CN102121313A - 砌体施工免植筋支模方法及其装置 - Google Patents
砌体施工免植筋支模方法及其装置 Download PDFInfo
- Publication number
- CN102121313A CN102121313A CN 201010608938 CN201010608938A CN102121313A CN 102121313 A CN102121313 A CN 102121313A CN 201010608938 CN201010608938 CN 201010608938 CN 201010608938 A CN201010608938 A CN 201010608938A CN 102121313 A CN102121313 A CN 102121313A
- Authority
- CN
- China
- Prior art keywords
- masonry
- construction
- bar planting
- bar
- die device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 238000009415 formwork Methods 0.000 title abstract 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 6
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 6
- 239000010959 steel Substances 0.000 claims abstract description 6
- 238000007789 sealing Methods 0.000 claims abstract description 5
- 230000003014 reinforcing Effects 0.000 claims description 7
- 239000011449 brick Substances 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 3
- 238000007796 conventional method Methods 0.000 abstract 1
- 210000000614 Ribs Anatomy 0.000 description 24
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 239000000084 colloidal system Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010608938 CN102121313B (zh) | 2010-12-28 | 2010-12-28 | 砌体施工免植筋支模方法及其装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010608938 CN102121313B (zh) | 2010-12-28 | 2010-12-28 | 砌体施工免植筋支模方法及其装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102121313A true CN102121313A (zh) | 2011-07-13 |
CN102121313B CN102121313B (zh) | 2012-07-25 |
Family
ID=44249963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010608938 Active CN102121313B (zh) | 2010-12-28 | 2010-12-28 | 砌体施工免植筋支模方法及其装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102121313B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015734A (zh) * | 2012-12-20 | 2013-04-03 | 南宁铁路局房产管理所 | 建筑拉结筋预埋的矿物棉胶合槽板盒的制作方法 |
CN109138476A (zh) * | 2018-08-17 | 2019-01-04 | 中国十七冶集团有限公司 | 墙体植筋定位装置 |
CN112832523A (zh) * | 2021-01-07 | 2021-05-25 | 中国建筑第四工程局有限公司 | 一种用于砌筑墙体拉结筋预埋件的施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4226061A (en) * | 1978-06-16 | 1980-10-07 | Day Jr Paul T | Reinforced masonry construction |
US4234156A (en) * | 1979-04-24 | 1980-11-18 | Acrow-Richmond Limited | Snap-tie |
CN2926393Y (zh) * | 2006-06-08 | 2007-07-25 | 周芝义 | 多功能建筑模板 |
CN201321720Y (zh) * | 2008-12-09 | 2009-10-07 | 赵贵增 | 砖混结构工程圈梁无架眼支模装置 |
-
2010
- 2010-12-28 CN CN 201010608938 patent/CN102121313B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4226061A (en) * | 1978-06-16 | 1980-10-07 | Day Jr Paul T | Reinforced masonry construction |
US4234156A (en) * | 1979-04-24 | 1980-11-18 | Acrow-Richmond Limited | Snap-tie |
CN2926393Y (zh) * | 2006-06-08 | 2007-07-25 | 周芝义 | 多功能建筑模板 |
CN201321720Y (zh) * | 2008-12-09 | 2009-10-07 | 赵贵增 | 砖混结构工程圈梁无架眼支模装置 |
Non-Patent Citations (3)
Title |
---|
《江苏建筑》 20000630 杨良荣等 砌块砌体与框架的拉结 , 第02期 * |
《辽宁建材》 20040127 杜丽英等 框间墙砌体拉结筋施工方法分析 , 第01期 * |
《黑龙江科技信息》 20030205 哈运一等 浅谈框架工程钢筋的设置方法 , 第03期 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015734A (zh) * | 2012-12-20 | 2013-04-03 | 南宁铁路局房产管理所 | 建筑拉结筋预埋的矿物棉胶合槽板盒的制作方法 |
CN103015734B (zh) * | 2012-12-20 | 2015-02-04 | 南宁铁路局房产管理所 | 建筑拉结筋预埋的矿物棉胶合槽板盒的制作方法 |
CN109138476A (zh) * | 2018-08-17 | 2019-01-04 | 中国十七冶集团有限公司 | 墙体植筋定位装置 |
CN112832523A (zh) * | 2021-01-07 | 2021-05-25 | 中国建筑第四工程局有限公司 | 一种用于砌筑墙体拉结筋预埋件的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102121313B (zh) | 2012-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205857530U (zh) | 插筋定位装置 | |
CN106760503A (zh) | 一种基于标准节组合的构造柱浇筑用模板 | |
CN203429641U (zh) | 建筑施工用单侧支模加固结构体系 | |
CN104295003A (zh) | 一种构造柱施工方法 | |
CN102121313B (zh) | 砌体施工免植筋支模方法及其装置 | |
CN204112525U (zh) | 高强度混凝土预制框架内嵌带竖缝预制剪力墙结构 | |
CN107083804B (zh) | 一种墙体构造柱插筋施工方法 | |
CN201915635U (zh) | 砌体施工免植筋支模装置 | |
CN209568705U (zh) | 一种构造柱定型化模板支模结构 | |
KR101639009B1 (ko) | 트러스거더형 데크패널을 이용한 천장거푸집 시공에서의 콘크리트 타설액 흘러내림 방지용 필러 및 이를 이용한 천장거푸집 시공구조 | |
CN207988490U (zh) | 一种变形缝处剪力墙模板支设的简易装置 | |
KR100626326B1 (ko) | 콘크리트 구조물 | |
CN208072390U (zh) | 一种桥梁托桩与水下系梁的连接结构 | |
CN206267523U (zh) | 一种基于标准节组合的构造柱浇筑用模板 | |
CN206539016U (zh) | 构造柱浇筑装置 | |
CN205677249U (zh) | 一种浇筑混凝土构造柱下料斗 | |
CN210658959U (zh) | 一种构造柱混凝土浇捣施工结构 | |
CN211622120U (zh) | 一种提高顶部浇筑质量的构造柱结构 | |
CN204983647U (zh) | 一种定型工具式铝合金模板 | |
CN201857766U (zh) | 快捷房屋抗震加固装置 | |
CN210421120U (zh) | 装配式孔桩护壁体系 | |
CN202284291U (zh) | 混凝土过流面八字型模板 | |
KR20130081756A (ko) | 하프 pc 슬래브의 제조방법 | |
CN103205983B (zh) | 一种地下室后支撑体系的施工方法 | |
CN201835524U (zh) | 一种顶部带有预埋件混凝土梁的浇注装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221227 Address after: Room 2105, 21st Floor, Tongda Plaza, No. 111 Wenhua Avenue, Jiangxia District, Wuhan City, Hubei Province 430000 Patentee after: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU Patentee after: China Construction Third Engineering Bureau Group (Jiangsu) Co.,Ltd. Patentee after: China Construction Third Engineering Bureau second construction and installation Co.,Ltd. Patentee after: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GREEN INDUSTRY INVESTMENT Co.,Ltd. Address before: 430074 No. 306 Lu Lu, Hongshan District, Hubei, Wuhan Patentee before: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU |