CN102082400A - Simple line spanning frame - Google Patents
Simple line spanning frame Download PDFInfo
- Publication number
- CN102082400A CN102082400A CN 201010247622 CN201010247622A CN102082400A CN 102082400 A CN102082400 A CN 102082400A CN 201010247622 CN201010247622 CN 201010247622 CN 201010247622 A CN201010247622 A CN 201010247622A CN 102082400 A CN102082400 A CN 102082400A
- Authority
- CN
- China
- Prior art keywords
- spanning
- line
- rod
- frame
- elongated slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
Description
技术领域technical field
本发明属于电力施工辅助设备技术领域,特别涉及一种简易线路跨越架。The invention belongs to the technical field of electric power construction auxiliary equipment, in particular to a simple line spanning frame.
背景技术Background technique
跨越架线针对线路施工中经常遇到公路、河道、山区、人口密集区等环境,如35KV、10KV、400V线路架设施工过程中经常遇到公路、建筑物及其他带电线路等情况,现有跨越架架设受地形、交通环境、人口密集度等影响,搭设困难,并且给交通及居民生活带来不便,施工过程中搭设跨越架需要较长时间,施工人员必须高空作业,在跨越线路前必须爬至跨越架顶部对跨越线进行紧固工作,跨越线通过被跨越线路后必须再到跨越架顶部取下跨越线,施工人员工作强度大、存在安全隐患,施工总体成本较高。在跨越距离较长时,有跨越线意外脱落至带电被跨越线路或跨越线弧度较大达不到与被跨越带电线路安全距离的危险,造成恶性事故。Crossing wiring is often encountered in roads, rivers, mountainous areas, densely populated areas and other environments during line construction. For example, roads, buildings and other live lines are often encountered during the construction of 35KV, 10KV, and 400V lines. The erection is affected by the terrain, traffic environment, population density, etc. It is difficult to erect, and it brings inconvenience to traffic and residents' lives. It takes a long time to erect the spanning frame during the construction process. The construction personnel must work at heights and must climb before crossing the line. Go to the top of the spanning frame to fasten the spanning line. After the spanning line passes the spanned line, it must go to the top of the spanning frame to remove the spanning line. The work intensity of the construction personnel is high, there are potential safety hazards, and the overall construction cost is high. When the crossing distance is long, there is a danger that the crossing line accidentally falls off to the live crossed line or the arc of the crossing line is too large to reach the safe distance from the crossed live line, resulting in a vicious accident.
发明内容Contents of the invention
本发明提供一种结构简单、安全性好、使用方便、无须高空作业、节约人力的简易线路跨越架。The invention provides a simple line spanning frame with simple structure, good safety, convenient use, no need for high-altitude operation and labor saving.
一种简易线路跨越架,包括两根立柱和一根跨越杆,所述跨越杆与其中一根立柱轴连接,与另一根立柱卡式连接,所述立柱上设置固定拉线,所述跨越杆上表面上纵向设置长槽,所述长槽内设置多个滑轮,所述滑轮上设置一根牵引线穿过跨越杆长槽并伸出跨越杆,牵引线一端设置配重块,所述跨越杆与立柱轴连接的一端设置拉绳。A simple line spanning frame, comprising two uprights and a spanning rod, the spanning rod is connected to one of the uprights by a shaft, and is snap-connected to the other upright, the upright is provided with a fixed stay wire, and the spanning rod Long grooves are arranged longitudinally on the upper surface, and a plurality of pulleys are arranged in the long grooves. A traction line is arranged on the pulleys to pass through the long groove of the spanning bar and extend out of the spanning bar. One end of the traction line is provided with a counterweight. One end that the bar is connected with the column shaft is provided with a pull cord.
所述水柱和跨越杆间设置支撑杆。A supporting rod is arranged between the water column and the spanning rod.
使用简易跨越架进行线路跨越,能够满足各种跨越环境,跨越架结构简单,重量轻,操作方便灵活,通用性强,跨越安全、无隐患,运输、组装简单方便。施工人员不需上下跨越架进行高空作业。跨越架结构不会对施工环境造成影响,根据跨越线路电压等级、线路对地距离,可以方便的增加侧杆高度及跨越杆长度,扩大作业范围。由于跨越杆上开口凹壶状,跨越线被限制在凹槽内,在跨越线路(公路等)较宽时,不会因线路弧度造成触电事故。跨越线前后不需登高即完成跨越工作。特别适用于跨越架线,不仅可以实现不登高跨越架设,而且可以降低跨越劳动强度,大大缩短跨越作业时间,大大提高了跨越架线施工安全系数及效率。Using the simple spanning frame for line spanning can meet various spanning environments. The spanning frame has a simple structure, light weight, convenient and flexible operation, strong versatility, safe crossing, no hidden dangers, and simple and convenient transportation and assembly. The construction personnel do not need to go up and down the cross frame for high-altitude operations. The spanning frame structure will not affect the construction environment. According to the voltage level of the spanning line and the distance between the line and the ground, the height of the side pole and the length of the spanning pole can be easily increased to expand the scope of work. Because the opening on the crossing rod is concave pot-shaped, the crossing line is limited in the groove, and when the crossing line (highway, etc.) is wide, electric shock accidents will not be caused by the radian of the line. The crossing work can be completed without climbing before and after the crossing line. It is especially suitable for straddling wires. It can not only realize spanning erection without climbing a height, but also reduce the labor intensity of spanning, greatly shorten the spanning operation time, and greatly improve the safety factor and efficiency of spanning stringing construction.
附图说明:Description of drawings:
下面结合附图对本发明做进一步地说明:The present invention will be further described below in conjunction with accompanying drawing:
图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2是本发明跨越杆长槽横剖面的结构示意图。Fig. 2 is a structural schematic view of the cross-section of the long groove spanning the rod of the present invention.
具体实施方式Detailed ways
如图1所示,一种简易线路跨越架,包括两根立柱11、12和一根跨越杆2,所述跨越杆2与其中一根立柱11轴连接,与另一根立柱12卡式连接,所述立柱11、12上设置固定拉线3,所述跨越杆2上表面上纵向设置长槽7,所述长槽7内设置多个滑轮8,所述滑轮8上设置一根牵引线4穿过跨越杆长槽7并伸出跨越杆2,牵引线4一端设置配重块5,所述跨越杆2与立柱11轴连接的一端设置拉绳6。As shown in Figure 1, a simple line spanning frame includes two
所述立柱11、12和跨越杆2间设置支撑杆9。A supporting
使用时将一侧立柱11和跨越杆2组装好,将牵引线4及连接的配重块5放进跨越杆2的长槽7内,配重块5与长槽7端部的滑轮齐,将立柱11钉入地下,用三根拉线3呈120度将立柱11固定牢固;固定于另一侧立柱12,并将立柱12立起,也用三根拉线3固定;缓缓放松跨越杆拉绳6,将跨越杆平稳放置于另一侧立柱支撑平台上。利用配重块5自重放下牵引线4,预放足够长够,将待跨越线固定于牵引线4上,拉动牵引线4带动跨越线至另一侧,将跨越线固定于两侧线路杆塔上,就完成一根线路的跨越工作。When in use, assemble the
使用简易跨越架进行线路跨越,能够满足各种跨越环境,跨越架结构简单,重量轻,操作方便灵活,通用性强,跨越安全、无隐患,运输、组装简单方便。施工人员不需上下跨越架进行高空作业。跨越架结构不会对施工环境造成影响,根据跨越线路电压等级、线路对地距离,可以方便的增加侧杆高度及跨越杆长度,扩大作业范围。由于跨越杆上开口凹壶状,跨越线被限制在凹槽内,在跨越线路(公路等)较宽时,不会因线路弧度造成触电事故。跨越线前后不需登高即完成跨越工作。特别适用于跨越架线,不仅可以实现不登高跨越架设,而且可以降低跨越劳动强度,大大缩短跨越作业时间,大大提高了跨越架线施工安全系数及效率。Using the simple spanning frame for line spanning can meet various spanning environments. The spanning frame has a simple structure, light weight, convenient and flexible operation, strong versatility, safe crossing, no hidden dangers, and simple and convenient transportation and assembly. The construction personnel do not need to go up and down the cross frame for high-altitude operations. The spanning frame structure will not affect the construction environment. According to the voltage level of the spanning line and the distance between the line and the ground, the height of the side pole and the length of the spanning pole can be easily increased to expand the scope of work. Because the opening on the crossing rod is concave pot-shaped, the crossing line is limited in the groove, and when the crossing line (highway, etc.) is wide, electric shock accidents will not be caused by the radian of the line. The crossing work can be completed without climbing before and after the crossing line. It is especially suitable for straddling wires. It can not only realize spanning erection without climbing a height, but also reduce the labor intensity of spanning, greatly shorten the spanning operation time, and greatly improve the safety factor and efficiency of spanning stringing construction.