CN102092645A - 潮间带浅水区风力发电设备安装方法 - Google Patents

潮间带浅水区风力发电设备安装方法 Download PDF

Info

Publication number
CN102092645A
CN102092645A CN201110005929XA CN201110005929A CN102092645A CN 102092645 A CN102092645 A CN 102092645A CN 201110005929X A CN201110005929X A CN 201110005929XA CN 201110005929 A CN201110005929 A CN 201110005929A CN 102092645 A CN102092645 A CN 102092645A
Authority
CN
China
Prior art keywords
crane
transport trolley
crawler crane
cranking
carrying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110005929XA
Other languages
English (en)
Other versions
CN102092645B (zh
Inventor
籍波
邹胜
吕新民
黄有方
高飞
郭春晓
王志良
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Huarui Heavy Industry Group Co Ltd
Original Assignee
Dalian Huarui Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Huarui Co Ltd filed Critical Dalian Huarui Co Ltd
Priority to CN201110005929XA priority Critical patent/CN102092645B/zh
Publication of CN102092645A publication Critical patent/CN102092645A/zh
Application granted granted Critical
Publication of CN102092645B publication Critical patent/CN102092645B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y02E10/722

Landscapes

  • Wind Motors (AREA)

Abstract

本发明公开了一种潮间带浅水区风力发电设备安装方法,旨在采用一种履带运输车、履带吊、起重船和驳船等巧妙配合的施工方法解决设备安装的难题。其特征在于:工艺步骤包括:起重船载运辅助吊自航进入最浅吃水处;驳船运输风机部件、履带牵引运输车、平台台块、引桥、主履带吊部件和辅助履带吊等设备至驳船最浅吃水处;履带牵引运输车载运风机部件、平台台块、引桥、主履带吊部件至风机安装工位;辅助履带吊完成在风机安装工位的施工平台与完整级主履带吊的组装;主履带吊与辅助履带吊完成风机部件的组装与吊装;完成上述步骤后,辅助履带吊拆卸主履带吊与施工平台至可运输重量,由履带牵引运输车转场至下一风机安装工位。

Description

潮间带浅水区风力发电设备安装方法
技术领域:
本发明涉及一种风力发电设备尤其是潮间带浅水区风力发电设备的安装方法。 
背景技术
我国海上风能资源丰富,具备大规模发展的条件。而潮间带风机安装技术是制约海上风电发展的国际性技术难题,目前,还没有成熟的解决方案,尤其是浅水区域的风电安装方法。国内在潮间带安装风机区域的水深为3.5m,是潮间带可满足风电安装设备工作的最浅水域,适用设备数量极为有限。低于此限乃至更浅水深区域,常规陆地安装设备由于潮间带地质条件限制无法入场施工,且满足风机安装的海上起重设备也因吃水条件受限无法入场施工。对于潮间带2m及以下水深区域,风机设备的运输、吊装与安装,尤其困难,因此设计发明一种2m及以下水深的潮间带区域风电安装方法,实现风电设备可靠、高效、快捷安装任务成为亟待解决的技术难题。 
发明内容
本发明的提出,旨在解决目前潮间带2m及以下水深区域风机设备的安装难题,实现在潮间带2m及以下水深区域设备运输和吊装,可靠、高效、快捷的完成风机设备的安装工作。 
本发明的技术解决方案是这样实现的: 
一种潮间带浅水区风力发电设备安装方法,其特征在于:包括下述步骤: 
(1)起重船载运260t辅助履带吊靠外力进入潮间带风场; 
(2)驳船载运150t履带牵引运输车I进入潮间带风场,靠泊起重船; 
(3)起重船将150t履带牵引运输车I卸运至滩涂上; 
(4)150t履带牵引运输车I牵引起重船与260t辅助履带吊至最浅吃水处; 
(5)驳船载运风机部件至潮间带风场最浅吃水处,150t履带牵引运输车牵引运输驳船靠泊起重船; 
(6)驳船载运若干150t履带牵引运输车至潮间带风场最浅吃水处,150t履带牵引运输车I牵引运输驳船靠泊起重船; 
(7)驳船载运若干40t履带牵引运输车至潮间带风场最浅吃水处,150t履带牵引 运输车1牵引运输驳船靠泊起重船; 
(8)驳船载运一台100t辅助履带吊、若干平台台块与引桥至潮间带风场最浅吃水处,150t履带牵引运输车I牵引运输驳船靠泊起重船; 
(9)驳船载运一台750t主履带吊的零部件至潮间带风场最浅吃水处,150t履带牵引运输车I牵引运输驳船靠泊起重船; 
(10)起重船将运抵的40t履带牵引运输车与若干台150t履带牵引运输车卸运至滩涂上; 
(11)起重船将260t辅助履带吊与100t辅助履带吊分别卸运至一台150t履带牵引运输车上,载运至风机安装工位; 
(12)起重船将运抵的平台台块与引桥卸运至40t履带牵引运输车与150t履带牵引运输车上,载运至风机安装工位; 
(13)260t辅助履带吊与100t辅助履带吊将运抵的平台台块与引桥卸载、拼装,组成施工平台后,坐底就位; 
(14)起重船将750t主履带吊零部件卸运至40t履带牵引运输车与150t履带牵引运输车上,载运至风机安装工位的施工平台; 
(15)260t辅助履带吊与100t辅助履带吊将运抵的750t主履带吊零部件卸载,并在施工平台上组装成完整的750t主履带吊; 
(16)起重船将风机部件卸运至40t履带牵引运输车与150t履带牵引运输车上,载运至风机安装工位; 
(17)750t主履带吊与260t辅助履带吊将风机部件卸载,并完成风机的安装; 
(18)260t辅助履带吊与100t辅助履带吊将750t主履带吊拆零,150t履带牵引运输车与40t履带牵引运输车载运750t主履带吊部件转场; 
(19)150t履带牵引运输车与40t履带牵引运输车载运平台台块与引桥转场; 
(20)150t履带牵引运输车载运260t辅助履带吊与100t辅助履带吊转场; 
与现在技术相比较,本发明的优点显而易见,主要表现在: 
1、实现潮间带2m及以下水深区域风机设备的安装工作; 
2、因40t与150t履带牵引运输车可涉水(设计2m水深)完成风机部件与辅助设备的快速运输与转场工作,故可实现风机部件与安装设备的高效运输; 
3、在风机吊装过程中,起重船(设计吃水1.2m、22m幅度时起吊330t)或 施工平台都为坐底作业,可不受潮汐的影响持续进行作业。 
4、安装效率高,适合于潮间带2m及以下水深区域风机设备的批量安装。 
附图说明
本发明有附图9幅,其中: 
图1,本发明的工艺流程框图a; 
图2,本发明的工艺流程框图b; 
图3,风机叶片安装作业示意图; 
图4,起重船载运260t履带吊的作业示意图; 
图5,风机部件运输作业示意图; 
图6,风机叶片吊装作业示意图; 
图7,起重船示意图; 
图8,轮毂与叶片组装作业示意图; 
图9,平台与引桥俯视图。 
在图中:1,起重船(设计吃水1.2m;22m幅度时起吊330t);2,平台台块;3,引桥;4,750t主履带吊(安装高度105m;22m幅度时起吊150t);5,260t辅助履带吊;6,100t辅助履带吊;7,150t履带牵引运输车;8,40t履带牵引运输车;9,驳船。 
具体实施方式
如图1~图9所示的一种潮间带浅水区风力发电设备安装方法,旨在采用一种履带运输车、履带吊与起重船和驳船等巧妙配合的施工方法,解决设备安装的难题,其步骤主要包括: 
起重船(配回转吊)载运辅助吊自航进入最浅吃水处;驳船运输风机部件、履带牵引运输车、平台台块、引桥、主履带吊部件、辅助履带吊等设备至驳船最浅吃水处;履带牵引运输车载运风机部件、平台台块、引桥、主履带吊部件至风机安装工位;辅助履带吊完成在风机安装工位的施工平台与完整级主履带吊的组装;主履带吊与辅助履带吊完成风机部件的组装与吊装;完成上述步骤后,辅助履带吊拆卸主履带吊与施工平台至可运输重量,由履带牵引运输车载运转场至下一风力发电机安装工位,以实现下一次安装作业。 
下面,结合实施例作进一步说明。 
实施例1 
一种在潮间带2m及以下水深区域运输、安装风力发电设备的施工方法,其特征在于,包括下述步骤: 
(1)起重船1载运260t辅助履带吊5靠外力进入潮间带风场; 
(2)驳船9载运150t履带牵引运输车I7进入潮间带风场,靠泊起重船1; 
(3)起重船1将150t履带牵引运输车I7卸运至滩涂上; 
(4)150t履带牵引运输车I7牵引起重船1与260t辅助履带吊5至最浅吃水处; 
(5)驳船9载运风机部件至潮间带风场最浅吃水处,150t履带牵引运输车I7牵引运输驳船9靠泊起重船1; 
(6)驳船9载运若干150t履带牵引运输车7至潮间带风场最浅吃水处,150t履带牵引运输车I7牵引运输驳船9靠泊起重船1; 
(7)驳船9载运若干40t履带牵引运输车8至潮间带风场最浅吃水处,150t履带牵引运输车17牵引运输驳船9靠泊起重船1; 
(8)驳船9载运一台100t辅助履带吊6、若干平台台块2与引桥3至潮间带风场最浅吃水处,150t履带牵引运输车I7牵引运输驳船9靠泊起重船1; 
(9)驳船9载运一台750t主履带吊4的零部件至潮间带风场最浅吃水处,150t履带牵引运输车I7牵引运输驳船9靠泊起重船1; 
(10)起重船1将运抵的40t履带牵引运输车8与若干台150t履带牵引运输车7卸运至滩涂上; 
(11)起重船1将260t辅助履带吊5与100t辅助履带吊6分别卸运至一台150t履带牵引运输车7上,载运至风机安装工位; 
(12)起重船1将运抵的平台台块2与引桥3卸运至40t履带牵引运输车8与150t履带牵引运输车7上,载运至风机安装工位; 
(13)260t辅助履带吊5与100t辅助履带吊6将运抵的平台台块2与引桥3卸载、拼装,组成施工平台后,坐底就位; 
(14)起重船1将750t主履带吊4零部件卸运至40t履带牵引运输车8与150t履带牵引运输车7上,载运至风机安装工位的施工平台; 
(15)260t辅助履带吊5与100t辅助履带吊6将运抵的750t主履带吊4零部件卸载,并在施工平台上组装成完整的750t主履带吊4; 
(16)起重船1将风机部件卸运至40t履带牵引运输车8与150t履带牵引运 输车7上,载运至风机安装工位; 
(17)750t主履带吊4与260t辅助履带吊5将风机部件卸载,并完成风机的安装; 
(18)260t辅助履带吊5与100t辅助履带吊6将750t主履带吊4拆零,150t履带牵引运输车7与40t履带牵引运输车8载运750t主履带吊4部件转场; 
(19)150t履带牵引运输车7与40t履带牵引运输车8载运平台台块2与引桥3转场; 
(20)150t履带牵引运输车7载运260t辅助履带吊5与100t辅助履带吊6转场。 

Claims (1)

1.一种潮间带浅水区风力发电设备安装方法,其特征在于:包括下述步骤:
1.1起重船(1)载运260t辅助履带吊(5)靠外力进入潮间带风场;
1.2驳船(9)载运150t履带牵引运输车I(7)进入潮间带风场,靠泊起重船(1);
1.3起重船(1)将150t履带牵引运输车I(7)卸运至滩涂上;
1.4 150t履带牵引运输车I(7)牵引起重船(1)与260t辅助履带吊(5)至最浅吃水处;
1.5驳船(9)载运风机部件至潮间带风场最浅吃水处,150t履带牵引运输车I(7)牵引运输驳船(9)靠泊起重船(1);
1.6驳船(9)载运若干150t履带牵引运输车(7)至潮间带风场最浅吃水处,150t履带牵引运输车I(7)牵引运输驳船(9)靠泊起重船(1);
1.7驳船(9)载运若干40t履带牵引运输车(8)至潮间带风场最浅吃水处,150t履带牵引运输车1(7)牵引运输驳船(9)靠泊起重船(1);
1.8驳船(9)载运一台100t辅助履带吊(6)、若干平台台块(2)与引桥(3)至潮间带风场最浅吃水处,150t履带牵引运输车I(7)牵引运输驳船(9)靠泊起重船(1);
1.9驳船(9)载运一台750t主履带吊(4)的零部件至潮间带风场最浅吃水处,150t履带牵引运输车I(7)牵引运输驳船(9)靠泊起重船(1);
1.10起重船(1)将运抵的40t履带牵引运输车(8)与若干台150t履带牵引运输车(7)卸运至滩涂上;
1.11起重船(1)将260t辅助履带吊(5)与100t辅助履带吊(6)分别卸运至一台150t履带牵引运输车(7)上,载运至风机安装工位;
1.12起重船(1)将运抵的平台台块(2)与引桥(3)卸运至40t履带牵引运输车(8)与150t履带牵引运输车(7)上,载运至风机安装工位;
1.13 260t辅助履带吊(5)与100t辅助履带吊(6)将运抵的平台台块(2)与引桥(3)卸载、拼装,组成施工平台后,坐底就位;
1.14起重船(1)将750t主履带吊(4)零部件卸运至40t履带牵引运输车 
(8)与150t履带牵引运输车(7)上,载运至风机安装工位的施工平台;
1.15 260t辅助履带吊(5)与100t辅助履带吊(6)将运抵的750t主履带吊(4)零部件卸载,并在施工平台上组装成完整的750t主履带吊(4);
1.16起重船(1)将风机部件卸运至40t履带牵引运输车(8)与150t履带牵引运输车(7)上,载运至风机安装工位;
1.17 750t主履带吊(4)与260t辅助履带吊(5)将风机部件卸载,并完成风机的安装;
1.18 260t辅助履带吊(5)与100t辅助履带吊(6)将750t主履带吊(4)拆零,150t履带牵引运输车(7)与40t履带牵引运输车(8)载运750t主履带吊(4)部件转场;
1.19 150t履带牵引运输车(7)与40t履带牵引运输车(8)载运平台台块(2)与引桥(3)转场;
1.20 150t履带牵引运输车(7)载运260t辅助履带吊(5)与100t辅助履带吊(6)转场。 
CN201110005929XA 2011-01-12 2011-01-12 潮间带浅水区风力发电设备安装方法 Expired - Fee Related CN102092645B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110005929XA CN102092645B (zh) 2011-01-12 2011-01-12 潮间带浅水区风力发电设备安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110005929XA CN102092645B (zh) 2011-01-12 2011-01-12 潮间带浅水区风力发电设备安装方法

Publications (2)

Publication Number Publication Date
CN102092645A true CN102092645A (zh) 2011-06-15
CN102092645B CN102092645B (zh) 2013-04-03

Family

ID=44125936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110005929XA Expired - Fee Related CN102092645B (zh) 2011-01-12 2011-01-12 潮间带浅水区风力发电设备安装方法

Country Status (1)

Country Link
CN (1) CN102092645B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359119A (zh) * 2011-09-13 2012-02-22 三一电气有限责任公司 一种潮间带风力发电机组的安装方法
CN102410157A (zh) * 2011-10-26 2012-04-11 江苏海上龙源风力发电有限公司 一种潮间带风机吊装工艺
CN106401879A (zh) * 2016-11-23 2017-02-15 国家电网公司 风电机组集中安装装置
CN109132890A (zh) * 2018-10-29 2019-01-04 徐工集团工程机械股份有限公司 起重船用的辅助起重机的移位方法和起重船系统
NO20200920A1 (en) * 2020-08-20 2022-02-21 Fred Olsen Ocean Ltd A method and facility for assembling a plurality of floating wind turbines

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008232071A (ja) * 2007-03-22 2008-10-02 Fuji Ps Corp 風力発電用タワーのナセル上架方法および装置
CN101298279A (zh) * 2008-05-30 2008-11-05 中国海洋石油总公司 一种风力发电机组海上整体安全吊装的方法
CN101429928A (zh) * 2007-11-09 2009-05-13 中国海洋石油总公司 风力发电机组海上整体吊装的方法
CN101565091A (zh) * 2009-05-21 2009-10-28 上海利策科技有限公司 水上风力发电机的安装设备及其施工方法
US20100293781A1 (en) * 2009-05-22 2010-11-25 Kok Seng Foo Offshore wind turbine installation
WO2010139725A1 (en) * 2009-06-04 2010-12-09 Dong Energy A/S Method of installation of an offshore wind turbine and combination of an offshore wind turbine and a floating vessel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008232071A (ja) * 2007-03-22 2008-10-02 Fuji Ps Corp 風力発電用タワーのナセル上架方法および装置
CN101429928A (zh) * 2007-11-09 2009-05-13 中国海洋石油总公司 风力发电机组海上整体吊装的方法
CN101298279A (zh) * 2008-05-30 2008-11-05 中国海洋石油总公司 一种风力发电机组海上整体安全吊装的方法
CN101565091A (zh) * 2009-05-21 2009-10-28 上海利策科技有限公司 水上风力发电机的安装设备及其施工方法
US20100293781A1 (en) * 2009-05-22 2010-11-25 Kok Seng Foo Offshore wind turbine installation
WO2010139725A1 (en) * 2009-06-04 2010-12-09 Dong Energy A/S Method of installation of an offshore wind turbine and combination of an offshore wind turbine and a floating vessel

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359119A (zh) * 2011-09-13 2012-02-22 三一电气有限责任公司 一种潮间带风力发电机组的安装方法
CN102410157A (zh) * 2011-10-26 2012-04-11 江苏海上龙源风力发电有限公司 一种潮间带风机吊装工艺
CN106401879A (zh) * 2016-11-23 2017-02-15 国家电网公司 风电机组集中安装装置
CN109132890A (zh) * 2018-10-29 2019-01-04 徐工集团工程机械股份有限公司 起重船用的辅助起重机的移位方法和起重船系统
CN109132890B (zh) * 2018-10-29 2024-12-20 徐工集团工程机械股份有限公司 起重船用的辅助起重机的移位方法和起重船系统
NO20200920A1 (en) * 2020-08-20 2022-02-21 Fred Olsen Ocean Ltd A method and facility for assembling a plurality of floating wind turbines
WO2022038165A1 (en) 2020-08-20 2022-02-24 Fred. Olsen Ocean Ltd. A method and facility for assembling a plurality of floating wind turbines
NO346384B1 (en) * 2020-08-20 2022-07-04 Fred Olsen Ocean Ltd A method and facility for assembling a plurality of floating wind turbines

Also Published As

Publication number Publication date
CN102092645B (zh) 2013-04-03

Similar Documents

Publication Publication Date Title
CN103015445B (zh) 浅海域风电场无过渡段单桩基础施工和风机设备安装工艺
CN101429928B (zh) 风力发电机组海上整体吊装的方法
CN102092645B (zh) 潮间带浅水区风力发电设备安装方法
CN102152841B (zh) 垂直立柱浮式风电平台及其构筑方法
CN202828023U (zh) 设置有插拔桩装置的浅滩海区抢险作业船
CN101707951A (zh) 运输、竖起和替换近海风力涡轮机的含有转子的机舱的方法以及实施该方法的船只
WO2014073956A1 (en) Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same
CN104806457A (zh) 一种下潜式海上风力发电装置
CN108626078B (zh) 一种海上风机Spar型浮式基础驳船助运扶装工艺
CN103057672A (zh) 海上风机机组整机的运输和安装作业平台
CN110712721A (zh) 一种海上风场风机安装作业工程船及其作业方法
JP5738643B2 (ja) 洋上風力発電設備の施工方法
CN102140789A (zh) 一种新的浅水导管架设计及安装方法
WO2024131858A1 (zh) 一种双浮筒单点系泊海上风电漂浮式基础及其安装方法
CN102536688A (zh) 海上风力机组的兔耳式装配与安装工艺
CN201474858U (zh) 海上垂直轴可升降复合式发电平台
WO2022098246A1 (en) Installing offshore floating wind turbines
JP2009073455A (ja) 玄武船による海流発電新工法。
CN104554639A (zh) 大型近海风电设备安装装备
JP2016109126A (ja) 潮流発電装置及び潮流発電方法
KR101262089B1 (ko) 기상타워 및 풍력 발전기의 해상 설치방법
CN203844964U (zh) 母子双浮体海上风力发电机组整体运输安装一体船
CN106194560B (zh) 一种折叠式海洋潮流能风能两用的发电装置
CN102923261A (zh) 一种坐底式海上风机安装驳船
CN107269448A (zh) 超大型水力发电站

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: DALIAN HUARUI HEAVY INDUSTRY GROUP CO., LTD.

Free format text: FORMER OWNER: HUARUI CO., LTD., DALIAN

Effective date: 20120405

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120405

Address after: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Applicant after: Dalian Huarui Heavy Industry Group Co., Ltd.

Address before: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Applicant before: Huarui Co., Ltd., Dalian

C14 Grant of patent or utility model
GR01 Patent grant