CN102104251A - Microgrid real-time energy optimizing and scheduling method in parallel running mode - Google Patents

Microgrid real-time energy optimizing and scheduling method in parallel running mode Download PDF

Info

Publication number
CN102104251A
CN102104251A CN201110045064XA CN201110045064A CN102104251A CN 102104251 A CN102104251 A CN 102104251A CN 201110045064X A CN201110045064X A CN 201110045064XA CN 201110045064 A CN201110045064 A CN 201110045064A CN 102104251 A CN102104251 A CN 102104251A
Authority
CN
China
Prior art keywords
little
power
electrical network
power supply
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110045064XA
Other languages
Chinese (zh)
Other versions
CN102104251B (en
Inventor
江全元
石庆均
耿光超
王云
刘霞
程玮
薛美东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201110045064XA priority Critical patent/CN102104251B/en
Publication of CN102104251A publication Critical patent/CN102104251A/en
Application granted granted Critical
Publication of CN102104251B publication Critical patent/CN102104251B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/14District level solutions, i.e. local energy networks

Abstract

The invention discloses a microgrid real-time energy optimizing and scheduling method in a parallel running mode. The method comprises the following steps of: firstly, dividing 24 hours in a day into a peak period of time, a general period of time and a trough period of time according to the load condition of a large power grid; and then, monitoring the working state of an accumulator in a microgrid in real time in the real-time process of the microgrid and adopting different energy optimizing strategies according to different periods of time and different working states of the accumulator so as to confirm the active power output of various schedulable micro power supplies, the charging and discharging power of the accumulator and scheduling instructions of the active power interactive with the power grid and the passive power of a passive adjustable power supply in the microgrid. The microgrid suitable for the invention comprises a reproducible energy generator, the schedulable micro power supplies and the accumulator. The invention not only can improve the economy and the reliability of the microgrid, but also can help the great power grid to cut peaks and fill troughs and is favorable to prolonging the service life of the accumulator.

Description

The energy-optimised dispatching method of little real-time power network under a kind of pattern that is incorporated into the power networks
Technical field
The present invention relates to a kind of little Electric Power Network Planning, operation and management, relate in particular to the energy-optimised dispatching method of little real-time power network under a kind of pattern that is incorporated into the power networks.
Background technology
The set that little electrical network is made up of various distributed power sources, energy-storage units, load and control protection system is by the cooperation between relevant control device, for load provides higher reliability and high-quality electric energy.Little electrical network replenishes because of factors such as its environmental friendliness, construction cost are low have become the useful of big electrical network, is more and more paid attention to and studies.Guaranteeing on the basis of little power network safety operation that the operation of the economic optimization of little electrical network is an important content in the energy management research.
At present, doing some researchs aspect the microgrid energy optimized dispatching both at home and abroad, in document [1]~[5] mainly from little operation of power networks cost minimum and environmental benefit set up energy-optimised model aspect best, by each active power that can dispatch little power supply of Optimization Model solving result scheduling, optimization is not but done in its reactive power output, and all do not consider little electrical network self networks structure, make that optimizing the result is short of reality, in addition, just there is not the cycle charging discharge of foundation for the use of the storage battery in little electrical network yet, accumulator cell charging and discharging is not optimized, thereby does not make full use of the economy that storage battery improves little operation of power networks.Pertinent literature:
[1] fourth is bright, Zhang Yingyuan, and the U.S. qin of cogongrass, poplar is Liu Xiaoping. the decline stable state modeling of network system of centralized control is optimized [J] with operation. Automation of Electric Systems, 2009,33 (24): 78-82.
[2] Chen Dawei, Zhu Guiping. little network load optimized distribution [J]. Automation of Electric Systems, 2010,34 (20): 45-48.
[3]Mohamed?FA,Koivo?HN.MicroGrid?Online?Management?andBalancing?Using?Multiobjective?Optimization.2007?IEEE?LAUSANNEPOWERTECH,VOLS?1-5,PP:639-644。
[4] ox inscription, Huang Wei, Guo Jiahuan, Su Ling. the Study on economical operation when little electrical network is incorporated into the power networks [J]. electric power network technique, 2010,34 (11): 39-42.
[5]Mohamed?F.and?H?Koivo.Online?Management?of?MicroGrid?with?BatteryStorage?Using?Multiobjective?Optimization,”the?first?Interna-tional?Conferenceon?Power?Engineering,Energy?and?Electrical?Drives(POWERENG07),12-14?April2007,Setubal,Portugal.231-236。
Summary of the invention
Overcharge or over-discharge state in order to guarantee that little electrical network internal battery in use is not in, give full play to simultaneously the effect of little electrical network internal battery again, to improve little operation of power networks economy, and help big electrical network to carry out " peak load shifting ", be different from existing microgrid energy optimized dispatching method, the purpose of this invention is to provide the energy-optimised dispatching method of little real-time power network under a kind of pattern that is incorporated into the power networks.
The technical solution used in the present invention is to comprise the steps:
1) according to the load condition of big electrical network with being divided into peak period, section, three kinds of periods of paddy period at ordinary times in one day 24 hours, if big electrical network adopts the peak and valley time electricity price, then just according to the determined peak of the tou power price period, at ordinary times section and the paddy dividing time-steps;
2) in the real time execution process of little electrical network, determine the present located period constantly in each scheduling, monitor the state-of-charge SOC of the storage battery in little electrical network, measure the active power and the reactive power of each node load, measure the active power of output and the reactive power of renewable energy power generation;
3) if current be in the paddy period or at ordinary times the section, then further judge whether the state-of-charge SOC of current storage battery satisfies SOC<SOC Max, be in the peak period as current, then further judge whether the state-of-charge of current storage battery satisfies SOC>SOC Min
4) if current paddy period or the section at ordinary times of being in and do not satisfy SOC<SOC Max, determine that then storage battery can discharge, and be optimized 1, satisfy SOC<SOC Max, determine that then storage battery is not only chargeable but also can discharge, and be optimized 2; If currently be in the peak period, and satisfy SOC>SOC Min, determine that then storage battery can discharge, and be optimized 3, do not satisfy SOC>SOC Min, then determine with firm power charge in batteries, and be optimized 4;
5) obtain the active power and the reactive power output order of each little power supply by the optimization result in the step 4), then it is sent to each little power supply, each little power supply is according to instruction corresponding active power of output and reactive power.
Described step 2) scheduling in is meant that constantly the energy-optimised management of little real-time power network is in little real-time power network running, is a time interval little electrical network to be carried out the primary energy optimized dispatching with per 5 minutes or 15 minutes.
Storage battery state-of-charge SOC in the described step 3) is the parameter that reflection storage battery dump energy accounts for the ratio of its total capacity, is defined as:
SOC = C net C = 1 - ∫ Idt C
C Net-storage battery dump energy Ah;
C-storage battery total capacity, Ah;
I-battery discharging electric current, A;
Corresponding SOC Max, SOC MinFor the bound value of storage battery state-of-charge, get SOC Max=0.9, SOC Min=0.5.
Optimization 1 in the described step 4) is meant finds the solution the energy-optimised model of being set up 1; energy-optimised model 1 is minimum with little operation of power networks cost to be target; with in little electrical network each can dispatch the startup-shutdown state of little power supply, meritorious output that each can dispatch little power supply, with dealing electrical power, the discharge power of storage battery and the reactive power of each idle output scalable power supply between the big electrical network serve as the optimization variable; energy-optimised model 1 is the mixed integer nonlinear programming problem, its target function:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + λ bat + U P t C P - U S t I S
In the formula: λ Bat=(σ P Bat) Δ t
The t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure BSA00000439322900033
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure BSA00000439322900034
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
Figure BSA00000439322900035
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
Δ t-optimizes the time interval;
σ-designed coefficient;
P BatThe discharge power of-storage battery;
Its constraints:
(a) trend constraints
P i - Σ j = 1 j = n [ e i ( G ij e j - B ij f j ) + f i ( G ij f j + B ij e j ) ] = 0
Q i - Σ j = 1 j = n [ f i ( G ij e j - B ij f j ) - e i ( G ij f j + B ij e j ) ] = 0
In the formula: P i, Q i-each node injects active power and reactive power;
e i, f iThe real part and the imaginary part of each node voltage of-usefulness complex representation;
C Ij, B IjThe real part and the imaginary part of-i node and j node admittance element;
Total node number in the little electrical network of n-.
(b) can dispatch little power supply capacity constraint
P i min ≤ P i t ≤ P i max
In the formula:
Figure BSA00000439322900042
-Di i platform can be dispatched the active power output of little power supply in the t period;
Figure BSA00000439322900043
-Di i platform can be dispatched the maximum active power output limit value and the minimum active power output limit value of little power supply;
(c) the discharge active power of storage battery constraint
0 ≤ P bat ≤ P dh _ max t
In the formula: P BatThe discharge power of-storage battery;
Figure BSA00000439322900045
But-at the maximum discharge power limit value of t storage battery constantly the time;
(d) heap(ed) capacity constraint that can be mutual between little electrical network and big electrical network, the supply and demand agreement that this may be between them to be reached or the physical transfer capacity limit value of interconnection
0 ≤ P Pgrid t ≤ P Pgrid max
0 ≤ P Sgrid t ≤ P Sgrid max
In the formula:
Figure BSA00000439322900048
-little electrical network is purchased the active power of electricity from big electrical network;
Figure BSA00000439322900049
-little electrical network is to the active power of big electrical network sale of electricity;
Figure BSA000004393229000410
-little electrical network is purchased the maximum active power limit value of electricity from big electrical network;
Figure BSA000004393229000411
-little electrical network is to the maximum active power limit value of big electrical network sale of electricity;
(e) can dispatch the shortest continuous operating time and the constraint of the shortest continuous idle time of little power supply
( T i , on t - 1 - MRT ) · ( U i t - 1 - U i t ) ≥ 0
( T i , off t - 1 - MST ) · ( U i t - U i t - 1 ) ≥ 0
In the formula:
Figure BSA000004393229000414
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure BSA000004393229000415
-t-1 constantly the i platform can dispatch the continuous operating time of little power supply;
Figure BSA000004393229000416
-in the t-1 i platform continuous idle time that can dispatch little power supply constantly;
MRT-i platform can be dispatched the minimum continuous operating time of little power supply;
MST-i platform can be dispatched the minimum idle time continuously of little power supply;
(f) can dispatch little power supply active power output rate of change limit
P i t - P i t - 1 ≤ Δ P U
P i t - 1 - P i t ≤ Δ P D
In the formula:
Figure BSA00000439322900053
-Di i platform can be dispatched the active power output of little power supply in the t period;
Δ P U-can dispatch little this scheduling of power supply moment power with respect to last one restriction of power increase constantly;
Δ P D-can dispatch little this scheduling of power supply moment power with respect to last one restriction of power reduction constantly;
(g) buy and sell electric mutual exclusion constraint from big electrical network
U P t + U S t ≤ 1
(h) the idle output constraint of reactive power output scalable power supply
0 ≤ Q i t ≤ Q i max
In the formula:
Figure BSA00000439322900056
-Di i platform reactive power output scalable power supply is in t reactive power output constantly;
Figure BSA00000439322900057
The maximum reactive power output limit value of-Di i platform reactive power output scalable power supply.
Optimization 2 in the described step 4) is meant finds the solution the energy-optimised model of being set up 2; energy-optimised model 2 is minimum with little operation of power networks cost to be target; so that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output that each can dispatch little power supply; and the dealing electrical power between the big electrical network; the reactive power of the discharge power of storage battery and each idle output scalable power supply is for optimizing variable; energy-optimised model 2 is the mixed integer nonlinear programming problem; its target function is identical with energy-optimised model 1; its constraints and energy-optimised model 1 are basic identical; just " (c) the discharge active power of the storage battery constraint " in the constraints changes, and " (c) the discharge active power of storage battery constraint " in the constraints of energy-optimised model 2 is:
- P ch _ max t ≤ P bat ≤ P dh _ max t
In the formula: P BatThe discharge power of-storage battery; P Bat<0, represent to charge in batteries P Bat>0, expression is to battery discharging;
The maximum chargeable power of-storage battery;
Figure BSA000004393229000510
But-storage battery maximum discharge power.
Optimization 3 in the described step 4) is meant finds the solution the energy-optimised model of being set up 3; energy-optimised model 3 is minimum with little operation of power networks cost to be target; so that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output that each can dispatch little power supply; and the dealing electrical power between the big electrical network; the reactive power of the discharge power of storage battery and each idle output scalable power supply is for optimizing variable; energy-optimised model 3 is the mixed integer nonlinear programming problem; its constraints is identical with energy-optimised model 1; its target function is different slightly with energy-optimised model 1, and difference is the λ in the target function of energy-optimised model 3 BatWith the target function of energy-optimised model 1 in λ BatItem designs differently, and the target function of energy-optimised model 3 is:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + λ bat + U P t C P - U S t I S
In the formula: λ Bat=δ P DhΔ t
δ=a 1+a 2·dSOC+a 3·P dh+a 4·dSOC·P dh+a 5·dSOC 2
dSOC=SOC-SOC min
The t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
Figure BSA00000439322900062
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure BSA00000439322900063
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure BSA00000439322900064
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
Figure BSA00000439322900065
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
Δ t-optimizes the time interval;
P BatThe discharge power of-storage battery;
The state-of-charge of SOC-storage battery;
SOC MinThe state-of-charge lower limit of-storage battery;
a 1, a 2, a 3, a 4, a 5-designed coefficient.
Optimization 4 in the described step 4) is meant finds the solution the energy-optimised model of being set up 4; energy-optimised model 4 is minimum with little operation of power networks cost to be target; with in little electrical network each can dispatch the startup-shutdown state of little power supply, meritorious output that each can dispatch little power supply, with dealing electrical power, the discharge power of storage battery and the reactive power of each idle output scalable power supply between the big electrical network serve as the optimization variable; energy-optimised model 4 is the mixed integer nonlinear programming problem; with respect to energy-optimised model 1, there is not λ in the target function of energy-optimised model 4 Bat, the target function of energy-optimised model 4 is:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + U P t C P - U S t I S
In the formula: the t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
Figure BSA00000439322900071
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure BSA00000439322900072
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure BSA00000439322900073
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
Figure BSA00000439322900074
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
The constraints of the constraints of energy-optimised model 4 and energy-optimised model 1 is basic identical, and being does not have " (c) the discharge active power of storage battery constraint " this item constraint in the constraints of energy-optimised model 4.
In the described step 4) with firm power to charge in batteries, and be optimized 4 and be meant that charging and discharging of accumulator power does not participate in optimizing in 4 optimizing, and with firm power to charge in batteries, this moment, storage battery was equivalent to a constant load, and will contribute to the firm power of charge in batteries in the load at little electrical network network node place at storage battery place and go, and be the constant charge power of storage battery
P bat t = I bat _ max _ ch · U batt t
In the formula: I Bat_max_chThe maximum charging current that allows of-storage battery, specification is given by producing;
Figure BSA00000439322900076
-accumulator voltage.
Optimization result in the described step 5) is meant by solution procedure 4) in optimization 1, optimize 2, optimize 3 and optimize the result that 4 related energy-optimised model 1, energy-optimised model 2, energy-optimised model 3 and energy-optimised models 4 obtain, comprise in little electrical network each can dispatch the startup-shutdown state of little power supply, meritorious output valve that each can dispatch little power supply, with dealing electrical power value, the discharge power value of storage battery and the reactive power value of each idle output scalable power supply between the electrical network greatly.
The present invention compares with background technology, and the beneficial effect that has is:
1) traditional microgrid energy optimized dispatching is not optimized charging and discharging of accumulator, and the present invention is by counting in the target function of Optimization Model at the different period cost functions that discharge and recharge different to battery designs, the paddy that makes at the big electrical network little electrical network of section at ordinary times comes charge in batteries to buy electricity than low electricity price from big electrical network, and allow battery discharging and sell big electrical network with higher electricity price at little electrical network of peak period, both improved the on-road efficiency of little electrical network thus, and helped again big electrical network is carried out " peak load shifting ".
2) traditional microgrid energy optimized dispatching has only been optimized the active power output that respectively can dispatch little power supply, and do not consider via net loss, the present invention has considered little electrical network self networks structure, considered via net loss in feasible the optimization, and with the idle output scalable power supply (power supply that is connected with AC network by converters, the output of its reactive power also is adjustable) reactive power also as optimizing variable, make the active power output and the reactive power output of each power supply output reach total optimization, it is actual to optimize the result, makes little operation of power networks more economically.
3) the battery discharging cost function in the target function of peak energy-optimised model during the period is designed to the function of storage battery state-of-charge and discharge power, when the storage battery state-of-charge more little (but greater than storage battery state-of-charge lower limit SOC Min) time this cost function value big more, when discharge power is big more, this cost function value is big more, thereby the guiding storage battery hour reduces discharge power at state-of-charge, make storage battery keep certain charge capacity at any time, provide urgent power to support in the time of transferring lonely network operation to for little electrical network, improved little operation of power networks reliability, can make the state-of-charge of storage battery maintain SOC all the time again simultaneously MinAnd SOC MaxBetween, prevented overcharge of a battery or overdischarge, help prolonging the useful life of storage battery.
Description of drawings
Fig. 1 is the energy-optimised scheduling flow figure of little real-time power network.
Fig. 2 is the little electrical network exemplary plot of embodiment.
Fig. 3 adopts the present invention that little electrical network is carried out each power supply that real-time energy-optimised scheduling obtains at intraday active power distribution diagram.
Fig. 4 adopts the present invention that little electrical network is carried out each power supply that real-time energy-optimised scheduling obtains at intraday reactive power distribution diagram.
Fig. 5 adopts the present invention that little electrical network is carried out storage battery that real-time energy-optimised scheduling obtains at intraday state-of-charge SOC variation diagram.
Embodiment
The invention will be further described below in conjunction with drawings and Examples.
As shown in Figure 1, the present invention includes following steps:
1) according to the load condition of big electrical network with being divided into peak period, section, three kinds of periods of paddy period at ordinary times in one day 24 hours, if big electrical network adopts the peak and valley time electricity price, then just according to the determined peak of the tou power price period, at ordinary times section and the paddy dividing time-steps;
2) in the real time execution process of little electrical network, determine the present located period constantly in each scheduling, monitor the state-of-charge SOC of the storage battery in little electrical network, measure the active power and the reactive power of each node load, measure the active power of output and the reactive power of renewable energy power generation (photovoltaic generation and wind power generation);
3) if current be in the paddy period or at ordinary times the section, then further judge whether the state-of-charge SOC of current storage battery satisfies SOC<SOC Max, be in the peak period as current, then further judge whether the state-of-charge of current storage battery satisfies SOC>SOC Min
4) if current paddy period or the section at ordinary times of being in and do not satisfy SOC<SOC Max, determine that then storage battery can discharge, and be optimized 1, satisfy SOC<SOC Max, determine that then storage battery is not only chargeable but also can discharge, and be optimized 2; If currently be in the peak period, and satisfy SOC>SOC Min, determine that then storage battery can discharge, and be optimized 3, do not satisfy SOC>SOC Min, then determine with firm power charge in batteries, and be optimized 4;
5) obtain the active power and the reactive power output order of each little power supply by the optimization result in the step 4), then it is sent to each little power supply, each little power supply is according to instruction corresponding active power of output and reactive power.
Storage battery state-of-charge SOC in the described step 3) is the parameter that reflection storage battery dump energy accounts for the ratio of its total capacity, is defined as:
SOC = C net C = 1 - ∫ Idt C
C Net-storage battery dump energy Ah;
C-storage battery total capacity, Ah;
I-battery discharging electric current, A;
Corresponding SOC Max, SOC MinFor the bound value of storage battery state-of-charge, get SOC Max=0.9, SOC Min=0.5.Overcharge of a battery or overdischarge all can be shortened its useful life, by judging storage battery state-of-charge and SOC Max, SOC MinBetween relation determine next link, be in order to allow storage battery in charge and discharge process, remain its state-of-charge SOC at SOC MinWith SOC MaxBetween, to prevent overcharge of a battery or overdischarge.Charge in batteries to its state-of-charge reaches at 0.9 o'clock and will produce the gassing reflection, continues charging and will lose storage battery useful life, can make SOC for this reason Max=0.9; DOD is the battery technology parameter that producer provides, and is meant the depth of discharge of storage battery, but promptly storage battery maximum discharge capacity accounts for the ratio of its total capacity, is generally 0.6~0.7, and SOC can be arranged Min=1-DOD, but the little electrical network that is incorporated into the power networks will prevent to transfer to the situation of the autonomous operation of lonely net when big electric network fault, the little power supply that needs storage battery and other to participate in voltage-frequency control in this case supports for lonely net provides urgent power, therefore requirement storage battery when being incorporated into the power networks should be kept certain charge capacity at any time, so that storage battery can in time discharge when transferring lonely net to, remedy power shortage because of causing with big electrical breakdown, for this reason, with SOC MinSet greatlyyer slightly, get SOC than 1-DOD Min=0.5.
Optimization 1 in the described step 4) is meant finds the solution the energy-optimised model of being set up 1; energy-optimised model 1 is minimum with little operation of power networks cost to be target; so that each can dispatch little power supply (as miniature gas turbine in little electrical network; fuel cell; diesel engine generator etc.) startup-shutdown state; the meritorious output that each can dispatch little power supply; and the dealing electrical power between the big electrical network; the discharge power of storage battery and each idle output scalable power supply (power supply that is connected with AC network by converters; its reactive power that outputs to AC network also can be regulated; as big electrical network; fuel cell; miniature gas turbine; storage battery; photovoltaic cell; wind-driven generator etc.) reactive power is for optimizing variable; energy-optimised model 1 is the mixed integer nonlinear programming problem, its target function:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + λ bat + U P t C P - U S t I S
In the formula: λ Bat=(σ P Bat) Δ t
The t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
Figure BSA00000439322900102
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure BSA00000439322900104
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
Δ t-optimizes the time interval;
σ-designed coefficient;
P BatThe discharge power of-storage battery;
Its constraints:
(a) trend constraints
P i - Σ j = 1 j = n [ e i ( G ij e j - B ij f j ) + f i ( G ij f j + B ij e j ) ] = 0
Q i - Σ j = 1 j = n [ f i ( G ij e j - B ij f j ) - e i ( G ij f j + B ij e j ) ] = 0
In the formula: P i, Q i-each node injects active power and reactive power;
e i, f iThe real part and the imaginary part of each node voltage of-usefulness complex representation;
G Ij, B IjThe real part and the imaginary part of-i node and j node admittance element;
Total node number in the little electrical network of n-.
(b) can dispatch little power supply capacity constraint
P i min ≤ P i t ≤ P i max
In the formula:
Figure BSA00000439322900112
-Di i platform can be dispatched the active power output of little power supply in the t period;
Figure BSA00000439322900113
-Di i platform can be dispatched the maximum active power output limit value and the minimum active power output limit value of little power supply;
(c) the discharge active power of storage battery constraint
0 ≤ P bat ≤ P dh _ max t
In the formula: P dh _ max t = min ( ( SO C t - SO C min ) · C batt ′ Δt , I bat _ max _ dh ) · U batt t
Figure BSA00000439322900116
-allow the discharge power value in the maximum of t storage battery during the moment;
SOC tThe state-of-charge of the storage battery that-scheduling monitors constantly;
SOC MinThe storage battery state-of-charge lower limit of-setting;
C ' Batt-battery capacity;
I Bat_max_dhThe maximum discharging current that allows of-storage battery, specification is given by producing;
Figure BSA00000439322900117
-accumulator voltage;
Δ t-scheduling time interval;
P BatThe discharge power of-storage battery;
(d) heap(ed) capacity constraint that can be mutual between little electrical network and big electrical network, the supply and demand agreement that this may be between them to be reached or the physical transfer capacity limit value of interconnection
0 ≤ P Pgrid t ≤ P Pgrid max
0 ≤ P Sgrid t ≤ P Sgrid max
In the formula:
Figure BSA000004393229001110
-little electrical network is purchased the active power of electricity from big electrical network;
Figure BSA000004393229001111
-little electrical network is to the active power of big electrical network sale of electricity;
Figure BSA000004393229001112
-little electrical network is purchased the maximum active power limit value of electricity from big electrical network;
Figure BSA000004393229001113
-little electrical network is to the maximum active power limit value of big electrical network sale of electricity;
(e) can dispatch the shortest continuous operating time and the constraint of the shortest continuous idle time of little power supply
( T i , on t - 1 - MRT ) · ( U i t - 1 - U i t ) ≥ 0
( T i , off t - 1 - MST ) · ( U i t - U i t - 1 ) ≥ 0
In the formula: -t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure BSA00000439322900124
-t-1 constantly the i platform can dispatch the continuous operating time of little power supply;
-in the t-1 i platform continuous idle time that can dispatch little power supply constantly;
MRT-i platform can be dispatched the minimum continuous operating time of little power supply;
MST-i platform can be dispatched the minimum idle time continuously of little power supply;
(f) can dispatch little power supply active power output rate of change limit
P i t - P i t - 1 ≤ Δ P U
P i t - 1 - P i t ≤ Δ P D
In the formula:
Figure BSA00000439322900128
-Di i platform can be dispatched the active power output of little power supply in the t period;
Δ P U-can dispatch little this scheduling of power supply moment power with respect to last one restriction of power increase constantly;
Δ P D-can dispatch little this scheduling of power supply moment power with respect to last one restriction of power reduction constantly;
(g) buy and sell electric mutual exclusion constraint from big electrical network
U P t + U S t ≤ 1
(h) the idle output constraint of reactive power output scalable power supply
0 ≤ Q i t ≤ Q i max
In the formula:
Figure BSA000004393229001211
-Di i platform reactive power output scalable power supply is in t reactive power output constantly;
Figure BSA000004393229001212
The maximum reactive power output limit value of-Di i platform reactive power output scalable power supply.
Optimization 2 in the described step 4) is meant finds the solution the energy-optimised model of being set up 2; energy-optimised model 2 is minimum with little operation of power networks cost to be target; so that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output that each can dispatch little power supply; and the dealing electrical power between the big electrical network; the reactive power of the discharge power of storage battery and each idle output scalable power supply is for optimizing variable; energy-optimised model 2 is the mixed integer nonlinear programming problem; its target function is identical with energy-optimised model 1; its constraints and energy-optimised model 1 are basic identical; just " (c) the discharge active power of the storage battery constraint " in the constraints changes, and " (c) the discharge active power of storage battery constraint " in the constraints of energy-optimised model 2 is:
- P ch _ max t ≤ P bat ≤ P dh _ max t
In the formula: P ch _ max t = min ( ( SOC max - SOC t ) · C batt ′ Δt , I bat _ max _ ch ) · U batt t
P dh _ max t = max ( 0 , min ( ( SOC t - SOC min ) · C batt ′ Δt , I bat _ max _ dh ) ) · U batt t
P BatThe discharge power of-storage battery; P Bat<0, represent to charge in batteries P Bat>0, expression is to battery discharging;
Figure BSA00000439322900133
The maximum of-storage battery allows charge power;
Figure BSA00000439322900134
The maximum of-storage battery allows discharge power;
SOC tThe state-of-charge of the storage battery that-scheduling monitors constantly;
SOC MaxThe storage battery state-of-charge upper limit of-setting;
SOC MinThe storage battery state-of-charge lower limit of-setting;
C ' Batt-battery capacity;
I Bat_max_dhThe maximum discharging current that allows of-storage battery, specification is given by producing;
I Bat_max_chThe maximum charging current that allows of-storage battery, specification is given by producing;
Figure BSA00000439322900135
-accumulator voltage;
Δ t-scheduling time interval.
Optimization 3 in the described step 4) is meant finds the solution the energy-optimised model of being set up 3; energy-optimised model 3 is minimum with little operation of power networks cost to be target; so that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output that each can dispatch little power supply; and the dealing electrical power between the big electrical network; the reactive power of the discharge power of storage battery and each idle output scalable power supply is for optimizing variable; energy-optimised model 3 is the mixed integer nonlinear programming problem; its constraints is identical with energy-optimised model 1; its target function is different slightly with energy-optimised model 1, and difference is the λ in the target function of energy-optimised model 3 BatWith the target function of energy-optimised model 1 in λ BatItem designs differently, and the target function of energy-optimised model 3 is:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + λ bat + U P t C P - U S t I S
In the formula: λ Bat=δ P DhΔ t
δ=a 1+a 2·dSOC+a 3·P dh+a 4·dSOC·P dh+a 5·dSOC 2
dSOC=SOC-SOC min
The t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
Figure BSA00000439322900137
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure BSA00000439322900141
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure BSA00000439322900142
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
Δ t-optimizes the time interval;
P BatThe discharge power of-storage battery;
The state-of-charge of SOC-storage battery;
SOC MinThe state-of-charge lower limit of-storage battery;
a 1, a 2, a 3, a 4, a 5-designed coefficient,
Optimize 3 and be in the peak period, mainly be in discharge condition at this period storage battery, consider that the little electrical network that is incorporated into the power networks will prevent to transfer to the situation of the autonomous operation of lonely net when big electric network fault, the little power supply that needs storage battery and other to participate in voltage-frequency control in this case provides urgent support for lonely net, therefore requirement storage battery when being incorporated into the power networks should be kept certain charge capacity at any time, so wishing storage battery can discharge when carrying capacity is sufficient more, and when carrying capacity discharge less, accumulator cell charging and discharging cost function in the designed target function that counts energy-optimised model 3 has following characteristic: when state-of-charge is more little, its functional value is big more; When power output is big more, its functional value is big more, again because optimization aim is to make the target function value minimum, therefore adopt this function representation battery discharging cost function will guide storage battery at state-of-charge than hour reducing discharge power, make storage battery can keep certain charge capacity, provide urgent power to support in the time of transferring lonely network operation to for little electrical network, improved little operation of power networks reliability.
Optimization 4 in the described step 4) is meant finds the solution the energy-optimised model of being set up 4; energy-optimised model 4 is minimum with little operation of power networks cost to be target; with in little electrical network each can dispatch the startup-shutdown state of little power supply, meritorious output that each can dispatch little power supply, with dealing electrical power, the discharge power of storage battery and the reactive power of each idle output scalable power supply between the big electrical network serve as the optimization variable; energy-optimised model 4 is the mixed integer nonlinear programming problem; with respect to energy-optimised model 1, there is not λ in the target function of energy-optimised model 4 Bat, the target function of energy-optimised model 4 is:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + U P t C P - U S t I S
In the formula: the t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
Figure BSA00000439322900151
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure BSA00000439322900152
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure BSA00000439322900153
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
Figure BSA00000439322900154
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
The constraints of the constraints of energy-optimised model 4 and energy-optimised model 1 is basic identical, and being does not have " (c) the discharge active power of storage battery constraint " this item constraint in the constraints of energy-optimised model 4.
In the described step 4) with firm power to charge in batteries, and be optimized 4 and be meant that charging and discharging of accumulator power does not participate in optimizing in 4 optimizing, and with firm power to charge in batteries, this moment, storage battery was equivalent to a constant load, and will contribute to the firm power of charge in batteries in the load at little electrical network network node place at storage battery place and go, and be the constant charge power of storage battery
P bat t = I bat _ max _ ch · U batt t
In the formula: I Bat_max_chThe maximum charging current that allows of-storage battery, specification is given by producing;
Figure BSA00000439322900156
-accumulator voltage.
Optimization result in the described step 5) is meant by solution procedure 4) in optimization 1, optimize 2, optimize 3 and optimize the result that 4 related energy-optimised model 1, energy-optimised model 2, energy-optimised model 3 and energy-optimised models 4 obtain, comprise in little electrical network each can dispatch the startup-shutdown state of little power supply, meritorious output valve that each can dispatch little power supply, with dealing electrical power value, the discharge power value of storage battery and the reactive power value of each idle output scalable power supply between the electrical network greatly.
Below in conjunction with accompanying drawing, embodiments of the invention are elaborated, the flow chart of this invention is as shown in Figure 1.
Embodiment:
Consider little electrical network as shown in Figure 2, little electrical network includes diesel engine generator, miniature gas turbine, fuel cell, wind-driven generator, photovoltaic cell and storage battery, and little electrical network is connected with electrical network greatly by point of common coupling (PCC) and is incorporated into the power networks.Suppose with per 15 minutes be a scheduling slot, the current time is 13: 30, adopts the present invention that little electrical network is carried out real-time energy-optimised scheduling, each step division is as follows:
1) will be divided into peak period, section and paddy period at ordinary times in one day 24 hours: the paddy period is 00:00-07:00, and section is 08:00-10:00,16:00-18:00 and 22:00-23:00 at ordinary times, and the peak period is 11:00-15:00 and 19:00-21:00.
2) in the real time execution process of little electrical network, determine the present located period constantly in each scheduling, the state-of-charge SOC of monitoring storage battery, measure the active power and the reactive power of each node load, measure the active power of output and the reactive power of renewable energy power generation (photovoltaic generation and wind power generation); Current time is 13: 30, according to the period of being divided as can be known, currently be in the peak period, suppose the state-of-charge SOC=0.67 of the storage battery that records.
3) currently be in the peak period, judge further whether the state-of-charge of current storage battery satisfies SOC>SOC Min, because SOC Min=0.5, so satisfy SOC>SOC Min
4) currently be in the peak period, and satisfy SOC>SOC MinThen be optimized 3; its energy-optimised model 3 of setting up is minimum with little operation of power networks cost to be target; so that each can dispatch little power supply (miniature gas turbine in little electrical network; fuel cell and diesel engine generator) the startup-shutdown state; each can dispatch little power supply (miniature gas turbine; fuel cell; diesel engine generator) meritorious output; and the dealing electrical power between the big electrical network; the discharge power of storage battery and each idle output scalable power supply (power supply that is connected with AC network by converters; its reactive power that outputs to AC network also can be regulated; present embodiment comprises big electrical network; fuel cell; miniature gas turbine; storage battery and wind-driven generator) reactive power for optimizing variable; energy-optimised model 3 is the mixed integer nonlinear programming problem, and its energy-optimised model of setting up 3 is:
Target function:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + λ bat + U P t C P - U S t I S
In the formula: C OM ( P i t ) = K OM P i t · Δt
C P ( P Pgrid t ) = c p t P Pgrid t · Δt
I S ( P Sgrid t ) = c s t P Sgrid t · Δt
The t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure BSA00000439322900172
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
Figure BSA00000439322900173
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
Δ t-optimizes the time interval;
K OMi-can dispatch the proportionality coefficient of little power supply operation expense;
Figure BSA00000439322900174
-little electrical network is purchased the active power of electricity from big electrical network;
Figure BSA00000439322900175
-little electrical network is to the active power of big electrical network sale of electricity;
Figure BSA00000439322900176
-little electrical network is purchased electric electricity price, unit/kilowatt hour from big electrical network;
Figure BSA00000439322900177
-little electrical network is to the electricity price of big electrical network sale of electricity, unit/kilowatt hour;
For diesel engine generator (DG, Diesel Generator), its energy consumption cost is the function of its active power output, can be expressed as follows with quadratic polynomial:
C f _ DG ( P i t ) = ( a ( P i t ) 2 + b P i t + c ) Δt
In the formula: a, b, c-quadratic polynomial coefficient correlation.
For fuel cell (FC, Fuel Cell) and micro combustion steam turbine (MT, Microturbine), its active power output is proportional with the fuel input variable, corresponding energy consumption cost can be expressed as:
C f _ FC ( P i t ) = ( c ng P i t η i t ) Δt
In the formula:
Figure BSA000004393229001710
-meritorious power output;
c NgFor-the fluid fuel price;
Figure BSA000004393229001711
-fuel utilization ratio is the ratio of the calorific value of output electric energy and input fuel;
The battery discharging cost function is designed to:
dSOC=SOC-SOC min
δ=a 1+a 2·dSOC+a 3·P dh+a 4·dSOC·P dh+a 5·dSOC 2
λ bat=δ·P dh
In the formula: P BatThe discharge power of-storage battery;
The state-of-charge of SOC-storage battery;
SOC MinThe state-of-charge lower limit of-storage battery;
a 1, a 2, a 3, a 4, a 5-designed coefficient;
Constraints:
(a) trend constraints
P i - Σ j = 1 j = n [ e i ( G ij e j - B ij f j ) + f i ( G ij f j + B ij e j ) ] = 0
Q i - Σ j = 1 j = n [ f i ( G ij e j - B ij f j ) - e i ( G ij f j + B ij e j ) ] = 0
In the formula: P i, Q i-each node injects active power and reactive power;
e i, f iThe real part and the imaginary part of each node voltage of-usefulness complex representation;
G Ij, B IjThe real part and the imaginary part of-i node and j node admittance element;
Total node number in the little electrical network of n-.
(b) can dispatch little power supply capacity constraint
P i min ≤ P i t ≤ P i max
In the formula:
Figure BSA00000439322900184
-Di i platform can be dispatched the active power output of little power supply in the t period;
Figure BSA00000439322900185
-Di i platform can be dispatched the maximum active power output limit value and the minimum active power output limit value of little power supply;
(c) the discharge active power of storage battery constraint
0 ≤ P bat ≤ P dh _ max t
In the formula: P dh _ max t = min ( ( SO C t - SO C min ) · C batt ′ Δt , I bat _ max _ dh ) · U batt t
Figure BSA00000439322900188
-allow the discharge power value in the maximum of t storage battery during the moment;
SOG tThe state-of-charge of the storage battery that-scheduling monitors constantly;
SOC MinThe storage battery state-of-charge lower limit of-setting;
C ' Batt-battery capacity;
I Bat_max_dhThe maximum discharging current that allows of-storage battery, specification is given by producing;
-accumulator voltage;
Δ t-scheduling time interval;
P BatThe discharge power of-storage battery;
(d) heap(ed) capacity constraint that can be mutual between little electrical network and big electrical network, the supply and demand agreement that this may be between them to be reached or the physical transfer capacity limit value of interconnection
0 ≤ P Pgrid t ≤ P Pgrid max
0 ≤ P Sgrid t ≤ P Sgrid max
In the formula:
Figure BSA00000439322900193
-little electrical network is purchased the active power of electricity from big electrical network;
Figure BSA00000439322900194
-little electrical network is to the active power of big electrical network sale of electricity;
Figure BSA00000439322900195
-little electrical network is purchased the maximum active power limit value of electricity from big electrical network;
Figure BSA00000439322900196
-little electrical network is to the maximum active power limit value of big electrical network sale of electricity;
(e) can dispatch the shortest continuous operating time and the constraint of the shortest continuous idle time of little power supply
( T i , on t - 1 - MRT ) · ( U i t - 1 - U i t ) ≥ 0
( T i , off t - 1 - MST ) · ( U i t - U i t - 1 ) ≥ 0
In the formula:
Figure BSA00000439322900199
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure BSA000004393229001910
-t-1 constantly the i platform can dispatch the continuous operating time of little power supply;
-in the t-1 i platform continuous idle time that can dispatch little power supply constantly;
MRT-i platform can be dispatched the minimum continuous operating time of little power supply;
MST-i platform can be dispatched the minimum idle time continuously of little power supply;
(f) can dispatch little power supply active power output rate of change limit
P i t - P i t - 1 ≤ Δ P U
P i t - 1 - P i t ≤ Δ P D
In the formula: -Di i platform can be dispatched the active power output of little power supply in the t period;
Δ P U-can dispatch little this scheduling of power supply moment power with respect to last one restriction of power increase constantly;
Δ P D-can dispatch little this scheduling of power supply moment power with respect to last one restriction of power reduction constantly;
(g) buy and sell electric mutual exclusion constraint from big electrical network
U P t + U S t ≤ 1
(h) the idle output constraint of reactive power output scalable power supply
0 ≤ Q i t ≤ Q i max
In the formula:
Figure BSA000004393229001917
-Di i platform reactive power output scalable power supply is in t reactive power output constantly;
Figure BSA000004393229001918
The maximum reactive power output limit value of-Di i platform reactive power output scalable power supply;
5) by finding the solution active power and the reactive power output order that above-mentioned energy-optimised model 3 obtains each little power supply, then it is sent to each little power supply, each little power supply is according to instruction corresponding active power of output and reactive power.
Fig. 3 for adopt the present invention carry out each power supply that the energy-optimised scheduling of little real-time power network obtains in one day each constantly active power (P_Grid for and the mutual active power of big electrical network, its value is purchased electricity greater than 0 expression from big electrical network, represents to big electrical network sale of electricity less than 0; P_MT is the active power of miniature gas turbine generating output; P_FC is the active power of fuel cell power generation output; P_DE is the active power of diesel engine generator generating output; P_Bat is a charging and discharging of accumulator power, its value is greater than 0 expression battery discharging, less than 0 expression to charge in batteries), Fig. 4 for adopt the present invention carry out each idle scalable power supply that the energy-optimised scheduling of little real-time power network obtains in one day each reactive power output constantly (Q_Grid is the reactive power of big electrical network to little electrical network output; Q_MT is the reactive power of miniature gas turbine generating output; Q_FC is the reactive power of fuel cell power generation output; Q_Bat is the reactive power of storage battery output; Q_MT is the reactive power of wind turbine power generation output), Fig. 5 is that the storage battery state-of-charge is in intraday situation of change.By Fig. 3 and Fig. 5 as can be known the discharge power P_Bat of storage battery at 0~4h (paddy period), 16~18h (section at ordinary times) and 22~23h (section at ordinary times) are less than 0 (charge in batteries), and at 11~16h (peak period) and 19~22h (peak period) greater than 0 (battery discharging), and with the mutual power P _ Grid of big electrical network in 0~10h (paddy, section at ordinary times) and 16~18h (at ordinary times section) greater than 0 (purchasing) from big electrical network, and at 11~15h (peak period) and 19~21h (peak period) less than 0 (to big electrical network sale of electricity), little like this electrical network is bought electricity to charge in batteries with low electricity price from big electrical network in Pinggu period, and sell electrical network in the battery discharging of peak period and with higher price, both improved the economy of little operation of power networks, and helped again big electrical network is carried out " peak load shifting ".The storage battery state-of-charge maintains 0.5 (SOC all the time as shown in Figure 5 Min) and 0.9 (SOC Max) between, battery discharging simultaneously is more little near 0.5 o'clock its discharge power more to its state-of-charge, illustrate that the microgrid energy management of adopting the present invention to carry out allows storage battery operate in the safe range all the time, overcharge of a battery or overdischarge have been prevented, and storage battery has kept certain charge capacity (because know that from Fig. 5 SOC is all the time more than 0.6 at any time, bigger than 0.5), can provide urgent power to support when little electrical network transfers lonely network operation under big electrical network breaks down situation.

Claims (9)

1. the energy-optimised dispatching method of little real-time power network under the pattern that is incorporated into the power networks is characterized in that comprising the steps:
1) according to the load condition of big electrical network with being divided into peak period, section, three kinds of periods of paddy period at ordinary times in one day 24 hours, if big electrical network adopts the peak and valley time electricity price, then just according to the determined peak of the tou power price period, at ordinary times section and the paddy dividing time-steps;
2) in the real time execution process of little electrical network, determine the present located period constantly in each scheduling, monitor the state-of-charge SOC of the storage battery in little electrical network, measure the active power and the reactive power of each node load, measure the active power of output and the reactive power of renewable energy power generation;
3) if current be in the paddy period or at ordinary times the section, then further judge whether the state-of-charge SOC of current storage battery satisfies SOC<SOC Max, be in the peak period as current, then further judge whether the state-of-charge of current storage battery satisfies SOC>SOC Min
4) if current paddy period or the section at ordinary times of being in and do not satisfy SOC<SOC Max, determine that then storage battery can discharge, and be optimized 1, satisfy SOC<SOC Max, determine that then storage battery is not only chargeable but also can discharge, and be optimized 2; If currently be in the peak period, and satisfy SOC>SOC Min, determine that then storage battery can discharge, and be optimized 3, do not satisfy SOC>SOC Min, then determine with firm power charge in batteries, and be optimized 4;
5) obtain the active power and the reactive power output order of each little power supply by the optimization result in the step 4), then it is sent to each little power supply, each little power supply is according to instruction corresponding active power of output and reactive power.
2. the little real-time power network energy optimizing method under a kind of pattern that is incorporated into the power networks according to claim 1, it is characterized in that: scheduling described step 2) is meant that constantly the energy-optimised management of little real-time power network is in little real-time power network running, is a time interval little electrical network to be carried out the primary energy optimized dispatching with per 5 minutes or 15 minutes.
3. the little real-time power network energy optimizing method under a kind of pattern that is incorporated into the power networks according to claim 1 is characterized in that: the storage battery state-of-charge SOC in the described step 3) is the parameter that reflection storage battery dump energy accounts for the ratio of its total capacity, is defined as:
SOC = C net C = 1 - ∫ Idt C
C Net-storage battery dump energy Ah;
C-storage battery total capacity, Ah;
I-battery discharging electric current, A;
Corresponding SOC Max, SOC MinFor the bound value of storage battery state-of-charge, get SOC Max=0.9, SOC Min=0.5.
4. the energy-optimised dispatching method of little real-time power network under a kind of pattern that is incorporated into the power networks according to claim 1; it is characterized in that: the optimization 1 in the described step 4) is meant finds the solution the energy-optimised model of being set up 1; energy-optimised model 1 is minimum with little operation of power networks cost to be target; so that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output that each can dispatch little power supply; and the dealing electrical power between the big electrical network; the reactive power of the discharge power of storage battery and each idle output scalable power supply is for optimizing variable; energy-optimised model 1 is the mixed integer nonlinear programming problem, its target function:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + λ bat + U P t C P - U S t I S
In the formula: λ Bat=(σ P Bat) Δ t
The t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
Figure FSA00000439322800022
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure FSA00000439322800023
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
Δ t-optimizes the time interval;
σ-designed coefficient;
P BatThe discharge power of-storage battery;
Its constraints:
(a) trend constraints
P i - Σ j = 1 j = n [ e i ( G ij e j - B ij f j ) + f i ( G ij f j + B ij e j ) ] = 0
Q i - Σ j = 1 j = n [ f i ( G ij e j - B ij f j ) - e i ( G ij f j + B ij e j ) ] = 0
In the formula: P i, Q i-each node injects active power and reactive power;
e i, f iThe real part and the imaginary part of each node voltage of-usefulness complex representation;
G Ij, B IjThe real part and the imaginary part of-i node and j node admittance element;
Total node number in the little electrical network of n-.
(b) can dispatch little power supply capacity constraint
P i min ≤ P i t ≤ P i max
In the formula:
Figure FSA00000439322800034
-Di i platform can be dispatched the active power output of little power supply in the t period;
Figure FSA00000439322800035
-Di i platform can be dispatched the maximum active power output limit value and the minimum active power output limit value of little power supply;
(c) the discharge active power of storage battery constraint
0 ≤ P bat ≤ P dh _ max t
In the formula: P BatThe discharge power of-storage battery;
But-at the maximum discharge power limit value of t storage battery constantly the time;
(d) heap(ed) capacity constraint that can be mutual between little electrical network and big electrical network, the supply and demand agreement that this may be between them to be reached or the physical transfer capacity limit value of interconnection
0 ≤ P Pgrid t ≤ P Pgrid max
0 ≤ P Sgrid t ≤ P Sgrid max
In the formula:
Figure FSA000004393228000310
-little electrical network is purchased the active power of electricity from big electrical network;
Figure FSA000004393228000311
-little electrical network is to the active power of big electrical network sale of electricity;
Figure FSA000004393228000312
-little electrical network is purchased the maximum active power limit value of electricity from big electrical network;
-little electrical network is to the maximum active power limit value of big electrical network sale of electricity;
(e) can dispatch the shortest continuous operating time and the constraint of the shortest continuous idle time of little power supply
( T i , on t - 1 - MRT ) · ( U i t - 1 - U i t ) ≥ 0
( T i , off t - 1 - MST ) · ( U i t - U i t - 1 ) ≥ 0
In the formula:
Figure FSA000004393228000316
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure FSA00000439322800041
-t-1 constantly the i platform can dispatch the continuous operating time of little power supply;
Figure FSA00000439322800042
-in the t-1 i platform continuous idle time that can dispatch little power supply constantly;
MRT-i platform can be dispatched the minimum continuous operating time of little power supply;
MST-i platform can be dispatched the minimum idle time continuously of little power supply;
(f) can dispatch little power supply active power output rate of change limit
P i t - P i t - 1 ≤ Δ P U
P i t - 1 - P i t ≤ Δ P D
In the formula:
Figure FSA00000439322800045
-Di i platform can be dispatched the active power output of little power supply in the t period;
Δ P U-can dispatch little this scheduling of power supply moment power with respect to last one restriction of power increase constantly;
Δ P D-can dispatch little this scheduling of power supply moment power with respect to last one restriction of power reduction constantly;
(g) buy and sell electric mutual exclusion constraint from big electrical network
U P t + U S t ≤ 1
(h) the idle output constraint of reactive power output scalable power supply
0 ≤ Q i t ≤ Q i max
In the formula: -Di i platform reactive power output scalable power supply is in t reactive power output constantly;
Figure FSA00000439322800049
The maximum reactive power output limit value of-Di i platform reactive power output scalable power supply.
5. according to the energy-optimised dispatching method of little real-time power network under claim 1 or the 4 described a kind of patterns that are incorporated into the power networks; it is characterized in that: the optimization 2 in the described step 4) is meant finds the solution the energy-optimised model of being set up 2; energy-optimised model 2 is minimum with little operation of power networks cost to be target; so that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output that each can dispatch little power supply; and the dealing electrical power between the big electrical network; the reactive power of the discharge power of storage battery and each idle output scalable power supply is for optimizing variable; energy-optimised model 2 is the mixed integer nonlinear programming problem; its target function is identical with energy-optimised model 1; its constraints and energy-optimised model 1 are basic identical; just " (c) the discharge active power of the storage battery constraint " in the constraints changes, and " (c) the discharge active power of storage battery constraint " in the constraints of energy-optimised model 2 is:
- P ch _ max t ≤ P bat ≤ P dh _ max t
In the formula: P BatThe discharge power of-storage battery; P Bat<0, represent to charge in batteries P Bat>0, expression is to battery discharging;
Figure FSA00000439322800051
The maximum chargeable power of-storage battery;
Figure FSA00000439322800052
But-storage battery maximum discharge power.
6. according to the energy-optimised dispatching method of little real-time power network under claim 1 or the 4 described a kind of patterns that are incorporated into the power networks; it is characterized in that: the optimization 3 in the described step 4) is meant finds the solution the energy-optimised model of being set up 3; energy-optimised model 3 is minimum with little operation of power networks cost to be target; so that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output that each can dispatch little power supply; and the dealing electrical power between the big electrical network; the reactive power of the discharge power of storage battery and each idle output scalable power supply is for optimizing variable; energy-optimised model 3 is the mixed integer nonlinear programming problem; its constraints is identical with energy-optimised model 1; its target function is different slightly with energy-optimised model 1, and difference is the λ in the target function of energy-optimised model 3 BatWith the target function of energy-optimised model 1 in λ BatItem designs differently, and the target function of energy-optimised model 3 is:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + λ bat + U P t C P - U S t I S
In the formula: λ Bat=δ P DhΔ t
δ=a 1+a 2·dSOC+a 3·P dh+a 4·dSOC·P dh+a 5·dSOC 2
dSOC=SOC-SOC min
The t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
Figure FSA00000439322800054
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
Figure FSA00000439322800055
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure FSA00000439322800056
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
Figure FSA00000439322800057
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
Δ t-optimizes the time interval;
P BatThe discharge power of-storage battery;
The state-of-charge of SOC-storage battery;
SOC MinThe state-of-charge lower limit of-storage battery;
a 1, a 2, a 3, a 4, a 5-designed coefficient.
7. according to the energy-optimised dispatching method of little real-time power network under claim 1 or the 4 described a kind of patterns that are incorporated into the power networks; it is characterized in that: the optimization 4 in the described step 4) is meant finds the solution the energy-optimised model of being set up 4; energy-optimised model 4 is minimum with little operation of power networks cost to be target; so that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output that each can dispatch little power supply; and the reactive power of the dealing electrical power between the big electrical network and each idle output scalable power supply is for optimizing variable; energy-optimised model 4 is the mixed integer nonlinear programming problem; with respect to energy-optimised model 1, there is not λ in the target function of energy-optimised model 4 Bat, the target function of energy-optimised model 4 is:
min Σ i = 1 N ( U i t C f + U i t C OM + U i t ( 1 - U i t - 1 ) C si t ) + U P t C P - U S t I S
In the formula: the t-system operation period;
Can dispatch little power supply number in the i-system;
Can dispatch total number of little power supply in the N-system;
Figure FSA00000439322800062
-t constantly the i platform can dispatch the state of little power supply, 0 expression is in shut down condition, 1 expression is in running status;
-whether purchase electricity at t little electrical network of the moment from big electrical network, 0 expression is denied that 1 expression is;
Figure FSA00000439322800064
-whether little electrical network is to big electrical network sale of electricity constantly at t, and 0 expression is denied that 1 expression is;
C f-can dispatch the energy consumption cost of little power supply;
C OM-can dispatch the operation expense of little power supply;
Figure FSA00000439322800065
-can dispatch the start-up cost of little power supply;
λ Bat-designed accumulator cell charging and discharging cost function;
C P-little electrical network is purchased the expenditure of electricity from big electrical network;
I S-little electrical network is to the income of big electrical network sale of electricity;
The constraints of the constraints of energy-optimised model 4 and energy-optimised model 1 is basic identical, and being does not have " (c) the discharge active power of storage battery constraint " this item constraint in the constraints of energy-optimised model 4.
8. the little real-time power network energy optimizing method under a kind of pattern that is incorporated into the power networks according to claim 1, it is characterized in that: in the described step 4) with firm power to charge in batteries, and be optimized 4 and be meant that charging and discharging of accumulator power does not participate in optimizing in 4 optimizing, and with firm power to charge in batteries, this moment, storage battery was equivalent to a constant load, and will contribute to the firm power of charge in batteries in the load at little electrical network network node place at storage battery place and go, and be the constant charge power of storage battery
P bat t = I bat _ max _ ch · U batt t
In the formula: I Bat_max_chThe maximum charging current that allows of-storage battery, specification is given by producing;
Figure FSA00000439322800072
-accumulator voltage.
9. according to the little real-time power network energy optimizing method under claim 1 or 4 or 5 or the 6 or 7 described a kind of patterns that are incorporated into the power networks; it is characterized in that: the optimization result in the described step 5) is meant by solution procedure 4) in optimization 1; optimize 2; optimize 3 and optimize 4 related energy-optimised models 1; energy-optimised model 2; energy-optimised model 3 and energy-optimised model 4 and the result that obtains comprises that each can dispatch the startup-shutdown state of little power supply in little electrical network; the meritorious output valve that each can dispatch little power supply; and the dealing electrical power value between the big electrical network; the reactive power value of the discharge power value of storage battery and each idle output scalable power supply.
CN201110045064XA 2011-02-24 2011-02-24 Microgrid real-time energy optimizing and scheduling method in parallel running mode Active CN102104251B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110045064XA CN102104251B (en) 2011-02-24 2011-02-24 Microgrid real-time energy optimizing and scheduling method in parallel running mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110045064XA CN102104251B (en) 2011-02-24 2011-02-24 Microgrid real-time energy optimizing and scheduling method in parallel running mode

Publications (2)

Publication Number Publication Date
CN102104251A true CN102104251A (en) 2011-06-22
CN102104251B CN102104251B (en) 2013-04-24

Family

ID=44156850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110045064XA Active CN102104251B (en) 2011-02-24 2011-02-24 Microgrid real-time energy optimizing and scheduling method in parallel running mode

Country Status (1)

Country Link
CN (1) CN102104251B (en)

Cited By (61)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102243673A (en) * 2011-06-28 2011-11-16 南京航空航天大学 Method for optimizing external power supply volume of microgrid in grid-connection mode
CN102244390A (en) * 2011-07-11 2011-11-16 天津大学 Smooth energy storage system capacity optimization method for microgrid junctor power fluctuation
CN102280938A (en) * 2011-08-29 2011-12-14 电子科技大学 Method for planning station construction capacity ratio of wind-light storage and transmission mixed power station
CN102289566A (en) * 2011-07-08 2011-12-21 浙江大学 Multiple-time-scale optimized energy dispatching method for micro power grid under independent operation mode
CN102315650A (en) * 2011-07-27 2012-01-11 南京航空航天大学 Optimizing method for power supply volume of micro gas turbine adopting microgrid under grid-connected mode
CN102324753A (en) * 2011-09-16 2012-01-18 上海市电力公司 Energy storage control method of battery energy storage system
CN102377248A (en) * 2011-10-10 2012-03-14 南方电网科学研究院有限责任公司 Method for optimizing capacity of energy storage system in case of fluctuation of smooth and renewable energy sources electricity generation output
CN102496964A (en) * 2011-11-25 2012-06-13 北京金风科创风电设备有限公司 Method for controlling output power of microgrid
CN102522763A (en) * 2011-12-23 2012-06-27 中国电力科学研究院 Control method for stabilizing fluctuation of wind power by energy storage system
CN102684199A (en) * 2012-06-05 2012-09-19 国电南瑞科技股份有限公司 Multiple time scale control method of exchange power of microgrid and power distribution network
CN102801164A (en) * 2011-06-28 2012-11-28 南京航空航天大学 Method for optimizing power generation amount of micro gas turbine in micro-grid operating in island mode
CN102810877A (en) * 2012-08-21 2012-12-05 湖南大学 Integrated microgrid control method
CN103001331A (en) * 2012-11-13 2013-03-27 中国电力科学研究院 Economic optimized dispatching method for energy storage power stations
CN103107579A (en) * 2013-02-26 2013-05-15 国电联合动力技术有限公司 Control method for battery energy storage system combining energy type and power type
CN103124076A (en) * 2011-11-18 2013-05-29 通用电气能源产品法国有限公司 Electricity generating installation provided with means for storage of energy and control process for an installation of this type
CN103166325A (en) * 2011-12-19 2013-06-19 三星Sdi株式会社 Energy storage system and controlling method of the same
WO2013097313A1 (en) * 2011-12-31 2013-07-04 国网信息通信有限公司 Method and system for analyzing user loads in combination with time information
CN103311942A (en) * 2013-03-18 2013-09-18 国家电网公司 Control method of battery energy storage system for peak clipping and valley filling in distribution network
CN103346562A (en) * 2013-07-11 2013-10-09 江苏省电力设计院 Multi-time scale microgrid energy control method considering demand response
CN103427429A (en) * 2013-08-21 2013-12-04 华北电力大学 Real-time power distribution system and method of user-side distributed energy storage device
CN103715707A (en) * 2014-01-15 2014-04-09 国家电网公司 Wind power plant storage capacity optimizing method taking battery service life and over-discharge phenomenon into consideration
CN103733459A (en) * 2011-08-23 2014-04-16 富士通株式会社 Power-smoothing controller and power-smoothing control method
CN103797844A (en) * 2012-09-13 2014-05-14 埃森哲环球服务有限公司 Method, system and apparatus for load shaving of a power grid and a tangible computer readable medium
CN103971172A (en) * 2014-04-18 2014-08-06 国家电网公司 Optimal configuration method for microgrid under condition of grid faults
CN103986193A (en) * 2014-05-30 2014-08-13 广西大学 Method for acquiring maximum capacity of wind power integration
CN103997058A (en) * 2014-05-08 2014-08-20 东北大学 Control method of wind, photovoltaic and storage micro grid system
CN103999317A (en) * 2011-12-16 2014-08-20 富士通株式会社 Method for controlling electric power leveling, electric power leveling control device, and program
CN104104099A (en) * 2014-05-05 2014-10-15 南方电网科学研究院有限责任公司 Energy management method of microgrid
CN104283227A (en) * 2014-10-30 2015-01-14 阳光电源股份有限公司 System and method for managing energy of micro-grid
CN104318336A (en) * 2014-11-17 2015-01-28 国家电网公司 Method and device for information interaction between micro-grids and large grid
CN104376385A (en) * 2014-11-27 2015-02-25 重庆大学 Microgrid power price optimizing method
CN104716693A (en) * 2013-12-13 2015-06-17 华为技术有限公司 Energy management method, controller and system for distributed energy storage batteries
CN104767224A (en) * 2015-03-04 2015-07-08 华南理工大学 Energy management method of multi-energy-storage-type containing grid-connection type wind and light storage micro-grid
CN104794588A (en) * 2015-05-11 2015-07-22 国家电网公司 Microgrid-large power grid information interaction method and device
CN104835080A (en) * 2015-04-30 2015-08-12 华南理工大学 Modeling method for micro-grid intraday scheduling plan mixed integer programming model
WO2015176547A1 (en) * 2014-05-21 2015-11-26 华为技术有限公司 Method and apparatus for electric energy dispatch, and, method and apparatus for power management
CN105427063A (en) * 2016-01-04 2016-03-23 厦门大学 Micro-grid scheduling decision method and micro-grid scheduling decision system
CN105470997A (en) * 2014-09-03 2016-04-06 特变电工新疆新能源股份有限公司 Microgrid control system
CN106056317A (en) * 2016-07-06 2016-10-26 浙江大学 Multiple flexible resource multi-state risk calculation method
CN106530141A (en) * 2016-12-26 2017-03-22 国网山东省电力公司泰安供电公司 Difference algorithm-based risk determining method and device for power dispatching operation
CN107147148A (en) * 2017-06-22 2017-09-08 湖南省德沃普储能有限公司 A kind of system and its grid-connected control method of the light source of bank savings and steam energy heat pump based on electricity price between peak and valley
CN107210606A (en) * 2014-12-02 2017-09-26 Imeon能源 The method of energy management
CN107453416A (en) * 2016-06-01 2017-12-08 环达电脑(上海)有限公司 The energy supply method of charging pile
CN107994592A (en) * 2017-11-30 2018-05-04 国网辽宁省电力有限公司 Power budget method when one kind improves electric-net valley based on heat-storing device
CN108510404A (en) * 2018-03-28 2018-09-07 山东大学 A kind of more microgrids orderly grid-connected Optimization Scheduling, apparatus and system
CN108649566A (en) * 2018-05-21 2018-10-12 上海电力学院 A kind of accumulator cell charging and discharging method based on Spot Price
CN108695871A (en) * 2018-05-03 2018-10-23 上海交通大学 The configuration method of the reduction stored energy capacitance demand of isolated island micro-capacitance sensor containing electric power spring
CN108933451A (en) * 2018-09-10 2018-12-04 合肥阳光新能源科技有限公司 Micro-grid system and its microgrid central controller and power distribution control method
CN108960642A (en) * 2018-07-10 2018-12-07 新疆大学 A kind of new energy power plant dynamic aggregation method and system
CN109103939A (en) * 2018-10-16 2018-12-28 山东三电新能源技术有限公司 A kind of energy-storage system intelligent controlling device and method reducing photovoltaic plant loss
CN109256802A (en) * 2018-10-08 2019-01-22 南京千智电气科技有限公司 A kind of peak regulation method for controlling power supply and device
CN110020742A (en) * 2018-12-25 2019-07-16 广东电网有限责任公司 A kind of industrial user source lotus stores up demand response optimization method and equipment
CN111027786A (en) * 2019-12-30 2020-04-17 云南恒协科技有限公司 Microgrid operation optimization and energy efficiency management system
CN111224432A (en) * 2020-01-16 2020-06-02 内蒙古工业大学 Microgrid optimization scheduling method and device
CN111463813A (en) * 2020-05-07 2020-07-28 上海电机学院 Household micro-grid system capable of participating in power grid energy optimization configuration
CN111525624A (en) * 2020-03-26 2020-08-11 天津理工大学 Household distributed energy scheduling method based on storage battery energy storage system
CN111628493A (en) * 2020-04-17 2020-09-04 湖北中钒储能科技有限公司 Control method of integrated energy storage power station for optical storage
CN111786422A (en) * 2020-08-04 2020-10-16 太原理工大学 Real-time optimization scheduling method for participating in upper-layer power grid by micro-power grid based on BP neural network
WO2021070704A1 (en) * 2019-10-08 2021-04-15 株式会社Gsユアサ Energy management device and energy management method
CN113919620A (en) * 2021-12-06 2022-01-11 南通大学 Day-ahead energy scheduling algorithm for wind-solar storage micro-grid
CN114498635A (en) * 2022-02-24 2022-05-13 国网江苏省电力有限公司苏州供电分公司 Power distribution network optimal scheduling method and system considering electric vehicle charging priority

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630840A (en) * 2009-08-12 2010-01-20 电子科技大学 Intelligent control system for microgrid energy
CN101950980A (en) * 2010-09-13 2011-01-19 江西省电力科学研究院 Capacity configuration method of energy storing device for regulating and controlling synchronization of distributed photovoltaic power supply

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630840A (en) * 2009-08-12 2010-01-20 电子科技大学 Intelligent control system for microgrid energy
CN101950980A (en) * 2010-09-13 2011-01-19 江西省电力科学研究院 Capacity configuration method of energy storing device for regulating and controlling synchronization of distributed photovoltaic power supply

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴红斌等: "可再生能源分布式发电系统的经济调度", 《农业工程学报》, vol. 26, no. 12, 31 December 2010 (2010-12-31), pages 287 - 292 *
牛铭等: "微网并网时的经济运行研究", 《电网技术》, vol. 34, no. 11, 30 November 2010 (2010-11-30), pages 38 - 42 *

Cited By (95)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102243673A (en) * 2011-06-28 2011-11-16 南京航空航天大学 Method for optimizing external power supply volume of microgrid in grid-connection mode
CN102801164A (en) * 2011-06-28 2012-11-28 南京航空航天大学 Method for optimizing power generation amount of micro gas turbine in micro-grid operating in island mode
CN102289566A (en) * 2011-07-08 2011-12-21 浙江大学 Multiple-time-scale optimized energy dispatching method for micro power grid under independent operation mode
CN102289566B (en) * 2011-07-08 2014-07-09 浙江大学 Multiple-time-scale optimized energy dispatching method for micro power grid under independent operation mode
CN102244390B (en) * 2011-07-11 2013-12-11 天津大学 Smooth energy storage system capacity optimization method for microgrid junctor power fluctuation
CN102244390A (en) * 2011-07-11 2011-11-16 天津大学 Smooth energy storage system capacity optimization method for microgrid junctor power fluctuation
CN102315650A (en) * 2011-07-27 2012-01-11 南京航空航天大学 Optimizing method for power supply volume of micro gas turbine adopting microgrid under grid-connected mode
CN103733459A (en) * 2011-08-23 2014-04-16 富士通株式会社 Power-smoothing controller and power-smoothing control method
CN103733459B (en) * 2011-08-23 2016-04-06 富士通株式会社 Electric power levelized control device and electric power levelized control method
CN102280938B (en) * 2011-08-29 2013-04-17 电子科技大学 Method for planning station construction capacity ratio of wind-light storage and transmission mixed power station
CN102280938A (en) * 2011-08-29 2011-12-14 电子科技大学 Method for planning station construction capacity ratio of wind-light storage and transmission mixed power station
CN102324753A (en) * 2011-09-16 2012-01-18 上海市电力公司 Energy storage control method of battery energy storage system
CN102324753B (en) * 2011-09-16 2014-09-03 上海市电力公司 Energy storage control method of battery energy storage system
CN102377248A (en) * 2011-10-10 2012-03-14 南方电网科学研究院有限责任公司 Method for optimizing capacity of energy storage system in case of fluctuation of smooth and renewable energy sources electricity generation output
CN102377248B (en) * 2011-10-10 2014-02-12 南方电网科学研究院有限责任公司 Method for optimizing capacity of energy storage system in case of fluctuation of smooth and renewable energy sources electricity generation output
CN103124076A (en) * 2011-11-18 2013-05-29 通用电气能源产品法国有限公司 Electricity generating installation provided with means for storage of energy and control process for an installation of this type
CN103124076B (en) * 2011-11-18 2017-05-10 通用电气能源产品法国有限公司 Electricity generating installation provided with means for storage of energy and control process for an installation of this type
CN102496964B (en) * 2011-11-25 2014-11-19 北京金风科创风电设备有限公司 Method for controlling output power of microgrid
CN102496964A (en) * 2011-11-25 2012-06-13 北京金风科创风电设备有限公司 Method for controlling output power of microgrid
CN103999317A (en) * 2011-12-16 2014-08-20 富士通株式会社 Method for controlling electric power leveling, electric power leveling control device, and program
CN103166325A (en) * 2011-12-19 2013-06-19 三星Sdi株式会社 Energy storage system and controlling method of the same
CN103166325B (en) * 2011-12-19 2017-03-01 三星Sdi株式会社 Energy storage system and the method controlling this energy storage system
US9293923B2 (en) 2011-12-19 2016-03-22 Samsung Sdi Co., Ltd. Energy storage system and controlling method of the same
CN102522763B (en) * 2011-12-23 2014-02-26 中国电力科学研究院 Control method for stabilizing fluctuation of wind power by energy storage system
CN102522763A (en) * 2011-12-23 2012-06-27 中国电力科学研究院 Control method for stabilizing fluctuation of wind power by energy storage system
WO2013097313A1 (en) * 2011-12-31 2013-07-04 国网信息通信有限公司 Method and system for analyzing user loads in combination with time information
US9722430B2 (en) 2011-12-31 2017-08-01 State Grid Information & Telecommunication Branch Method and system for analyzing user loads in combination with time information
CN102684199A (en) * 2012-06-05 2012-09-19 国电南瑞科技股份有限公司 Multiple time scale control method of exchange power of microgrid and power distribution network
CN102684199B (en) * 2012-06-05 2015-04-08 国电南瑞科技股份有限公司 Multiple time scale control method of exchange power of microgrid and power distribution network
CN102810877A (en) * 2012-08-21 2012-12-05 湖南大学 Integrated microgrid control method
CN103797844A (en) * 2012-09-13 2014-05-14 埃森哲环球服务有限公司 Method, system and apparatus for load shaving of a power grid and a tangible computer readable medium
CN103001331A (en) * 2012-11-13 2013-03-27 中国电力科学研究院 Economic optimized dispatching method for energy storage power stations
CN103107579A (en) * 2013-02-26 2013-05-15 国电联合动力技术有限公司 Control method for battery energy storage system combining energy type and power type
CN103311942B (en) * 2013-03-18 2015-05-13 国家电网公司 Control method of battery energy storage system for peak clipping and valley filling in distribution network
CN103311942A (en) * 2013-03-18 2013-09-18 国家电网公司 Control method of battery energy storage system for peak clipping and valley filling in distribution network
CN103346562A (en) * 2013-07-11 2013-10-09 江苏省电力设计院 Multi-time scale microgrid energy control method considering demand response
CN103427429A (en) * 2013-08-21 2013-12-04 华北电力大学 Real-time power distribution system and method of user-side distributed energy storage device
CN104716693B (en) * 2013-12-13 2017-06-06 华为技术有限公司 The energy management method and controller, system of a kind of distributed energy storage battery
CN104716693A (en) * 2013-12-13 2015-06-17 华为技术有限公司 Energy management method, controller and system for distributed energy storage batteries
CN103715707A (en) * 2014-01-15 2014-04-09 国家电网公司 Wind power plant storage capacity optimizing method taking battery service life and over-discharge phenomenon into consideration
CN103715707B (en) * 2014-01-15 2015-08-12 国家电网公司 Consider battery life and cross the wind farm energy storage capacity optimization method of putting phenomenon
CN103971172A (en) * 2014-04-18 2014-08-06 国家电网公司 Optimal configuration method for microgrid under condition of grid faults
CN104104099A (en) * 2014-05-05 2014-10-15 南方电网科学研究院有限责任公司 Energy management method of microgrid
CN103997058B (en) * 2014-05-08 2015-11-04 东北大学 A kind of control method of wind-light storage micro-grid system
CN103997058A (en) * 2014-05-08 2014-08-20 东北大学 Control method of wind, photovoltaic and storage micro grid system
US10505381B2 (en) 2014-05-21 2019-12-10 Huawei Technologies Co., Ltd. Electric energy dispatch method and apparatus, and power management method and apparatus
WO2015176547A1 (en) * 2014-05-21 2015-11-26 华为技术有限公司 Method and apparatus for electric energy dispatch, and, method and apparatus for power management
JP2017516448A (en) * 2014-05-21 2017-06-15 ホアウェイ・テクノロジーズ・カンパニー・リミテッド Electric energy dispatch method and apparatus, and power management method and apparatus
CN103986193A (en) * 2014-05-30 2014-08-13 广西大学 Method for acquiring maximum capacity of wind power integration
CN103986193B (en) * 2014-05-30 2016-04-20 广西大学 A kind of method that maximum wind grid connection capacity obtains
CN105470997A (en) * 2014-09-03 2016-04-06 特变电工新疆新能源股份有限公司 Microgrid control system
CN105470997B (en) * 2014-09-03 2018-07-17 特变电工新疆新能源股份有限公司 A kind of micro grid control system
CN104283227A (en) * 2014-10-30 2015-01-14 阳光电源股份有限公司 System and method for managing energy of micro-grid
CN104318336A (en) * 2014-11-17 2015-01-28 国家电网公司 Method and device for information interaction between micro-grids and large grid
CN104318336B (en) * 2014-11-17 2018-05-08 国家电网公司 A kind of micro-capacitance sensor and bulk power grid information interacting method and device
CN104376385A (en) * 2014-11-27 2015-02-25 重庆大学 Microgrid power price optimizing method
CN107210606A (en) * 2014-12-02 2017-09-26 Imeon能源 The method of energy management
CN107210606B (en) * 2014-12-02 2021-06-08 Imeon能源 Method for energy management
CN104767224A (en) * 2015-03-04 2015-07-08 华南理工大学 Energy management method of multi-energy-storage-type containing grid-connection type wind and light storage micro-grid
CN104835080A (en) * 2015-04-30 2015-08-12 华南理工大学 Modeling method for micro-grid intraday scheduling plan mixed integer programming model
CN104835080B (en) * 2015-04-30 2018-06-22 华南理工大学 The modeling method of micro-capacitance sensor in a few days operation plan mixed-integer programming model
CN104794588A (en) * 2015-05-11 2015-07-22 国家电网公司 Microgrid-large power grid information interaction method and device
CN105427063A (en) * 2016-01-04 2016-03-23 厦门大学 Micro-grid scheduling decision method and micro-grid scheduling decision system
CN107453416A (en) * 2016-06-01 2017-12-08 环达电脑(上海)有限公司 The energy supply method of charging pile
CN106056317A (en) * 2016-07-06 2016-10-26 浙江大学 Multiple flexible resource multi-state risk calculation method
CN106056317B (en) * 2016-07-06 2019-05-24 浙江大学 A kind of multiple flexible resource multimode Risk Calculation method
CN106530141A (en) * 2016-12-26 2017-03-22 国网山东省电力公司泰安供电公司 Difference algorithm-based risk determining method and device for power dispatching operation
CN107147148A (en) * 2017-06-22 2017-09-08 湖南省德沃普储能有限公司 A kind of system and its grid-connected control method of the light source of bank savings and steam energy heat pump based on electricity price between peak and valley
CN107147148B (en) * 2017-06-22 2020-03-27 湖南德沃普电气股份有限公司 Light storage source and water vapor energy heat pump system based on peak-to-valley electricity price difference and grid-connected control method thereof
CN107994592A (en) * 2017-11-30 2018-05-04 国网辽宁省电力有限公司 Power budget method when one kind improves electric-net valley based on heat-storing device
CN107994592B (en) * 2017-11-30 2021-06-25 国网辽宁省电力有限公司 Method for improving electric energy load of power grid during valley time based on heat storage device
CN108510404A (en) * 2018-03-28 2018-09-07 山东大学 A kind of more microgrids orderly grid-connected Optimization Scheduling, apparatus and system
CN108695871B (en) * 2018-05-03 2021-07-06 上海交通大学 Configuration method for reducing energy storage capacity requirement of island micro-grid containing power spring
CN108695871A (en) * 2018-05-03 2018-10-23 上海交通大学 The configuration method of the reduction stored energy capacitance demand of isolated island micro-capacitance sensor containing electric power spring
CN108649566A (en) * 2018-05-21 2018-10-12 上海电力学院 A kind of accumulator cell charging and discharging method based on Spot Price
CN108960642A (en) * 2018-07-10 2018-12-07 新疆大学 A kind of new energy power plant dynamic aggregation method and system
CN108933451B (en) * 2018-09-10 2023-01-10 阳光新能源开发股份有限公司 Microgrid system, microgrid central controller thereof and power distribution control method
CN108933451A (en) * 2018-09-10 2018-12-04 合肥阳光新能源科技有限公司 Micro-grid system and its microgrid central controller and power distribution control method
CN109256802A (en) * 2018-10-08 2019-01-22 南京千智电气科技有限公司 A kind of peak regulation method for controlling power supply and device
CN109103939A (en) * 2018-10-16 2018-12-28 山东三电新能源技术有限公司 A kind of energy-storage system intelligent controlling device and method reducing photovoltaic plant loss
CN110020742A (en) * 2018-12-25 2019-07-16 广东电网有限责任公司 A kind of industrial user source lotus stores up demand response optimization method and equipment
JP7404751B2 (en) 2019-10-08 2023-12-26 株式会社Gsユアサ Energy management device, energy management method
WO2021070704A1 (en) * 2019-10-08 2021-04-15 株式会社Gsユアサ Energy management device and energy management method
CN111027786A (en) * 2019-12-30 2020-04-17 云南恒协科技有限公司 Microgrid operation optimization and energy efficiency management system
CN111027786B (en) * 2019-12-30 2023-07-25 云南恒协科技有限公司 Micro-grid operation optimization and energy efficiency management system
CN111224432A (en) * 2020-01-16 2020-06-02 内蒙古工业大学 Microgrid optimization scheduling method and device
CN111224432B (en) * 2020-01-16 2024-03-29 内蒙古工业大学 Micro-grid optimal scheduling method and device
CN111525624A (en) * 2020-03-26 2020-08-11 天津理工大学 Household distributed energy scheduling method based on storage battery energy storage system
CN111628493A (en) * 2020-04-17 2020-09-04 湖北中钒储能科技有限公司 Control method of integrated energy storage power station for optical storage
CN111463813A (en) * 2020-05-07 2020-07-28 上海电机学院 Household micro-grid system capable of participating in power grid energy optimization configuration
CN111786422A (en) * 2020-08-04 2020-10-16 太原理工大学 Real-time optimization scheduling method for participating in upper-layer power grid by micro-power grid based on BP neural network
CN113919620B (en) * 2021-12-06 2022-05-03 南通大学 Day-ahead energy scheduling algorithm for wind-solar storage micro-grid
CN113919620A (en) * 2021-12-06 2022-01-11 南通大学 Day-ahead energy scheduling algorithm for wind-solar storage micro-grid
CN114498635A (en) * 2022-02-24 2022-05-13 国网江苏省电力有限公司苏州供电分公司 Power distribution network optimal scheduling method and system considering electric vehicle charging priority
CN114498635B (en) * 2022-02-24 2023-12-19 国网江苏省电力有限公司苏州供电分公司 Power distribution network optimal scheduling method and system considering charging priority of electric automobile

Also Published As

Publication number Publication date
CN102104251B (en) 2013-04-24

Similar Documents

Publication Publication Date Title
CN102104251B (en) Microgrid real-time energy optimizing and scheduling method in parallel running mode
Jiang et al. A multiagent-based hierarchical energy management strategy for maximization of renewable energy consumption in interconnected multi-microgrids
CN102289566B (en) Multiple-time-scale optimized energy dispatching method for micro power grid under independent operation mode
CN106026152A (en) Charging and discharging scheduling method for electric vehicles connected to micro-grid
Musio et al. Vehicles to grid (V2G) concept applied to a virtual power plant structure
CN107294122A (en) A kind of mixed energy storage system is layered dynamic control method
CN104170201A (en) Method and device for operating power system, and rechargeable-battery management device
Rosati et al. Techno-economic analysis of battery electricity storage towards self-sufficient buildings
Meiqin et al. Economic analysis of the microgrid with multi-energy and electric vehicles
Bin et al. Research on power flexible load regulation technology based on demand response
CN112446745A (en) Double-layer stochastic programming-based multi-microgrid-containing power distribution market trading method
Cheng et al. A review on virtual power plants interactive resource characteristics and scheduling optimization
Isono et al. Development of battery aggregation technology for smart grid
Pelosi et al. Battery-hydrogen vs. flywheel-battery hybrid storage systems for renewable energy integration in mini-grid: A techno-economic comparison
Joench et al. A short review on smart building energy resource optimization
CN104701842A (en) Independent micro-grid power supply system and power supply reliability evaluation method
Skander-Mustapha et al. Energy Management of Rooftop PV System including Battery Storage: Case Study of ENIT building
Hosseini et al. Battery swapping station as an energy storage for capturing distribution-integrated solar variability
Zimmermann et al. A comparative analysis of the cumulative energy demand of stationary grid-integrated battery systems
Pavić et al. Fast charging stations—Power and ancillary services provision
Aghajan-Eshkevari et al. Electric Vehicle Services to Support the Power Grid
Hu et al. Research on intelligent peak-cutting and valley-filling charging and swapping mode based on potential game theory
Pillai et al. Electric vehicle based battery storages for future power system regulation services
Cao et al. A Novel Game-Theoretic-based Security-Constrained Unit Commitment Including Wind and Vehicle-to-Grid
Li et al. Control Strategy of Microgrid Switching Station based on B2G Mode of Fully Charged Battery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant