CN102182180A - 旋转挤压套管锚杆及利其施工工法 - Google Patents

旋转挤压套管锚杆及利其施工工法 Download PDF

Info

Publication number
CN102182180A
CN102182180A CN 201110081945 CN201110081945A CN102182180A CN 102182180 A CN102182180 A CN 102182180A CN 201110081945 CN201110081945 CN 201110081945 CN 201110081945 A CN201110081945 A CN 201110081945A CN 102182180 A CN102182180 A CN 102182180A
Authority
CN
China
Prior art keywords
sleeve
grouting
anchor pole
inner sleeve
outer tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110081945
Other languages
English (en)
Other versions
CN102182180B (zh
Inventor
邢占东
王奋
岳霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Construction Group Co., Ltd.
Original Assignee
WEIHAI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIHAI CONSTRUCTION GROUP CO Ltd filed Critical WEIHAI CONSTRUCTION GROUP CO Ltd
Priority to CN2011100819457A priority Critical patent/CN102182180B/zh
Publication of CN102182180A publication Critical patent/CN102182180A/zh
Application granted granted Critical
Publication of CN102182180B publication Critical patent/CN102182180B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及工程锚杆施工技术领域,尤其涉及一种旋转挤压套管锚杆及利其施工工法。一种旋转挤压套管锚杆,包括外套管和同心设置于外套管内部的内套管和锚杆,内套管与外套管之间形成有间隙,该间隙内设置有一个注浆管,该注浆管上端为注浆口,注浆管末端为出浆口,内套管底部设有活门。一种施工的工法,包括以下步骤:将套管通过一个注浆转换器与电动旋挖钻机的动力头相连;开启动力头带动套管旋转挤压成孔;在内套管内安装锚杆体,同时通过注浆管的注浆口向孔内注入水泥浆,注浆过程中动力头反转逐渐将套管拔出;二次注浆,施工完成。本发明优点:旋转挤压套管锚杆能满足注水泥浆的功能;施工的工法能保证了安装位置准确,还能确保居中安置。

Description

旋转挤压套管锚杆及利其施工工法
技术领域
本发明涉及工程锚杆施工技术领域,尤其涉及一种旋转挤压套管锚杆及利其施工工法。
背景技术
抗浮(拔)锚杆就是将钢筋、钢绞线等材料通过水泥浆锚固在土体中,给建筑物、构筑物提供抗拔反力的一种构件。随着经济的高速发展,建筑物逐渐向高层大面积方向发展,几乎所有的高层、大型建筑物都有地下室、地下车库等,这也使锚杆在工程建筑物、构筑物的抗浮及基坑支护体系中大量应用。
现有的抗浮锚杆施工一直沿用传统工艺,采用泥浆护壁成孔的施工工艺。
在传统施工工艺中,锚杆施工中所使用的机械设备主要是回转钻机及液压钻机等,成孔效率非常低,通常需要二、三个小时,才能完成一根锚杆,同时采用泥浆循环、护壁,对现场非常污染,后期泥浆处理也会造成环境污染,同时护壁泥浆的存在也会造成施工质量不易保证;在传统的工艺中,存在的泥皮也会造成锚固体与土体的摩擦力降低,不能充分发挥材料的性能。
中国国家知识产权局公开了申请号为201010239764,名称为一种抗浮锚杆的施工方法及专用长螺旋钻机的一项发明专利申请,抗浮锚杆的施工方法工艺步骤为:1、专用长螺旋钻机就位;2、利用长螺旋钻机进行钻孔;3、采用压力泵通过注浆管进行压力注浆,边灌注水泥浆边提升钻杆;4、注浆后的钻孔内插入锚杆;5、水泥浆沉降后,人工补充注浆。这种施工方法存在以下问题:
1.施工方法是通过取土方式成孔的,虽然减少了泥浆用量,但是仍然存在渣土污染,同时取土造成土体的侧摩阻力降低;
2.施工时锚杆后插入的,也存在安插过程会跑偏,保护层不足,甚至个别的因沙砾、石块的影响会造成钢筋安插不到位,虽然有振动器仍不能保证100%安插到位,如果设计采用钢绞线,因为材料本身刚性不足,无法实施反插。
发明内容
本发明的目的之一是提供一种施工工序少、且简单的旋转挤压套管锚杆。
为了实现上述目的,本发明采用以下技术方案:
一种旋转挤压套管锚杆,其包括套管和锚杆体,套管包括外套管和同心设置于外套管内部的内套管,所述内套管外壁直径小于外套管内壁直径,使内套管与外套管之间形成有间隙,该间隙内设置有一个注浆管,该注浆管上端为用于连接注浆系统的注浆口,注浆管末端为出浆口,所述内套管底部设有活门。
进一步地,所述外套管下方的外表面设有螺旋叶片。
进一步地,所述内套管通过支架与外套管内壁相连。
进一步地,所述外套管上端设有法兰盘。
本发明的另一目的是提供一种利用上述旋转挤压套管锚杆进行施工工法,能够提高工作效率,没有泥浆污染,施工质量好,且环保节能。
为了实现上述目的,本发明采用以下技术方案:
一种利用所述旋转挤压套管锚杆进行施工的工法,包括以下步骤:
1)将旋转挤压套管锚杆的套管通过一个注浆转换器与三支点结构电动旋挖钻机的动力头相连;
2)开启动力头带动旋转挤压套管锚杆的套管旋转挤压成孔,并到设计深度;
3)在内套管内安装锚杆体,同时通过注浆管的注浆口向孔内注入水泥浆,注浆过程中动力头反转逐渐将套管拔出;
4) 根据水泥浆液面下降的程度在孔内二次注浆,施工完成。
本发明实施例中,所述三支点结构电动旋挖钻机的动力头的减速机中轴为中空结构。
本发明实施例中,所述三支点结构电动旋挖钻机上设有加压卷扬机,该加压卷扬机经滑轮通过钢丝绳与动力头相连,可以保证旋转挤压套管锚杆快速到位。
本发明旋转挤压套管锚杆,与原有技术相比,具有如下优点:
包括内、外套管,外套管承受钻进的荷载,内套管是安装锚杆体的通道,在内、外套管之间设一个注浆管,满足注水泥浆的功能。
本发明施工工法,与原有技术相比,具有如下优点:
1、本工法采用套管旋转挤压成孔,大幅度提高了锚杆体的抗拔力,不需要泥浆,完全没有泥浆的污染,更没有泥浆处理对环境的污染,非常环保;
2、本发明工法中锚杆体可以采用钢绞线通过套管中空部分直接安装到位,保证了安装位置准确,还能确保居中安置;
3、本工法没有泥皮,反转提出套管可以增加锚固体表面的粗糙度,增强了摩擦力,能有效的发挥材料的力学性能,能节省大量建材。
附图说明
图1为旋转挤压套管锚杆的结构示意图。
图2为旋转挤压套管锚杆与支点结构电动旋挖钻机结合的结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明做进一步详细说明,下述说明仅是示例性的,以便于本领域人员更好理解本发明。
参考附图1,一种旋转挤压套管锚杆,其包括套管和锚杆体20,套管包括外套管14和内套管15,所述外套管14与内套管15同心设置,内套管15位于外套管14内,且内套管15外壁直径小于外套管14内壁直径,使内套管15与外套管14之间形成有间隙,该间隙内设置有一个注浆管16,该注浆管16上端为用于连接注浆系统的注浆管12的注浆口17,注浆管16末端为出浆口19,所述内套管底部设有活门20,以便于锚杆能够从内套管15中孔穿出。
所述内套管15通过支架B与外套管14内壁焊接为一体,加工制造简单且成本低廉。
所述外套管14下方的外表面可以设置螺旋叶片18,便于套管旋转入土速度更快,套管提升时,可以增加锚杆体表面粗糙度,提高侧磨阻力,使锚固更加坚实稳定。
考虑到连接方便,所述外套管14上端设有法兰盘A。
一种所述旋转挤压套管锚杆进行施工的工法,包括以下步骤:
1)将旋转挤压套管锚杆3的套管通过一个注浆转换器5与三支点结构电动旋挖钻机的动力头2相连,其中注浆转换器5已于2011年3月23日由发明人申请了实用新型专利,专利申请号为201120077834.4;
2)开启动力头2带动旋转挤压套管锚杆3的套管旋转挤压成孔,并到设计深度;
3)在内套管15内安装锚杆体20,同时通过注浆管16的注浆口17向孔内注入水泥浆,注浆过程中动力头2反转逐渐将套管拔出;
4)根据水泥浆液面下降的程度在孔内二次注浆,施工完成。
参考附图2上述施工过程中用到的三支点结构电动旋挖钻机,其包括底座9、动力头2、液压系统11、卷扬机7、立柱1、斜撑及斜撑油缸4、操控室6和履带行走系统10,卷扬机7和液压系统11通过电机驱动并各自独立安装于底座9上,操控室6设置于底座9上方;立柱1安装于底座9前端、其中段上端与斜撑铰接构成三支点结构并且通过斜撑油缸调整其倾斜角度; 履带行走系统10采用电机通过变速箱减速器带动驱动轮运动设置于底座9下方,底座9通过液压支腿8升高后开合伸缩履带和装拆其下的拖行轮; 所述三支点结构电动旋挖钻机上设有加压卷扬机21,该加压卷扬机21经滑轮23通过钢丝绳22与动力头2相连。
所述三支点结构电动旋挖钻机的动力头2的减速机中轴为中空结构,可以方便从内套管中安装锚杆。
以上描述了本发明的基本原理和具体实施例,不能理解为对本发明的保护范围的限定,对于本领域人员来说,在不脱离本发明的原理的情况下,可以做出很多变形和改进,这些应该属于本发明的保护范围。

Claims (7)

1.一种旋转挤压套管锚杆,其特征在于:其包括套管和锚杆体,套管包括外套管(14)和同心设置于外套管(14)内部的内套管(15),所述内套管(15)外壁直径小于外套管(14)内壁直径,使内套管(15)与外套管(14)之间形成有间隙,该间隙内设置有一个注浆管(16),该注浆管(16)上端为用于连接注浆系统的注浆口(17),注浆管(16)末端为出浆口(19),所述内套管(15)底部设有活门(20)。
2.根据权利要求1所述旋转挤压套管锚杆,其特征在于:所述外套管(14)下方的外表面设有螺旋叶片(18)。
3.根据权利要求1所述旋转挤压套管锚杆,其特征在于:所述内套管(15)通过支架(B)与外套管(14)内壁相连。
4.根据权利要求1或2或3所述旋转挤压套管锚杆,其特征在于:所述外套管(14)上端设有法兰盘(A)。
5.一种利用权利要求1所述旋转挤压套管锚杆进行施工的工法,其特征在于:包括以下步骤:
将旋转挤压套管锚杆(3)的套管通过一个注浆转换器(5)与三支点结构电动旋挖钻机的动力头(2)相连;
开启动力头(2)带动旋转挤压套管锚杆(3)的套管旋转挤压成孔,并到设计深度;
在内套管(15)内安装锚杆体(20),同时通过注浆管(16)的注浆口(17)向孔内注入水泥浆,注浆过程中动力头(2)反转逐渐将套管拔出;
根据水泥浆液面下降的程度在孔内二次注浆,施工完成。
6.根据权利要求5所述旋转挤压套管锚杆进行施工的工法,其特征在于:所述三支点结构电动旋挖钻机上设有加压卷扬机(21),该加压卷扬机(21)经滑轮(23)通过钢丝绳(22)与动力头(2)相连。
7.根据权利要求5所述旋转挤压套管锚杆进行施工的工法,其特征在于:所述三支点结构电动旋挖钻机的动力头(2)的减速机中轴为中空结构。
CN2011100819457A 2011-04-01 2011-04-01 利用制作锚杆的装置进行施工的工法 Active CN102182180B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100819457A CN102182180B (zh) 2011-04-01 2011-04-01 利用制作锚杆的装置进行施工的工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100819457A CN102182180B (zh) 2011-04-01 2011-04-01 利用制作锚杆的装置进行施工的工法

Publications (2)

Publication Number Publication Date
CN102182180A true CN102182180A (zh) 2011-09-14
CN102182180B CN102182180B (zh) 2012-06-27

Family

ID=44568457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100819457A Active CN102182180B (zh) 2011-04-01 2011-04-01 利用制作锚杆的装置进行施工的工法

Country Status (1)

Country Link
CN (1) CN102182180B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587366A (zh) * 2012-03-13 2012-07-18 胜利油田胜利工程建设(集团)有限责任公司 一种自钻式螺旋锚杆及其随钻注浆搅拌固化施工工艺
CN102644266A (zh) * 2012-05-02 2012-08-22 杭州岩土工程有限公司 一种采用劈裂锚杆桩加固桥台区域软土层路面的方法
CN106193032A (zh) * 2016-08-23 2016-12-07 中国建筑第五工程局有限公司 一种抗浮锚杆施工方法
CN108589724A (zh) * 2018-04-26 2018-09-28 青岛新华友建工集团股份有限公司 钢管及pvc管复合套管砂地质成孔抗浮锚杆施工工法
CN108726962A (zh) * 2018-07-11 2018-11-02 江苏尼高科技有限公司 速凝型无机植筋胶及注浆施工设备
CN112593859A (zh) * 2020-11-08 2021-04-02 张新华 一种建筑施工用同心双轴旋转式土石方钻挖装置
CN113846621A (zh) * 2021-09-03 2021-12-28 中铁上海设计院集团有限公司 一种岩土体定向注浆装置及其应用方法
CN115613564A (zh) * 2022-10-09 2023-01-17 中国水利水电第七工程局有限公司 一种抗浮锚杆施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4231683A (en) * 1977-08-11 1980-11-04 Walpy Vanderline Process and a device for making anchorages in soils and rocks
CN1401858A (zh) * 2002-10-11 2003-03-12 贾金青 用双套管法进行锚杆施工的方法
CN1712670A (zh) * 2005-07-13 2005-12-28 吴德兴 一种带防腐套管的注浆锚杆
CN201962674U (zh) * 2011-04-01 2011-09-07 威海建设集团股份有限公司 旋转挤压套管锚杆

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4231683A (en) * 1977-08-11 1980-11-04 Walpy Vanderline Process and a device for making anchorages in soils and rocks
CN1401858A (zh) * 2002-10-11 2003-03-12 贾金青 用双套管法进行锚杆施工的方法
CN1712670A (zh) * 2005-07-13 2005-12-28 吴德兴 一种带防腐套管的注浆锚杆
CN201962674U (zh) * 2011-04-01 2011-09-07 威海建设集团股份有限公司 旋转挤压套管锚杆

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587366A (zh) * 2012-03-13 2012-07-18 胜利油田胜利工程建设(集团)有限责任公司 一种自钻式螺旋锚杆及其随钻注浆搅拌固化施工工艺
CN102644266A (zh) * 2012-05-02 2012-08-22 杭州岩土工程有限公司 一种采用劈裂锚杆桩加固桥台区域软土层路面的方法
CN102644266B (zh) * 2012-05-02 2014-03-19 岩土科技股份有限公司 一种采用劈裂锚杆桩加固桥台区域软土层路面的方法
CN106193032A (zh) * 2016-08-23 2016-12-07 中国建筑第五工程局有限公司 一种抗浮锚杆施工方法
CN106193032B (zh) * 2016-08-23 2018-01-05 中国建筑第五工程局有限公司 一种抗浮锚杆施工方法
CN108589724A (zh) * 2018-04-26 2018-09-28 青岛新华友建工集团股份有限公司 钢管及pvc管复合套管砂地质成孔抗浮锚杆施工工法
CN108726962A (zh) * 2018-07-11 2018-11-02 江苏尼高科技有限公司 速凝型无机植筋胶及注浆施工设备
CN112593859A (zh) * 2020-11-08 2021-04-02 张新华 一种建筑施工用同心双轴旋转式土石方钻挖装置
CN113846621A (zh) * 2021-09-03 2021-12-28 中铁上海设计院集团有限公司 一种岩土体定向注浆装置及其应用方法
CN115613564A (zh) * 2022-10-09 2023-01-17 中国水利水电第七工程局有限公司 一种抗浮锚杆施工方法

Also Published As

Publication number Publication date
CN102182180B (zh) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102182180B (zh) 利用制作锚杆的装置进行施工的工法
CN201924360U (zh) 多功能液压静力压桩机
CN104763328A (zh) 一种液压扩孔循环钻机及其扩孔桩施工工艺
CN110331936B (zh) 一种组合式钻孔扩底植桩施工方法
CN110374500B (zh) 一种成组钻孔植桩施工方法
CN114033387A (zh) 一种超大直径带水作业深井掘进系统及施工方法
WO2009049470A1 (fr) Machine à percussion et injection pour forage
CN102628336B (zh) 利用斜桩施工钻机进行施工的方法
CN104453717A (zh) 长螺旋钻孔扩底装置及扩体锚杆施工工法
CN210530738U (zh) 一种成组钻孔植桩系统
CN105649083A (zh) 全套管一次性旋切式清桩装置及其清桩方法
CN102943468A (zh) 一种可减少挤土性的多轴搅拌桩装置及其应用
CN102226342B (zh) 旋喷沉桩多功能桩机
CN101914915A (zh) 一种抗浮锚杆的施工方法及专用长螺旋钻机
CN203256735U (zh) 一种可减少挤土性的多轴搅拌桩装置
CN105239575B (zh) 一种钻孔扩底灌浆静压管桩施工装置及施工方法
CN210509059U (zh) 一种成组钻孔处理机单元
CN205387708U (zh) 全套管一次性旋切式清桩装置
CN102330426A (zh) 横旋式深层搅拌桩机
CN108468334B (zh) 砂砾地层干挖粘土护壁成孔灌注桩施工装置
CN204627406U (zh) 一种液压扩孔循环钻机
CN210530745U (zh) 一种组合式钻孔扩底植桩系统
CN201962674U (zh) 旋转挤压套管锚杆
CN109252510A (zh) 一种地下连续墙施工方法
CN220150292U (zh) 一种超深复合桩组合施工装备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: WEIHAI CONSTRUCTION GROUP CO., LTD.

Owner name: XING ZHANDONG

Free format text: FORMER OWNER: WEIHAI CONSTRUCTION GROUP CO., LTD.

Effective date: 20111010

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20111010

Address after: 264200 Kunming Road, Shandong, China, No. 13, No.

Applicant after: Xing Zhandong

Co-applicant after: Weihai Construction Group Co., Ltd.

Address before: 264200 Kunming Road, Shandong, China, No. 13, No.

Applicant before: Weihai Construction Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant