CN102121230A CN2010106120155A CN201010612015A CN102121230A CN 102121230 A CN102121230 A CN 102121230A CN 2010106120155 A CN2010106120155 A CN 2010106120155A CN 201010612015 A CN201010612015 A CN 201010612015A CN 102121230 A CN102121230 A CN 102121230A
Authority
CN
China
Prior art keywords
bridge
steel
pier
plate
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010106120155A
Other languages
Chinese (zh)
Inventor
杨宏量
赵彦学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JINFU JIARUN HIGHWAY SPECIAL ENGINEERING CO LTD
Original Assignee
BEIJING JINFU JIARUN HIGHWAY SPECIAL ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JINFU JIARUN HIGHWAY SPECIAL ENGINEERING CO LTD filed Critical BEIJING JINFU JIARUN HIGHWAY SPECIAL ENGINEERING CO LTD
Priority to CN2010106120155A priority Critical patent/CN102121230A/en
Publication of CN102121230A publication Critical patent/CN102121230A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a manufacturing method of a steel structure cover coping of a single-column bridge pier for supporting a girder of a circular curve ramp bridge. The steel structure cover coping manufactured with the manufacturing method is seated on the top of a pier column reinforcing body of the single-column bridge pier and is used for supporting the girder of the ramp bridge to make the girder return to a set position. The structure cover coping consists of a bottom plate, two wing plates, eight double-cantilever plates, seven rows of channel steel connecting bodies, twenty-three through tensile main bars, fourteen rows of connecting steel plates, two decorating plates, the top of a pier column of the bridge pier with the height of 1,170 millimeters and cast concrete. According to the steel structure cover coping manufactured with the method, all members can be machined in a workshop and are assembled together on a construction site through bolts by welding, so that the steel structure cover coping has high accuracy and good quality. The steel structure cover coping is attractive and firm, and has high physical and mechanical properties. In an entire manufacturing process, bridge traffic does not need to be interrupted, and tight fit with the operating process of a support girder can be realized.

Description

Support the facture of the single-columned pier steel work bent cap of circular curve ramp bridge girder
Technical field
The present invention relates to a kind of facture that supports the single-columned pier steel work bent cap of circular curve ramp bridge girder, utilize the steel-structured lids beam seat of this facture made to drop on the top that the single-columned pier pier stud adds solid, supporting the girder of this ramp bridge, making it revert to the position that sets.
Background technology
In metropolitan city, between the main road of interchange viaduct, big multi-link circular curve ramp bridge, the radius of its circular arc is 150-300m, deck profile grade is 1-3%, and is one with the 2-4 hole.The top supporting member of this ramp bridge is the Prestressed Continuous box-girder of single box single chamber, the wide 3.5-4.5m of its underpart case, the wide 8.0-9.0m of its end face carriageway plate.At the two ends of each connection, adopt abutment or two-columned pier to support; At the middle part of each connection, by the single-columned pier support on drilled pile basis.At the top of abutment or two-columned pier, be equipped with a bent cap.At the end face of this bent cap, pasting two boards formula neoprene bearing side by side and supporting girder.Single-columned pier is the Reinforced Concrete Circular Cylinder body that a diameter is 1400-1600mm, and it is located in the position, center of cushion cap, and its end face is installed with a pot bearing.
At the two ends of circular curve ramp bridge, at the end face of pier bent cap, the two boards formula neoprene bearing outside circular curve draws a straight line, and this straight line is the rotating shaft A of whole circular curve ramp bridge girder.In the outside of rotating shaft A, be the main body of this ramp bridge girder, its weight accounts for the 70-90% of gross weight; In the inboard of rotating shaft A, be the part at these ramp bridge girder two ends, its weight only accounts for the 30-10% of gross weight.Under normal circumstances, the center of gravity line of wagon flow is positioned at the 100-200cm in the bridge floor circular curve outside.When the construction quality of pontic substructure was relatively poor, under the long-term effect of wagon flow eccentricity pressure and centrifugal force, in the outside of rotating shaft A, the pontic superstructure was sunk, the inboard at these ramp bridge bridge floor two ends warpage that makes progress.Meanwhile, the superstructure of whole pontic produces translation to the outside of rotating shaft A.
Repair the circular curve ramp bridge, at first need girder is carried out translation, and then upwards prop up the top, make girder return to the position of this bridge when just being completed.In order to carry out two-way top to girder, at first to add the pier stud of Guyuan single-columned pier, have enough flexural strengths to guarantee this pier stud; Add at this pier stud then and make the steel work bent cap on the solid, and lay jack and temporary support, go to a top and support girder in the end face and the side of this steel work bent cap.In the whole process of making the steel work bent cap, promptly to keep the normal traffic of bridge floor, cooperate a top girder again, so the structure of this steel work bent cap must be novel, its preparation method also must innovation.
The present invention is exactly according to this above-mentioned conception and by the meticulous a kind of facture developed of the inventor, utilize this facture to make the steel work bent cap at the top that circular curve ramp bridge single-columned pier pier stud adds solid, need not interruption of bridge deck traffic, and match with a top and support girder.At the end face of this steel work bent cap, the new board-like bearing of being installed can accurately be set the position that the ramp bridge girder is located in, and eliminates the warpage of the inboard bridge floor in its two ends fully, makes the driving quality be able to obvious raising, makes and is able to obvious prolongation in application life of pontic.
Summary of the invention
Problem to be solved by this invention just provides a kind of under the situation of interruption of bridge deck traffic not, adds the job practices that the top of solid makes the steel work bent cap at circular curve ramp bridge single-columned pier.This facture is simple and easy to do, the steel work bent cap quality height of made, and can match with the technology of a top and support circular curve ramp bridge girder.
The objective of the invention is to be achieved through the following technical solutions:
A kind of facture that supports the single-columned pier steel work bent cap of circular curve ramp bridge girder, will carry out successively by following operational sequence: the end face that adds solid at the single-columned pier pier stud is installed base plate; 1 block of wing plate of each side welding at base plate; About on the outer longitudinal edge of 2 blocks of wing plates, each along vertical bridge to 1 block of side plate of vertical welding; On base plate, the two outrigger bases in 8 roads are welded altogether with the spacing that equates in the both sides, front and back from the centre to bridge pier pier stud top, and between the two outrigger bases in every 2 adjacent roads 1 emissions groove steel connector are installed all; In front and back the both sides, front and back at two outrigger base tops, each 3 road, in front and back the centre at each 2 emissions groove steel connector top, each welds 1 and connects the tension main reinforcement, amounts to 16; Connect between the tension main reinforcements at every adjacent 2 on each 2 emissions groove steel connector of front and back, above each channel-section steel connector and the inboard of left side plate, all weld 1 and connect steel plate, form 8 row's connection steel plates altogether; On base plate, 1 packaged plaque respectively welds in edge before and after it; First behind the fluid concrete, at the place, place of middle 3 emissions groove steel connectors, its end face of the concrete of being poured into a mould is lower than the top margin 70mm of this steel work in the steel work of above-mentioned made; The place, the place of each 2 emissions groove steel connector in front and back, the top margin of its end face of the concrete of being poured into a mould and this steel work is evened up; After the concrete of being poured into a mould reaches design strength, concrete surface on each 2 emissions groove steel connector of front and back is at first laid jack, according to the girder of construction crown line Zhi Dingyuan arc curved ramp bridge, lay temporary support then and support this girder, to replace and to remove jack; Remove the former pot bearing of single-columned pier end face; The both sides, front and back at two outrigger base tops in middle 2 roads, the centre at middle 3 emissions groove steel connector tops, each welds 1 and connects the tension main reinforcement, amounts to 7; Connect between the tension main reinforcements at every adjacent 2 on the middle 3 emissions groove steel connectors, above each channel-section steel connector and the inboard of left side plate, all weld 1 and connect steel plate, form 6 rows altogether and connect steel plates; At place, the place of middle 3 emissions groove steel connectors, fluid concrete makes its end face of concrete of being poured into a mould even up with the top margin of the steel work of made once more, makes the end face of the steel work bent cap of making according to the present invention become a complete rectangle plane; Paste new board-like bearing at the end face of this steel work bent cap, fall the girder of circular curve ramp bridge after rise; This steel work bent cap facture is characterised in that:
The steel work bent cap of making according to the present invention include 1 base plate, 2 blocks of wing plates, 2 blocks of side plates, the two outrigger bases in 8 roads, 7 emissions groove steel connectors, 23 connect tension main reinforcement, 14 rows and connect steel plates, 2 packaged plaques, bridge pier pier stud top that 1170mm is high, and the concrete poured into a mould; This steel-structured lids deck-molding 1230mm, it is located in the end face that described single-columned pier pier stud adds solid, and its end face is the high bridge pier pier stud top of 1170mm apart from the bottom surface 180mm of described ramp bridge girder in the middle of it; From geometric figure, this steel work bent cap can be divided into two parts up and down, and top is a rectangular cylinder, and the lower part is a flat trapezoidal cylinder that crouches; This rectangular column height 630mm, the width that equals described ramp bridge girder along the length of direction across bridge adds 600mm, along vertical bridge to the width diameter that equals described bridge pier pier stud top add 320mm; This trapezoidal column height 600mm, its front and back sides are two identical trapezoidal vertical planes, and its left and right side is the rectangle plane of two inclinations, and its end face and bottom surface are all the rectangle plane of level; This end face and bottom surface along vertical bridge to the width diameter that all equals described bridge pier pier stud top add 160mm, end face adds 600mm along the width that the length of direction across bridge equals described ramp bridge girder, its vertical bridge is tangent to the circular curve of axis and this ramp bridge, the bottom surface is along the long 2400mm of direction across bridge, and its vertical bridge is positioned at this ramp bridge circular curve 100-150mm place in addition to the axis; Described floor level is placed; In the left and right sides of this base plate, outwards be followed successively by described wing plate and side plate from the lining; In the front and back of described base plate edge, front and back are respectively installed 1 described decorative panel symmetrically, and the wing plate of this 2 packaged plaque and described base plate and this base plate left and right sides and side plate have constituted the steel sheel of this steel work bent cap jointly; In this steel sheel, between 2 described decorative panels, to have made the described pair of outrigger base in 8 roads before and after the spacing that equates symmetrically altogether; Between every adjacent described pair of outrigger base in 2 roads, all be that spacing makes the described channel-section steel connector of 1 row with 300mm; In the both sides, front and back at described pair of outrigger base top of per pass, in the centre at the described channel-section steel connector of every row top, respectively establish 1 described perforation tension main reinforcement along direction across bridge; On the described channel-section steel connector of every row, between every 2 adjacent perforation tension main reinforcements, all weld the described connection steel plate of 1 row; In above-mentioned formed steel work, be full of the concrete of being poured into a mould.
Described base plate is made of the thick rectangular steel plates of 20mm, and its long limit along direction across bridge is 2400mm, along indulge bridge to the minor face diameter that equals described bridge pier pier stud top add 160mm; In this rectangular steel plates, be provided with the circular hole that a diameter equals bridge pier pier stud reinforcing cage external diameter; Along vertical bridge about the center of circle by this circular hole is divided into described base plate two, form splicing seams at the place of being separated; Separated base plate is clamped the reinforcing cage of bridge pier pier stud from the left and right sides, implement the straight joint full weld at its seam crossing of abandoning, and makes it to form again an integral body; Described base plate is the level of state, and distance at long limit to this bridge pier pier stud center equates before and after it, and the minor face that is positioned at the ramp bridge circular curve outside to the distance at this bridge pier pier stud center is 1300-1350mm; Intersection on this plate top surface and steel casing base, described bridge pier pier stud top adds the intersection of solid steel casing top margin at this base plate bottom surface and described single-columned pier pier stud, implements the border full weld respectively; Described base plate is a steel member of forming a connecting link, and it also is the top board that described single-columned pier pier stud adds solid simultaneously.
About described wing plate is divided into two, they all are the thick rectangular steel plates of 6mm, and are installed in the left and right sides of described base plate respectively; The interior longitudinal edge of this wing plate and outer longitudinal edge along indulge bridge to, length equals the length of described base plate minor face, the horizontal projection of its former and later two horizontal edges is along direction across bridge; The interior longitudinal edge of these two blocks of wing plates splices mutually with the left and right sides minor face of described base plate respectively, and implements the straight joint full weld at its edge joint position; The outer longitudinal edge of these two blocks of wing plates all is higher than longitudinal edge 600mm in it, and stretches out 300mm to the left and right sides of ramp bridge girder respectively; The left and right sides at described bridge pier pier stud top, these two blocks of wing plates are asymmetric state.
Described side plate is the thick rectangular steel plates of 6mm, about on the outer longitudinal edge of two blocks of described wing plates, each along vertical bridge to 1 block of this side plate of vertical making and settlement; The vertical edge of this side plate vertically, high 630mm, its top longitudinal edge and end longitudinal edge along vertical bridge to, the diameter that length equals described bridge pier pier stud top adds 320mm; The end longitudinal edge of this side plate splices mutually with the outer longitudinal edge of the same side wing plate, and implements the straight joint full weld at its edge joint position; Their top longitudinal edge all is lower than the bottom surface 180mm of ramp bridge girder, and its former and later two vertical edges stretch out this wing plate 80mm respectively forward and backward; The left and right sides at described bridge pier pier stud top, these two blocks of side plates are symmetrical.
The described pair of outrigger base made of the thick steel plate of 6mm, it by about two asymmetrical parts constitute; These two parts vertically make respectively in the left and right sides at described bridge pier pier stud top along direction across bridge, the inner side edge of its each part all pastes mutually with the steel casing at bridge pier pier stud top, outer side edges respectively with about two blocks of described side plates paste mutually, all paste mutually with described base plate on the base, hypotenuse respectively with about two blocks of described wing plates paste mutually, all implement the straight joint full weld in subsides place mutually of per two block plates; The top margin of this pair outrigger base is higher than bridge pier pier stud end face 30mm and is lower than the top longitudinal edge 30mm of described side plate; With regard to whole steel work bent cap, described pair of outrigger base installed and welded in the both sides forwards, backwards from the centre by the road.
Described channel-section steel connector is tailored with channel-section steel and is formed, and its width equals the clear distance of described pair of outrigger base of adjacent twice; Between the two outrigger bases of adjacent twice, described channel-section steel connector is that spacing vertically makes with 300mm along direction across bridge; In the installation position of this channel-section steel connector, described pair of outrigger base clamped in the side of former and later two channel-section steel connectors, by the 1 row bolt that is made from top to bottom they is fixed together tightly; The diameter of this bolt is 12mm, and spacing is 150mm, and its top bolt is lower than the top margin 50mm of this pair outrigger base; After the two outrigger bases in 1 road install, all reach and utilize the described channel-section steel connector of bolt 1 row, the top margin of these channel-section steel connectors all is lower than the top margin 30mm of this pair outrigger base; With subsides place mutually of this pair outrigger base, in subsides place mutually of its base and described base plate or wing plate, all implement the straight joint full weld in its side.
The indented bars that described perforation tension main reinforcement diameter is 22mm is tailored and is formed, and the width that its length equals described ramp bridge girder adds 588mm; Both sides, front and back at described pair of outrigger base top of per pass connect subsides place mutually with it of tension main reinforcement at this, all implement the straight joint full weld; The bilateral welding in the intersection that connects tension main reinforcement and each channel-section steel connector end face, is all implemented in centre at the described channel-section steel connector of every row top.
Described connection steel plate is tailored with the thick steel plate of 8mm and is formed, and its width is 60mm, and its length equals the clear distance of adjacent two described perforation tension main reinforcements; All paste mutually with 1 described perforation tension main reinforcement on the every both sides, front and back that connect steel plate, and its mutually subsides place implement the straight joint full weld; At the two ends, the left and right sides of described perforation tension main reinforcement, a side of described connection steel plate is also pasted mutually with described side plate, its mutually subsides place also should implement the straight joint full weld.
Described decorative panel includes riser, following riser, upper cross plate and lower cross plate, and they all use the thick steel plate of 6mm to make; Last riser is a rectangle, and the width that its length equals described ramp bridge girder adds 588mm, high 630mm; Should go up riser and vertically make along direction across bridge, two vertical edge respectively with about two blocks of described side plates paste mutually, the vertical edge of its lateral surface and these two blocks of side plates is in the same plane, the top longitudinal edge of its top margin and these two blocks of side plates is in the same plane; Following riser is trapezoidal, and the width that the length of its top margin equals described ramp bridge girder adds 588mm, bottom side length 2400mm, high 580mm; This time riser vertically makes along direction across bridge, and its base is positioned on the described base plate, its two waist respectively with about two blocks of described wing plates paste mutually, the long limit of its lateral surface and this base plate and the horizontal edge of these two blocks of wing plates all are in the same plane; Upper cross plate is identical rectangle with lower cross plate, the width that its length equals described ramp bridge girder adds 588mm, width is 154mm, they all make along the direction across bridge level, all paste mutually with the lateral surface of described pair of outrigger base of limit portion on long limit in it, and all paste mutually with the described medial surface of going up riser on its foreign minister limit; The end face of upper cross plate is lower than the top margin 100mm of described pair of outrigger base, and the bottom surface of lower cross plate and described base of going up riser are in the same plane, and pastes mutually with the described top margin of riser down; At the external surface of described decorative panel, in subsides place mutually of per two block plates, all make bevel for welding in advance, behind the straight joint full weld, again weld bond is polished flat.
When making the steel work bent cap, the concrete of being poured into a mould is a C30 non-shrinking steel fibrous concrete according to the present invention; In every cubic meter of concrete, its proportioning is: 425 Portland cement 440kg, water 189kg, steel fibre 100kg, sand 851kg, stone 851kg.
Advantage of the present invention is: make the steel work bent cap according to the present invention, it has attractive appearance, and job practices is easy, and its all members all can be used machining in the workshop, thereby the precision height, and quality is good.At the construction field (site), by bolt and welding, can assemble.In work progress, can both guarantee that from start to finish bridge floor normally drives a vehicle.After construction was finished, the girder of this circular curve ramp bridge had been eliminated all defect, and whole pontic is taken on an entirely new look.
Description of drawings
Fig. 1 is the front schematic view of the former single-columned pier of circular curve ramp bridge and girder among the present invention.
Fig. 2 is the side schematic view of the former single-columned pier of circular curve ramp bridge and girder among the present invention.
Fig. 3 is the single-columned pier after the circular curve ramp bridge is reinforced among the present invention and the front schematic view of girder.
Fig. 4 is the single-columned pier after the circular curve ramp bridge is reinforced among the present invention and the side schematic view of girder.
Fig. 5 is that the steel work bent cap adds solid top front schematic view in place at the bridge pier pier stud among the present invention.
Fig. 6 is that the steel work bent cap adds solid top side schematic view in place at the bridge pier pier stud among the present invention.
Fig. 7 is that the steel member of steel work bent cap among the present invention is in the middle along the vertical section schematic diagram of direction across bridge.
Fig. 8 be the steel member of steel work bent cap among the present invention along the vertical bridge of reinforcing body side surface to the vertical section schematic diagram.
Fig. 9 is the floor map of base plate among the present invention.
Figure 10 is the floor map of wing plate among the present invention.
Figure 11 is the floor map of latus inframedium of the present invention.
Figure 12 is the floor map of two outrigger bases among the present invention.
Figure 13 is the side schematic view of decorative panel among the present invention.
Figure 14 is the plane distribution schematic diagram of the two outrigger bases of steel work bent cap and decorative panel among the present invention.
Figure 15 is the plane distribution schematic diagram of steel work bent cap channel-section steel connector among the present invention.
Figure 16 is the plane distribution schematic diagram that the steel work bent cap connects the tension main reinforcement among the present invention before a top girder.
Figure 17 is the plane distribution schematic diagram that the steel work bent cap connects steel plate among the present invention before a top girder.
Figure 18 is the concrete floor map that the steel work bent cap is poured into a mould before a top girder among the present invention.
Figure 19 is a floor map of laying jack among the present invention at the steel-structured lids top surface of the beam.
Figure 20 is a floor map of laying temporary support among the present invention at the steel-structured lids top surface of the beam.
Figure 21 is the floor map at steel-structured lids joist steel member top among the present invention.
Figure 22 is the front schematic view of the steel work bent cap of making according to the present invention.
Figure 23 is a floor map of laying new board-like bearing among the present invention at the steel-structured lids top surface of the beam.
Reference numeral
1 base plate, 2 wing plates, 3 side plates, 4 pairs of outrigger bases, 5 channel-section steel connectors, 6 connect the tension main reinforcement, and 7 connect steel plate, 8 decorative panels, 9 bridge pier pier stud tops, 10 single-columned pier pier studs add solid, 11 concrete of being poured into a mould, 12 ramp bridge girders, the 13 steel work bent caps of making according to the present invention, 14 former pot bearings, 15 new board-like bearings, 16 jack, 17 temporary supports, the long limit of 1-1,1-2 minor face, 1-3 circular hole, the 1-4 splicing seams, longitudinal edge in the 2-1 horizontal edge, 2-2, the outer longitudinal edge of 2-3, the 3-1 vertical edge, 3-2 top longitudinal edge, longitudinal edge at the bottom of the 3-3, the 4-1 inner side edge, 4-2 outer side edges, 4-3 top margin, the 4-4 base, 4-5 hypotenuse, the last riser of 8-1, riser under the 8-2,8-3 upper cross plate, 8-4 lower cross plate.
Describe the job practices that supports the single-columned pier steel work bent cap of circular curve ramp bridge girder according to making proposed by the invention in detail below in conjunction with Fig. 1 to Figure 23.
The specific embodiment
Adopt the present invention to make the steel work bent cap of the single-columned pier of support circular curve ramp bridge girder, should carry out step by step according to Fig. 1 to Figure 23.
The steel work bent cap of making according to the present invention, its base plate 1 is a steel member of forming a connecting link, when the single-columned pier pier stud was reinforced, it added the top board of solid as this and is made.The base plate 1 of installation in position is the level of state, and long limit 1-1 equates to distance at this bridge pier pier stud center before and after it, the minor face 1-2 that is positioned at the ramp bridge circular curve outside to the distance at this bridge pier pier stud center be 1300-1350mm.Intersection on this base plate 1 end face and 9 steel casing bases, bridge pier pier stud top adds the intersection of solid 10 steel casing top margins at this base plate 1 bottom surface and single-columned pier pier stud, implements the border full weld respectively.
The thick rectangular steel plates of base plate 1 usefulness 20mm is made, and its long limit 1-1 along direction across bridge is 2400mm, along indulge bridge to the minor face 1-2 diameter that equals bridge pier pier stud top 9 add 160mm.In this rectangular steel plates, be provided with the circular hole 1-3 that a diameter equals bridge pier pier stud reinforcing cage external diameter.Along vertical bridge about the center of circle by this circular hole 1-3 is divided into base plate 1 two, form splicing seams 1-4 at the place of being separated.Separated base plate 1 is clamped the reinforcing cage of bridge pier pier stud from the left and right sides, implement the straight joint full weld at its splicing-in seam 1-4 place, makes it to form again an integral body.
About wing plate 2 is divided into two, they all are the thick rectangular steel plates of 6mm, and are installed in the left and right sides of base plate 1 respectively.The interior longitudinal edge 2-2 of this wing plate 2 and outer longitudinal edge 2-3 along vertical bridge to, length equals the length of base plate 1 minor face 1-2, the horizontal projection of 2 the horizontal edge 2-1 in its front and back is along direction across bridge.The interior longitudinal edge 2-2 of these two blocks of wing plates 2 splices mutually with the left and right sides minor face 1-2 of base plate 1 respectively, and implements the straight joint full weld at its edge joint position.The outer longitudinal edge 2-3 of these two blocks of wing plates 2 is than the high 600mm of longitudinal edge 2-2 in it, and stretches out 300mm to the left and right sides of ramp bridge girder 12 respectively.The left and right sides at bridge pier pier stud top 9, these two blocks of wing plates 2 are asymmetric state.
Side plate 3 is the thick rectangular steel plates of 6mm, about on the outer longitudinal edge 2-3 of two blocks of wing plates 2, each along vertical bridge to 1 block of this side plate 3 of vertical making and settlement.The vertical edge 3-1 of this side plate 3 vertically, high 630mm, its top longitudinal edge 3-2 and end longitudinal edge 3-3 along vertical bridge to, the diameter that length equals bridge pier pier stud top 9 adds 320mm.The end longitudinal edge 3-3 of this side plate 3 splices mutually with the outer longitudinal edge 2-3 of the same side wing plate 2, and implements the straight joint full weld at its edge joint position.Their top longitudinal edge 3-2 all is lower than the bottom surface 180mm of ramp bridge girder 12, and its former and later two vertical edge 3-1 stretches out 80mm to the front side and the rear side of this wing plate 2 respectively.The left and right sides at bridge pier pier stud top 9, these two blocks of side plates 3 are symmetrical.
The thick steel plate of two outrigger base 4 usefulness 6mm is manufactured, it by about two asymmetrical parts constitute.These two parts vertically make respectively in the left and right sides at bridge pier pier stud top 9 along direction across bridge, the inner side edge 4-1 of its each part pastes mutually with the steel casing at bridge pier pier stud top 9, outer side edges 4-2 respectively with about two blocks of side plates 3 paste mutually, base 4-4 all pastes mutually with base plate 1, hypotenuse 4-5 respectively with about two blocks of wing plates 2 paste mutually.The straight joint full weld is all implemented in subsides place mutually at per two block plates.The top margin 4-3 of this pair outrigger base 4 is higher than bridge pier pier stud end face 30mm and than the low 30mm of the top longitudinal edge 3-2 of side plate 3.With regard to whole steel work bent cap, install and the two outrigger bases 4 of welding by the road both sides forwards, backwards from the centre.
Channel-section steel connector 5 usefulness channel-section steels are tailored and are formed, and its width equals the clear distance of the two outrigger bases 4 of adjacent twice.Between the two outrigger bases 4 of adjacent twice, channel-section steel connector 5 is that spacing vertically makes with 300mm along direction across bridge.In the installation position of this channel-section steel connector 5, two outrigger bases 4 are clamped in the side of former and later two channel-section steel connectors 5, by the 1 row bolt that is made from top to bottom they are fixed together tightly.The diameter of this bolt is 12mm, and spacing is 150mm, and its top bolt is than the low 50mm of top margin 4-3 of this pair outrigger base 4.After one pair of outrigger base 4 installs, all reach and utilize bolt 1 emissions groove steel connector 5.The top margin of these channel-section steel connectors 5 all than the low 30mm of top margin 4-3 of this pair outrigger base 4, with subsides place mutually of this pair outrigger base 4, in subsides place mutually of its base and base plate 1 or wing plate 2, is all implemented the straight joint full weld in its side.
The indented bars that connects tension main reinforcement 6 usefulness diameters and be 22mm is tailored and is formed, and the width that its length equals ramp bridge girder 12 adds 588mm.Both sides, front and back at two outrigger base 4 tops of per pass connect 6 subsides place mutually with it of tension main reinforcement at this, all implement the straight joint full weld.Centre at every emissions groove steel connector 5 tops is connecting the intersection of tension main reinforcement 6 with each channel-section steel connector 5 end face, all implements the bilateral welding.
The thick steel plate of connection steel plate 7 usefulness 8mm is tailored and is formed, and its width is 60mm, and its length equals the clear distance that adjacent twice connect tension main reinforcement 6.The every both sides, front and back that connect steel plate 7 all connect tension main reinforcement 6 with 1 road and paste mutually, and its mutually subsides place implement the straight joint full weld.At the two ends, the left and right sides that connect tension main reinforcement 6, a side that connects steel plate 7 is also pasted mutually with side plate 3, its mutually subsides place also should implement the straight joint full weld.
Decorative panel 8 includes riser 8-1, following riser 8-2, upper cross plate 8-3 and lower cross plate 8-4, and they all use the thick steel plate of 6mm to make.Last riser 8-1 is a rectangle, and the width that its length equals ramp bridge girder 12 adds 588mm, high 630mm.Should go up riser 8-1 and vertically make along direction across bridge, two vertical edge respectively with about two blocks of side plates 3 paste mutually, the vertical edge 3-1 of its lateral surface and these two blocks of side plates 3 is in the same plane, the top longitudinal edge 3-2 of its top margin and these two blocks of side plates 3 is in the same plane.Following riser 8-2 is trapezoidal, and the width that the length of its top margin equals ramp bridge girder 12 adds 588mm, bottom side length 2400mm, high 580mm.This time riser 8-2 vertically makes along direction across bridge, and its base is positioned on the base plate 1, its two waist respectively with about two blocks of wing plates 2 paste mutually, the long limit 1-1 of its lateral surface and this base plate 1 and the horizontal edge 2-1 of these two blocks of wing plates 2 are in the same plane.Upper cross plate 8-3 is identical rectangle with lower cross plate 8-4, the width that its length equals ramp bridge girder 12 adds 588mm, and width is 154mm, and they all make along the direction across bridge level, all paste mutually with the lateral surface of two outrigger bases 4 of limit portion on long limit in it, and all paste mutually with the medial surface of last riser 8-1 on its foreign minister limit.The end face of upper cross plate 8-3 is lower than the top margin 100mm of two outrigger bases 4, and the base of the bottom surface of lower cross plate 8-4 and last riser 8-1 is in the same plane, and pastes mutually with the top margin of following riser 8-2.At the external surface of decorative panel 8, in subsides place mutually of per two block plates, all make bevel for welding in advance, behind the straight joint full weld, again weld bond is polished flat.
The concrete of being poured into a mould 11 is C30 non-shrinking steel fibrous concrete.In every cubic meter of concrete, its proportioning is: 425 Portland cement 440kg, water 189kg, steel fibre 100kg, sand 851kg, stone 851kg.
Before a top ramp bridge girder 12, the steel-structured lids Liangqi overwhelming majority steel member of making according to the present invention all is in place, but because the stopping of the former pot bearing 14 at bridge pier pier stud top 9, therebetween the both sides, front and back at two outrigger base 4 tops, 2 roads, in the centre at middle 3 emissions groove steel connectors 5 tops, have 7 and connect tension main reinforcements 6 and can't install; Between the 2 every adjacent perforation tension main reinforcements 6 on the middle 3 emissions groove steel connectors 5, having 6 row's connection steel plates 7 can't weld.Behind fluid concrete first, at the place, place of middle 3 emissions groove steel connectors 5, concrete 11 its end faces of being poured into a mould are lower than the top margin 70mm of the steel work of made; The place, the place of each 2 emissions groove steel connector 5 in front and back, the top margin of concrete 11 its end faces poured into a mould and the steel work of made is evened up.
After the concrete of being poured into a mould first 11 reached design strength, the concrete surface on each 2 emissions groove steel connector 5 of front and back was at first laid jack 16, and the girder 12 according to construction crown line Zhi Dingyuan arc curved ramp bridge makes former pot bearing 14 unloadings; Lay temporary support 17 then and support this girder 12, to replace and to remove jack 16; Use large-scale clamp that former pot bearing 14 is pressed from both sides out at last, bridge pier pier stud top 9 is separated fully with ramp bridge girder 12.
The both sides, front and back at two outrigger base 4 tops in middle 2 roads, the centre at middle 3 emissions groove steel connectors 5 tops, 7 of being made connect tension main reinforcement 6 all can be accurately in place.Between the 2 every adjacent perforation tension main reinforcements 6 on the middle 3 emissions groove steel connectors 5,6 rows that made connect steel plates 7 and all can weld.At place, the place of middle 3 emissions groove steel connectors 5, fluid concrete makes concrete 11 its end faces of being poured into a mould even up with the top margin of the steel work of made once more, makes the end face of the steel work bent cap 13 of making according to the present invention become a complete rectangle plane.Paste new board-like bearing 15 at the end face of this steel work bent cap 13, fall ramp bridge girder 12 after rise.

Claims (10)

1. a facture that supports the single-columned pier steel work bent cap of circular curve ramp bridge girder will be carried out successively by following operational sequence: the end face installation base plate (1) that adds solid (10) at the single-columned pier pier stud; 1 block of wing plate of each side welding (2) at base plate (1); About on the outer longitudinal edge (2-3) of 2 blocks of wing plates (2), each along vertical bridge to 1 block of side plate of vertical welding (3); On base plate (1), the two outrigger bases (4) in 8 roads are welded altogether with the spacing that equates in the both sides, front and back from the centre to bridge pier pier stud top (9), and between the two outrigger bases (4) in every 2 adjacent roads 1 emissions groove steel connector (5) are installed all; In front and back the both sides, front and back at two outrigger base (4) tops, each 3 road, in front and back the centre at each 2 emissions groove steel connector (5) top, each welds 1 and connects tension main reinforcement (6), amounts to 16; Between the every adjacent 2 perforation tension main reinforcements (6) on each 2 emissions groove steel connector (5) of front and back, in the top of each channel-section steel connector (5) and the inboard of left side plate (3), all weld 1 and connect steel plate (7), form 8 rows altogether and connect steel plate (7); On base plate (1), 1 packaged plaque (8) respectively welds in edge before and after it; First behind the fluid concrete, at the place, place of middle 3 emissions groove steel connectors (5), its end face of the concrete of being poured into a mould (11) is lower than the top margin 70mm of this steel work in the steel work of above-mentioned made; The place, the place of each 2 emissions groove steel connector (5) in front and back, the top margin of its end face of the concrete of being poured into a mould (11) and this steel work is evened up; After the concrete of being poured into a mould (11) reaches design strength, concrete surface on each 2 emissions groove steel connector (5) of front and back, at first lay jack (16), girder (12) according to construction crown line Zhi Dingyuan arc curved ramp bridge, lay temporary support (17) then and support this girder (12), to replace and to remove jack (16); Remove the former pot bearing (14) of single-columned pier end face; The both sides, front and back at two outrigger base (4) tops in middle 2 roads, the centre at middle 3 emissions groove steel connector (5) tops, each welds 1 and connects tension main reinforcement (6), amounts to 7; Between the every adjacent 2 perforation tension main reinforcements (6) on the middle 3 emissions groove steel connectors (5), in the top of each channel-section steel connector (5) and the inboard of left side plate (3), all weld 1 and connect steel plate (7), form 6 rows altogether and connect steel plate (7); Place, place at middle 3 emissions groove steel connectors (5), fluid concrete once more, the top margin of the steel work of its end face of concrete (11) poured into a mould and made is evened up, made the end face of the steel work bent cap of making according to the present invention (13) become a complete rectangle plane; Paste new board-like bearing (15) at the end face of this steel work bent cap (13), fall the girder (12) of circular curve ramp bridge after rise; This steel work bent cap facture is characterised in that:
The steel work bent cap of making according to the present invention (13) includes 1 base plate (1), 2 blocks of wing plates (2), 2 blocks of side plates (3), the two outrigger bases (4) in 8 roads, 7 emissions groove steel connectors (5), 23 and connects tension main reinforcement (6), 14 rows and connect steel plates (7), 2 packaged plaques (8), bridge pier pier stud top (9) that 1170mm is high, and the concrete (11) poured into a mould; The high 1230mm of this steel work bent cap (13), it is located in the end face that described single-columned pier pier stud adds solid (10), and its end face is the high bridge pier pier stud top (9) of 1170mm apart from the bottom surface 180mm of described ramp bridge girder (12) in the middle of it; From geometric figure, this steel work bent cap (13) can be divided into two parts up and down, and top is a rectangular cylinder, and the lower part is a flat trapezoidal cylinder that crouches; This rectangular column height 630mm, the width that equals described ramp bridge girder (12) along the length of direction across bridge adds 600mm, along vertical bridge to the width diameter that equals described bridge pier pier stud top (9) add 320mm; This trapezoidal column height 600mm, its front and back sides are two identical trapezoidal vertical planes, and its left and right side is the rectangle plane of two inclinations, and its end face and bottom surface are all the rectangle plane of level; This end face and bottom surface along vertical bridge to the width diameter that all equals described bridge pier pier stud top (9) add 160mm, end face adds 600mm along the width that the length of direction across bridge equals described ramp bridge girder (12), its vertical bridge is tangent to the circular curve of axis and this ramp bridge, the bottom surface is along the long 2400mm of direction across bridge, and its vertical bridge is positioned at this ramp bridge circular curve 100-150mm place in addition to the axis; Described base plate (1) horizontal positioned; The left and right sides in this base plate (1) outwards is followed successively by described wing plate (2) and side plate (3) from the lining; Front and back edge at described base plate (1), front and back are respectively installed 1 described decorative panel (8) symmetrically, this 2 packaged plaque (8) and described base plate (1) and the wing plate (2) of this base plate (1) left and right sides and the steel sheel that side plate (3) has constituted this steel work bent cap jointly; In this steel sheel, between 2 described decorative panels (8), to have made the described pair of outrigger bases in 8 roads (4) before and after the spacing that equates symmetrically altogether; Between every adjacent described pair of outrigger bases in 2 roads (4), all be that spacing makes 1 row's described channel-section steel connector (5) with 300mm; In the both sides, front and back at described pair of outrigger base of per pass (4) top, in the centre at the described channel-section steel connector of every row (5) top, respectively establish 1 described perforation tension main reinforcement (6) along direction across bridge; On the described channel-section steel connector of every row (5), between every adjacent 2 perforation tension main reinforcements (6), all weld 1 row's described connection steel plate (7); In above-mentioned formed steel work, be full of the concrete of being poured into a mould (11).
2. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1, it is characterized in that: described base plate (1) is made of the thick rectangular steel plates of 20mm, its long limit (1-1) along direction across bridge is 2400mm, along vertical bridge to minor face (1-2) diameter that equals described bridge pier pier stud top (9) add 160mm; In this rectangular steel plates, be provided with the circular hole (1-3) that a diameter equals bridge pier pier stud reinforcing cage external diameter; Along vertical bridge about the center of circle by this circular hole (1-3) is divided into described base plate (1) two, form splicing seams (1-4) at the place of being separated; Separated base plate (1) is clamped the reinforcing cage of bridge pier pier stud from the left and right sides, locate to implement the straight joint full weld at its splicing-in seam (1-4), makes it to form again an integral body; Described base plate (1) is the level of state, and distance at long limits (1-1) to this bridge pier pier stud center equates before and after it, and the minor face (1-2) that is positioned at the ramp bridge circular curve outside to the distance at this bridge pier pier stud center is 1300-1350mm; In the intersection on this base plate (1) end face and steel casing base, described bridge pier pier stud top (9), this base plate (1) bottom surface and described single-columned pier pier stud add the intersection of solid (10) steel casing top margin, implement the border full weld respectively; Described base plate (1) is a steel member of forming a connecting link, and it also is the top board that described single-columned pier pier stud adds solid (10) simultaneously.
3. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1, it is characterized in that: about described wing plate (2) is divided into two, they all are the thick rectangular steel plates of 6mm, and are installed in the left and right sides of described base plate (1) respectively; The interior longitudinal edge (2-2) of this wing plate (2) and outer longitudinal edge (2-3) along vertical bridge to, length equals the length of described base plate (1) minor face (1-2), the horizontal projection of its former and later two horizontal edges (2-1) is along direction across bridge; The interior longitudinal edge (2-2) of these two blocks of wing plates (2) splices mutually with the left and right sides minor face (1-2) of described base plate (1) respectively, and implements the straight joint full weld at its edge joint position; The outer longitudinal edge (2-3) of these two blocks of wing plates (2) all is higher than longitudinal edge (2-2) 600mm in it, and stretches out 300mm to the left and right sides of ramp bridge girder (12) respectively; The left and right sides at described bridge pier pier stud top (9), these two blocks of wing plates (2) are asymmetric state.
4. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1, it is characterized in that: described side plate (3) is the thick rectangular steel plates of 6mm, about on the outer longitudinal edge (2-3) of two blocks of described wing plates (2), each along vertical bridge to 1 block of these side plate of vertical making and settlement (3); The vertical edge (3-1) of this side plate (3) vertically, high 630mm, its top longitudinal edge (3-2) and end longitudinal edge (3-3) along vertical bridge to, the diameter that length equals described bridge pier pier stud top (9) adds 320mm; The end longitudinal edge (3-3) of this side plate (3) splices mutually with the outer longitudinal edge (2-3) of the same side wing plate (2), and implements the straight joint full weld at its edge joint position; Their top longitudinal edge (3-2) all is lower than the bottom surface 180mm of ramp bridge girder (12), and its former and later two vertical edges (3-1) stretch out this wing plate (2) 80mm respectively forward and backward; The left and right sides at described bridge pier pier stud top (9), these two blocks of side plates (3) are symmetrical.
5. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1 is characterized in that: described pair of outrigger base (4) made of the thick steel plate of 6mm, it by about two asymmetrical parts constitute; These two parts vertically make respectively in the left and right sides at described bridge pier pier stud top (9) along direction across bridge, the inner side edge of its each part (4-1) all pastes mutually with the steel casing at bridge pier pier stud top (9), outer side edges (4-2) respectively with about two blocks of described side plates (3) paste mutually, all paste mutually with described base plate (1) on base (4-4), hypotenuse (4-5) respectively with about two blocks of described wing plates (2) paste mutually, all implement the straight joint full weld in subsides place mutually of per two block plates; The top margin (4-3) of this pair outrigger base (4) is higher than bridge pier pier stud end face 30mm and is lower than top longitudinal edge (3-2) 30mm of described side plate (3); With regard to whole steel work bent cap, described pair of outrigger base (4) installed and welded in the both sides forwards, backwards from the centre by the road.
6. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1, it is characterized in that: described channel-section steel connector (5) is tailored with channel-section steel and is formed, and its width equals the clear distance of described pair of outrigger bases of adjacent twice (4); Between the two outrigger bases (4) of adjacent twice, described channel-section steel connector (5) is that spacing vertically makes with 300mm along direction across bridge; In the installation position of this channel-section steel connector (5), described pair of outrigger base (4) clamped in the side of former and later two channel-section steel connectors (5), by the 1 row bolt that is made from top to bottom they is fixed together tightly; The diameter of this bolt is 12mm, and spacing is 150mm, and its top bolt is lower than top margin (4-3) 50mm of this pair outrigger base (4); After the two outrigger bases (4) in 1 road install, all reach and utilize bolt 1 row's described channel-section steel connector (5), the top margin of these channel-section steel connectors (5) all is lower than top margin (4-3) 30mm of this pair outrigger base (4); With subsides place mutually of this pair outrigger base (4), in subsides place mutually of its base and described base plate (1) or wing plate (2), all implement the straight joint full weld in its side.
7. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1, it is characterized in that: described perforation tension main reinforcement (6) is that the indented bars of 22mm is tailored and formed with diameter, and the width that its length equals described ramp bridge girder (12) adds 588mm; Both sides, front and back at described pair of outrigger base of per pass (4) top connect tension main reinforcement (6) subsides place mutually with it at this, all implement the straight joint full weld; Centre at the described channel-section steel connector of every row (5) top is connecting the intersection of tension main reinforcement (6) with each channel-section steel connector (5) end face, all implements the bilateral welding.
8. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1, it is characterized in that: described connection steel plate (7) is tailored with the thick steel plate of 8mm and is formed, its width is 60mm, and its length equals the clear distance of adjacent two described perforation tension main reinforcements (6); All paste mutually with 1 described perforation tension main reinforcement (6) on the every both sides, front and back that connect steel plate (7), and at its subsides place enforcement straight joint full weld mutually; At the two ends, the left and right sides of described perforation tension main reinforcement (6), a side of described connection steel plate (7) is also pasted mutually with described side plate (3), its mutually subsides place also should implement the straight joint full weld.
9. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1, it is characterized in that: described decorative panel (8) includes riser (8-1), following riser (8-2), upper cross plate (8-3) and lower cross plate (8-4), and they all use the thick steel plate of 6mm to make; Last riser (8-1) is a rectangle, and the width that its length equals described ramp bridge girder (12) adds 588mm, high 630mm; Should go up riser (8-1) vertically makes along direction across bridge, two vertical edge respectively with about two blocks of described side plates (3) paste mutually, the vertical edge (3-1) of its lateral surface and these two blocks of side plates (3) is in the same plane, and the top longitudinal edge (3-2) of its top margin and these two blocks of side plates (3) is in the same plane; Following riser (8-2) is trapezoidal, and the width that the length of its top margin equals described ramp bridge girder (12) adds 588mm, bottom side length 2400mm, high 580mm; This time riser (8-2) vertically makes along direction across bridge, its base is positioned on the described base plate (1), its two waist respectively with about two blocks of described wing plates (2) paste mutually, the long limit (1-1) of its lateral surface and this base plate (1) and the horizontal edge (2-1) of these two blocks of wing plates (2) all are in the same plane; Upper cross plate (8-3) is identical rectangle with lower cross plate (8-4), the width that its length equals described ramp bridge girder (12) adds 588mm, width is 154mm, they all make along the direction across bridge level, all paste mutually with the lateral surface of the described pair of outrigger base (4) of limit portion on long limit in it, and all paste mutually with the described medial surface of going up riser (8-1) on its foreign minister limit; The end face of upper cross plate (8-3) is lower than the top margin 100mm of described pair of outrigger base (4), and the bottom surface of lower cross plate (8-4) and described base of going up riser (8-1) are in the same plane, and pastes mutually with the described top margin of riser (8-2) down; External surface in described decorative panel (8) in subsides place mutually of per two block plates, is all made bevel for welding in advance, behind the straight joint full weld, weld bond is polished flat again.
10. the facture of the single-columned pier steel work bent cap of support circular curve ramp bridge girder according to claim 1, it is characterized in that: when making the steel work bent cap, the concrete of being poured into a mould (11) is a C30 non-shrinking steel fibrous concrete according to the present invention; In every cubic meter of concrete, its proportioning is: 425 Portland cement 440kg, water 189kg, steel fibre 100kg, sand 851kg, stone 851kg.
CN2010106120155A 2010-12-20 2010-12-20 Manufacturing method of steel structure cover coping of single-column bridge pier for supporting girder of circular curve ramp bridge Pending CN102121230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106120155A CN102121230A (en) 2010-12-20 2010-12-20 Manufacturing method of steel structure cover coping of single-column bridge pier for supporting girder of circular curve ramp bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106120155A CN102121230A (en) 2010-12-20 2010-12-20 Manufacturing method of steel structure cover coping of single-column bridge pier for supporting girder of circular curve ramp bridge

Publications (1)

Publication Number Publication Date
CN102121230A true CN102121230A (en) 2011-07-13

Family

ID=44249881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106120155A Pending CN102121230A (en) 2010-12-20 2010-12-20 Manufacturing method of steel structure cover coping of single-column bridge pier for supporting girder of circular curve ramp bridge

Country Status (1)

Country Link
CN (1) CN102121230A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147384A (en) * 2013-03-16 2013-06-12 曹枫 Anti-crossing-over single-pier bridge
CN111979901A (en) * 2020-08-28 2020-11-24 同济大学建筑设计研究院(集团)有限公司 Combined bridge structure and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147384A (en) * 2013-03-16 2013-06-12 曹枫 Anti-crossing-over single-pier bridge
CN103147384B (en) * 2013-03-16 2015-03-11 曹枫 Anti-crossing-over single-pier bridge
CN111979901A (en) * 2020-08-28 2020-11-24 同济大学建筑设计研究院(集团)有限公司 Combined bridge structure and construction method

Similar Documents

Publication Publication Date Title
CN101078198B (en) Steel box beam erection method for self-anchored suspension bridge
CN109629440B (en) Steel box girder pushing construction method based on walking type three-dimensional hydraulic pushing equipment
CN113718636A (en) Special-shaped double-layer tower bridge structure and manufacturing method
CN101487232A (en) Steel box girder assembling construction method
CN105568866A (en) Incremental launching construction method for large-span steel box girder spanning constructed road
CN209260531U (en) The dual deck bridge of motor vehicle and non-motor vehicle layering circulation
CN206216902U (en) Prefabricated bar body reinforcing bar binding tire film
CN102121236A (en) Reinforcement method for single column type pier column for supporting main beam of circular arc curve ramp bridge
CN110184903B (en) A truss-type prefabricated pipe column assembled bridge pier
CN104233961A (en) Triangular supporting bracket of suspended cast bridge block 0
CN201605527U (en) Steel structure bent cap additionally arranged at top of pier stud
CN202107989U (en) Eccentric steel structure bridge pier coping positioned below main girder of circular arc ramp ridge
CN101906757A (en) Assembly method for replacing plate type rubber support on abutment of highway bridge
CN201605528U (en) Bridge pier column for installing steel-structure bent cap
CN106381810B (en) With the cast-in-place outstanding method for filling beam of beam-column type bracket
CN104895108A (en) Bailey piece assembled movable-type truss unilateral framework system construction method
CN114108499A (en) Suspended casting beam reference section hinged type triangular bracket combined hanging basket integrated device and construction method thereof
CN202107990U (en) Eccentric steel structure bridge pier post positioned under circular arc curve ramp bridge main beam
CN114134801A (en) Main beam dismantling structure and dismantling construction method for overwater large-span tied arch bridge
CN204059973U (en) Tool-type body of wall one side formwork support type steel truss
CN221029657U (en) Large steel member total splicing platform in canyon ladder space
CN107558385A (en) A kind of stone arch bridge strengthening structure and method
CN118911002A (en) Precast spliced railway pier structure based on steel pipe concrete skeleton
CN212707308U (en) Integral pedestal for standardized prefabrication of bridge deck
CN206256388U (en) A kind of bridge jig structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110713