CN102174698A - Processes for rapidly repairing enamel liner - Google Patents

Processes for rapidly repairing enamel liner Download PDF

Info

Publication number
CN102174698A
CN102174698A CN 201110008360 CN201110008360A CN102174698A CN 102174698 A CN102174698 A CN 102174698A CN 201110008360 CN201110008360 CN 201110008360 CN 201110008360 A CN201110008360 A CN 201110008360A CN 102174698 A CN102174698 A CN 102174698A
Authority
CN
China
Prior art keywords
enamel
inner bag
defect point
inner container
sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110008360
Other languages
Chinese (zh)
Inventor
白海亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG XINJIDE ELECTRIC CO Ltd
Original Assignee
SHANDONG XINJIDE ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG XINJIDE ELECTRIC CO Ltd filed Critical SHANDONG XINJIDE ELECTRIC CO Ltd
Priority to CN 201110008360 priority Critical patent/CN102174698A/en
Publication of CN102174698A publication Critical patent/CN102174698A/en
Pending legal-status Critical Current

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The invention discloses processes for rapidly repairing an enamel liner, belonging to the technical field of water heaters. Different processes are adopted to repair (1) circular seams, straight slits, pores with the diameter of 1-3mm at the T-shaped opening and the positions subjected to iron exposure of the enamel liner as well as the positions subjected to cracking and peeling caused by any bruise of the enamel liner, and are also adopted to repair (2) hard spots on the surface of the enamel liner and any position with a large iron exposure area. In the processes, artificial painting and repairing are avoided, so the labor cost is greatly reduced; electric sintering is omitted, so the charge for repeated enamel sintering is zero; and the repair cost is extremely low, the repair work is simple and rapid, high efficiency and good quality are achieved, and the service life of the enamel liner of a water heater is prolonged at the same time.

Description

The enamel inner container technique for rapidly repairing
Technical field
The invention belongs to technical field of water heaters, a kind of specifically enamel inner container technique for rapidly repairing.
Background technology
The enamel water heater liner originated from the U.S. before 50 years.China in water-heater is produced, extensively adopts enamel inner container in recent years.The main process of enamel inner container is: ℃ burn till inner bag welding → chemical pre-treatment → oven dry → application of slip → 845.Because welded, the influence of factors such as pre-treatment, the application of slip, the surface of enamel inner container inevitably many mass defects will occur, such as: circumferential weld, vertical masonry joint, middle tube and top, leakage iron, the pore at T shape mouth place at the end, the burst porcelain that leakage iron, pit and the transportation of middle tube, top, basal surface collided with and caused.If these defectives are not handled, water-heater uses and will occur leaking in 2~3 months.
At present both at home and abroad the method for the reparation inner bag that the water heater porcelain enamel industry is traditional is: earlier with the inner bag defective locations with pneumatic grinding mill polish → again with enamel material correction of the defect position → drying → advance enamelling kiln carries out 845 ℃ of sintering.The shortcoming that this technology exists is: because double sintering, enamel inner container surface (circumferential weld, vertical masonry joint, middle tube and top, the T shape mouth place at the end, water inlet pipe and water outlet pipe place) can produce new recessive defective, and sightless recessive defective manifests once more through double sintering, produce new pore, leak iron, qualification rate is only about 50%; It is lower to ward off qualification rate more for the third time again, and new defective is more and more, and variation has taken place in the metallographic structure of steel plate, until scrapping.At present, both at home and abroad the water-heater production industry (as Haier, beautiful, the emperor is bright, Saden is grand, A.O Smith etc.) method that is still traditional reparation inner bag of reparation employing of enamel inner container.This method efficient is low, of poor quality, cost is high, and answering time and again warded off partial enamel layer thickness is increased, and inner bag in use can occur splitting porcelain, burst porcelain, has not had the protection of enamel layer and leaks very soon.Inner bag after repairing according to the conventional method and newly courage the same all will be in the electric furnace of 500~1000KW high temperature sintering, inner bag one is less important to expend the 20 polybasic electricity charge, cost of labor and increase progressively successively because of the tooling cost of repeatedly warding off again.Efficient is low, wards off of poor qualityly again, and work-ing life of inner bag is short, causes very big loss for enterprise, user.
Summary of the invention
In order to overcome the problem of above-mentioned existence, the invention provides a kind of enamel inner container technique for rapidly repairing, it need not artificial coating and repairs, and need not the electricity consumption sintering, rehabilitation expense is extremely low, simple and fast, efficient height, quality is good, once repairs qualification rate and reaches 100%, and further prolong work-ing life.
Technical scheme of the present invention is: a kind of enamel inner container technique for rapidly repairing, it is characterized in that, and comprise the steps:
(1). at first preparing welding burner, oxygen cylinder, acetylene cylinder, lighter, operator's console, 12V low-voltage lighting, eye-protection glasses and area is 0.2-0.6cm 2, thickness is that 0.2~0.5mm enamel sheet is some standby;
(2). enamel inner container is placed on the operator's console, utilization has the support rotation inner bag of four 203 or 205 bearings, use the 12V low-voltage lighting to begin all sites (circumferential weld, vertical masonry joint, middle tube and top, T shape mouth, flange port, water inlet pipe and water outlet pipe etc.) to whole inner bag, the defect point at scrutiny place from the enamel inner container flange port at the end;
(3). after determining defect point, make defect point rotate to inner bag under;
(4). with dried cloth with defect point place wiped clean;
(5). determine the attribute of defect point and select restorative procedure:
A. enamel inner container circumferential weld, vertical masonry joint, T shape mouth place exist diameter at the pore of 1~3mm, the position and any crackle, the burst porcelain position of damaging and causing of enamel inner container of leaking iron;
Restorative procedure: the total valve of at first opening oxygen cylinder, acetylene cylinder, open oxygen, acetylene gas switch on the air gun then, put fuel gas welding torch with lighter, earlier carry out preheating in the outside of defect point inner bag with the front portion of welding burner flame, the direction of travel of welding burner moves around defect point front and back or left and right directions, makes its abundant preheating (avoiding stress concentration); Observe the inner bag change in color, when the defect point surface is dark red, use the indirect heating of the middle part of welding burner flame again to inner bag, observe the inner bag color to orange (sintering temperatures of about 840~850 ℃ of normal enamel inner containers), rejected region is melted flat up to pore or the enamel material thawing of leakage iron position; The new bubble that cruises that is produced around rejected region is heated slowly, determine that the gas discharge is flat up to melting, be cooled to room temperature, pile up in qualified district repairing good inner bag;
B. the larger area at the pit on enamel inner container surface and any position leaks the iron position;
Restorative procedure: getting area is 0.2~0.6cm 2Thickness is the enamel sheet (deciding according to leakage iron, pit area) of 0.2~0.5mm, the shiny surface of enamel sheet is affixed on the defect point of inner bag, the point fuel gas welding torch, use of the outside preheating of the front portion of welding burner flame earlier at the defect point inner bag, the direction of travel of welding burner moves around defect point front and back or left and right directions, makes its abundant preheating (avoiding stress concentration); Observe the inner bag change in color, when the defect point surface is dark red, use the indirect heating of the middle part of welding burner flame again, observe inner bag color to orange (sintering temperatures of about 840~850 ℃ of normal enamel inner containers) and rejected region is melted flat, covering up to leaking the thawing of iron or pit position enamel sheet to inner bag; Be cooled to room temperature, pile up in qualified district repairing good inner bag.
Raw materials used and the normal inner bag enamel of the preparation of described enamel sheet is raw materials used identical.
The preparation method of described enamel sheet comprises following two kinds:
A. utilize useless enamel inner container, knock the outer wall of inner bag, collect the enamel sheet that drops because of peeled off by external force with iron hammer;
B. as enamel inner container gives up, during normal enamel production operation, get one of the enamel steel plate special of SPCC material, steel plate and normal enamel inner container material therefor, thickness are identical, enameling process is close with the enameling process of normal heat water heater liner, inner bag adopts the single face application of slip, and steel plate adopts the two-sided application of slip, with enamel inner container with the normal sintering of stove; Come out of the stove after the cooling,, collect the enamel sheet that drops because of peeled off by external force with the positive and negative that iron hammer knocks enameling sheet.
Quality-guarantee and safety notice:
The normal firing temperature of enamel inner container is 840~850 ℃, notes observing the variation of enamel surface color when heating with welding burner, the distance of regulating air gun at any time, and keeping the color on enamel surface is orange, prevents that temperature is too high and burns;
The safety of oxygen cylinder and acetylene cylinder is placed distance and is remained on more than the 5m, and the safe distance of operator and oxygen cylinder, acetylene cylinder remains on more than the 10m.The operator will be with eye-protection glasses, not facing to the people, will close oxygen, acetylene gas switch on the air gun when quitting work respectively, and close the total valve of oxygen, acetylene cylinder respectively when lighting welding gun.
The invention has the beneficial effects as follows: the enamel inner container technique for rapidly repairing of the present invention fully method with the traditional reparation inner bag of enamel industry is different, need not artificial coating repairing, and cost of labor will reduce significantly.Need not the electricity consumption sintering, multiple enamel firing knot energy charge is zero, and rehabilitation expense is extremely low, simple and fast, and the efficient height, quality is good, can prolong the work-ing life of enamel internal container of water-heater simultaneously.
Experimental data:, adopt the technology of the present invention to repair overstocked enamel defect inner bag 561pcs, qualified 561pcs, qualification rate 100% altogether in Xinjide Electrical Appliances Co., Ltd., Shandong from January 8,4 days to 2011 January in 2011.Detect according to German enamel standard DIN4753 repairing enamel inner container, detected result is as shown in table 1.
Table 1 is repaired enamel inner container according to German enamel standard DIN4753 detected result
Project Requirement Detected result
Coat-thickness 0.15~0.5mm 0.2~0.35mm
Adherence Must not be block Meet the requirements
Shock-resistance The damage of diameter greater than 1.5mm do not take place in visual porcelain facing (testing in back 24 hours) meets the requirements
The heatproof acute degeneration 185 ℃ of range estimations of the temperature difference do not have damage Meet the requirements
Acidproof aggressiveness The A level The A level
Standard protection electric current ≤22.5mA/m 2 13.2~15.3mA/m 2
Annotate: pcs is a unit of quantity.
Table 2 repairs enamel inner container for traditional method and the technology of the present invention is repaired the contrast of enamel inner container expense:
Table 2 traditional method repairs enamel inner container and the technology of the present invention is repaired the contrast of enamel inner container expense
Figure BDA0000043992300000051
Performance analysis:
Utilize enamel inner container fast repair technique of the present invention once altogether successfully to repair 561pcs qualified, save 47.1 yuan of costs, save 26423.1 yuan of funds altogether for every.
Embodiment
Embodiment 1
Exist diameter to repair to enamel inner container circumferential weld, vertical masonry joint, T shape mouth place, comprise the steps: at the pore of 1~3mm, the position and any crackle, the burst porcelain position of causing of damaging of enamel inner container of leakage iron
(1). it is standby at first to prepare welding burner, oxygen cylinder, acetylene cylinder, lighter, operator's console, 12V low-voltage lighting and eye-protection glasses;
(2). enamel inner container is placed on the operator's console, utilization has the support rotation inner bag of four 203 (or 205) bearings, use the 12V low-voltage lighting to begin all sites (circumferential weld, vertical masonry joint, middle tube and top, T shape mouth, flange port, water inlet pipe and water outlet pipe etc.) to whole inner bag, the defect point at scrutiny place from the enamel inner container flange port at the end;
(3). after determining defect point, make defect point rotate to inner bag under;
(4). with dried cloth with defect point place wiped clean;
(5). at first open the total valve of oxygen cylinder, acetylene cylinder, open oxygen, acetylene gas switch on the air gun then, put fuel gas welding torch with lighter, earlier carry out preheating in the outside of defect point inner bag with the front portion of welding burner flame, the direction of travel of welding burner moves around defect point front and back or left and right directions, makes its abundant preheating (avoiding stress concentration); Observe the inner bag change in color, when the defect point surface is dark red, use the indirect heating of the middle part of welding burner flame again, observe inner bag color to orange (sintering temperatures of about 840~850 ℃ of normal enamel inner containers) and rejected region is melted flat up to pore or the enamel material thawing of leakage iron position to inner bag; The new bubble that cruises that is produced around rejected region is heated slowly, determine that the gas discharge is flat up to melting, be cooled to room temperature, pile up in qualified district repairing good inner bag.
Embodiment 2
The pit on enamel inner container surface and the larger area leakage iron position at any position are repaired, comprise the steps:
(1). at first preparing welding burner, oxygen cylinder, acetylene cylinder, lighter, operator's console, 12V low-voltage lighting, eye-protection glasses and area is 0.2~0.6cm 2, thickness is that 0.2~0.5mm enamel sheet is some standby;
(2). enamel inner container is placed on the operator's console, utilization has the support rotation inner bag of four 203 (or 205) bearings, use the 12V low-voltage lighting to begin all sites (circumferential weld, vertical masonry joint, middle tube and top, T shape mouth, flange port, water inlet pipe and water outlet pipe etc.) to whole inner bag, the defect point at scrutiny place from the enamel inner container flange port at the end;
(3). after determining defect point, make defect point rotate to inner bag under;
(4). with dried cloth with defect point place wiped clean;
(5). getting area is 0.2~0.6cm 2Thickness is the enamel sheet (deciding according to leakage iron, pit area) of 0.2~0.5mm, the shiny surface of enamel sheet is affixed on the defect point of inner bag, the point fuel gas welding torch, use of the outside preheating of the front portion of welding burner flame earlier at the defect point inner bag, the direction of travel of welding burner moves around defect point front and back or left and right directions, makes its abundant preheating (avoiding stress concentration); Observe the inner bag change in color, when the defect point surface is dark red, use the indirect heating of the middle part of welding burner flame again, observe inner bag color to orange (sintering temperatures of about 840~850 ℃ of normal enamel inner containers) and rejected region is melted flat, covering up to leaking the thawing of iron or pit position enamel sheet to inner bag; Be cooled to room temperature, pile up in qualified district repairing good inner bag.

Claims (3)

1. an enamel inner container technique for rapidly repairing is characterized in that, comprises the steps:
(1). at first preparing welding burner, oxygen cylinder, acetylene cylinder, lighter, operator's console, 12V low-voltage lighting, eye-protection glasses and area is 0.2~0.6cm 2, thickness is that 0.2~0.5mm enamel sheet is some standby;
(2). enamel inner container is placed on the operator's console, utilizes the support rotation inner bag have four 203 or 205 bearings, use the 12V low-voltage lighting to begin all sites to whole inner bag, the defect point at scrutiny place from the enamel inner container flange port;
(3). after determining defect point, make defect point rotate to inner bag under;
(4). with dried cloth with defect point place wiped clean;
(5). determine the attribute of defect point and select restorative procedure:
A. enamel inner container circumferential weld, vertical masonry joint, T shape mouth place exist diameter at the pore of 1~3mm, the position and any crackle, the burst porcelain position of damaging and causing of enamel inner container of leaking iron;
Restorative procedure: the total valve of at first opening oxygen cylinder, acetylene cylinder, open oxygen, acetylene gas switch on the air gun then, put fuel gas welding torch with lighter, earlier carry out preheating in the outside of defect point inner bag with the front portion of welding burner flame, the direction of travel of welding burner moves around defect point front and back or left and right directions, makes its abundant preheating; Observe the inner bag change in color, when the defect point surface is dark red, use the indirect heating of the middle part of welding burner flame again, observe the inner bag color, rejected region is melted flat up to pore or the enamel material thawing of leakage iron position to orange to inner bag; The new bubble that cruises that is produced around rejected region is heated slowly, determine that the gas discharge is flat up to melting, be cooled to room temperature, pile up in qualified district repairing good inner bag;
B. the larger area at the pit on enamel inner container surface and any position leaks the iron position;
Restorative procedure: getting area is 0.2~0.6cm 2Thickness is the enamel sheet of 0.2~0.5mm, the shiny surface of enamel sheet is affixed on the defect point of inner bag, and the some fuel gas welding torch is used the outside preheating of the front portion of welding burner flame at the defect point inner bag earlier, the direction of travel of welding burner moves around defect point front and back or left and right directions, makes its abundant preheating; Observation inner bag change in color when the defect point surface is dark red, is used the indirect heating of the middle part of welding burner flame to inner bag again, observes the inner bag color to orange, up to leaking the thawing of iron or pit position enamel sheet rejected region is melted flat, covering; Be cooled to room temperature, pile up in qualified district repairing good inner bag.
2. a kind of enamel inner container technique for rapidly repairing according to claim 1 is characterized in that, the preparation raw material of described enamel sheet is raw materials used identical with normal inner bag enamel.
3. described a kind of enamel inner container technique for rapidly repairing according to claim 1 and 2, it is characterized in that, the preparation method of described enamel sheet is: utilize useless enamel inner container, knock the outer wall of inner bag with iron hammer, when collecting because of the enamel sheet that peeled off by external force to drop or normal enamel production operation, get one of the enamel steel plate special of SPCC material, steel plate and normal enamel inner container material therefor, thickness are identical, steel plate adopts the two-sided application of slip, with enamel inner container with the normal sintering of stove; Come out of the stove after the cooling,, collect the enamel sheet that drops because of peeled off by external force with the positive and negative that iron hammer knocks enameling sheet.
CN 201110008360 2011-01-17 2011-01-17 Processes for rapidly repairing enamel liner Pending CN102174698A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110008360 CN102174698A (en) 2011-01-17 2011-01-17 Processes for rapidly repairing enamel liner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110008360 CN102174698A (en) 2011-01-17 2011-01-17 Processes for rapidly repairing enamel liner

Publications (1)

Publication Number Publication Date
CN102174698A true CN102174698A (en) 2011-09-07

Family

ID=44517928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110008360 Pending CN102174698A (en) 2011-01-17 2011-01-17 Processes for rapidly repairing enamel liner

Country Status (1)

Country Link
CN (1) CN102174698A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103170794A (en) * 2013-03-21 2013-06-26 安徽淮河化工股份有限公司 Method of mending damage on non-clamping sleeve portion of enamel reaction kettle
CN105200423A (en) * 2015-10-13 2015-12-30 浙江开尔新材料股份有限公司 Splicing and cladding technology for enamel materials
CN107308894A (en) * 2017-06-07 2017-11-03 湖北兴瑞化工有限公司 A kind of enamel equipment repair technology
CN111360363A (en) * 2020-04-28 2020-07-03 安徽马钢设备检修有限公司 Manual gas welding repair device and repair process for large heat-resistant steel heating furnace door

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87100254A (en) * 1987-01-07 1988-07-20 青岛化工学院 The method for repairing and mending of enamel chemical equipment enamel lining

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87100254A (en) * 1987-01-07 1988-07-20 青岛化工学院 The method for repairing and mending of enamel chemical equipment enamel lining

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
> 20011231 张文生,赵剑,高勋 化工搪瓷设备的使用及维护 第27页第3.1部分 1-3 , 第9期 2 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103170794A (en) * 2013-03-21 2013-06-26 安徽淮河化工股份有限公司 Method of mending damage on non-clamping sleeve portion of enamel reaction kettle
CN105200423A (en) * 2015-10-13 2015-12-30 浙江开尔新材料股份有限公司 Splicing and cladding technology for enamel materials
CN107308894A (en) * 2017-06-07 2017-11-03 湖北兴瑞化工有限公司 A kind of enamel equipment repair technology
CN107308894B (en) * 2017-06-07 2019-04-23 湖北兴瑞硅材料有限公司 A kind of enamel equipment repair technology
CN111360363A (en) * 2020-04-28 2020-07-03 安徽马钢设备检修有限公司 Manual gas welding repair device and repair process for large heat-resistant steel heating furnace door
CN111360363B (en) * 2020-04-28 2023-09-29 安徽马钢设备检修有限公司 Manual gas welding repair process for furnace door of large heat-resistant steel heating furnace

Similar Documents

Publication Publication Date Title
CN102174698A (en) Processes for rapidly repairing enamel liner
CN2389289Y (en) Gas infrared ray burner
CN101799352A (en) Online and rapid leakage detecting method for roller hearth type non-oxidation furnace radiating pipe
CN101053921A (en) Mixed gas shielded welding process for runners of large and medium-sized Francis turbines
CN101934434B (en) Cast iron hot repair welding process and device
CN101799350B (en) Rapid leakage detecting method for roller hearth type non-oxidation furnace radiating pipes in batch
CN105823045A (en) Converter gas nozzle for RH refining furnace and RH refining furnace
CN103212946B (en) Machining method of gas radiation pipe
CN111889684B (en) Preparation method of pulverized coal direct ignition burner
CN219541621U (en) Gas forging heating furnace
CN211104656U (en) Automatic control electric heating PCCP steam curing equipment
CN204301286U (en) A kind of cylindrical many interlayers burner
CN103567612B (en) A kind of flame tube repair method
CN218842058U (en) A new type of combustion chamber for fully continuous pyrolysis equipment
CN111496357A (en) Transverse welding method for BB41-BF hot blast furnace shell
CN110370438A (en) Automatic control electrical heating PCCP steaming apparatus and maintenance process
CN209399407U (en) A kind of fin panel casing of heating surface Wear-proof
CN110527771B (en) Blast furnace hot blast stove flue flange connection part burst treatment method
CN101328460A (en) Efficient energy-saving environment protective beige frying kitchen range
CN221222997U (en) Horizontal series prizing organic heat carrier furnace
CN202543276U (en) Heat storage type burner of steel billet heating furnace
CN203976884U (en) Stove air single heat accumulating type nozzle at the bottom of a kind of roller
CN204694084U (en) A kind of metal alloy smelting furnace apparatus for reusing residual heat
CN202382640U (en) Hollow Plugs for Handling Leakage of Heat Exchanger Tube Bundle Welding Joints
CN222700246U (en) Preheating burner device of coal gasifier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110907