CN102121313A - 砌体施工免植筋支模方法及其装置 - Google Patents

砌体施工免植筋支模方法及其装置 Download PDF

Info

Publication number
CN102121313A
CN102121313A CN 201010608938 CN201010608938A CN102121313A CN 102121313 A CN102121313 A CN 102121313A CN 201010608938 CN201010608938 CN 201010608938 CN 201010608938 A CN201010608938 A CN 201010608938A CN 102121313 A CN102121313 A CN 102121313A
Authority
CN
China
Prior art keywords
masonry
construction
bar planting
bar
die device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010608938
Other languages
English (en)
Other versions
CN102121313B (zh
Inventor
黄余武
王祥志
罗宏
刘自信
杜凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Group Jiangsu Co ltd
China Construction Third Engineering Bureau Second Construction And Installation Co ltd
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
China Construction Third Bureau Green Industry Investment Co Ltd
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN 201010608938 priority Critical patent/CN102121313B/zh
Publication of CN102121313A publication Critical patent/CN102121313A/zh
Application granted granted Critical
Publication of CN102121313B publication Critical patent/CN102121313B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种砌体施工免植筋支模方法及其装置。该方法是在混凝土浇筑前先将单皮砌体紧靠墙或柱钢筋砌筑,将拉结筋放置于砌体灰缝内,然后用砌体施工免植筋支模装置与混凝土墙或柱的木模板将单皮砌体、拉结筋、墙或柱钢筋一起封闭,并用对拉螺杆将支模装置固定,形成整体组合封闭模板体系,最后完成混凝土浇筑。其中,砌体施工免植筋支模装置呈U形,其正面板设置拉结筋穿孔,两侧面板设置对拉螺杆穿孔。应用本发明的方法和装置可克服现有拉结筋设置方法损耗木模板、拉结筋偏位等问题,整体浇筑施工无需后期植筋,提高了建筑的抗震性能。

Description

砌体施工免植筋支模方法及其装置
技术领域
[0001] 本发明涉及建筑工程中砌体施工领域,尤其是一种砌体施工免植筋支模方法及其
直O
背景技术
[0002] 建筑施工中,混凝土与砌体交接处需设置拉结筋以满足建筑抗震及抗裂要求。现 有的拉结筋设置方法有预埋法和后植筋法:预埋法即混凝土浇筑前在木模板上开洞预埋钢 筋,但是,在混凝土浇筑过程中拉结筋容易因振动棒对混凝土的振捣产生偏位而无法保证 其能够满足砌体灰缝位置的要求,此外,木模板开洞过多会导致模板损耗严重、周转率低, 造成材料大量浪费;后植筋法即后期砌体施工前在混凝土上打孔用植筋胶进行拉结筋植 筋,该法应用较广,然而,由于植筋工序较为繁琐以及植筋市场管理不完善,较多植筋的孔 深不够,化学植筋胶质量无法保证,从而导致植筋抗拔试验效果差,无法满足原设计要求, 这将对房屋抗震性能产生不良影响,而且植筋钻孔的噪音和混凝土粉末亦会造成环境污
^fe ο
发明内容
[0003] 本发明要解决的技术问题是提供一种砌体施工免植筋支模方法及其装置,以确保 砌体与混凝土之间拉结筋的设置质量,降低木模板损耗率,避免后期植筋的繁琐工序和额 外费用,高效高质、清洁环保地完成砌体施工。
[0004] 为解决上述技术问题采用如下技术方案:砌体施工免植筋支模方法,即混凝土浇 筑前先将单皮砌体紧靠墙或柱钢筋砌筑,将拉结筋放置于砌体灰缝内,然后用砌体施工免 植筋支模装置与混凝土墙或柱的木模板将单皮砌体、拉结筋、墙或柱钢筋一起封闭,并用对 拉螺杆将支模装置固定,形成整体组合封闭模板体系,最后完成混凝土浇筑。
[0005] 砌体施工免植筋支模装置呈U形,其正面板设置拉结筋穿孔,两侧面板设置对拉 螺杆穿孔。
[0006] 上述支模装置由钢板焊接而成。
[0007] 上述支模装置的拉结筋穿孔有两个,对拉螺杆穿孔有四个,两侧面板上各有两个 且相互对称。
[0008] 本发明的砌体施工免植筋支模方法将单皮砌体、拉结筋置于砌体施工免植筋支模 装置内,而支模装置与原墙或柱的木模板形成整体封闭模板体系,使砌体、拉结筋与墙或柱 混凝土能一次性定位成型,完成墙或柱与砌体交接部位的拉结筋设置。其中,砌体施工免植 筋支模装置根据砌体尺寸设计成U形,装置的正面板拉结筋穿孔设置与砌体灰缝共同固定 拉结筋,保证施工中其位置固定不偏位,且混凝土浇筑后,支模装置可拆除循环使用。因此, 采用本发明的砌体施工免植筋支模方法及其装置省去了拉结筋植筋步骤,降低了木模板损 耗,整体浇筑又改善了建筑的抗震及抗裂性能。附图说明
[0009] 图1是本发明砌体施工免植筋支模装置的立体图。
[0010] 图2是混凝土浇筑前砌体砌筑及拉结筋设置示意图
[0011] 图3是本发明砌体施工免植筋支模装置的使用状态示意图。
[0012] 图4是图3的俯视示意图。
[0013] 图中:1对拉螺杆穿孔,2拉结筋穿孔,3木模板,4单皮砌体,5砌体施工免植筋支 模装置,6拉结筋,7墙或柱钢筋,8对拉螺杆,9螺帽。
具体实施方式
[0014] 如图1所示,本发明的砌体施工免植筋支模装置呈U形,是根据砌体尺寸由钢板焊 接而成的,其正面板设置两个拉结筋穿孔2,两侧面板各设置相互对称的两个对拉螺杆穿孔 1。
[0015] 图2至图4显示了使用上述支模装置的砌体施工免植筋支模方法:混凝土浇筑前 先将单皮砌体4紧靠墙或柱钢筋7砌筑,将拉结筋6按设计间距要求放置于砌体灰缝内(见 图2),然后用支模装置5与混凝土墙或柱的木模板3将单皮砌体4、拉结筋6、墙或柱钢筋7 一起封闭(见图3和图4),其中,拉结筋6穿过拉结筋穿孔2,对拉螺杆8穿过对拉螺杆穿 孔1并用螺帽9锁紧固定支模装置5,形成整体组合封闭模板体系,最后完成混凝土浇筑,使 砌体、拉结筋与墙或柱混凝土能一次性定位成型。

Claims (4)

1. 一种砌体施工免植筋支模方法,其特征在于:混凝土浇筑前先将单皮砌体紧靠墙或 柱钢筋砌筑,将拉结筋放置于砌体灰缝内,然后用砌体施工免植筋支模装置与混凝土墙或 柱的木模板将单皮砌体、拉结筋、墙或柱钢筋一起封闭,并用对拉螺杆将支模装置固定,形 成整体组合封闭模板体系,最后完成混凝土浇筑。
2. 一种用于权利要求1所述支模方法的砌体施工免植筋支模装置,其特征在于:该装 置呈U形,其正面板设置拉结筋穿孔,两侧面板设置对拉螺杆穿孔。
3.根据权利要求2所述的砌体施工免植筋支模装置,其特征在于:该装置由钢板焊接 而成。
4.根据权利要求2或3所述的砌体施工免植筋支模装置,其特征在于:所述拉结筋穿 孔有两个,所述对拉螺杆穿孔有四个,两侧面板上各有两个且相互对称。
CN 201010608938 2010-12-28 2010-12-28 砌体施工免植筋支模方法及其装置 Active CN102121313B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010608938 CN102121313B (zh) 2010-12-28 2010-12-28 砌体施工免植筋支模方法及其装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010608938 CN102121313B (zh) 2010-12-28 2010-12-28 砌体施工免植筋支模方法及其装置

Publications (2)

Publication Number Publication Date
CN102121313A true CN102121313A (zh) 2011-07-13
CN102121313B CN102121313B (zh) 2012-07-25

Family

ID=44249963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010608938 Active CN102121313B (zh) 2010-12-28 2010-12-28 砌体施工免植筋支模方法及其装置

Country Status (1)

Country Link
CN (1) CN102121313B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015734A (zh) * 2012-12-20 2013-04-03 南宁铁路局房产管理所 建筑拉结筋预埋的矿物棉胶合槽板盒的制作方法
CN109138476A (zh) * 2018-08-17 2019-01-04 中国十七冶集团有限公司 墙体植筋定位装置
CN112832523A (zh) * 2021-01-07 2021-05-25 中国建筑第四工程局有限公司 一种用于砌筑墙体拉结筋预埋件的施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4226061A (en) * 1978-06-16 1980-10-07 Day Jr Paul T Reinforced masonry construction
US4234156A (en) * 1979-04-24 1980-11-18 Acrow-Richmond Limited Snap-tie
CN2926393Y (zh) * 2006-06-08 2007-07-25 周芝义 多功能建筑模板
CN201321720Y (zh) * 2008-12-09 2009-10-07 赵贵增 砖混结构工程圈梁无架眼支模装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4226061A (en) * 1978-06-16 1980-10-07 Day Jr Paul T Reinforced masonry construction
US4234156A (en) * 1979-04-24 1980-11-18 Acrow-Richmond Limited Snap-tie
CN2926393Y (zh) * 2006-06-08 2007-07-25 周芝义 多功能建筑模板
CN201321720Y (zh) * 2008-12-09 2009-10-07 赵贵增 砖混结构工程圈梁无架眼支模装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《江苏建筑》 20000630 杨良荣等 砌块砌体与框架的拉结 , 第02期 *
《辽宁建材》 20040127 杜丽英等 框间墙砌体拉结筋施工方法分析 , 第01期 *
《黑龙江科技信息》 20030205 哈运一等 浅谈框架工程钢筋的设置方法 , 第03期 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015734A (zh) * 2012-12-20 2013-04-03 南宁铁路局房产管理所 建筑拉结筋预埋的矿物棉胶合槽板盒的制作方法
CN103015734B (zh) * 2012-12-20 2015-02-04 南宁铁路局房产管理所 建筑拉结筋预埋的矿物棉胶合槽板盒的制作方法
CN109138476A (zh) * 2018-08-17 2019-01-04 中国十七冶集团有限公司 墙体植筋定位装置
CN112832523A (zh) * 2021-01-07 2021-05-25 中国建筑第四工程局有限公司 一种用于砌筑墙体拉结筋预埋件的施工方法

Also Published As

Publication number Publication date
CN102121313B (zh) 2012-07-25

Similar Documents

Publication Publication Date Title
CN205857530U (zh) 插筋定位装置
CN106760503A (zh) 一种基于标准节组合的构造柱浇筑用模板
CN203429641U (zh) 建筑施工用单侧支模加固结构体系
CN104295003A (zh) 一种构造柱施工方法
CN102121313B (zh) 砌体施工免植筋支模方法及其装置
CN204112525U (zh) 高强度混凝土预制框架内嵌带竖缝预制剪力墙结构
CN107083804B (zh) 一种墙体构造柱插筋施工方法
CN201915635U (zh) 砌体施工免植筋支模装置
CN209568705U (zh) 一种构造柱定型化模板支模结构
KR101639009B1 (ko) 트러스거더형 데크패널을 이용한 천장거푸집 시공에서의 콘크리트 타설액 흘러내림 방지용 필러 및 이를 이용한 천장거푸집 시공구조
CN207988490U (zh) 一种变形缝处剪力墙模板支设的简易装置
KR100626326B1 (ko) 콘크리트 구조물
CN208072390U (zh) 一种桥梁托桩与水下系梁的连接结构
CN206267523U (zh) 一种基于标准节组合的构造柱浇筑用模板
CN206539016U (zh) 构造柱浇筑装置
CN205677249U (zh) 一种浇筑混凝土构造柱下料斗
CN210658959U (zh) 一种构造柱混凝土浇捣施工结构
CN211622120U (zh) 一种提高顶部浇筑质量的构造柱结构
CN204983647U (zh) 一种定型工具式铝合金模板
CN201857766U (zh) 快捷房屋抗震加固装置
CN210421120U (zh) 装配式孔桩护壁体系
CN202284291U (zh) 混凝土过流面八字型模板
KR20130081756A (ko) 하프 pc 슬래브의 제조방법
CN103205983B (zh) 一种地下室后支撑体系的施工方法
CN201835524U (zh) 一种顶部带有预埋件混凝土梁的浇注装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221227

Address after: Room 2105, 21st Floor, Tongda Plaza, No. 111 Wenhua Avenue, Jiangxia District, Wuhan City, Hubei Province 430000

Patentee after: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU

Patentee after: China Construction Third Engineering Bureau Group (Jiangsu) Co.,Ltd.

Patentee after: China Construction Third Engineering Bureau second construction and installation Co.,Ltd.

Patentee after: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GREEN INDUSTRY INVESTMENT Co.,Ltd.

Address before: 430074 No. 306 Lu Lu, Hongshan District, Hubei, Wuhan

Patentee before: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU