CN102146707A - Building curtain wall structure - Google Patents

Building curtain wall structure Download PDF

Info

Publication number
CN102146707A
CN102146707A CN 201010108217 CN201010108217A CN102146707A CN 102146707 A CN102146707 A CN 102146707A CN 201010108217 CN201010108217 CN 201010108217 CN 201010108217 A CN201010108217 A CN 201010108217A CN 102146707 A CN102146707 A CN 102146707A
Authority
CN
China
Prior art keywords
curtain wall
wall structure
building curtain
vertical material
structure according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010108217
Other languages
Chinese (zh)
Other versions
CN102146707B (en
Inventor
曾晓武
徐皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Fang Daxin Material Co Ltd
Original Assignee
Shenzhen Fangda Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=44421161&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN102146707(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Shenzhen Fangda Decoration Engineering Co ltd filed Critical Shenzhen Fangda Decoration Engineering Co ltd
Priority to CN201010108217.6A priority Critical patent/CN102146707B/en
Publication of CN102146707A publication Critical patent/CN102146707A/en
Application granted granted Critical
Publication of CN102146707B publication Critical patent/CN102146707B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention relates to a building curtain wall structure, which comprises a support used for connecting a fixed body and a plurality of sectional materials fixedly connected with curtain wall surface materials, wherein the sectional materials are of a frame structure formed by connecting an upper transverse material, a lower transverse material, a female vertical material and a male vertical material; the upper transverse material and the lower transverse material between the upper and lower adjacent sections are connected with each other, and the female vertical material and the male vertical material between the left and right adjacent sections are connected with each other; the core sleeves are respectively arranged on the negative vertical material and the positive vertical material and are fixedly connected to the support through the hanging piece; and a sealant is arranged at the gap between the adjacent curtain wall surface materials. The building curtain wall structure combines the unit type curtain wall form and the frame type curtain wall form, makes up for the deficiencies of the unit type curtain wall form and complements the advantages of the unit type curtain wall form and the frame type curtain wall form, so that the whole building curtain wall structure is simple and safe to install, the installation progress and quality of the curtain wall can be guaranteed, and meanwhile, the construction cost is relatively low.

Description

一种建筑幕墙结构A building curtain wall structure

技术领域technical field

本发明涉及建筑幕墙技术领域,尤其涉及一种单元式幕墙的安装结构的改进。The invention relates to the technical field of building curtain walls, in particular to an improvement of the installation structure of a unitized curtain wall.

背景技术Background technique

现有的单元式幕墙是由各种墙面权与支承框架在工厂制成完整的幕墙结构基本单位,直接安装在主体结构上的建筑幕墙,其生产加工及安装质量较好,工地安装工期较短,但是其防水构造复杂,整体造价较高。The existing unitized curtain wall is a complete basic unit of curtain wall structure made by various wall surfaces and supporting frames in the factory, and the building curtain wall directly installed on the main structure has good production, processing and installation quality, and the construction site installation period is relatively short. Short, but its waterproof structure is complicated, and the overall cost is relatively high.

而框架式幕墙采用硅酮密封胶进行密封防水,构造简单,造价低廉,但现场安装工作量大,施工周期长,安装质量不容易保证。The frame-type curtain wall uses silicone sealant for sealing and waterproofing, which has a simple structure and low cost, but the on-site installation workload is large, the construction period is long, and the installation quality is not easy to guarantee.

发明内容Contents of the invention

本发明要解决的技术问题在于,针对现有技术的上述缺陷,提供一种建筑幕墙结构,其便于安装,且加工及安装质量好,同时造价又相对较为低廉。The technical problem to be solved by the present invention is to provide a building curtain wall structure which is easy to install, has good processing and installation quality, and is relatively cheap in terms of the above-mentioned defects of the prior art.

本发明解决其技术问题所采用的技术方案是:The technical solution adopted by the present invention to solve its technical problems is:

构造一种建筑幕墙结构,包括用于连接固定体的支座,还包括多个固定连接有幕墙面材的型材,其中,所述型材为由上横料、下横料、阴竖料和阳竖料连接组成的框架结构,其中,所述上横料和下横料相对设置,所述阴竖料和阳竖料相对设置;Constructing a building curtain wall structure, including a support for connecting a fixed body, and also including a plurality of profiles fixedly connected with a curtain wall surface material, wherein the profile is composed of an upper horizontal material, a lower horizontal material, a female vertical material and a male vertical material. A frame structure composed of connected vertical members, wherein the upper horizontal member and the lower horizontal member are arranged oppositely, and the female vertical member and the male vertical member are arranged oppositely;

上下相邻的型材之间的上横料与下横料相互连接,左右相邻的型材之间的阴竖料与阳竖料相互连接;The upper horizontal material and the lower horizontal material between the upper and lower adjacent profiles are connected to each other, and the female vertical material and male vertical material between the left and right adjacent profiles are connected to each other;

所述阴竖料和阳竖料上分别设置有芯套,所述芯套通过挂件固定连接在所述支座上;The female vertical material and the male vertical material are respectively provided with core sleeves, and the core sleeves are fixedly connected to the support through a pendant;

相邻的幕墙面材之间的间隙处设置有密封胶。A sealant is provided in the gap between the adjacent curtain wall surface materials.

本发明所述的建筑幕墙结构,其中,所述上横料的上部设置有两个挂杆,在所述下横料上相应设置有两个挂钩,所述挂杆与所述挂钩的连接处设置有密封胶条。In the building curtain wall structure according to the present invention, two hanging rods are arranged on the upper part of the upper cross member, and two hooks are correspondingly arranged on the lower cross member, and the connection between the hanging rod and the hook is A sealing strip is provided.

本发明所述的建筑幕墙结构,其中,所述下横料上设置有用于托住幕墙面材的托件。In the building curtain wall structure according to the present invention, the lower cross member is provided with a bracket for supporting the curtain wall surface material.

本发明所述的建筑幕墙结构,其中,所述芯套插接在所述阴竖料或阳竖料的内部,且沿型材整体的长度方向伸出至相邻型材的位置。In the building curtain wall structure according to the present invention, the core sleeve is plugged into the inside of the female vertical member or the male vertical member, and protrudes to the position of the adjacent profile along the overall length direction of the profile.

本发明所述的建筑幕墙结构,其中,所述上横料和下横料内沿长度方向贯穿设置有多个连接所述阴竖料和阳竖料的自攻螺钉。In the building curtain wall structure of the present invention, a plurality of self-tapping screws connecting the female vertical members and the male vertical members are provided through the upper horizontal member and the lower horizontal member along the length direction.

本发明所述的建筑幕墙结构,其中,所述上横料、下横料、阴竖料和阳竖料均采用铝合金制成。In the building curtain wall structure of the present invention, the upper rail, the lower rail, the female vertical rail and the male vertical rail are all made of aluminum alloy.

本发明所述的建筑幕墙结构,其中,所述托件与相应的下横料和幕墙面材之间密封设置。In the building curtain wall structure according to the present invention, the bracket is arranged in a sealed manner with the corresponding lower cross member and curtain wall surface material.

本发明所述的建筑幕墙结构,其中,所述支座和所述挂件均为L形。In the building curtain wall structure of the present invention, both the support and the hanger are L-shaped.

本发明所述的建筑幕墙结构,其中,所述幕墙面材为钢化中空玻璃。In the building curtain wall structure of the present invention, the curtain wall surface material is tempered hollow glass.

本发明所述的建筑幕墙结构,其中,所述上横料与下横料之间还设置有中间横料,所述自动螺钉贯穿设置在所述中间横料内。In the building curtain wall structure according to the present invention, an intermediate horizontal member is arranged between the upper horizontal member and the lower horizontal member, and the automatic screw is arranged through the intermediate horizontal member.

本发明的建筑幕墙结构通过改进固定由玻璃幕墙的型材中横料和竖料的结构,使相邻型材之间安装更加方便,并可以使得固定在相邻型材上的幕墙面材之间可以采用密封胶进行密封。同时通过采用支座和挂件连接型材的竖料,将单元式和框架式两种幕墙形式结合,取长补短,优势互补,使得整个建筑幕墙结构安装简单安全,既能保证幕墙安装进度和质量,造价又相对较为低廉。The building curtain wall structure of the present invention makes the installation between adjacent profiles more convenient by improving the structure of fixing the cross members and vertical members of the profiles of the glass curtain wall, and can make the curtain wall surface materials fixed on the adjacent profiles possible. Sealant to seal. At the same time, by using the vertical material of the support and the pendant to connect the profiles, the two types of curtain walls, the unit type and the frame type, are combined to learn from each other and complement each other's advantages, making the installation of the entire building curtain wall structure simple and safe, which can not only ensure the installation progress and quality of the curtain wall, but also reduce the cost. Relatively cheap.

附图说明Description of drawings

下面将结合附图及实施例对本发明作进一步说明,附图中:The present invention will be further described below in conjunction with accompanying drawing and embodiment, in the accompanying drawing:

图1为本发明实施例的建筑幕墙结构水平安装节点结构示意图;Fig. 1 is the schematic diagram of the horizontal installation node structure of the building curtain wall structure of the embodiment of the present invention;

图2为本发明实施例的建筑幕墙结构竖直安装节点结构示意图;Fig. 2 is a schematic diagram of the vertical installation node structure of the building curtain wall structure according to the embodiment of the present invention;

图3为图2中A部分放大示意图。FIG. 3 is an enlarged schematic diagram of part A in FIG. 2 .

具体实施方式Detailed ways

下面结合图示,对本发明的优选实施例作详细介绍。The preferred embodiments of the present invention will be described in detail below with reference to the drawings.

本发明较佳实施例的建筑幕墙结构示意如图1所示,同时参阅图2,所述建筑幕墙结构包括用于连接固定体100的支座10,还包括多个固定连接有幕墙面材50的型材。其中型材为由横料(包括:上横料70和下横料80)、竖料(包括:阴竖料40和阳竖料30)连接组成的框架结构,上横料70和下横料80相对设置,阴竖料40和阳竖料30相对设置。The building curtain wall structure diagram of the preferred embodiment of the present invention is shown in Figure 1, and referring to Figure 2 at the same time, the building curtain wall structure includes a support 10 for connecting a fixed body 100, and also includes a plurality of fixedly connected curtain wall surface materials 50 profiles. Wherein the profile is a frame structure composed of horizontal material (including: upper horizontal material 70 and lower horizontal material 80 ), vertical material (including: female vertical material 40 and male vertical material 30 ), the upper horizontal material 70 and lower horizontal material 80 Relatively arranged, the female vertical material 40 and the male vertical material 30 are relatively arranged.

其中上下相邻的型材之间的上横料70与下横料80相互连接,左右相邻的型材之间的阴竖料40与阳竖料30相互连接。阴竖料40和阳竖料30上分别设置有芯套32,芯套32通过挂件20固定连接在支座10上,实现幕墙面材50在固定体100,如建筑墙面,上的固定。相邻的幕墙面材50之间的间隙处设置有密封胶51,以实现建筑幕墙结构的防水性能。Wherein the upper horizontal material 70 and the lower horizontal material 80 between the vertically adjacent profiles are connected to each other, and the female vertical material 40 and the male vertical material 30 between the left and right adjacent profiles are connected to each other. Core sleeves 32 are respectively arranged on the female vertical material 40 and the male vertical material 30, and the core sleeves 32 are fixedly connected to the support 10 through the pendant 20, so as to realize the fixing of the curtain wall surface material 50 on the fixed body 100, such as a building wall. A sealant 51 is provided in the gap between adjacent curtain wall surface materials 50 to realize the waterproof performance of the building curtain wall structure.

本实施例中,如图2所示,上横料70与下横料80连接的方式可以有多种,具体可以是在上横料70的上部设置两个挂杆71,在下横料80上相应设置两个挂钩81,通过挂杆71与挂钩81的配合实现上横料70与下横料80的连接,并在挂杆71与挂钩81的连接处设置有密封胶条,以加强建筑幕墙结构的防水效果,这种结构使得建筑幕墙结构安装更加简单。In this embodiment, as shown in FIG. 2 , there are various ways to connect the upper rail 70 and the lower rail 80 , specifically, two hanging rods 71 are arranged on the top of the upper rail 70 , and on the lower rail 80 Correspondingly set two hooks 81, through the cooperation of the hanging rod 71 and the hook 81, the connection between the upper rail 70 and the lower rail 80 is realized, and a sealing strip is provided at the connection between the hanging rod 71 and the hook 81 to strengthen the building curtain wall The waterproof effect of the structure, this structure makes the installation of the building curtain wall structure easier.

相应地,如图1所示,在阴竖料40上设置有竖料挂钩41,在阳竖料30上相应设置有竖料挂杆31。Correspondingly, as shown in FIG. 1 , a vertical material hook 41 is provided on the female vertical material 40 , and a vertical material hanging rod 31 is correspondingly provided on the male vertical material 30 .

本实施例中,如图1和图2所示,相邻的幕墙面材50之间的间隙处的密封胶51采用硅酮建筑密封胶。其中,幕墙面材50优选采用钢化中空玻璃。In this embodiment, as shown in FIG. 1 and FIG. 2 , the sealant 51 in the gap between adjacent curtain wall surface materials 50 adopts silicone building sealant. Among them, the curtain wall surface material 50 is preferably made of tempered hollow glass.

本实施例中,如图1和图2所示,下横料80上设置有用于托住幕墙面材的托件90。托件90为L形,其侧边通过螺钉固定连接在下横料80上,底边托住固定在型材上的幕墙面材50,使得建筑幕墙结构更加稳固。在托件90与相应的下横料80和幕墙面材50之间也密封设置,以加强建筑幕墙结构的防水效果。In this embodiment, as shown in FIG. 1 and FIG. 2 , the lower cross member 80 is provided with a bracket 90 for supporting the curtain wall surface material. The bracket 90 is L-shaped, and its side is fixedly connected to the lower cross member 80 by screws, and the bottom supports the curtain wall surface material 50 fixed on the section bar, so that the building curtain wall structure is more stable. Sealing is also provided between the bracket 90 and the corresponding lower cross member 80 and curtain wall surface material 50, so as to enhance the waterproof effect of the building curtain wall structure.

本实施例中,如图1和图2所示,芯套32插接在阴竖料40或阳竖料30的内部,且芯套32沿型材整体的长度方向伸出至相邻型材的位置,保证每个型材都有至少两个固定点,使得建筑幕墙结构更加稳固。In this embodiment, as shown in Figure 1 and Figure 2, the core sleeve 32 is plugged into the inside of the female vertical material 40 or the male vertical material 30, and the core sleeve 32 protrudes to the position of the adjacent profile along the overall length direction of the profile. , to ensure that each profile has at least two fixing points, making the building curtain wall structure more stable.

本实施例中,如图1和图2所示,上横料70和下横料80内沿长度方向贯穿设置有多个连接阴竖料40和阳竖料30的自攻螺钉42。In this embodiment, as shown in FIG. 1 and FIG. 2 , a plurality of self-tapping screws 42 connecting the female vertical member 40 and the male vertical member 30 are provided through the upper horizontal member 70 and the lower horizontal member 80 along the length direction.

优选地,如图2所示,在上横料70与下横料80之间还设置有中间横料60,自攻螺钉42贯穿设置在中间横料60内,使得型材整体结构更加稳定。Preferably, as shown in FIG. 2 , an intermediate rail 60 is provided between the upper rail 70 and the lower rail 80 , and self-tapping screws 42 are inserted through the intermediate rail 60 , so that the overall structure of the profile is more stable.

本实施例中,上横料70、下横料80、阴竖料40和阳竖料30均优选采用铝合金制成。In this embodiment, the upper rail 70 , the lower rail 80 , the female vertical rail 40 and the male vertical rail 30 are preferably made of aluminum alloy.

为了节省材料成本,如图1和图2所示,上横料70、下横料80、阴竖料40和阳竖料30优选设计为镂空结构。In order to save material cost, as shown in Fig. 1 and Fig. 2, the upper rail 70, the lower rail 80, the female vertical rail 40 and the male vertical rail 30 are preferably designed as hollow structures.

本实施例中,如图1和图2所示,支座10和挂件20均为L形,支座10的侧边固定在固定体100上,底边伸出固定体100外,用于与挂钩20的侧边连接,挂钩20的底边用于连接阴竖料40和阳竖料30上的芯套32。In this embodiment, as shown in Figures 1 and 2, both the support 10 and the pendant 20 are L-shaped, the side of the support 10 is fixed on the fixed body 100, and the bottom edge protrudes outside the fixed body 100 for use with The sides of the hook 20 are connected, and the bottom of the hook 20 is used to connect the core sleeve 32 on the female vertical material 40 and the male vertical material 30 .

生产时,可先生产各部件,再在施工现场进行安装。安装竖直方向的型材时,先将多个支座10固定到固定体100上,相邻支座10之间的间隙可根据型材的大小来确定;再将挂件20固定到支座10上,然后将其中一个型材固定到挂件20上,再将另一个型材的下横料80与前一型材的上横料70连接,然后固定到挂件20上。During production, each component can be produced first, and then installed at the construction site. When installing a profile in the vertical direction, first fix a plurality of supports 10 on the fixed body 100, and the gap between adjacent supports 10 can be determined according to the size of the profile; then fix the pendant 20 on the support 10, Then one of the profiles is fixed on the hanger 20 , and the lower rail 80 of the other profile is connected with the upper rail 70 of the previous profile, and then fixed on the hanger 20 .

安装水平方向的型材时,将相邻型材的阴竖料40和阳竖料30连接,再将型材固定到挂钩20上。幕墙面材50可事先采用双面胶固定在型材上,安装好型材后,在相邻的幕墙面材50之间采用密封胶51密封,即可实现建筑幕墙的安装。When installing profiles in the horizontal direction, connect the female vertical members 40 and male vertical members 30 of adjacent profiles, and then fix the profiles to the hooks 20 . The curtain wall surface material 50 can be fixed on the profile with double-sided adhesive tape in advance, and after the profile is installed, a sealant 51 is used to seal between adjacent curtain wall surface materials 50, and the installation of the building curtain wall can be realized.

本发明的建筑幕墙结构通过改进固定玻璃幕墙的型材中横料和竖料的结构,使相邻型材之间安装更加方便,并可以使得固定在相邻型材上的幕墙面材之间可以采用密封胶进行密封。The building curtain wall structure of the present invention makes the installation between adjacent profiles more convenient by improving the structure of the cross members and vertical members in the profiles of the fixed glass curtain walls, and can make the curtain wall surface materials fixed on the adjacent profiles adopt sealing Glue to seal.

且通过采用支座和挂件连接型材的竖料,将单元式和框架式两种幕墙形式结合,保留单元式幕墙的单元板块组装及安装方式,方便工厂的组装和现场的安装,取消单元式幕墙的多道胶条密封构造,直接(现场)采用在板块连接处硅酮建筑密封胶密封方式,取长补短,优势互补,从而使得整个建筑幕墙结构安装简单安全,既能保证幕墙安装进度,又能保证安装质量,且整体造价较为低廉。In addition, by using supports and pendants to connect the vertical materials of the profiles, the two types of curtain walls, unitized and framed, are combined, and the assembly and installation of the unit panels of the unitized curtain wall are retained, which is convenient for factory assembly and on-site installation, and the unitized curtain wall is cancelled. The multi-channel rubber strip sealing structure directly (on site) adopts the silicone building sealant sealing method at the joint of the plates, learns from each other, and complements each other's advantages, so that the installation of the entire building curtain wall structure is simple and safe, which can not only ensure the installation progress of the curtain wall, but also ensure Installation quality, and the overall cost is relatively low.

应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本发明所附权利要求的保护范围。It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should belong to the protection scope of the appended claims of the present invention.

Claims (10)

1.一种建筑幕墙结构,包括用于连接固定体(100)的支座(10),还包括多个固定连接有幕墙面材(50)的型材,其特征在于,所述型材是由上横料(70)、下横料(80)、阴竖料(40)和阳竖料(30)连接组成的框架结构,其中,所述上横料(70)和下横料(80)相对设置,所述阴竖料(40)和阳竖料(30)相对设置;1. A building curtain wall structure, comprising a support (10) for connecting a fixed body (100), also comprising a plurality of profiles fixedly connected with a curtain wall surface material (50), characterized in that, the profile is made of A frame structure composed of horizontal members (70), lower horizontal members (80), female vertical members (40) and male vertical members (30), wherein the upper horizontal members (70) and lower horizontal members (80) are opposite to each other Setting, the female vertical material (40) and the male vertical material (30) are relatively arranged; 上下相邻的型材之间的上横料(70)与下横料(80)相互连接,左右相邻的型材之间的阴竖料(40)与阳竖料(30)相互连接;The upper horizontal material (70) and the lower horizontal material (80) between the upper and lower adjacent profiles are connected to each other, and the female vertical material (40) and male vertical material (30) between the left and right adjacent profiles are connected to each other; 所述阴竖料(40)和阳竖料(30)上分别设置有芯套(32),所述芯套(32)通过挂件(20)固定连接在所述支座(10)上;The female vertical material (40) and the male vertical material (30) are respectively provided with a core sleeve (32), and the core sleeve (32) is fixedly connected to the support (10) through a pendant (20); 相邻的幕墙面材(50)之间的间隙处设置有密封胶(51)。A sealant (51) is provided at the gap between adjacent curtain wall surface materials (50). 2.根据权利要求1所述的建筑幕墙结构,其特征在于,所述上横料(70)的上部设置有两个挂杆(71),在所述下横料(80)上相应设置有两个挂钩(81),所述挂杆(71)与所述挂钩(81)的连接处设置有密封胶条。2. The building curtain wall structure according to claim 1, characterized in that, two hanging rods (71) are arranged on the upper part of the upper cross member (70), and two hanging rods (71) are arranged on the lower cross member (80) correspondingly. There are two hooks (81), and a sealing rubber strip is arranged at the joint between the hanging rod (71) and the hook (81). 3.根据权利要求1所述的建筑幕墙结构,其特征在于,所述下横料(80)上设置有用于托住幕墙面材(50)的托件(90)。3. The building curtain wall structure according to claim 1, characterized in that, the lower cross member (80) is provided with a bracket (90) for supporting the curtain wall surface material (50). 4.根据权利要求1所述的建筑幕墙结构,其特征在于,所述芯套(32)插接在所述阴竖料(40)或阳竖料(30)的内部,且沿型材整体的长度方向延伸至相邻型材的位置。4. The building curtain wall structure according to claim 1, characterized in that, the core sleeve (32) is plugged into the inside of the female vertical material (40) or male vertical material (30), and along the entire profile The length direction extends to the position of the adjacent profile. 5.根据权利要求1所述的建筑幕墙结构,其特征在于,所述上横料(70)和下横料(80)内沿长度方向贯穿设置有多个连接所述阴竖料(40)和阳竖料(30)的自攻螺钉(42)。5. The building curtain wall structure according to claim 1, characterized in that, there are a plurality of female vertical members (40) connected to the upper rail (70) and the lower rail (80) along the length direction. And the self-tapping screw (42) of Yang vertical material (30). 6.根据权利要求1所述的建筑幕墙结构,其特征在于,所述上横料(70)、下横料(80)、阴竖料(40)和阳竖料(30)均采用铝合金制成。6. The building curtain wall structure according to claim 1, characterized in that, the upper rail (70), the lower rail (80), the female vertical rail (40) and the male vertical rail (30) are all made of aluminum alloy production. 7.根据权利要求3所述的建筑幕墙结构,其特征在于,所述托件(90)与相应的下横料(80)和幕墙面材(50)之间密封设置。7. The building curtain wall structure according to claim 3, characterized in that, the bracket (90) is arranged in a sealed manner with the corresponding lower cross member (80) and curtain wall surface material (50). 8.根据权利要求1所述的建筑幕墙结构,其特征在于,所述支座(10)和所述挂件(20)均为L形,所述支座(10)的侧边固定在固定体(100)上,底边伸出固定体(100)外,用于与挂钩(20)的侧边连接,挂钩(20)的底边用于连接阴竖料(40)和阳竖料(30)上的芯套(32)。8. The building curtain wall structure according to claim 1, characterized in that, both the support (10) and the pendant (20) are L-shaped, and the sides of the support (10) are fixed on the fixed body (100), the bottom edge stretches out of the fixed body (100), and is used to connect with the side of the hook (20), and the bottom edge of the hook (20) is used to connect the female vertical material (40) and the male vertical material (30) ) on the core sleeve (32). 9.根据权利要求1所述的建筑幕墙结构,其特征在于,所述幕墙面材(50)为钢化中空玻璃。9. The building curtain wall structure according to claim 1, characterized in that, the curtain wall surface material (50) is tempered hollow glass. 10.根据权利要求5所述的建筑幕墙结构,其特征在于,所述上横料(70)与下横料(80)之间还设置有中间横料(60),所述自攻螺钉(42)贯穿设置在所述中间横料(60)内。10. The building curtain wall structure according to claim 5, characterized in that, an intermediate cross member (60) is also arranged between the upper cross member (70) and the lower cross member (80), and the self-tapping screw ( 42) It is arranged through the middle cross member (60).
CN201010108217.6A 2010-02-05 2010-02-05 Building curtain wall structure Active CN102146707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010108217.6A CN102146707B (en) 2010-02-05 2010-02-05 Building curtain wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010108217.6A CN102146707B (en) 2010-02-05 2010-02-05 Building curtain wall structure

Publications (2)

Publication Number Publication Date
CN102146707A true CN102146707A (en) 2011-08-10
CN102146707B CN102146707B (en) 2014-04-02

Family

ID=44421161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010108217.6A Active CN102146707B (en) 2010-02-05 2010-02-05 Building curtain wall structure

Country Status (1)

Country Link
CN (1) CN102146707B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981986A (en) * 2014-05-28 2014-08-13 江河创建集团股份有限公司 Unitized curtain wall stand column hook connection structure
CN104018603A (en) * 2013-03-01 2014-09-03 深圳市方大建科集团有限公司 Anti-dropping hooking system of back-bolt type stone curtain wall
CN104895223A (en) * 2015-06-02 2015-09-09 东南大学 Cold-formed thin-walled section steel combined guide rail capable of transferring vertical load
CN108691376A (en) * 2017-04-07 2018-10-23 深圳市盈科幕墙设计咨询有限公司 A kind of novel frame unitized curtain wall structure

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2139151Y (en) * 1992-08-05 1993-07-28 沈阳黎明铝门窗工程公司 Concealed frame type aluminium alloy glass curtain wall
CN2148113Y (en) * 1992-10-15 1993-12-01 熊建明 Colored plate curtain wall
CN2289004Y (en) * 1997-05-15 1998-08-26 上海金粤幕墙有限公司 Plate curtain wall
CN2479097Y (en) * 2001-02-19 2002-02-27 中钛铝业股份有限公司 Combined curtain wall
CN1417430A (en) * 2001-10-31 2003-05-14 王广武 Heat isolating glass curtain fixed via gap hold-down plate
CN1670323B (en) * 2004-03-15 2010-06-30 王广武 Bi-fixation planking curtain
CN2778928Y (en) * 2005-03-04 2006-05-10 金融街重庆置业有限公司 Glass curtain wall
CN100585107C (en) * 2007-02-14 2010-01-27 佛山澳美铝业有限公司 A hook type hidden frame curtain wall
CN201169849Y (en) * 2008-01-28 2008-12-24 深圳中航幕墙工程有限公司 Unit type curtain wall structure for complicated space curved surface
CN201381568Y (en) * 2009-01-05 2010-01-13 深圳市方大装饰工程有限公司 Novel curtain wall
CN201377135Y (en) * 2009-06-12 2010-01-06 北京东方泰洋装饰工程有限公司 Clay curtain wall
CN201649375U (en) * 2010-02-05 2010-11-24 深圳市方大装饰工程有限公司 Building curtain wall structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018603A (en) * 2013-03-01 2014-09-03 深圳市方大建科集团有限公司 Anti-dropping hooking system of back-bolt type stone curtain wall
CN104018603B (en) * 2013-03-01 2016-04-27 深圳市方大建科集团有限公司 A kind of anticreep mounting system of back-bolt type stone curtain wall
CN103981986A (en) * 2014-05-28 2014-08-13 江河创建集团股份有限公司 Unitized curtain wall stand column hook connection structure
CN103981986B (en) * 2014-05-28 2017-01-25 江河创建集团股份有限公司 Unitized curtain wall stand column hook connection structure
CN104895223A (en) * 2015-06-02 2015-09-09 东南大学 Cold-formed thin-walled section steel combined guide rail capable of transferring vertical load
CN104895223B (en) * 2015-06-02 2017-03-22 东南大学 Cold-formed thin-walled section steel combined guide rail capable of transferring vertical load
CN108691376A (en) * 2017-04-07 2018-10-23 深圳市盈科幕墙设计咨询有限公司 A kind of novel frame unitized curtain wall structure

Also Published As

Publication number Publication date
CN102146707B (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN203684468U (en) Curtain wall system with combination of exposed frame and hidden frame
CN207177596U (en) Lower support cell curtain wall window system
CN203307974U (en) Point supporting type glass curtain wall system
CN203640113U (en) Unit curtain wall system
CN216865625U (en) A three-dimensional structure of architectural decorative glass curtain wall
CN205369625U (en) Hidden frame curtain wall with LED lamp area
CN102146707B (en) Building curtain wall structure
CN202401901U (en) Hidden pivoted window of unit curtain wall
CN111075072A (en) The same frame and different sides unit curtain wall system
CN206220307U (en) Concealed frame glass curtain wall glass supporting piece structure
CN206815609U (en) Rimless overall external corner glass unit system
CN102425255A (en) Assembled unit frame glass curtain wall system
CN201649375U (en) Building curtain wall structure
CN204983139U (en) Whole prefabricated window that wafts
CN209585374U (en) A hanging glass curtain wall structure
CN201981674U (en) Energy-saving exterior projecting glass rib decoration system
CN206174228U (en) A Component Curtain Wall Based on Assembly Technology
CN204645345U (en) With the window curtain wall of splicing type aluminium sheet
CN202809939U (en) Frame-hidden corner upright column capable of opening window
CN211714902U (en) A unitary building exterior window
CN211114268U (en) A LED transparent screen wall system
CN211473834U (en) Outer flat-open of glass curtain wall hidden frame opens a system
CN211899144U (en) Vertically plugged inclined energy-saving unit curtain wall
CN202108368U (en) A bright frame unit window system
CN2594345Y (en) Open non-adhesive granite curtain walls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENZHEN FANGDA JIANKE GROUP CO., LTD

Free format text: FORMER NAME: FANGDA DECORATION ENGINEERING CO., LTD., SHENZHEN CITY

CP03 Change of name, title or address

Address after: 518057 Nanshan District science and Technology Industrial Park, Guangdong Province, the Southern District of science and technology in the south of the road on the way to the big science and technology building, building 19, building twelve

Patentee after: Shenzhen Fangda Jianke Group Co., Ltd

Address before: 518055 Guangdong city of Shenzhen province Nanshan District Xili Town, Longjing Fangda industrial city

Patentee before: Fangda Decoration Engineering Co., Ltd., Shenzhen City

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160617

Address after: 523000 No. 11 industrial North Road, Songshan hi tech Industrial Development Zone, Guangdong, Dongguan

Patentee after: Dongguan Fang Daxin Material Co., Ltd.

Address before: 518057 Nanshan District science and Technology Industrial Park, Guangdong Province, the Southern District of science and technology in the south of the road on the way to the big science and technology building, building 19, building twelve

Patentee before: Shenzhen Fangda Jianke Group Co., Ltd