cost information of generating apparatus feedack.
Fig. 4 is the structure chart of data object in present embodiment.Selected topic information comprises selected topic state information and selected topic cost information, and selected topic cost information forms by including cost, acquisition cost and cost of manufacture etc.Selected topic information externally provides unified interface.This structure has facilitated the expansion of selected topic information subclass, and the expansion of selected topic cost information subclass.If increase other guide in selected topic information, or the mode of composition selected topic cost information increases, and is easy to new content to add in system.
Obviously, those skilled in the art can carry out various changes and modification and not depart from the spirit and scope of the present invention the present invention.Like this, if within of the present invention these are revised and modification belongs to the scope of the claims in the present invention and equivalent technology thereof, the present invention is also intended to comprise these changes and modification interior.

Claims (2)

1. a supervisory control system for program making process and cost, comprising:
Titles selector (11), for creating the selected topic;
Control device (12), issues program making task for the selected topic creating according to titles selector (11);
Generating apparatus (13), generates program for the task of issuing according to control device (12), and after program generates, immediately program is generated to object information and program manufacturing cost information feeds back to control device (12), generating apparatus (13) comprises includes device (131) for what include program, for gathering the harvester (132) of program, and producing device (133) for programming, receive if include device (131) task of including, start to include program according to the task of including, after having included, will include object information and include cost information immediate feedback to control device (12), if harvester (132) receives acquisition tasks, start to gather program according to acquisition tasks, after collection completes by collection result information and the immediate feedback of acquisition cost information to control device (12), if producing device (133) receives making task, start to programme according to making task, after completing, will make object information and the immediate feedback of cost of manufacture information to control device (12),
Described control device (12) is also for receiving after the information that generating apparatus (13) returns, more new task completion status information and cost information.
2. a method for supervising for program making process and cost, is characterized in that comprising the following steps:
Create the selected topic and the selected topic of establishment is sent to control device;
Control device sends to one or more generating apparatus the program task that generates according to content topic;
Generating apparatus receives after task, generates program, and immediately program is generated to object information and program manufacturing cost information feeds back to control device after program generates, generating apparatus comprises the device of including for including program, for gathering the harvester of program, and producing device for programming, receive if include device the task of including, start to include program according to the task of including, after having included, will include object information and include cost information immediate feedback to control device, if harvester receives acquisition tasks, start to gather program according to acquisition tasks, after collection completes by collection result information and the immediate feedback of acquisition cost information to control device, if producing device receives making task, start to programme according to making task, after completing, will make object information and the immediate feedback of cost of manufacture information to control device,
Control device is according to more new task completion status and cost information of generating apparatus feedack.
CN201010135249.5A 2010-03-29 2010-03-29 system and method for monitoring program making process and cost Expired - Fee Related CN102209183B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010135249.5A CN102209183B (en) 2010-03-29 2010-03-29 system and method for monitoring program making process and cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010135249.5A CN102209183B (en) 2010-03-29 2010-03-29 system and method for monitoring program making process and cost

Publications (2)

Publication Number Publication Date
CN102209183A CN102209183A (en) 2011-10-05
CN102209183B true CN102209183B (en) 2014-06-04

Family

ID=44697828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010135249.5A Expired - Fee Related CN102209183B (en) 2010-03-29 2010-03-29 system and method for monitoring program making process and cost

Country Status (1)

Country Link
CN (1) CN102209183B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1416263A (en) * 2002-11-26 2003-05-07 廖作全 System for controlling and managing post production facilities in TV station

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3529759B2 (en) * 2001-01-26 2004-05-24 株式会社ソニー・コンピュータエンタテインメント Image processing program, computer-readable recording medium storing image processing program, program execution device, image processing device, and image processing method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1416263A (en) * 2002-11-26 2003-05-07 廖作全 System for controlling and managing post production facilities in TV station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
电视编辑机房制作设备管理系统设计方案;皇甫潇红;《广播电视信息》;20080531;88-90 *
皇甫潇红.电视编辑机房制作设备管理系统设计方案.《广播电视信息》.2008,88-90.

Also Published As

Publication number Publication date
CN102209183A (en) 2011-10-05

Similar Documents

Publication Publication Date Title
CN110794800B (en) Intelligent factory information management monitoring system
CN106815071A (en) Big data job scheduling system based on directed acyclic graph
CN203583166U (en) Remote monitoring and failure diagnosis system for industrial sewing machine
CN202975721U (en) Intelligent stage control system based on intelligent visual positioning technology
CN104578414A (en) Method for realizing visualization of protective operation of intelligent station based on SVG
CN104494653A (en) Rail transit integrated monitoring system
CN111564905A (en) Automatic simultaneous joint debugging method and system for unattended multiple power distribution terminals of main station
EP3690561B1 (en) Method and system for 3d visually monitoring a building, and memorizer
CN107341609B (en) Energy efficiency management system and method based on cloud platform
CN101807075B (en) Automatic control system of hot rolled strip steel leveling unit
CN110969286A (en) Building operation safety diagnosis and analysis system and method based on Internet of things data
CN106991482A (en) A kind of intelligent substation IED exchanges method and device
CN105305627B (en) The data concentrated collection of cities and counties' scheduling power equipment and the method for monitoring
CN103984326B (en) Production management system and method
CN105632248A (en) Safety monitoring system and data processing method therefor
CN102209183B (en) system and method for monitoring program making process and cost
CN101753386A (en) Method and system for setting networking of alarm equipment and home appliance equipment of residential district
CN102883350A (en) Equipment information collection method and system
CN219351760U (en) Programmable intelligent industrial control gateway
TWI235900B (en) System and method for managing equipments
CN102393820A (en) Logical implementation method for controlling building monitoring system
CN106054629A (en) An intelligent device control method and device based on internet of things
CN205450732U (en) Control controlling means of assembly line robot
KR101475596B1 (en) dispatcher training system and its control method
CN106019001A (en) Automatic electromagnetic signal dynamic loading device and method for environmental adaptability tests

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20170329