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010247622 CN102082400B (en) | 2009-12-01 | 2010-08-09 | Simple line spanning frame |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN200910227220.7 | 2009-12-01 | ||
| CN200910227220 | 2009-12-01 | ||
| CN 201010247622 CN102082400B (en) | 2009-12-01 | 2010-08-09 | Simple line spanning frame |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102082400A true CN102082400A (en) | 2011-06-01 |
| CN102082400B CN102082400B (en) | 2012-09-05 |
Family
ID=44088186
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201010247622 Expired - Fee Related CN102082400B (en) | 2009-12-01 | 2010-08-09 | Simple line spanning frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102082400B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101908740A (en) * | 2009-12-01 | 2010-12-08 | 河南省电力公司南阳供电公司 | A line spanning method and a special spanning frame |
| CN103001149A (en) * | 2012-12-04 | 2013-03-27 | 陕西送变电工程公司 | Tool for dragging and crossing drainage object and method for crossing leading wire |
| AT515121B1 (en) * | 2013-11-19 | 2015-06-15 | Europ Trans Energy Gmbh | protection bridge |
| CN106451200A (en) * | 2016-07-01 | 2017-02-22 | 浙江浙电经济技术研究院 | London tower bridge type non-powercut spanning system and spanning method of power transmission line |
| CN109560505A (en) * | 2018-12-25 | 2019-04-02 | 宁波和泰电气有限公司 | It is catchmented by moisture and collects the power grid construction highway crossing device of atomization wire body |
| CN110137849A (en) * | 2019-05-27 | 2019-08-16 | 广东电网有限责任公司 | A kind of docking facilities for block crossing frame |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2293141Y (en) * | 1996-11-28 | 1998-09-30 | 烟台市牟平区电业局 | Conductor overhead supporter for surmounting obstacle |
| JP2002262420A (en) * | 2001-03-05 | 2002-09-13 | Dainichi Denken:Kk | Temporary arm equipment for power transmission tower and its construction method |
| CN101908740A (en) * | 2009-12-01 | 2010-12-08 | 河南省电力公司南阳供电公司 | A line spanning method and a special spanning frame |
-
2010
- 2010-08-09 CN CN 201010247622 patent/CN102082400B/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2293141Y (en) * | 1996-11-28 | 1998-09-30 | 烟台市牟平区电业局 | Conductor overhead supporter for surmounting obstacle |
| JP2002262420A (en) * | 2001-03-05 | 2002-09-13 | Dainichi Denken:Kk | Temporary arm equipment for power transmission tower and its construction method |
| CN101908740A (en) * | 2009-12-01 | 2010-12-08 | 河南省电力公司南阳供电公司 | A line spanning method and a special spanning frame |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101908740A (en) * | 2009-12-01 | 2010-12-08 | 河南省电力公司南阳供电公司 | A line spanning method and a special spanning frame |
| CN101908740B (en) * | 2009-12-01 | 2012-09-19 | 河南省电力公司南阳供电公司 | Line crossing method |
| CN103001149A (en) * | 2012-12-04 | 2013-03-27 | 陕西送变电工程公司 | Tool for dragging and crossing drainage object and method for crossing leading wire |
| CN103001149B (en) * | 2012-12-04 | 2015-06-03 | 陕西送变电工程公司 | Tool for dragging and crossing drainage object and method for crossing drainage object |
| AT515121B1 (en) * | 2013-11-19 | 2015-06-15 | Europ Trans Energy Gmbh | protection bridge |
| AT515121A4 (en) * | 2013-11-19 | 2015-06-15 | Europ Trans Energy Gmbh | protection bridge |
| EP2916405A1 (en) * | 2013-11-19 | 2015-09-09 | European Trans Energy GmbH | Protective bridge |
| CN106451200A (en) * | 2016-07-01 | 2017-02-22 | 浙江浙电经济技术研究院 | London tower bridge type non-powercut spanning system and spanning method of power transmission line |
| CN109560505A (en) * | 2018-12-25 | 2019-04-02 | 宁波和泰电气有限公司 | It is catchmented by moisture and collects the power grid construction highway crossing device of atomization wire body |
| CN110137849A (en) * | 2019-05-27 | 2019-08-16 | 广东电网有限责任公司 | A kind of docking facilities for block crossing frame |
| CN110137849B (en) * | 2019-05-27 | 2024-04-30 | 广东电网有限责任公司 | A docking device for sealing net crossing frame |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102082400B (en) | 2012-09-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102082400B (en) | Simple line spanning frame | |
| CN202187601U (en) | Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line | |
| CN201874296U (en) | Power ensured emergency tent | |
| CN204333766U (en) | Portable transmission overhead line crossing construction device | |
| CN104695752A (en) | Rapid repairing tower system and erection method thereof | |
| CN101908740A (en) | A line spanning method and a special spanning frame | |
| CN201083018Y (en) | Mobile multipurpose fast mounting scaffold | |
| CN104577871B (en) | Portable transmission overhead line crossing construction device | |
| CN1152458C (en) | Method and device for spanning construction using aerial cableway | |
| CN202899720U (en) | Steel pole provided with foot treadles and used for high-tension transmission line iron tower | |
| CN221201940U (en) | Flowing type crossing frame | |
| CN110748140A (en) | Track beam hanging basket special for stepped curtain wall | |
| CN203393628U (en) | Ground basket device | |
| CN215858925U (en) | Quick-mounting type insulating crossing frame | |
| CN206290066U (en) | A kind of electric pole for being easy to climb | |
| CN211775606U (en) | Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway | |
| CN203878962U (en) | Independent supporting device for high-place operation hanging basket cantilever | |
| CN210693256U (en) | Simple crossing frame | |
| CN214034706U (en) | Tower crane pedestrian safety passage used on attached lifting scaffold | |
| CN113931516A (en) | Holding pole standing device | |
| CN210828267U (en) | Externally-hung drilling construction platform | |
| CN224032111U (en) | Assembled building construction platform | |
| CN206736745U (en) | Goods-shelf type pier shaft external scaffolding | |
| CN113175196A (en) | Cable net construction platform | |
| CN217679626U (en) | Large-span truss device with stable structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C53 | Correction of patent for invention or patent application | ||
| CB03 | Change of inventor or designer information |
Inventor after: Yang Hongju Inventor after: Xiao Hong Inventor after: Xie Yougang Inventor after: Shi Chenyu Inventor after: Yang Zhixin Inventor after: Yu Shanhua Inventor after: Zhao Xiao Inventor after: Chu Songling Inventor after: He Yiwen Inventor before: Yan Junguo Inventor before: Li Yonggang Inventor before: Huang Guoxi Inventor before: Xie Yougang |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: YAN JUNGUO LI YONGGANG HUANG GUOXI XIE YOUGANG TO: YANG HONGJU XIAO HONG XIE YOUGANG SHI CHENYU YANG ZHIXIN YU SHANHUA ZHAO XIAO CHU SONGLING HE YIWEN |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120905 Termination date: 20170809 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |