CN102128036A - 高速铁路隧道扩大断面回路型减压洞口的修建方法 - Google Patents

高速铁路隧道扩大断面回路型减压洞口的修建方法 Download PDF

Info

Publication number
CN102128036A
CN102128036A CN 201110036362 CN201110036362A CN102128036A CN 102128036 A CN102128036 A CN 102128036A CN 201110036362 CN201110036362 CN 201110036362 CN 201110036362 A CN201110036362 A CN 201110036362A CN 102128036 A CN102128036 A CN 102128036A
Authority
CN
China
Prior art keywords
tunnel
portal
cross
basal area
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110036362
Other languages
English (en)
Inventor
王英学
高波
申玉生
张超
周佳媚
贺旭洲
全晓娟
高玄涛
付业凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN 201110036362 priority Critical patent/CN102128036A/zh
Publication of CN102128036A publication Critical patent/CN102128036A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

一种高速铁路隧道扩大断面回路型减压洞口的修建方法,其做法是:A、在隧道的洞口处修建断面积为隧道断面积的1.3~1.6倍的扩大段;B、在隧道洞口的两侧修建与隧道平行且与外界连通的侧导洞,侧导洞与隧道的横向距离为20~30m,侧导洞的断面积为隧道断面积的25%~35%;C、再在两侧导洞之间修建两条横向贯通侧导洞和隧道的第一、第二和第三横通道。采用该方法修建的铁路隧道洞口,能有效地降低高速列车进入隧道所产生的微压波,而且施工容易、设置不受隧道周围地形影响、建造成本低。

Description

高速铁路隧道扩大断面回路型减压洞口的修建方法
技术领域
本发明涉及铁路隧道的修建方法,特别涉及高速铁路隧道洞口的修建方法。
背景技术
随着京津城际快线、郑西、武广时速350km/h客运专线的开通,标志着我国高速列车技术的日臻完善,使国人可以期盼在不久的未来困扰十三亿人民的出行问题可以彻底解决。当然伴随着高速铁路速度的提高,同时也会造成很多新的问题。当列车以高速进入铁路隧道时,列车前面将会产生初始压缩波,此波沿隧道向前传播。当压缩波到达隧道出口处时,即向进口反射成膨胀波,与此同时,产生一个脉冲波自隧道出口向周围地区辐射,并发出爆炸声,并使附近房屋的窗框、百叶窗等急剧振动,发出“咯啦”的响声,此脉冲波即微压波。列车进入隧道所产生的压缩波,影响了旅客的乘车舒适性;隧道出口微压波的存在,对周围环境也造成了较严重的危害。
微压波的大小和压缩波到达隧道出口时的压力梯度值(单位时间内的压力差)成正比。目前,高速铁路隧道微压波减缓的常用技术措施主要有:一、在隧道的上方开设竖井,通过竖井泄压来减小压缩波的压力梯度峰值。对于特长的隧道,往往因埋深很大,竖井施工难度大、成本高,这种减压方法难于推广使用;二、扩大隧道断面积,通过减低阻塞比(列车断面积与隧道断面积的比值)来减压,由于采用这种方法,隧道建造工程量增加很大,其建造成本高,因而使用也受到限制;三、提高机车车辆的气密性,此法只能改善车厢内的乘车环境,提高旅客的乘车舒适性,但在机车的气密性达到一定程度时,要想再提高气密性,技术难度大,维护费用高,经济性差,不能得到很好的推广使用。
发明内容
本发明的目的就是提供一种高速铁路隧道扩大断面回路型减压洞口的修建方法,采用该方法修建的铁路隧道洞口,能有效地降低高速列车进入隧道所产生的微压波,而且施工容易、不受隧道周围地形影响、建造成本低。
本发明解决其技术问题所采用的技术方案是:一种高速铁路隧道扩大断面回路型减压洞口的修建方法,其做法是:
A、在隧道的洞口处修建15~20m长的扩大段,扩大段的断面积为隧道断面积的1.3~1.6倍;
B、在隧道洞口的两侧修建与隧道平行且长度为扩大段长度2~3倍的侧导洞,侧导洞的外端与外界连通,侧导洞与隧道的横向距离为20~30m,侧导洞的断面积为隧道断面积的25%~35%;
C、再在两侧导洞与隧道之间修建横向的第一、第二和第三横通道,第一横通道的纵向位置位于扩大段的中间,断面积为隧道断面积的15%~20%;第二横通道的纵向位置与第一横通道的纵向位置相距10~18m,断面积为隧道断面积的15%~20%;第三横通道的纵向位置位于侧导洞的内端,断面积为隧道断面积的10%~20%。
与现有技术相比,本发明的有益效果是:
1、在隧道洞口通过修建长15~20m的断面积为隧道断面积1.3~1.6倍的扩大段,扩大段的空间明显增加,列车进入洞口的压缩波得到明显的减小,明显降低了压缩波的压力峰值及压力梯度。
2、在隧道洞口(扩大段)两侧修建侧导洞及连通侧导洞与隧道的第一、第二、第三横通道,使得隧道洞口通过侧导洞与外界连通,增加了隧道洞口处压缩波向外界扩散的路径,从而有效地改变了初始压缩波的波前形状,将压缩波分成几个较弱的波,进一步降低了压缩波的压力峰值及压力梯度。
3、本发明仅需在隧道洞口处修建扩大段、侧导洞及横通道,不受隧道周围地形影响、其施工容易。在相同的减压效果下,较之直接加大隧道断面积以减少阻塞比所增加的隧道面积小得多,其施工成本明显降低。
总之,本发明能有效的降低隧道洞口压缩波的压力峰值及压力梯度,大大削减了高速列车进出隧道所产生的空气动力学效应,增加旅客的乘车舒适性;也使压缩波到达隧道出口处时产生的微压波大大减小,减小对周围环境的危害。且施工容易,建造成本低。
理论计算表明:当车速为350km/h,隧道面积为100m2,列车面积为11.0m2时,隧道模型长度取500m。隧道洞口采用本发明方法修建时,隧道内200m测点处的压力梯度峰值为4.9kPa/s;而洞口不采用本发明方法修建,在其它条件均相同的情况下,相同测点的压力梯度峰值为11.6kPa/s;本发明方法修建的隧道在出洞口处,压力梯度峰值较现有隧道降低58%。由于压力梯度与微压波峰值成正比,因此,隧道出口微压波峰值也将降低58%左右,其减压效果显著。
下面结合附图和具体实施方式对本发明作进一步的详细说明。
附图说明
图1是本发明方法修建的铁路隧道扩大断面回路型减压洞口的横向剖视结构示意图。
图2是图1的A-A剖视结构示意图。
图3是图1的B-B剖视结构示意图。
图4是图1的C-C剖视结构示意图。
图5是本发明方法修建的隧道洞口与普通方法修建的隧道洞口结构无变化的相同条件的隧道内测点的压力梯度值与时间的数值模拟关系曲线。
图5中:横坐标为时间、单位为秒(s),纵坐标为压力梯度、单位为kPa/s。其中曲线D为普通方法修建的隧道的曲线,曲线F为本发明修建的隧道的曲线。具体的计算条件是车速为350km/h,隧道面积为100m2,列车面积为11.0m2时,隧道模型长度取500m。
具体实施方式
实施例
图1-4示出,本发明的一种具体实施方式是,一种高速铁路隧道扩大断面回路型减压洞口的修建方法,其做法是:
A、在隧道10的洞口处修建15~20m长的扩大段11,扩大段11的断面积为隧道10断面积的1.3~1.6倍;
B、在隧道10洞口的两侧修建与隧道10平行且长度为扩大段11长度2~3倍的侧导洞12,侧导洞12的外端与外界连通,侧导洞12与隧道10的横向距离为20~30m,侧导洞12的断面积为隧道10断面积的25%~35%;
C、再在两侧导洞12与隧道10之间修建横向的第一、第二和第三横通道20,21,22,第一横通道20的纵向位置位于扩大段11的中间,断面积为隧道10断面积的15%~20%;第二横通道21的纵向位置与第一横通道的纵向位置相距10~18m,断面积为隧道10断面积的15%~20%;第三横通道22的纵向位置位于侧导洞12的内端,断面积为隧道10断面积的10%~20%。
图5是本发明方法修建的隧道洞口与普通方法修建的隧道洞口结构无变化的相同条件的隧道内测点的压力梯度值与时间的数值模拟关系曲线。图5中:横坐标为时间、单位为秒(s),纵坐标为压力梯度、单位为kPa/s。其中曲线D为普通方法修建的隧道的曲线,曲线F为本发明修建的隧道的曲线。具体的计算条件是车速为350km/h,隧道面积为100m2,列车面积为11.0m2时,隧道模型长度取500m。
从图5可以看出,隧道洞口采用本发明方法修建时,隧道内200m测点处的压力梯度峰值为4.9kPa/s;而洞口不采用本发明方法修建,在其它条件均相同的情况下,相同测点的压力梯度峰值为11.6kPa/s;本发明方法修建的隧道在出洞口处,压力梯度峰值较现有隧道降低58%。由于压力梯度与微压波峰值成正比,因此,隧道出口微压波峰值也将降低58%左右,其减压效果显著。

Claims (1)

1.一种高速铁路隧道扩大断面回路型减压洞口的修建方法,其做法是:
A、在隧道(10)的洞口处修建15~20m长的扩大段(11),扩大段(11)的断面积为隧道(10)断面积的1.3~1.6倍;
B、在隧道(10)洞口的两侧修建与隧道(10)平行且长度为扩大段(11)长度2~3倍的侧导洞(12),侧导洞(12)的外端与外界连通,侧导洞(12)与隧道(10)的横向距离为20~30m,侧导洞(12)的断面积为隧道(10)断面积的25%~35%;
C、再在两侧导洞(12)与隧道(10)之间修建横向的第一、第二和第三横通道(20,21,22),第一横通道(20)的纵向位置位于扩大段(11)的中间,断面积为隧道(10)断面积的15%~20%;第二横通道(21)的纵向位置与第一横通道的纵向位置相距10~18m,断面积为隧道(10)断面积的15%~20%;第三横通道(22)的纵向位置位于侧导洞(12)的内端,断面积为隧道(10)断面积的10%~20%。
CN 201110036362 2010-12-24 2011-02-11 高速铁路隧道扩大断面回路型减压洞口的修建方法 Pending CN102128036A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110036362 CN102128036A (zh) 2010-12-24 2011-02-11 高速铁路隧道扩大断面回路型减压洞口的修建方法

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201010604406 2010-12-24
CN201010604406.2 2010-12-24
CN 201110036362 CN102128036A (zh) 2010-12-24 2011-02-11 高速铁路隧道扩大断面回路型减压洞口的修建方法

Publications (1)

Publication Number Publication Date
CN102128036A true CN102128036A (zh) 2011-07-20

Family

ID=44266285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110036362 Pending CN102128036A (zh) 2010-12-24 2011-02-11 高速铁路隧道扩大断面回路型减压洞口的修建方法

Country Status (1)

Country Link
CN (1) CN102128036A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104948208A (zh) * 2015-06-30 2015-09-30 昆明理工大学 一种基于狭小地下通道侧向扩建大跨洞室的施工结构及方法
CN109083656A (zh) * 2018-09-17 2018-12-25 中铁二院工程集团有限责任公司 一种具有气动效应缓解功能的铁路隧道衬砌结构
CN111852500A (zh) * 2020-06-30 2020-10-30 中南大学 一种时速600km以上磁悬浮铁路隧道的横通道设计方法
CN111852499A (zh) * 2020-06-30 2020-10-30 中南大学 一种时速600km以上磁悬浮铁路隧道的竖井设计方法
CN112282786A (zh) * 2020-11-06 2021-01-29 太原理工大学 一种高速铁路长大隧道微气压波减缓方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0842291A (ja) * 1994-07-29 1996-02-13 Uchu Kagaku Kenkyusho トンネル構造
CN1814920A (zh) * 2006-03-08 2006-08-09 上海市隧道工程轨道交通设计研究院 多孔壁缓冲方式
CN201106157Y (zh) * 2007-10-29 2008-08-27 中铁二院工程集团有限责任公司 高速铁路隧道洞口微压波缓冲设施
WO2009057852A1 (en) * 2007-10-31 2009-05-07 Korea Railroad Research Institute High-speed railway tunnel hood for reducing micro-pressure waves
CN101812991A (zh) * 2009-10-30 2010-08-25 西南交通大学 铁路隧道回路式减压洞口的修建方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0842291A (ja) * 1994-07-29 1996-02-13 Uchu Kagaku Kenkyusho トンネル構造
CN1814920A (zh) * 2006-03-08 2006-08-09 上海市隧道工程轨道交通设计研究院 多孔壁缓冲方式
CN201106157Y (zh) * 2007-10-29 2008-08-27 中铁二院工程集团有限责任公司 高速铁路隧道洞口微压波缓冲设施
WO2009057852A1 (en) * 2007-10-31 2009-05-07 Korea Railroad Research Institute High-speed railway tunnel hood for reducing micro-pressure waves
CN101812991A (zh) * 2009-10-30 2010-08-25 西南交通大学 铁路隧道回路式减压洞口的修建方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104948208A (zh) * 2015-06-30 2015-09-30 昆明理工大学 一种基于狭小地下通道侧向扩建大跨洞室的施工结构及方法
CN104948208B (zh) * 2015-06-30 2017-07-28 昆明理工大学 一种基于狭小地下通道侧向扩建大跨洞室的施工结构及方法
CN109083656A (zh) * 2018-09-17 2018-12-25 中铁二院工程集团有限责任公司 一种具有气动效应缓解功能的铁路隧道衬砌结构
CN109083656B (zh) * 2018-09-17 2024-05-28 中铁二院工程集团有限责任公司 一种具有气动效应缓解功能的铁路隧道衬砌结构
CN111852500A (zh) * 2020-06-30 2020-10-30 中南大学 一种时速600km以上磁悬浮铁路隧道的横通道设计方法
CN111852499A (zh) * 2020-06-30 2020-10-30 中南大学 一种时速600km以上磁悬浮铁路隧道的竖井设计方法
CN111852500B (zh) * 2020-06-30 2021-09-24 中南大学 一种时速600km以上磁悬浮铁路隧道的横通道设计方法
CN112282786A (zh) * 2020-11-06 2021-01-29 太原理工大学 一种高速铁路长大隧道微气压波减缓方法
CN112282786B (zh) * 2020-11-06 2023-02-28 太原理工大学 一种高速铁路长大隧道微气压波减缓方法

Similar Documents

Publication Publication Date Title
CN102128036A (zh) 高速铁路隧道扩大断面回路型减压洞口的修建方法
CN103670436B (zh) 高速铁路隧道洞口侧部条带式音爆控制构造
CN101929339A (zh) 高速铁路隧道洞身微压波减缓构造
Zhai et al. Analysis of vibration reduction characteristics and applicability of steel-spring floating-slab track
CN207144952U (zh) 一种高速地铁隧道洞口气动效应缓冲结构
CN105952468A (zh) 一种具有微气压波缓解功能的高速铁路隧道连接明洞
CN103016025A (zh) 一种高速铁路双线隧道洞口缓冲结构
CN105756684A (zh) 缓解铁路隧道洞口的微压波的装置
CN105003282A (zh) 高速铁路隧道端部扩大式硐室减缓构造
CN114165253A (zh) 超高速铁路隧道洞口双层式渐变开孔缓冲结构
CN101812991B (zh) 铁路隧道回路式减压洞口的修建方法
CN204327113U (zh) 铁路隧道内挡板型缓冲结构
CN205421054U (zh) 高铁用桥梁金属高强声屏障
CN208137949U (zh) 一种高速铁路隧道洞口的微气压波减缓构造
CN205135645U (zh) 高速铁路隧道端部扩大式硐室减缓构造
CN205711868U (zh) 一种城市道路环保防护栏
CN104213926A (zh) 一种高速铁路隧道洞口风压过渡自适应装置
CN103470269B (zh) 高速铁路隧道洞口间缝式高效缓冲结构
CN202534407U (zh) 电缆防护套
CN207093094U (zh) 一种高速地铁隧道洞口处泄压孔缓冲结构
CN104806250B (zh) 一种掘进机始发牵引方法
CN207017154U (zh) 一种桥梁墙式防撞护栏
CN205823291U (zh) 一种具有微气压波缓解功能的高速铁路隧道连接明洞
CN203008928U (zh) 一种高速铁路隧道结构
CN103016024A (zh) 一种高速铁路单线隧道洞口缓冲结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110720