CN102125808B - Ionic membrane detection device - Google Patents

Ionic membrane detection device Download PDF

Info

Publication number
CN102125808B
CN102125808B CN 201010593245 CN201010593245A CN102125808B CN 102125808 B CN102125808 B CN 102125808B CN 201010593245 CN201010593245 CN 201010593245 CN 201010593245 A CN201010593245 A CN 201010593245A CN 102125808 B CN102125808 B CN 102125808B
Authority
CN
China
Prior art keywords
box body
air
ionic membrane
detection device
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010593245
Other languages
Chinese (zh)
Other versions
CN102125808A (en
Inventor
王永明
宋德锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PANZIHUA STEEL XINYU CHEMICAL CO Ltd
Original Assignee
PANZIHUA STEEL XINYU CHEMICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PANZIHUA STEEL XINYU CHEMICAL CO Ltd filed Critical PANZIHUA STEEL XINYU CHEMICAL CO Ltd
Priority to CN 201010593245 priority Critical patent/CN102125808B/en
Publication of CN102125808A publication Critical patent/CN102125808A/en
Application granted granted Critical
Publication of CN102125808B publication Critical patent/CN102125808B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The invention discloses an ionic membrane detection device, which has a simple structure and can determine whether leakage is needed to be mended or not and determine the specific positions of leakage points. The device comprises a box body with a cover body, wherein a sealing cavity is formed inside the box body; a ventilating structure capable of dividing the cavity inside the box body into an upper cavity and a lower cavity is arranged inside the box body; the upper cavity and the lower cavity are communicated by the ventilating structure; the shape of the top surface of the ventilating structure is adaptive with that of the ionic membrane, and a ventilating pressed membrane grid is arranged on the top surface of the ventilating structure; a gas transmission pipe communicated with the lower cavity is connected on the box body corresponding to the lower cavity, and the gas transmission pipe is connected with a gas source; and a gas outlet pipe communicated with the upper cavity is connected on the box body corresponding to the upper cavity, and a gas flowmeter is connected on the gas outlet pipe.

Description

离子膜检测装置Ion membrane detection device

技术领域 technical field

本发明涉及一种离子膜检测装置。The invention relates to an ion membrane detection device.

背景技术 Background technique

离子交换膜(以下简称离子膜)是离子膜制碱工艺中的核心,它具有昂贵、易损坏的特点。离子膜对工艺稳定的要求非常高,在日常操作中压差变化、保存安装不当均会引起离子膜的损坏,离子膜的损坏主要是指离子膜上出现大量泄漏点,离子膜损坏后需要对离子膜进行检测,以确认离子膜泄漏程度是否达到需要补漏的程度,如果达到该程度,则需要补漏后继续使用。现在的离子膜试漏工艺虽然可以确定泄漏程度是否达到需要补漏的程度,但不能确定离子膜上泄漏点的具体位置,而现有的确定离子膜上泄漏点具体位置的检测工艺所用设备经常不能完全找出泄漏点,设备昂贵、维修和使用十分不便。Ion-exchange membrane (hereinafter referred to as ion-exchange membrane) is the core of ion-exchange membrane soda production process, and it is expensive and easily damaged. The ionic membrane has very high requirements for process stability. In daily operation, changes in pressure difference and improper storage and installation will cause damage to the ionic membrane. The damage of the ionic membrane mainly refers to a large number of leakage points on the ionic membrane. The ionic membrane is tested to confirm whether the leakage of the ionic membrane reaches the level that needs to be repaired. If it reaches this level, it needs to be repaired before continuing to use. Although the current ionic membrane leak testing process can determine whether the degree of leakage reaches the level that needs to be repaired, it cannot determine the specific position of the leak point on the ionic membrane, and the existing detection technology for determining the specific position of the leak point on the ionic membrane often cannot. To find out the leak point completely, the equipment is expensive, and the maintenance and use are very inconvenient.

发明内容 Contents of the invention

本发明解决的技术问题是提供一种结构简单的离子膜检测装置。The technical problem solved by the invention is to provide an ion membrane detection device with a simple structure.

本发明解决其技术问题所采用的技术方案是:离子膜检测装置,包括带有盖体的盒体,所述盒体内部形成封闭空腔,所述盒体内部设置有将盒体内部空腔分割成上腔和下腔的透气结构,所述上腔与下腔仅通过透气结构连通,上述透气结构的顶面形状与离子膜形状适配且透气结构的顶面上设置有透气压膜栅格;下腔对应的盒体上连接有与下腔连通的输气管,输气管与气源相连,上腔对应的盒体上连接有与上腔连通的出气管,出气管上连接有气体流量计。The technical solution adopted by the present invention to solve the technical problem is: the ionic membrane detection device includes a box body with a cover, the inside of the box body forms a closed cavity, and the inside of the box body is provided with a cavity inside the box body. Divided into an upper chamber and a lower chamber with a ventilating structure, the upper chamber and the lower chamber are only connected through the ventilating structure, the shape of the top surface of the above ventilating structure is adapted to the shape of the ionic membrane and the top surface of the ventilating structure is provided with a ventilating pressure film grid grid; the box body corresponding to the lower chamber is connected with an air delivery pipe connected with the lower chamber, and the air delivery pipe is connected with the gas source; count.

进一步的是:所述透气结构为金属网。Further, the air-permeable structure is a metal mesh.

进一步的是:所述上腔对应的盒体为上盒体,下腔对应的盒体为下盒体,所述上盒体与下盒体可拆卸式连接,所述透气结构安装在下盒体的顶部,所述透气压膜栅格安装在上盒体的底部,所述盖体设置在上盒体的顶部。Further, the box body corresponding to the upper cavity is the upper box body, the box body corresponding to the lower cavity is the lower box body, the upper box body and the lower box body are detachably connected, and the ventilation structure is installed on the lower box body The top of the air-permeable pressure-film grid is installed on the bottom of the upper box, and the cover is arranged on the top of the upper box.

进一步的是:所述输气管上安装有限压装置。Further, a pressure limiting device is installed on the gas delivery pipe.

进一步的是:所述限压装置包括限压支管和装有液体的容器,所述限压支管一端与输气管连通,另一端插入容器内的液体中。Further, the pressure limiting device includes a pressure limiting branch pipe and a container filled with liquid, one end of the pressure limiting branch pipe communicates with the gas delivery pipe, and the other end is inserted into the liquid in the container.

进一步的是:所述下腔对应的盒体上连接有与下腔连通的测压装置。Further, a pressure measuring device communicating with the lower chamber is connected to the box body corresponding to the lower chamber.

进一步的是:所述侧压装置包括测压支管和U形管压力计,所述测压支管一端与所述下腔连通,另一端与U形管压力计相连。Further, the lateral pressure device includes a pressure measuring branch pipe and a U-shaped pipe manometer, one end of the pressure measuring branch pipe communicates with the lower cavity, and the other end is connected with the U-shaped pipe manometer.

进一步的是:所述上腔对应的盒体的侧壁上设置有与上腔连通的U形溢流管。Further, a U-shaped overflow pipe communicating with the upper chamber is provided on the side wall of the box body corresponding to the upper chamber.

本发明的有益效果是:本发明的检测装置结构简单,且一方面可以确定泄漏程度是否达到需要补漏的程度,另一方面可以确定泄漏点的具体位置。The beneficial effects of the present invention are: the detection device of the present invention has a simple structure, and on the one hand, it can determine whether the degree of leakage reaches the level that needs to be repaired; on the other hand, it can determine the specific position of the leakage point.

附图说明 Description of drawings

图1为本发明的离子膜检测装置内部的透气结构的示意图;Fig. 1 is the schematic diagram of the air-permeable structure inside the ionic membrane detection device of the present invention;

图2为本发明的离子膜检测装置的示意图;Fig. 2 is the schematic diagram of ion membrane detection device of the present invention;

图3为包括限压支管和容器的限压装置的示意图;3 is a schematic diagram of a pressure limiting device comprising a pressure limiting branch pipe and a container;

图4为设置有U形溢流管的上腔的示意图。Fig. 4 is a schematic diagram of an upper chamber provided with a U-shaped overflow pipe.

图中标记为:1-气体流量计,2-出气管,3-上盒体,4-U形溢流管,5-透气结构,6-下盒体,7-下腔,8-测压支管,9-侧压装置,10-气源,11-限压装置,12-输气管,13-上腔,14-透气压膜栅格,15-盒体,16-盖体,17-限压支管,18-容器,19-U形管压力计。Marked in the figure: 1-gas flow meter, 2-outlet pipe, 3-upper box, 4-U-shaped overflow pipe, 5-ventilated structure, 6-lower box, 7-lower chamber, 8-pressure measurement Branch pipe, 9-side pressure device, 10-air source, 11-pressure limiting device, 12-air delivery pipe, 13-upper cavity, 14-ventilated pressure film grid, 15-box, 16-cover, 17-limit Pressure branch pipe, 18-container, 19-U-shaped pipe pressure gauge.

具体实施方式 Detailed ways

下面结合附图和具体实施方式对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

如图1和图2所示,离子膜检测装置,包括带有盖体16的盒体15,所述盒体15内部形成封闭空腔,所述盒体15内部设置有将盒体内部空腔分割成上腔13和下腔7的透气结构5,所述上腔13与下腔7仅通过透气结构5连通,上述透气结构5的顶面形状与离子膜形状适配且透气结构5的顶面上设置有透气压膜栅格14;下腔7对应的盒体上连接有与下腔7连通的输气管12,输气管12与气源10相连,上腔13对应的盒体上连接有与上腔13连通的出气管2,出气管2上连接有气体流量计1。上述透气结构的顶面形状与离子膜形状适配是指:透气结构的顶面形状及大小与离子膜的形状及大小相同,比如离子膜为矩形,则透气结构的顶面形状也为矩形,且离子膜可以完全覆盖透气结构的顶面。上述透气结构可以为平板,在平板上设置多个透气孔,也可以为栅格等,优选实施方式是:透气结构5为金属网,这样可以保证下腔的气体顺利流入上腔,有利于减少透气结构对气体流动的阻挡作用。另外,上述透气压膜栅格14也可以用金属网或带有多个透气孔的平板取代。As shown in Fig. 1 and Fig. 2, the ionic membrane detection device comprises a box body 15 with a cover body 16, the inside of the box body 15 forms a closed cavity, and the inside of the box body 15 is provided with a box body inner cavity Divided into the air-permeable structure 5 of the upper chamber 13 and the lower chamber 7, the upper chamber 13 and the lower chamber 7 are only communicated through the air-permeable structure 5, the shape of the top surface of the above-mentioned air-permeable structure 5 is adapted to the shape of the ionic membrane and the top of the air-permeable structure 5 Air-permeable pressure-film grids 14 are arranged on the surface; the box body corresponding to the lower chamber 7 is connected with an air delivery pipe 12 communicating with the lower chamber 7, the air delivery pipe 12 is connected with the gas source 10, and the box body corresponding to the upper chamber 13 is connected with a The air outlet pipe 2 communicating with the upper cavity 13 is connected with the gas flow meter 1 . The shape of the top surface of the above-mentioned air-permeable structure is adapted to the shape of the ionic membrane, which means that the shape and size of the top surface of the air-permeable structure are the same as the shape and size of the ionic membrane. For example, if the ionic membrane is rectangular, the shape of the top surface of the air-permeable structure is also rectangular. And the ionic membrane can completely cover the top surface of the air-permeable structure. The above-mentioned air-permeable structure can be a flat plate, and a plurality of air-vent holes are arranged on the plate, and can also be a grid, etc., the preferred embodiment is: the air-permeable structure 5 is a metal mesh, which can ensure that the gas in the lower chamber flows into the upper chamber smoothly, which is beneficial to reduce The barrier effect of the breathable structure on the flow of gas. In addition, the above-mentioned air-permeable pressure-film grid 14 can also be replaced by a metal mesh or a flat plate with a plurality of air-ventilating holes.

使用时,打开盖体,将离子膜固定在透气结构的顶面上,固定方式可以为将离子膜粘贴在顶面上或将离子膜的边缘压置在顶面上等,且使离子膜将透气结构的顶面完全覆盖,这样可以保证下腔的气体只能通过离子膜流入上腔,然后将离子膜上搁置透气压膜栅格,透气压膜栅格的大小可以根据离子膜的形状和大小确定,以能够覆盖离子膜整个区域为佳,这样可以保证下腔内的气体上顶离子膜时不会将离子膜冲破,然后将盖体合上,使盒体内部形成封闭空腔,接着通过输气管向盒体的下腔通入气体,气体可以为氮气等,通入气体的压力和流量可根据需要检测的离子膜的种类确定,然后通过记录单位时间内出气管上气体流量计上的数值,可得出单位时间内通过离子膜的气体流量,离子膜上的泄漏点越多,则单位时间内通过离子膜的气体越多,如果单位时间内的气体流量值超过正常值,则说明该离子膜需要补漏,否则不需要补漏,例如10L/H为正常值,超过该值,则需要补漏。When in use, open the cover and fix the ionic membrane on the top surface of the air-permeable structure. The fixing method can be to paste the ionic membrane on the top surface or press the edge of the ionic membrane on the top surface, etc., and make the ionic membrane The top surface of the air-permeable structure is completely covered, so that the gas in the lower chamber can only flow into the upper chamber through the ionic membrane, and then the air-permeable pressure-film grid is placed on the ionic membrane. The size of the air-permeable pressure-film grid can be determined according to the shape of the ionic membrane and The size is determined, and it is better to cover the entire area of the ion membrane, so as to ensure that the gas in the lower chamber will not break through the ion membrane when it goes up to the ion membrane, and then close the cover to form a closed cavity inside the box, and then The gas can be fed into the lower cavity of the box body through the gas delivery pipe. The gas can be nitrogen, etc. The pressure and flow rate of the gas can be determined according to the type of ion membrane to be detected, and then recorded on the gas flow meter on the gas outlet pipe per unit time. The value of the value can be obtained per unit time through the gas flow through the ion membrane, the more leakage points on the ion membrane, the more gas passing through the ion membrane per unit time, if the gas flow value per unit time exceeds the normal value, then It means that the ionic membrane needs to be repaired, otherwise it is not necessary, for example, 10L/H is a normal value, and if it exceeds this value, it needs to be repaired.

当需要确定离子膜上泄漏点的具体位置时,将上盖打开,向上腔内放入少量液体,例如水,使液体将整个离子膜覆盖即可,离子膜上虽然具有泄漏点,但一般情况下液体无法通过泄漏点流入下腔,如果液体通过泄漏点流入到下腔,说明泄漏点过大,通过目测已经可以观察出,此时也就无须再通过本发明的检测装置确定其具体位置;然后向下腔通入气体,气体通过离子膜上的泄漏点后会在离子膜上方的液体中产生气泡,通过观察气泡的位置,即可确定离子膜上泄漏点的具体位置。上述过程中,如果上腔内放入的液体过多,则一方面不便于观察气泡产生的具体位置,另外有可能使离子膜在水压作用下损坏,为了防止上述情况的发生,如图4所示,所述上腔13对应的盒体的侧壁上设置有与上腔13连通的U形溢流管4,当上腔内的液体过多时,过多的液体会从U形溢流管4流出,这样就可控制上腔内液体的容量,有利于检测过程的顺利进行。另外,设置有U形溢流管4后,在检测离子膜泄漏程度时,即通过气体流量计上的数值确定离子膜是否需要补漏的检测过程中,可先向U形溢流管4内注入液体,起到液密封的作用,这样上腔13内的气体就不会从U形溢流管4流出,从而有利于检测过程的顺利进行。When it is necessary to determine the specific location of the leakage point on the ionic membrane, open the upper cover, and put a small amount of liquid, such as water, into the upward cavity, so that the liquid can cover the entire ionic membrane. Although there is a leak point on the ionic membrane, the general condition The lower liquid cannot flow into the lower cavity through the leakage point. If the liquid flows into the lower cavity through the leakage point, it means that the leakage point is too large, and it can be observed through visual inspection. At this time, it is not necessary to determine its specific location through the detection device of the present invention; Then the gas is passed into the lower cavity, and after the gas passes through the leakage point on the ion membrane, bubbles will be generated in the liquid above the ion membrane. By observing the position of the bubble, the specific position of the leakage point on the ion membrane can be determined. In the above process, if too much liquid is put into the upper chamber, it will be inconvenient to observe the specific position of the bubbles on the one hand, and the ion membrane may be damaged under the action of water pressure. In order to prevent the above situation from happening, as shown in Figure 4 As shown, the side wall of the box body corresponding to the upper chamber 13 is provided with a U-shaped overflow pipe 4 communicating with the upper chamber 13. When the liquid in the upper chamber is too much, the excessive liquid will overflow from the U-shaped Tube 4 flows out, so just can control the capacity of the liquid in the upper cavity, is conducive to the smooth progress of detection process. In addition, after the U-shaped overflow pipe 4 is provided, when detecting the leakage degree of the ionic membrane, that is, in the detection process of determining whether the ionic membrane needs to be repaired through the numerical value on the gas flow meter, it can be injected into the U-shaped overflow pipe 4 first. The liquid acts as a liquid seal, so that the gas in the upper chamber 13 will not flow out from the U-shaped overflow pipe 4, thereby facilitating the smooth progress of the detection process.

为了便于将离子膜置于透气结构上,同时也便于将透气压膜栅格搁置在离子膜上,所述上腔13对应的盒体为上盒体3,下腔7对应的盒体为下盒体6,所述上盒体3与下盒体6可拆卸式连接,所述透气结构5安装在下盒体6的顶部,所述透气压膜栅格14安装在上盒体3的底部,所述盖体16设置在上盒体3的顶部。使用时,将上盒体抬起,将离子膜置于透气结构上,再将上盒体与下盒体连接,则上盒体底部的透气压膜栅格恰好位于离子膜上,这样可以节省用于检测的时间,提高检测效率。In order to facilitate placing the ionic membrane on the air-permeable structure, and to place the air-permeable pressure-membrane grid on the ionic membrane, the corresponding box body of the upper chamber 13 is the upper box body 3, and the corresponding box body of the lower chamber 7 is the lower box body. Box body 6, the upper box body 3 is detachably connected to the lower box body 6, the breathable structure 5 is installed on the top of the lower box body 6, and the air-permeable pressure-film grid 14 is installed on the bottom of the upper box body 3, The cover body 16 is arranged on the top of the upper box body 3 . When in use, lift the upper box body, place the ionic membrane on the air-permeable structure, and then connect the upper box body with the lower box body, the air-permeable pressure-membrane grid at the bottom of the upper box body is just on the ionic membrane, which can save The time used for detection improves detection efficiency.

为了提高检测过程的安全性,所述输气管12上安装有限压装置11。当输气管12内的气体压力过大时,限压装置11自动开启进行泄压,防止意外发生。限压装置11可以为安装在输气管12上的限压阀,优选实施方式是:如图3所示,所述限压装置11包括限压支管17和装有液体的容器18,所述限压支管17一端与输气管12连通,另一端插入容器18内的液体中。当输气管12内的压力为正常值时,限压支管17内的气体压力也为正常值,此时,限压支管17内部由于存在液体,使得气体不会泄漏;当输气管12内的压力过大时,限压支管17内的气体会将限压支管17内的液体从管内排出,进而使输气管12内的气体通过限压支管排出至容器18内的液体中,并最终排出至外部大气环境中。In order to improve the safety of the detection process, a pressure limiting device 11 is installed on the gas delivery pipe 12 . When the gas pressure in the gas delivery pipe 12 is too high, the pressure limiting device 11 is automatically opened for pressure relief to prevent accidents. The pressure limiting device 11 can be a pressure limiting valve installed on the gas delivery pipe 12. A preferred embodiment is: as shown in FIG. One end of the branch pipe 17 communicates with the gas delivery pipe 12 , and the other end is inserted into the liquid in the container 18 . When the pressure in the gas delivery pipe 12 was a normal value, the gas pressure in the pressure limiting branch pipe 17 was also a normal value. At this time, the gas would not leak due to the presence of liquid in the pressure limiting branch pipe 17; When it is too large, the gas in the pressure-limiting branch pipe 17 will discharge the liquid in the pressure-limiting branch pipe 17 from the pipe, and then the gas in the gas delivery pipe 12 will be discharged into the liquid in the container 18 through the pressure-limiting branch pipe, and finally discharged to the outside atmospheric environment.

为了提高检测的准确性,所述下腔7对应的盒体上连接有与下腔7连通的测压装置9。因为检测过程需要在一定压力下进行,压力过大和过小都会影响检测精确度,所以设置测压装置9有利于保证检测过程中压力稳定。上述测压装置9可以为压力表,优选实施方式是:所述侧压装置9包括测压支管8和U形管压力计19,所述测压支管8一端与所述下腔7连通,另一端与U形管压力计19相连,采用上述结构,可以通过简单的结构实现压力的检测。In order to improve the detection accuracy, a pressure measuring device 9 communicating with the lower chamber 7 is connected to the box body corresponding to the lower chamber 7 . Because the detection process needs to be carried out under a certain pressure, too high or too low pressure will affect the detection accuracy, so setting the pressure measuring device 9 is beneficial to ensure that the pressure is stable during the detection process. The above-mentioned pressure measuring device 9 can be a pressure gauge, and the preferred embodiment is: the side pressure device 9 includes a pressure measuring branch pipe 8 and a U-shaped pipe manometer 19, one end of the pressure measuring branch pipe 8 communicates with the lower chamber 7, and the other One end is connected with the U-shaped tube pressure gauge 19, and the above-mentioned structure can realize pressure detection through a simple structure.

Claims (8)

1.离子膜检测装置,包括带有盖体(16)的盒体(15),所述盒体(15)内部形成封闭空腔,其特征是:所述盒体(15)内部设置有将盒体内部空腔分割成上腔(13)和下腔(7)的透气结构(5),所述上腔(13)与下腔(7)仅通过透气结构(5)连通,上述透气结构(5)的顶面形状与离子膜形状适配且透气结构(5)的顶面上设置有透气压膜栅格(14);下腔(7)对应的盒体上连接有与下腔(7)连通的输气管(12),输气管(12)与气源(10)相连,上腔(13)对应的盒体上连接有与上腔(13)连通的出气管(2),出气管(2)上连接有气体流量计(1)。 1. ionic membrane detection device comprises the box body (15) that has lid (16), and described box body (15) inside forms closed cavity, it is characterized in that: described box body (15) inside is provided with The inner cavity of the box body is divided into a ventilating structure (5) of an upper chamber (13) and a lower chamber (7). The upper chamber (13) and the lower chamber (7) are only communicated through the venting structure (5). The shape of the top surface of (5) is adapted to the shape of the ionic membrane and the top surface of the air-permeable structure (5) is provided with an air-permeable pressure-film grid (14); the box body corresponding to the lower cavity (7) is connected with the lower cavity ( 7) Connected air delivery pipe (12), the air delivery pipe (12) is connected to the air source (10), and the box body corresponding to the upper chamber (13) is connected with the air outlet pipe (2) connected with the upper chamber (13). A gas flow meter (1) is connected to the gas pipe (2). 2.如权利要求1所述的离子膜检测装置,其特征是:所述透气结构(5)为金属网。 2. The ionic membrane detection device according to claim 1, characterized in that: the air-permeable structure (5) is a metal mesh. 3.如权利要求1或2所述的离子膜检测装置,其特征是:所述上腔(13)对应的盒体为上盒体(3),下腔(7)对应的盒体为下盒体(6),所述上盒体(3)与下盒体(6)可拆卸式连接,所述透气结构(5)安装在下盒体(6)的顶部,所述透气压膜栅格(14)安装在上盒体(3)的底部,所述盖体(16)设置在上盒体(3)的顶部。 3. The ionic membrane detection device according to claim 1 or 2, characterized in that: the box body corresponding to the upper cavity (13) is the upper box body (3), and the box body corresponding to the lower cavity (7) is the lower box body A box body (6), the upper box body (3) is detachably connected to the lower box body (6), the air-permeable structure (5) is installed on the top of the lower box body (6), and the air-permeable film-pressed grid (14) is installed on the bottom of the upper box body (3), and the cover (16) is arranged on the top of the upper box body (3). 4.如权利要求1或2所述的离子膜检测装置,其特征是:所述输气管(12)上安装有限压装置(11)。 4. The ionic membrane detection device according to claim 1 or 2, characterized in that: a pressure limiting device (11) is installed on the gas delivery pipe (12). 5.如权利要求4所述的离子膜检测装置,其特征是:所述限压装置(11)包括限压支管(17)和装有液体的容器(18),所述限压支管(17)一端与输气管(12)连通,另一端插入容器(18)内的液体中。 5. ion membrane detection device as claimed in claim 4 is characterized in that: described pressure limiting device (11) comprises pressure limiting branch pipe (17) and the container (18) that liquid is housed, and described pressure limiting branch pipe (17) One end communicates with the air delivery pipe (12), and the other end is inserted into the liquid in the container (18). 6.如权利要求1或2所述的离子膜检测装置,其特征是:所述下腔(7)对应的盒体上连接有与下腔(7)连通的测压装置(9)。 6. The ionic membrane detection device according to claim 1 or 2, characterized in that: a pressure measuring device (9) communicating with the lower chamber (7) is connected to the box body corresponding to the lower chamber (7). 7.如权利要求6所述的离子膜检测装置,其特征是:所述测压装置(9)包括测压支管(8)和U形管压力计(19),所述测压支管(8)一端与所述下腔(7)连通,另一端与U形管压力计(19)相连。 7. ion membrane detection device as claimed in claim 6, is characterized in that: described pressure measurement device (9) comprises pressure measurement branch pipe (8) and U-shaped tube manometer (19), and described pressure measurement branch pipe (8) ) one end communicates with the lower cavity (7), and the other end links to each other with the U-shaped tube pressure gauge (19). 8.如权利要求1或2所述的离子膜检测装置,其特征是:所述上腔(13)对应的盒体的侧壁上设置有与上腔(13)连通的U形溢流管(4)。  8. The ionic membrane detection device according to claim 1 or 2, characterized in that: a U-shaped overflow pipe communicating with the upper chamber (13) is provided on the side wall of the box body corresponding to the upper chamber (13) (4). the
CN 201010593245 2010-12-17 2010-12-17 Ionic membrane detection device Expired - Fee Related CN102125808B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010593245 CN102125808B (en) 2010-12-17 2010-12-17 Ionic membrane detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010593245 CN102125808B (en) 2010-12-17 2010-12-17 Ionic membrane detection device

Publications (2)

Publication Number Publication Date
CN102125808A CN102125808A (en) 2011-07-20
CN102125808B true CN102125808B (en) 2013-01-16

Family

ID=44264232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010593245 Expired - Fee Related CN102125808B (en) 2010-12-17 2010-12-17 Ionic membrane detection device

Country Status (1)

Country Link
CN (1) CN102125808B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106769777A (en) * 2017-01-19 2017-05-31 智能(厦门)传感器有限公司 The ventilative amount detecting device and detection method of a kind of ventilated membrane
CN112569797A (en) * 2020-12-18 2021-03-30 武汉艾科滤膜技术有限公司 Immersed hollow fiber membrane component detection device and detection method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2437394Y (en) * 2000-07-05 2001-07-04 天津膜天膜工程技术有限公司 Film separating device
CN1325148C (en) * 2005-07-04 2007-07-11 天津工业大学 Detecting assemble for film products

Also Published As

Publication number Publication date
CN102125808A (en) 2011-07-20

Similar Documents

Publication Publication Date Title
CN204612984U (en) A kind of Groundwater Flow sampling overflow mechanism
CN204228385U (en) A kind of off-line testing device for demarcating safety valve setting value and off-line testing system
EP2682727B1 (en) Leakage Detection Device Using Siphon Principle
CN205426439U (en) A valve sealing test tool
CN106323565A (en) Rubber glove leak detection device and detection method
CN102125808B (en) Ionic membrane detection device
CN202065686U (en) Drainer capable of preventing gas leakage at low altitude
CN204475500U (en) Hyperbaric oxygen chamber sewage discharge device
CN105256860A (en) Pressure-superposed water supply pressure-stabilized tank and method for measuring gas missing amount
CN204535977U (en) A kind of performance test apparatus of high-speed ventilation valve
CN205404419U (en) Food sulfur dioxide content detector
CN210742049U (en) Ammonia process desulfurization slurry density on-line testing device
CN105699017A (en) Leak hunting device for multi-hole workpiece
CN110589277A (en) A siphon type liquid level metering device for vertical storage tank
CN206656948U (en) A kind of device of the latent erosion of temperature control lab simulation karst
CN203561482U (en) Ventilation window filter leak tightness detecting device
CN204718742U (en) A PCT high pressure accelerated test box
CN202501998U (en) Gas sampling and detecting device
CN106950166A (en) A kind of device of the latent erosion of lab simulation karst
CN202599791U (en) Waterproof coil detector
CN205483429U (en) Porous work piece device that leaks hunting
CN201527300U (en) Ventilation apparatus for liquid level spacing
CN221466290U (en) Nuclear power plant reactor main loop drainage monitoring system
CN205861289U (en) Blast furnace cooling equipment leak detection device
CN204846950U (en) Gas recovery system is breathed to chemical tank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130116

Termination date: 20161217