CN102183923A - Computer related event executing control method and system - Google Patents

Computer related event executing control method and system Download PDF

Info

Publication number
CN102183923A
CN102183923A CN2011101053089A CN201110105308A CN102183923A CN 102183923 A CN102183923 A CN 102183923A CN 2011101053089 A CN2011101053089 A CN 2011101053089A CN 201110105308 A CN201110105308 A CN 201110105308A CN 102183923 A CN102183923 A CN 102183923A
Authority
CN
China
Prior art keywords
incident
correlating
desire
testing result
trafficability characteristic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101053089A
Other languages
Chinese (zh)
Other versions
CN102183923B (en
Inventor
罗东晓
王旭光
吴毅
郭海球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Industrial and Commercial Bank of China Ltd ICBC
Original Assignee
Industrial and Commercial Bank of China Ltd ICBC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Industrial and Commercial Bank of China Ltd ICBC filed Critical Industrial and Commercial Bank of China Ltd ICBC
Priority to CN 201110105308 priority Critical patent/CN102183923B/en
Publication of CN102183923A publication Critical patent/CN102183923A/en
Application granted granted Critical
Publication of CN102183923B publication Critical patent/CN102183923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The embodiment of the invention provides a computer related event executing control method and system. The method comprises the following steps: constructing a mapping relationship between business and events; receiving a business request transmitted by a user; obtaining all related events corresponding to the business from the mapping relationship of the business and the events according to the business request; extracting each event in the related events in sequence as a corresponding event to be executed, carrying out passing detection to the corresponding related event to be executed and each related event in all the related events, and generating a detection result set including the passing detection result; obtaining the detection result set corresponding to the corresponding event to be executed; and executing the corresponding event to be executed when the each passing detection result in the detection result set is successful. The invention solves the problems that in the prior art, the control node efficiency is low and the control is not flexible, and reduces the connection times of a computer system and a database when the computer system processes the related events.

Description

A kind of computer association incident is carried out control method and system
Technical field
The present invention particularly about the treatment technology of correlating event, is that a kind of computer association incident is carried out control method and system about data processing technique concretely.
Background technology
Constantly perfect along with infotech, all trades and professions all generally the technology of using a computer come data in the process for producing business process.When deal with data, can relate to considerable judgment processing usually with correlating event of mutual restriction relation.Wherein, the mutual restriction of correlating event relation depends on such as the execution of incident A whether incident B and incident C finish, and the execution of incident B depends on whether incident B1 has finished, and the execution of incident C depends on then whether incident C1 finishes.When for example the technology of using a computer is handled the refund data in financial industry, need to judge the restricting relation of the multiple refund incident (as give back debit interest in the table, give back off-balancesheet debit interest etc.) and a refund amount of money, thereby determine whether this loan can refund.And for example: during with computer technology control production line, need to judge whether each product can carry out certain one in the countless procedures, all sequencing can be arranged between each procedure, the priority of some operation is adjusted so that preferentially finish according to the actual conditions needs.
Mainly carry out in the following way when handling in the prior art: when whether the decision event A of system can carry out such as above-mentioned correlating event, need to connect database and obtain the incident that all are associated with incident A, and whether the treatment state of judging the incident B that priority ratio incident A in this incident is high is to finish, if for finishing, then allow incident A to carry out; Otherwise refusal incident A carries out, thereby at this moment if the incident B of finishing can carry out incident A, needs to start the treatment scheme whether decision event B can carry out, and repeats above-mentioned steps.When each incident all also has other correlating events, then need constantly to repeat above-mentioned steps.Mainly there are the following problems for the mode of above-mentioned processing events:
(1), treatment effeciency is low.During incident of the every processing of above-mentioned mode, all need accessing database to obtain the treatment state of the variety of event that is associated with this incident, the number of times that is connected with database in the processing procedure is various.When a large amount of correlating event of batch processing, need be connected more number of times with database, therefore, expend a large amount of time and system resource, cause the efficient carried out low.
(2), control is dumb.In the above-mentioned processing mode, be the priority of incident when changing when the shut sequence of variety of event changes, system need remodify whole data.And the judgment processing of incident with mutual restriction relation is generally all very complicated, the error of any step all can cause final processing to make mistakes, therefore, and when the priority of incident changes, system need expend a large amount of time and resource remodifies data, can not realize flexible control.
Summary of the invention
The embodiment of the invention provides a kind of computer association incident to carry out control method and system, obtain and professional all relevant correlating events according to service request, according to the execution of the completion status of all correlating events, priority control correlating event, solved control mode efficient of the prior art low, control inflexible problem.
One of purpose of the present invention is, provides a kind of computer association incident to carry out control method, and this method comprises: set up mapping relations professional and incident; Receive the service request that the user sends; From the mapping relations of described business and incident, obtain all corresponding correlating events of described business according to described service request; From described all correlating events, extract each incident successively and carry out incident as the desire of correspondence, and the desire of described correspondence is carried out incident carry out trafficability characteristic with each correlating event in described all correlating events and detect, generation comprises the detection result sets of trafficability characteristic testing result; Obtain each desire and carry out incident corresponding detection result collection; When each trafficability characteristic testing result that described testing result is concentrated is successfully, then carries out corresponding desire and carry out incident.
One of purpose of the present invention is, a kind of computer association incident executive control system is provided, and described system comprises: the first mapping apparatus for establishing is used to set up mapping relations professional and incident; The service request receiving trap is used to receive the service request that the user sends; The correlating event deriving means is used for obtaining all corresponding correlating events of described business according to described service request from the described business and the mapping relations of incident; The trafficability characteristic pick-up unit, be used for extracting each incident successively and carry out incident as the desire of correspondence from described all correlating events, and the desire of described correspondence is carried out incident carry out trafficability characteristic with each correlating event in described all correlating events and detect, generation comprises the detection result sets of trafficability characteristic testing result; The testing result deriving means is used to obtain each desire and carries out incident corresponding detection result collection; The execution incident is determined device, is used for determining that each concentrated trafficability characteristic testing result of described testing result is the desire execution incident of success, carries out corresponding desire and carries out incident.
A kind of computer association incident of the embodiment of the invention is carried out control method and system, obtain and professional all relevant correlating events according to service request, completion status according to all correlating events, the execution of priority control correlating event, it is low to have solved control mode efficient of the prior art, control inflexible problem, when having reduced the computer system processor correlating event with the number of times that is connected of database, improved treatment effeciency to correlating event, discharged system resource, and improved the dirigibility that correlating event priority is adjusted, reduce the complexity of system handles, improved the accuracy of data processing.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, to do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the process flow diagram that a kind of computer association incident of the embodiment of the invention is carried out control method;
Fig. 2 is the process flow diagram of the first kind of embodiment of the step S400 among Fig. 1;
Fig. 3 is the process flow diagram of the second kind of embodiment of the step S400 among Fig. 1;
Fig. 4 is the particular flow sheet of the step S403 among Fig. 2, Fig. 3;
Fig. 5 is the particular flow sheet of the step S404 among Fig. 2, Fig. 3;
Fig. 6 is the structured flowchart of a kind of computer association incident executive control system of the embodiment of the invention;
Fig. 7 is the structured flowchart of the trafficability characteristic pick-up unit among Fig. 6;
Fig. 8 is the structured flowchart of the first trafficability characteristic detecting unit among Fig. 7;
Fig. 9 is the structured flowchart of the second trafficability characteristic detecting unit among Fig. 7;
Structured flowchart when Figure 10 handles bank's refund incident for a kind of computer association incident executive control system of the utilization embodiment of the invention;
Figure 11 is the matrix table of the pre-postpone of process when handling bank's refund incident;
Figure 12 is the matrix table that obtains after the priority correction according to all correlating events when handling bank's refund incident in the embodiment of the invention;
Figure 13 is the matrix table that obtains after the completion status correction according to all correlating events when handling bank's refund incident in the embodiment of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
Fig. 1 is the process flow diagram that a kind of computer association incident that the embodiment of the invention provides is carried out control method, and as shown in Figure 1, this method comprises:
S100: set up mapping relations professional and incident.Such as: when in financial industry, handling correlating event with computer technology, set up reimbursement business and incident mapping relations, set up the mapping relations of loan transaction and incident etc.; During correlating event on the active computer technology control production line, be established as the mapping relations etc. that certain specific products is bound professional and incident, different business is corresponding with a series of different incidents.
S200: receive the service request that the user sends.Such as: when in financial industry, handling correlating event with computer technology, user's reimbursement business request, loan transaction request etc.; During correlating event on the active computer technology control production line, the service request of binding for certain specific products etc.
S300: from the mapping relations of described business and incident, obtain all corresponding correlating events of described business according to described service request.
S400: from described all correlating events, extract each incident successively and carry out incident as the desire of correspondence, and the desire of described correspondence is carried out incident carry out trafficability characteristic with each correlating event in described all correlating events and detect, generation comprises the detection result sets of trafficability characteristic testing result.
S500: obtain each desire and carry out incident corresponding detection result collection;
S600: when each trafficability characteristic testing result that described testing result is concentrated is successfully, then carries out corresponding desire and carry out incident.
A kind of computer association incident provided by the invention is carried out control method, except above-mentioned steps, also comprises: the mapping relations of setting up sign, completion status and the priority of described incident.The priority of each incident is used to characterize the priority size of different incidents.The completion status of each incident is used to the performance of the incident that characterizes.In concrete embodiment, can represent that this incident finishes with 0, represent that with 1 this incident do not finish.Preferably, can come the completion status of presentation of events with Percent Complete, when the incident Percent Complete was 100%, the presentation of events executed finished, when the incident Percent Complete less than 100% the time, presentation of events is not finished.
Fig. 2 is the particular flow sheet of the embodiment one of the step S400 among Fig. 1, and as shown in Figure 2, this step specifically comprises:
S401: sign, completion status and the priority of from the mapping relations of sign, completion status and the priority of described incident, obtaining described all correlating event correspondences according to described professional all corresponding correlating events;
S402: from described all correlating events, extract each incident successively and carry out incident as the desire of correspondence;
S403: each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events carries out the trafficability characteristic detection;
S404: each correlating event of desire being carried out in incident and described all correlating events according to the priority of described all correlating events carries out the trafficability characteristic detection;
S405: the desire that generates described correspondence is carried out the detection result sets that comprises the trafficability characteristic testing result of incident.
Fig. 3 is the particular flow sheet of the second kind of embodiment of the step S400 among Fig. 1, and as shown in Figure 3, this step specifically comprises:
S401: sign, completion status and the priority of from the mapping relations of sign, completion status and the priority of described incident, obtaining described all correlating event correspondences according to described professional all corresponding correlating events;
S402: from described all correlating events, extract each incident successively and carry out incident as the desire of correspondence;
S404: each correlating event of desire being carried out in incident and described all correlating events according to the priority of described all correlating events carries out the trafficability characteristic detection;
S403: each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events carries out the trafficability characteristic detection;
S405: the desire that generates described correspondence is carried out the detection result sets that comprises the trafficability characteristic testing result of incident.
Promptly in embodiments of the present invention, from described all correlating events, extract each incident successively and carry out incident as the desire of correspondence, and each correlating event that the desire of described correspondence is carried out in incident and described all correlating events carries out the trafficability characteristic detection, when generation comprises the detection result sets of trafficability characteristic testing result, at first each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events carries out the trafficability characteristic detection, each correlating event of desire being carried out in incident and described all correlating events according to the priority of described all correlating events carries out the trafficability characteristic detection then, also can carry out each correlating event of desire being carried out in incident and described all correlating events according to the priority of described all correlating events earlier and carry out the trafficability characteristic detection, carry out each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events then and carry out the trafficability characteristic detection.
Fig. 4 is the particular flow sheet of the step S403 in the embodiment of the invention, and as shown in Figure 4, this step is specially:
S4031: from all correlating events of described service request correspondence, extract an incident and carry out incident as the desire of correspondence;
S4032: from all correlating events of described service request correspondence, extract a correlating event;
S4033: whether the completion status of a correlating event of judging described extraction for finishing, when being judged as when being, and execution in step S4034, otherwise, execution in step S4035;
S4034: generating the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
S4035: generate described desire and carry out trafficability characteristic testing result the testing result for fail corresponding incident with sign this correlating event;
S4036: whether a correlating event judging described extraction is last in all correlating events, when being judged as not, returns execution in step S4032, otherwise, execution in step S4037;
S4037: judge that desire carries out last in all correlating events whether incident is described service request correspondence, when being judged as not, execution in step S4031, otherwise this step finishes.
Fig. 5 is the particular flow sheet of the step S404 in the embodiment of the invention, and as shown in Figure 5, this step is specially:
S4041: from all correlating events of described service request correspondence, extract an incident and carry out incident as the desire of correspondence;
S4042: from all correlating events of described service request correspondence, extract a correlating event;
S4043: judge priority that described desire carries out incident whether less than the priority of a correlating event of described extraction, when being judged as when being, execution in step S4045, otherwise, execution in step S4044;
S4044: generating the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
S4045: generate described desire and carry out trafficability characteristic testing result the testing result for fail corresponding incident with sign this correlating event;
S4046: whether a correlating event judging described extraction is last in all correlating events, when being judged as not, returns execution in step S4042, otherwise, execution in step S4047;
S4047: judge that desire carries out last in all correlating events whether incident is described service request correspondence, when being judged as not, execution in step S4041, otherwise this step finishes.
In other embodiments of the present invention, step S400 can realize by following matrix-style, also can realize by other modes such as similar forms certainly, only is that example illustrates with the matrix herein.
S41: the matrix table that generates number * number according to the number of all correlating events of described service request correspondence.For example the correlating event of certain service request correspondence is masked as incident 1, incident 2, incident 3, incident 4, and promptly the number of the correlating event of this service requesting information correspondence is 4, then generates following matrix table:
Figure BDA0000057537730000081
In this matrix table, the incident that the representations of events of vertical Y need be handled, the incident that the representations of events of horizontal X is associated with incident Y, X is a checkmark with the position that Y intersects, be used to promptly represent that horizontal X incident is to whether the Y incident is influential longitudinally, as influential, show that then must execute incident X earlier could carry out incident Y.
S42: the checkmark of described matrix table is predisposed to do not pass through.If preestablish 0 for passing through, 1 for not passing through, and then the checkmark in the matrix table is predisposed to 1, generates following matrix table:
Figure BDA0000057537730000082
S43: according to the checkmark of the completion status correction matrix table of described each correlating event, promptly when the completion status of correlating event for imperfect tense, this correlating event checkmark of column in matrix table is modified to do not passed through; When the completion status of incident when finishing, with this incident checkmark of column in matrix table be modified to by.
S44: according to the checkmark of the priority correction matrix table of described each correlating event, when promptly the priority of the incident of being expert at when checkmark is more than or equal to the priority of the incident of this checkmark column, with this checkmark be modified to by, the priority of the incident of being expert at when checkmark is during less than the priority of the incident of this checkmark column, this checkmark is modified to do not pass through.
Fig. 6 is the structured flowchart that a kind of computer association incident that the embodiment of the invention provides is carried out the system of control, and as shown in Figure 6, this system comprises:
The first mapping apparatus for establishing 100 is used to set up mapping relations professional and incident, such as: when in financial industry, handling correlating event with computer technology, set up reimbursement business and incident mapping relations, set up the mapping relations of loan transaction and incident etc.; During correlating event on the active computer technology control production line, be established as the mapping relations etc. that certain specific products is bound professional and incident, different business is corresponding with a series of different incidents.
Service request receiving trap 200 is used to receive the service request that the user sends.Such as: when in financial industry, handling correlating event with computer technology, user's reimbursement business request, loan transaction request etc.; During correlating event on the active computer technology control production line, the service request of binding for certain specific products etc.
Correlating event deriving means 300 is used for obtaining all corresponding correlating events of described business according to described service request from the described business and the mapping relations of incident.
Trafficability characteristic pick-up unit 400, be used for extracting each incident successively and carry out incident as the desire of correspondence from described all correlating events, and the desire of described correspondence is carried out incident carry out trafficability characteristic with each correlating event in described all correlating events and detect, generation comprises the detection result sets of trafficability characteristic testing result.
Testing result deriving means 500 is used to obtain each desire and carries out incident corresponding detection result collection.
The execution incident is determined device 600, is used for determining that each concentrated trafficability characteristic testing result of described testing result is the desire execution incident of success, carries out corresponding desire and carries out incident.
A kind of computer association incident executive control system provided by the invention except said apparatus, also comprises: second shines upon apparatus for establishing, is used to set up the mapping relations of sign, completion status and the priority of described incident.The priority of each incident is used to characterize the priority size of different incidents.The completion status of each incident is used to the performance of the incident that characterizes.In concrete embodiment, can represent that this incident finishes with 0, represent that with 1 this incident do not finish.Preferably, can come the completion status of presentation of events with Percent Complete, when the incident Percent Complete was 100%, the presentation of events executed finished, when the incident Percent Complete less than 100% the time, presentation of events is not finished.
Fig. 7 is the structured flowchart of trafficability characteristic pick-up unit 400 in a kind of computer association incident executive control system of providing of the embodiment of the invention, and as shown in Figure 7, trafficability characteristic pick-up unit 400 specifically comprises:
Deriving means 401 is used for obtaining from the mapping relations of sign, completion status and the priority of described incident according to described all professional corresponding correlating events sign, completion status and the priority of described all correlating event correspondences;
Desire is carried out incident extraction element 402, is used for extracting each incident successively from described all correlating events and carries out incident as the desire of correspondence;
The first trafficability characteristic detecting unit 403 is used for carrying out the trafficability characteristic detection according to each correlating event that the completion status of described all correlating events is carried out incident and described all correlating events with desire;
The second trafficability characteristic detecting unit 404 is used for carrying out the trafficability characteristic detection according to each correlating event that the priority of described all correlating events is carried out incident and described all correlating events with desire;
Testing result generating apparatus 405, the desire that is used to generate described correspondence is carried out the detection result sets that comprises the trafficability characteristic testing result of incident.
In embodiments of the present invention, from described all correlating events, extract each incident successively and carry out incident as the desire of correspondence, and each correlating event that the desire of described correspondence is carried out in incident and described all correlating events carries out the trafficability characteristic detection, when generation comprises the detection result sets of trafficability characteristic testing result, at first each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events carries out the trafficability characteristic detection, each correlating event of desire being carried out in incident and described all correlating events according to the priority of described all correlating events carries out the trafficability characteristic detection then, also can carry out each correlating event of desire being carried out in incident and described all correlating events according to the priority of described all correlating events earlier and carry out the trafficability characteristic detection, carry out each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events then and carry out the trafficability characteristic detection.
Fig. 8 is the structured flowchart of the first trafficability characteristic detecting unit 403 among Fig. 7, and as shown in Figure 8, the first trafficability characteristic detecting unit 403 specifically comprises:
State is determined device 4031, and whether the completion status of a correlating event that is used for determining described all correlating events for finishing, when when being, changes the first testing result unit over to, otherwise, change the second testing result unit over to;
The described first testing result unit 4032, being used to generate the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
The described second testing result unit 4033 is used to generate described desire and carries out trafficability characteristic testing result the testing result for fail corresponding with sign this correlating event incident.
Fig. 4 is the workflow diagram of the first trafficability characteristic detecting unit 403, and as shown in Figure 4, this flow process is specially:
S4031: from all correlating events of described service request correspondence, extract an incident and carry out incident as the desire of correspondence;
S4032: from all correlating events of described service request correspondence, extract a correlating event;
S4033: whether the completion status of a correlating event of judging described extraction for finishing, when being judged as when being, and execution in step S4034, otherwise, execution in step S4035;
S4034: generating the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
S4035: generate described desire and carry out trafficability characteristic testing result the testing result for fail corresponding incident with sign this correlating event;
S4036: whether a correlating event judging described extraction is last in all correlating events, when being judged as not, returns execution in step S4032, otherwise, execution in step S4037;
S4037: judge that desire carries out last in all correlating events whether incident is described service request correspondence, when being judged as not, execution in step S4031, otherwise this step finishes.
Fig. 9 is the structured flowchart of the second trafficability characteristic detecting unit 404 among Fig. 7, and as shown in Figure 9, the second trafficability characteristic detecting unit 404 specifically comprises:
Priority determining unit 4041 is used for determining priority that described desire carries out incident whether less than a correlating event corresponding priorities of all correlating events, when when being, changes the 3rd testing result unit over to, otherwise, change the 4th testing result unit over to;
Described the 3rd testing result unit 4042 is used to generate described desire and carries out trafficability characteristic testing result the testing result for fail corresponding with sign this correlating event incident;
The 4th testing result unit 4043, being used to generate the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result.
Fig. 5 is the workflow diagram of the second trafficability characteristic detecting unit 404 in the embodiment of the invention, and as shown in Figure 5, this flow process is specially:
S4041: from all correlating events of described service request correspondence, extract an incident and carry out incident as the desire of correspondence;
S4042: from all correlating events of described service request correspondence, extract a correlating event;
S4043: judge priority that described desire carries out incident whether less than the priority of a correlating event of described extraction, when being judged as when being, execution in step S4045, otherwise, execution in step S4044;
S4044: generating the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
S4045: generate described desire and carry out trafficability characteristic testing result the testing result for fail corresponding incident with sign this correlating event;
S4046: whether a correlating event judging described extraction is last in all correlating events, when being judged as not, returns execution in step S4042, otherwise, execution in step S4047;
S4047: judge that desire carries out last in all correlating events whether incident is described service request correspondence, when being judged as not, execution in step S4041, otherwise this step finishes.
In other embodiments of the present invention, trafficability characteristic pick-up unit 400 can be realized by following matrix-style, also can realize by other modes such as similar forms certainly, only is that example illustrates with the matrix herein.
S41: the matrix table that generates number * number according to the number of all correlating events of described service request correspondence.For example the correlating event of certain service request correspondence is masked as incident 1, incident 2, incident 3, incident 4, and promptly the number of the correlating event of this service requesting information correspondence is 4, then generates following matrix table:
Figure BDA0000057537730000131
In this matrix table, the incident that the representations of events of vertical Y need be handled, the incident that the representations of events of horizontal X is associated with incident Y, X is a checkmark with the position that Y intersects, be used to promptly represent that horizontal X incident is to whether the Y incident is influential longitudinally, as influential, show that then must execute incident X earlier could carry out incident Y.
S42: the checkmark of described matrix table is predisposed to do not pass through.If preestablish 0 for passing through, 1 for not passing through, and then the checkmark in the matrix table is predisposed to 1, generates following matrix table:
Figure BDA0000057537730000132
S43: according to the checkmark of the completion status correction matrix table of described each correlating event, promptly when the completion status of correlating event for imperfect tense, this correlating event checkmark of column in matrix table is modified to do not passed through; When the completion status of incident when finishing, with this incident checkmark of column in matrix table be modified to by.
S44: according to the checkmark of the priority correction matrix table of described each correlating event, when promptly the priority of the incident of being expert at when checkmark is more than or equal to the priority of the incident of this checkmark column, with this checkmark be modified to by, the priority of the incident of being expert at when checkmark is during less than the priority of the incident of this checkmark column, this checkmark is modified to do not pass through.
A kind of Computer Processing correlating event executive control system that below embodiment of the invention is provided is used in the financial field, such as being used in banking system when handling reimbursement business to the public affairs loan, all correlating events relevant with reimbursement business according to user's reimbursement business acquisition request, completion status according to all correlating events, the execution of priority control correlating event, both can control and to have carried out another refund type after certain refund type must be finished, also can control some refund type can carry out simultaneously, reduced the number of times that is connected with database, improve the treatment effeciency of refund incident, also improved the dirigibility that various refund incident execution sequences are adjusted.
Figure 10 is the system chart that bank's refund correlating event is carried out control, and as shown in Figure 10, this system comprises: system host 20, the banking system 30 of accepting terminal 10, control correlating event.Accepting terminal 10 is used to receive the service request that the user sends, and is user's the refund request to the public affairs loan in the present embodiment.
Bank main 30 is used to set up mapping relations professional and incident, and sets up the mapping relations of sign, completion status and the priority of described incident.In the present embodiment, incident to the refund request correspondence of public affairs loans comprises 8, is respectively: give back normal capital, give back normal capital interest, give back debit interest in the table, give back debit interest interest in the table, give back the off-balancesheet debit interest, give back off-balancesheet debit interest interest, give back the capital that exceeds the time limit, give back the capital interest of exceeding the time limit.Processing sequence to 8 incidents of the refund request correspondence of public affairs loans: give back the capital that exceeds the time limit, give back debit interest in the table, give back the capital interest of exceeding the time limit, give back debit interest interest in the table, give back the off-balancesheet debit interest, give back off-balancesheet debit interest interest, give back normal capital, give back normal capital interest, wherein give back debit interest and give back the capital interest of exceeding the time limit and to carry out simultaneously in the table, both priority equate, give back in the table debit interest interest and give back the off-balancesheet debit interest and can carry out simultaneously, both priority equate.Therefore, it is 1 that the priority of 8 incidents is respectively the priority of giving back the capital that exceeds the time limit, giving back the priority of showing interior debit interest and giving back the capital interest of exceeding the time limit is 2, giving back the interior debit interest interest of table is 3 with the priority of giving back the off-balancesheet debit interest, the priority of giving back off-balancesheet debit interest interest is 4, the priority of giving back normal capital is 5, and the priority of giving back normal capital interest is 6.In the present embodiment, the completion status of 8 incidents of the refund request correspondence of public affairs loans is generated by what of amount owed, amount owed is 0, shows that then this event handling finishes, and represents that with 0 the completion status of this incident is for finishing; If amount owed is not 0, show then that this incident still is untreated to finish, represent that with 1 this incident do not finish.In the present embodiment, the amount owed of 8 incidents is respectively: give back 50 yuan of normal capitals, give back 30 yuan of normal capital interests, give back 20 yuan of the interior debit interests of table, give back 10 yuan of the interior debit interest interests of table, give back 0 yuan of off-balancesheet debit interest, give back 100 yuan of off-balancesheet debit interest interests, give back 0 yuan of the capital of exceeding the time limit, give back 40 yuan of the capital interests of exceeding the time limit, then Dui Ying completion status is respectively and gives back normal capital and do not finish, giving back normal capital interest does not finish, giving back the interior debit interest of table does not finish, giving back the interior debit interest interest of table does not finish, giving back the off-balancesheet debit interest finishes, giving back off-balancesheet debit interest interest does not finish, giving back the capital that exceeds the time limit finishes, giving back the capital interest of exceeding the time limit does not finish.
The system host 20 of control correlating event specifically comprises:
Correlating event deriving means 201 is used for obtaining all correlating events corresponding with described business, sign, completion status and the priority of incident according to described service request from banking system.In the present embodiment, the completion status of 8 incidents, priority are stored as follows:
Trafficability characteristic pick-up unit 202, be used for extracting each incident successively and carry out incident as the desire of correspondence from described all correlating events, and the desire of described correspondence is carried out incident carry out trafficability characteristic with each correlating event in described all correlating events and detect, generation comprises the detection result sets of trafficability characteristic testing result.In the present embodiment, also be that example describes with the matrix.At first, the checkmark of described matrix table is predisposed to does not pass through.In the present embodiment, to 8 incidents should be arranged, the matrix table of pre-postpone as shown in figure 10 to the refund request of public affairs loans.
Secondly, according to the checkmark of the priority correction matrix table of described each incident.Be specially in the present embodiment:
(1), for the 1st the row, the priority of giving back normal capital then is that the checkmark of (1,1), (1,2) is changed to 0 with coordinate greater than giving back normal capital interest;
(2), for the 2nd the row, the priority of giving back normal capital interest is minimum, then is that the checkmark of (2,2) is changed to 0 with coordinate;
(3), for the 3rd row, the priority of giving back debit interest in the table is greater than giving back debit interest interest in the table, give back the off-balancesheet debit interest, give back off-balancesheet debit interest interest, give back normal capital, giving back normal capital interest, the capital interest of exceeding the time limit is equal with giving back, and is (3,1), (3 with coordinate then, 2), (3,3), (3,4), (3,5), (3,6), the checkmark of (3,8) is changed to 0;
(4), for the 4th row, the priority of giving back debit interest interest in the table equates greater than giving back off-balancesheet debit interest interest, give back normal capital, give back normal capital interest and giving back the off-balancesheet debit interest, then be (4,1), (4,2), (4 with coordinate, 4), the checkmark of (4,5), (4,6) is changed to 0;
(5), for the 5th row, the priority of giving back the off-balancesheet debit interest is greater than giving back off-balancesheet debit interest interest, give back normal capital, give back normal capital interest and giving back that the debit interest interest equates in the table, then be (5,1), (5,2), (5 with coordinate, 4), the checkmark of (5,5), (5,6) is changed to 0;
(6), for the 6th the row, the priority of giving back off-balancesheet debit interest interest then is that the checkmark of (6,1), (6,2), (6,6) is changed to 0 with coordinate greater than giving back normal capital, giving back normal capital interest;
(7), for the 7th the row, the priority maximum of giving back the capital that exceeds the time limit then is that the checkmark of (7,1), (7,2), (7,3), (7,4), (7,5), (7,6), (7,7), (7,8) is changed to 0 with coordinate;
(8), for eighth row, the priority of giving back the capital interest of exceeding the time limit is greater than giving back debit interest interest in the table, give back the off-balancesheet debit interest, give back off-balancesheet debit interest interest, give back normal capital, giving back normal capital interest, with give back that debit interest equates in the table, be (8,1), (8 then with coordinate, 2), (8,3), (8,4), (8,5), (8,6), the checkmark of (8,8) is changed to 0.
The matrix table that obtains behind the checkmark according to the priority correction matrix table of described each incident as shown in figure 11.
Then, the checkmark according to the completion status correction matrix table of described each incident is specially in the present embodiment:
In the present embodiment, the debt of only give back the off-balancesheet debit interest in 8 incidents, giving back the capital that exceeds the time limit is complete restitution, amount owed is 0, then the completion status of this two incident is for finishing, then will give back the off-balancesheet debit interest, give back the capital place of exceeding the time limit the 5th, 7 row checkmarks be changed to 0, the matrix table that obtains at last is as shown in figure 12.
Testing result deriving means 203 is used to obtain each desire and carries out incident corresponding detection result collection.By shown in Figure 12, in the present embodiment, each incident checkmark of being expert at is respectively: give back normal capital [00110101], give back normal capital interest [10110101], give back debit interest [00000000] in the table, give back debit interest interest [00100001] in the table, give back off-balancesheet debit interest [00100001], give back off-balancesheet debit interest interest [00110001], give back the capital that exceeds the time limit [00000000], give back the capital interest [00000000] of exceeding the time limit.
The execution incident is determined device 204, is used for determining that each concentrated trafficability characteristic testing result of described testing result is the desire execution incident of success.In the present embodiment, therefore debit interest interest, off-balancesheet debit interest interest, the capital interest of exceeding the time limit in debit interest in the existence table, the table are given back normal capital failure and are looked into; Existence is given back normal capital, gives back debit interest in the table, gives back debit interest interest in the table, gives back off-balancesheet debit interest interest, is given back the capital interest of exceeding the time limit, so gives back normal capital interest failure; Give back debit interest success in the table; Existence is given back debit interest in the table, is given back the capital interest of exceeding the time limit, and therefore gives back table interior debit interest interest failure; Existence is given back debit interest in the table, is given back the capital interest of exceeding the time limit, and therefore gives back off-balancesheet debit interest failure; Existence is given back debit interest in the table, gives back the capital interest of exceeding the time limit, is given back debit interest interest in the table, so gives back the failure of off-balancesheet debit interest interest; Give back the capital success that exceeds the time limit, give back the capital interest success that exceeds the time limit.Therefore, the executable desire execution incident of determining is: give back debit interest in the table, give back the capital that exceeds the time limit, give back the capital interest of exceeding the time limit.In the present embodiment, the object information by the incident checked is not transferred to accepting terminal, to transfer to banking system by the object information of the incident checked, as: to accepting terminal 10 transmit " debit interest interest, off-balancesheet debit interest interest, the capital interest of exceeding the time limit in the debit interest existence table in, the table; give back normal capital and pass through inspection, can not carry out and give back operation; Send to banking system 30 and to give back the object information of capital that exceed the time limit, by the banking system accounting processing of refunding by checking.
Described banking system 30 also is used to carry out the desire execution incident that each concentrated trafficability characteristic testing result of testing result is success.In the present embodiment, banking system can be carried out and give back debit interest in the table, gives back the capital that exceeds the time limit, be given back the capital interest of exceeding the time limit.
A kind of computer association incident of the embodiment of the invention is carried out control method and system, obtain and professional all relevant correlating events according to service request, completion status according to all correlating events, the execution of priority control correlating event, it is low to have solved control mode efficient of the prior art, control inflexible problem, when having reduced the computer system processor correlating event with the number of times that is connected of database, improved treatment effeciency to correlating event, discharged system resource, and improved the dirigibility that correlating event priority is adjusted, reduce the complexity of system handles, improved the accuracy of data processing.
Used specific embodiment among the present invention principle of the present invention and embodiment are set forth, the explanation of above embodiment just is used for helping to understand method of the present invention and core concept thereof; Simultaneously, for one of ordinary skill in the art, according to thought of the present invention, the part that all can change in specific embodiments and applications, in sum, this description should not be construed as limitation of the present invention.

Claims (11)

1. a computer association incident is carried out control method, it is characterized in that described method comprises:
Set up mapping relations professional and incident;
Receive the service request that the user sends;
From the mapping relations of described business and incident, obtain all corresponding correlating events of described business according to described service request;
From described all correlating events, extract each incident successively and carry out incident as the desire of correspondence, and the desire of described correspondence is carried out incident carry out trafficability characteristic with each correlating event in described all correlating events and detect, generation comprises the detection result sets of trafficability characteristic testing result;
Obtain each desire and carry out incident corresponding detection result collection;
When each trafficability characteristic testing result that described testing result is concentrated is successfully, then carries out corresponding desire and carry out incident.
2. method according to claim 1 is characterized in that, described method also comprises the mapping relations of sign, completion status and the priority of setting up described incident.
3. method according to claim 2, it is characterized in that, from described all correlating events, extract each incident successively and carry out incident as the desire of correspondence, each correlating event that the desire of described correspondence is carried out in incident and described all correlating events carries out the trafficability characteristic detection, generates the detection result sets that comprises corresponding trafficability characteristic testing result and comprises:
From the mapping relations of sign, completion status and the priority of described incident, obtain sign, completion status and the priority of described all correlating event correspondences according to described professional all corresponding correlating events;
From described all correlating events, extract each incident successively and carry out incident as the desire of correspondence;
Each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events carries out the trafficability characteristic detection;
Each correlating event of desire being carried out in incident and described all correlating events according to the priority of described all correlating events carries out the trafficability characteristic detection;
The desire that generates described correspondence is carried out the detection result sets that comprises the trafficability characteristic testing result of incident.
4. method according to claim 2, it is characterized in that, from described all correlating events, extract each incident successively and carry out incident as the desire of correspondence, each correlating event that the desire of described correspondence is carried out in incident and described all correlating events carries out the trafficability characteristic detection, generates the detection result sets that comprises corresponding trafficability characteristic testing result and comprises:
From the mapping relations of sign, completion status and the priority of described incident, obtain sign, completion status and the priority of described all correlating event correspondences according to described professional all corresponding correlating events;
From described all correlating events, extract each incident successively and carry out incident as the desire of correspondence;
Each correlating event of desire being carried out in incident and described all correlating events according to the priority of described all correlating events carries out the trafficability characteristic detection;
Each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events carries out the trafficability characteristic detection;
The desire that generates described correspondence is carried out the detection result sets that comprises the trafficability characteristic testing result of incident.
5. according to claim 3 or 4 described methods, it is characterized in that the priority of carrying out incident according to the desire of described correspondence is carried out each correlating event in incident and described all correlating events with desire and carried out trafficability characteristic and detect and comprise:
The priority of carrying out incident when described desire is during less than correlating event corresponding priorities in all correlating events, generates described desire and carries out the testing result of the trafficability characteristic testing result corresponding with sign this correlating event incident for failure;
Otherwise generating the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result.
6. method according to claim 5 is characterized in that, the completion status of carrying out incident according to the desire of described correspondence is carried out each correlating event in incident and described all correlating events with desire and carried out the trafficability characteristic detection and comprise:
When the completion status of a correlating event in described all correlating events when finishing, generating described desire, to carry out the trafficability characteristic testing result corresponding with sign this correlating event incident be successful testing result;
Otherwise, generate described desire and carry out trafficability characteristic testing result the testing result for fail corresponding incident with sign this correlating event.
7. computer association incident executive control system is characterized in that described system comprises:
The first mapping apparatus for establishing is used to set up mapping relations professional and incident;
The service request receiving trap is used to receive the service request that the user sends;
The correlating event deriving means is used for obtaining all corresponding correlating events of described business according to described service request from the described business and the mapping relations of incident;
The trafficability characteristic pick-up unit, be used for extracting each incident successively and carry out incident as the desire of correspondence from described all correlating events, and the desire of described correspondence is carried out incident carry out trafficability characteristic with each correlating event in described all correlating events and detect, generation comprises the detection result sets of trafficability characteristic testing result;
The testing result deriving means is used to obtain each desire and carries out incident corresponding detection result collection;
The execution incident is determined device, is used for determining that each concentrated trafficability characteristic testing result of described testing result is the desire execution incident of success, carries out corresponding desire and carries out incident.
8. system according to claim 7 is characterized in that, described system also comprises the second mapping apparatus for establishing, is used to set up the mapping relations of sign, completion status and the priority of described incident.
9. system according to claim 8 is characterized in that, described trafficability characteristic pick-up unit comprises:
Deriving means is used for obtaining from the mapping relations of sign, completion status and the priority of described incident according to described all professional corresponding correlating events sign, completion status and the priority of described all correlating event correspondences;
Desire is carried out the incident extraction element, is used for extracting each incident successively from described all correlating events and carries out incident as the desire of correspondence;
The first trafficability characteristic detecting unit is used for carrying out the trafficability characteristic detection according to each correlating event that the completion status of described all correlating events is carried out incident and described all correlating events with desire;
The second trafficability characteristic detecting unit is used for carrying out the trafficability characteristic detection according to each correlating event that the priority of described all correlating events is carried out incident and described all correlating events with desire;
The testing result generating apparatus, the desire that is used to generate described correspondence is carried out the detection result sets that comprises the trafficability characteristic testing result of incident.
10. system according to claim 9 is characterized in that, the described first trafficability characteristic detecting unit comprises:
State is determined device, and whether the completion status of a correlating event that is used for determining described all correlating events for finishing, when when being, changes the first testing result unit over to, otherwise, change the second testing result unit over to;
The described first testing result unit, being used to generate the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
The described second testing result unit is used to generate described desire and carries out trafficability characteristic testing result the testing result for fail corresponding with sign this correlating event incident.
11. system according to claim 9 is characterized in that, the described second trafficability characteristic detecting unit comprises:
Priority determining unit is used for determining priority that described desire carries out incident whether less than a correlating event corresponding priorities of all correlating events, when when being, changes the 3rd testing result unit over to, otherwise, change the 4th testing result unit over to;
Described the 3rd testing result unit is used to generate described desire and carries out trafficability characteristic testing result the testing result for fail corresponding with sign this correlating event incident;
The 4th testing result unit, being used to generate the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result.
CN 201110105308 2011-04-26 2011-04-26 Computer related event executing control method and system Active CN102183923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110105308 CN102183923B (en) 2011-04-26 2011-04-26 Computer related event executing control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110105308 CN102183923B (en) 2011-04-26 2011-04-26 Computer related event executing control method and system

Publications (2)

Publication Number Publication Date
CN102183923A true CN102183923A (en) 2011-09-14
CN102183923B CN102183923B (en) 2013-06-05

Family

ID=44570112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110105308 Active CN102183923B (en) 2011-04-26 2011-04-26 Computer related event executing control method and system

Country Status (1)

Country Link
CN (1) CN102183923B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105530274A (en) * 2014-09-29 2016-04-27 阿里巴巴集团控股有限公司 Electronic data transfer method and electronic data transfer equipment
CN105938528A (en) * 2016-04-03 2016-09-14 长春工业大学 Control system for computer events
CN106656839A (en) * 2016-10-20 2017-05-10 财付通支付科技有限公司 Resource transfer method and apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11119823A (en) * 1997-10-21 1999-04-30 Yaskawa Electric Corp Fault diagnostic device
US20040024630A1 (en) * 2002-07-31 2004-02-05 Rajeshwari Ganesan Method and system for developing early design components of a software application
CN1503947A (en) * 1999-12-28 2004-06-09 ض� Dynamic priority external transaction system
US6819797B1 (en) * 1999-01-29 2004-11-16 International Business Machines Corporation Method and apparatus for classifying and querying temporal and spatial information in video

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11119823A (en) * 1997-10-21 1999-04-30 Yaskawa Electric Corp Fault diagnostic device
US6819797B1 (en) * 1999-01-29 2004-11-16 International Business Machines Corporation Method and apparatus for classifying and querying temporal and spatial information in video
CN1503947A (en) * 1999-12-28 2004-06-09 ض� Dynamic priority external transaction system
US20040024630A1 (en) * 2002-07-31 2004-02-05 Rajeshwari Ganesan Method and system for developing early design components of a software application

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105530274A (en) * 2014-09-29 2016-04-27 阿里巴巴集团控股有限公司 Electronic data transfer method and electronic data transfer equipment
CN105530274B (en) * 2014-09-29 2019-06-21 阿里巴巴集团控股有限公司 A kind of transfer method and equipment of electronic data
CN105938528A (en) * 2016-04-03 2016-09-14 长春工业大学 Control system for computer events
CN105938528B (en) * 2016-04-03 2019-03-12 长春工业大学 A kind of control system of computer events
CN106656839A (en) * 2016-10-20 2017-05-10 财付通支付科技有限公司 Resource transfer method and apparatus

Also Published As

Publication number Publication date
CN102183923B (en) 2013-06-05

Similar Documents

Publication Publication Date Title
WO2018166116A1 (en) Car damage recognition method, electronic apparatus and computer-readable storage medium
JP4077909B2 (en) Form processing device
CN106327317A (en) Data verification method and device used for computer system
CN107317725A (en) The method for visualizing and system of a kind of block chain
TW202026992A (en) Industry identification model determination method and device
CN103903137A (en) Automatic payment and account-checking method and system
CN104867225A (en) Banknote face orientation identification method and apparatus
CN102509241A (en) Management method and management device of POS (Point Of Sale) terminal system for insurance sales
CN102183923B (en) Computer related event executing control method and system
CN108038776A (en) A kind of data processing method and data processing terminal
CN112560754A (en) Bill information acquisition method, device, equipment and storage medium
CN106910065A (en) Data processing method, the apparatus and system of the settlement of exchange amount of money are calculated based on many transactions
CN100405004C (en) High precision and fast extraction device with optical strip image features and method thereof
CN106897988A (en) Unimolecule image correction system
CN112132812B (en) Certificate verification method and device, electronic equipment and medium
CN202230327U (en) Computer associated event executing control system
CN112686658A (en) Method, device, electronic equipment and storage medium for settling out payment fund
CN108960111B (en) Face recognition method, face recognition system and terminal equipment
CN114882273B (en) Visual identification method, device, equipment and storage medium applied to narrow space
CN102509222A (en) Electronic signature tool and safety control method thereof
CN107767257A (en) credit data paperless data processing method and system
CN113033469A (en) Tool damage identification method, device, equipment, system and readable storage medium
CN106934588A (en) A kind of financial system interest computational methods and system
CN105590224A (en) Method for determining failure node in transaction process
CN112001791A (en) Renewable energy power consumption trading system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant