- CN102080530A CN102080530A CN2010106017718A CN201010601771A CN102080530A CN 102080530 A CN102080530 A CN 102080530A CN 2010106017718 A CN2010106017718 A CN 2010106017718A CN 201010601771 A CN201010601771 A CN 201010601771A CN 102080530 A CN102080530 A CN 102080530A
- Authority
- CN
- China
- Prior art keywords
- horizontal
- well
- drilled
- horizontal well
- horizontal segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The embodiment of the invention discloses a method for constructing a horizontal coal bed gas well and a vertical drainage and mining well, which comprises the following steps: drilling a vertical drainage and mining well communicated with a horizontal well; when the horizontal well is drilled, drilling a horizontal section of the horizontal well on a stratum which is a set distance away from the plane of a target layer; cleaning the horizontal well and putting in a casing pipe; and carrying out directed duct communication toward the direction of the target layer on the horizontal section. The embodiment adopts the technical scheme that the horizontal section of the horizontal well is drilled on the stratum which is the set distance away from the plane of the target layer when the horizontal well is drilled, and directed duct communication is carried out toward the direction of the target layer on the drilled horizontal section; and thus, when the coal bed gas of the target layer is collected, the horizontal section of the horizontal well does not need to be drilled on the target layer, thereby solving the problem that the normal drainage and mining of the coal bed gas is possibly affected by wellhole blocking as a result of wellhole collapse accidents because the horizontal section wellhole of the horizontal well needs to be drilled on the target layer in the prior art and the geologic structure of the target layer is too loose.
Description
Technical field
The present invention relates to the coal-bed gas exploitation field, more particularly, relate to a kind of coal bed gas horizontal well and row and adopt the straight well job practices.
Background technology
In the coal-bed gas exploitation field, with what need in the stratum to exploit, the coal seam of output coal bed gas is referred to as destination layer.
At present, when adopting the horizontal wells coal bed gas, the general mode that adopts is, at first the row of being drilled with adopts straight well and passes destination layer, and then be drilled with horizontal well, the horizontal segment of horizontal well is drilled with in destination layer, is communicated with, thereby make the coal bed gas of oozing out in the destination layer adopt outside row adopts the well of straight well along hoistway row by horizontal well is adopted straight well with row.
But, if adopt aforesaid way, when the geologic structure of destination layer is too loose, as, destination layer is the high coalbed gas geology structure of cherry coal, owing to can't be drilled with the hoistway of horizontal well at destination layer like this, so can't implement the exploitation of coal bed gas at such destination layer; And, even be drilled with the horizontal segment of horizontal well, owing to be easy to take place the hoistway cave-in accident, thereby hoistway is stopped up, and then the normal row who influences coal bed gas adopt at the too loose destination layer of geologic structure.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of horizontal well and row to adopt the straight well job practices, to be implemented in the purpose that normal row adopts under the loose situation of destination layer geologic structure.
The embodiment of the invention is achieved in that
A kind of coal bed gas horizontal well and row adopt the straight well job practices, comprise step:
Be drilled with the row who is used for being communicated with and adopt straight well and reaming with horizontal well;
When being drilled with horizontal well, the horizontal segment that is drilled with horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance is communicated with straight well;
Horizontal well is cleaned and is lowered to sleeve pipe;
Implementing directed duct at described horizontal segment to described destination layer direction of living in links up.
Preferably, in embodiments of the present invention, described setpoint distance is 2 to 3 meters.
Preferably, described when being drilled with horizontal well in embodiments of the present invention, be drilled with the horizontal segment of horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance, be specially:
Be drilled with the horizontal segment of horizontal well at the geological stratification of the following setpoint distance in distance objective layer plane of living in.
Preferably, described when being drilled with horizontal well in embodiments of the present invention, be drilled with the horizontal segment of horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance, be specially:
Be drilled with the horizontal segment of horizontal well at the geological stratification of the above setpoint distance in distance objective layer plane of living in.
Preferably, in embodiments of the present invention, the horizontal segment that described geological stratification at distance objective layer plane of living in setpoint distance is drilled with horizontal well is: the horizontal segment that is drilled with horizontal well at the geological stratification of the above setpoint distance in plane of living in, destination layer coal seam.
Preferably, in embodiments of the present invention, the concrete mode of described directed communication is: directed jetting.
Preferably, in embodiments of the present invention, described horizontal segment adopts barefoot completion.
Preferably, in embodiments of the present invention, the concrete mode of described directed communication is: the horizontal segment sidetracking enters described destination layer, forms multi-branched horizontal well.From above-mentioned technical scheme as can be seen, in embodiments of the present invention, by adopting when being drilled with horizontal well, be drilled with the horizontal segment of horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance, and implement the technical scheme that directed duct is linked up to the direction of destination layer at the horizontal segment that is drilled with, make when gathering the coal bed gas of destination layer, needn't be drilled with the horizontal segment of horizontal well at destination layer, thereby make when destination layer is the high coalbed gas geology structure of cherry coal, in the recovery process to coal bed gas in the destination layer, avoided to be drilled with at such destination layer in the prior art horizontal segment hoistway of horizontal well, thereby can the hoistway cave-in accident take place easily because the geologic structure of destination layer is too loose and hoistway is stopped up, and then influence the problem that the normal row of coal bed gas adopts.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, to do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is that horizontal well described in the embodiment of the invention and row adopt the flow chart of straight well job practices;
Fig. 2 adopts the horizontal segment position view of horizontal well in the straight well job practices for horizontal well described in the embodiment of the invention and row;
Fig. 3 adopts the horizontal segment position view of another horizontal well in the straight well job practices for horizontal well described in the embodiment of the invention and row.
The specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
In the practice of construction process,, also can carry out the purpose that normal coal bed gas row adopts to destination layer for the geologic structure that realizes destination layer when too loose, the embodiment of the invention provides a kind of horizontal well and row to adopt the straight well job practices, it is characterized in that, as shown in Figure 1, comprise step:
S11, be drilled with the row who is used for being communicated with and adopt straight well and carry out reaming with horizontal well;
Because the horizontal segment of horizontal well is at destination layer, so, in embodiments of the present invention, when adopting straight well in the row of being drilled with, arrange adopt straight well the cave also not at destination layer, but, be positioned at the top or the below of destination layer according to the residing position of the horizontal segment of horizontal well.
The security needs of straight well cave well section in order to mine of prior art, the glass reinforced plastic sleeve that all is lowered to cuts and coal seam section reaming glass reinforced plastic sleeve when doing the cave.In the present embodiment, the cave well section of the straight well that is communicated with horizontal segment can be lowered to glass reinforced plastic sleeve, carries out reaming according to prior art, also can be lowered to steel sleeve, forges to mill according to prior art to form the cave.
S12, when being drilled with horizontal well, be drilled with the horizontal segment of horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance;
Because in the embodiment of the invention, at the geologic structure of destination layer too loose, for this reason, when being drilled with horizontal well, the horizontal segment of horizontal well is avoided destination layer, like this, because horizontal segment is not at destination layer, so its geologic structure is relatively stable, can not cave in, thereby can not cause the obstruction of hoistway.
Concrete, in embodiments of the present invention, can be drilled with the horizontal segment of horizontal well at the geological stratification of the following setpoint distance in distance objective layer plane of living in; In addition, also can be drilled with the horizontal segment of horizontal well at the geological stratification of the above setpoint distance in distance objective layer plane of living in.
As shown in Figure 2, when the geological stratification at the following setpoint distance in distance objective layer 14 plane of living in is drilled with the horizontal segment 12 of horizontal well 11, when being drilled with horizontal well, can design according to borehole track, behind well section deflecting above in the of 14 and pass destination layer, the horizontal segment 12 that is drilled with horizontal well 11 then below destination layer plane of living in is adopted straight well with row and is communicated with.
As shown in Figure 3, when the geological stratification at the above setpoint distance in distance objective layer 4 plane of living in is drilled with the horizontal segment 2 of horizontal well 1, when being drilled with horizontal well 1, after can destination layer 4 top deflectings, the horizontal segment 2 that is drilled with horizontal well 1 at the geological stratification of the above setpoint distance on destination layer 4 planes of living in be adopted straight well with row and is communicated with.
When can be convenient to be communicated with destination layer pore-creating, the geologic structure that can also guarantee the horizontal segment of horizontal well is stablized, for the directed jetting of follow-up enforcement provides implementation condition, in the invention process example, described setpoint distance can be 2 to 3 meters, that is to say that the vertical distance of horizontal segment hoistway distance objective layer is 2 to 3 meters.
In embodiments of the present invention, the target coal seam in the applied environment is soft, and pore-creating character is very poor, horizontal segment is arranged on the destination layer and destination layer under dual mode in, the mode of preferred levels section on destination layer, this be because:
The first, from the wellbore construction angle, horizontal segment will pass through this coal seam section at the inclination section of following mode, and the risk of wellbore construction and follow-up completion practice such as setting of casing or cementing operation is bigger.The second, from the angle of follow-up directed sidetracking, the technology difficulty of sidetracking is more much smaller than the difficulty of the sidetracking that makes progress downwards; The 3rd, adopt the angle of operation from follow-up row, row adopts in the process, local coal seam section collapses when stopping up the duct, horizontal segment is in last situation, the section of collapsing only influences the smoothness of the well section oneself that collapses, horizontal segment under situation, the later well Duan Jun of the section of collapsing is stopped up.
S13, horizontal well is cleaned and is lowered to sleeve pipe.
After horizontal segment and row adopt straight well and are communicated with, horizontal well is cleaned, so that the hoistway of horizontal well horizontal segment is unimpeded, is lowered to sleeve pipe then the borehole wall is carried out supporting, guarantee that this well can be reentried and ickings cleans.
S14, implement directed duct at described horizontal segment to described destination layer direction of living in and link up;
Because in the invention process, the horizontal segment of horizontal well is not at destination layer, so the coal bed gas after being drilled with horizontal segment in the destination layer is in the horizontal segment hoistway that can't ooze out in the horizontal well, adopts thereby can't arrange coal bed gas; For this reason, after being drilled with of the horizontal segment hoistway of finishing horizontal well, the invention process also need be implemented directed duct to described destination layer direction of living at horizontal segment and link up, destination layer is communicated with the horizontal segment hoistway of horizontal well, thereby the coal bed gas that makes destination layer can be oozed out and discharge along horizontal segment, adopts to well thereby can adopt straight well row by row.
Concrete, in embodiments of the present invention, described directed duct is linked up and is specifically as follows: directed jetting mode.
Adopt directed jetting technology, its technology and existing jetting technology type are seemingly; But prior art is not high for the required precision of injection direction, as long as satisfy at the destination layer horizontal-jet just passable.The injection here requires the jetting direction along the direction of setting towards target coal seam, before each the injection, need carry out the tool-face location to shower nozzle.Therefore this programme was connected with aspect sensor and emission assembly before the taking device of original oil pipe pipe string on original technical foundation, and is after calculating by angular difference that the whipstock direction is super following or up, thereby makes the waterpower shower nozzle injection direction coal seam that aims at the mark.
Directed duct in the embodiment of the invention is linked up, can also adopt the horizontal segment barefoot completion after, the mode that enters the coal seam to the destination layer sidetracking at described horizontal segment, and stretch 50-100m guaranteeing that downhole safety prerequisite backspin is returned forms several sidetracking branch well holes.
In sum, in embodiments of the present invention, by adopting when being drilled with horizontal well, be drilled with the horizontal segment of horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance, and implement the technical scheme that directed duct is linked up to the direction of destination layer at the horizontal segment that is drilled with, make when gathering the coal bed gas of destination layer, needn't be drilled with the horizontal segment of horizontal well at destination layer, thereby make when destination layer is the high coalbed gas geology structure of cherry coal, in the recovery process to coal bed gas in the destination layer, avoided to be drilled with at such destination layer in the prior art horizontal segment hoistway of horizontal well, thereby can the hoistway cave-in accident take place easily because the geologic structure of destination layer is too loose and hoistway is stopped up, and then influence the problem that the normal row of coal bed gas adopts.
In addition, what need prompting is, the present technique field personnel should also know, described coal bed gas horizontal well and row in the embodiment of the invention adopt straight well job practices method, can also utilize before the coal mining coal seam in the gas production in the coal seam, reducing the gas bearing capacity in the coal seam, thereby play the effect of coal mine gas protrusion-dispelling.
Each embodiment adopts the mode of going forward one by one to describe in this manual, and what each embodiment stressed all is and the difference of other embodiment that identical similar part is mutually referring to getting final product between each embodiment.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the present invention.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined herein General Principle can realize under the situation that does not break away from the spirit or scope of the present invention in other embodiments.Therefore, the present invention will can not be restricted to these embodiment shown in this article, but will meet and principle disclosed herein and features of novelty the wideest corresponding to scope.
Claims (8)
1. coal bed gas horizontal well and row adopt the straight well job practices, it is characterized in that, comprise step:
Be drilled with the row who is used for being communicated with and adopt straight well and reaming with horizontal well;
When being drilled with horizontal well, the horizontal segment that is drilled with horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance is communicated with straight well;
Horizontal well is cleaned and is lowered to sleeve pipe;
Implementing directed duct at described horizontal segment to described destination layer direction of living in links up.
2. according to the described method of claim 1, it is characterized in that described setpoint distance is 2 to 3 meters.
3. according to the described method of claim 1, it is characterized in that, described when being drilled with horizontal well, be drilled with the horizontal segment of horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance, be specially:
Be drilled with the horizontal segment of horizontal well at the geological stratification of the following setpoint distance in distance objective layer plane of living in.
4. according to the described method of claim 1, it is characterized in that, described when being drilled with horizontal well, be drilled with the horizontal segment of horizontal well at the geological stratification of distance objective layer plane of living in setpoint distance, be specially:
Be drilled with the horizontal segment of horizontal well at the geological stratification of the above setpoint distance in distance objective layer plane of living in.
5. according to claim 3 or 4 described methods, it is characterized in that the horizontal segment that described geological stratification at distance objective layer plane of living in setpoint distance is drilled with horizontal well is: the horizontal segment that is drilled with horizontal well at the geological stratification of the above setpoint distance in plane of living in, destination layer coal seam.
6. according to claim 3 or 4 described methods, it is characterized in that the concrete mode of described directed communication is: directed jetting.
7. according to the described method of claim 1, it is characterized in that described horizontal segment adopts barefoot completion.
8. according to the described method of claim 7, it is characterized in that the concrete mode of described directed communication is: the horizontal segment sidetracking enters described destination layer, forms multi-branched horizontal well.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010601771 CN102080530B (en) | 2010-12-22 | 2010-12-22 | Method for constructing horizontal coal bed gas well and vertical drainage and mining well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010601771 CN102080530B (en) | 2010-12-22 | 2010-12-22 | Method for constructing horizontal coal bed gas well and vertical drainage and mining well |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102080530A true CN102080530A (en) | 2011-06-01 |
CN102080530B CN102080530B (en) | 2013-05-22 |
Family
ID=44086694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010601771 Active CN102080530B (en) | 2010-12-22 | 2010-12-22 | Method for constructing horizontal coal bed gas well and vertical drainage and mining well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102080530B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425397A (en) * | 2011-12-29 | 2012-04-25 | 郑州大学 | Method for exploiting coal-bed methane by utilizing water force of horizontal pinnate well of double well-shaft to scour, drill and relieve pressure |
CN102493790A (en) * | 2011-12-27 | 2012-06-13 | 北京奥瑞安能源技术开发有限公司 | Method for increasing yield of coal bed gas |
CN103422813A (en) * | 2013-08-02 | 2013-12-04 | 奥瑞安能源国际有限公司 | Single-well coal bed gas multi-branch horizontal well system and well drilling method |
CN103510854A (en) * | 2013-10-17 | 2014-01-15 | 中国石油集团渤海钻探工程有限公司 | Horizontal well target layer dynamic modeling method while drilling |
CN104453792A (en) * | 2014-07-04 | 2015-03-25 | 贵州省煤层气页岩气工程技术研究中心 | Coal seam mining method and structure |
CN104847263A (en) * | 2015-04-30 | 2015-08-19 | 中煤科工集团西安研究院有限公司 | Coal bed methane far-end butt joint horizontal well drilling method |
CN106596174A (en) * | 2016-12-14 | 2017-04-26 | 中煤科工集团西安研究院有限公司 | Pressure-maintaining fixed-point sealed collecting method for underground coal mine nearly-horizontal long-distance coal sample |
CN110656941A (en) * | 2019-10-31 | 2020-01-07 | 中煤科工集团重庆研究院有限公司 | Design method and construction process of man-shaped ground well in coal mining area |
CN114607318A (en) * | 2022-03-24 | 2022-06-10 | 中煤科工集团西安研究院有限公司 | Fracturing cooperative construction method for combined production and drilling of multi-layer horizontal well for deep coal bed methane |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3425555A (en) * | 1966-11-25 | 1969-02-04 | Union Oil Co | Process for recovery of contaminants from the ground |
US4095650A (en) * | 1977-08-10 | 1978-06-20 | The United States Of America As Represented By The United States Department Of Energy | Method for increasing the calorific value of gas produced by the in situ combustion of coal |
US4422505A (en) * | 1982-01-07 | 1983-12-27 | Atlantic Richfield Company | Method for gasifying subterranean coal deposits |
US5246273A (en) * | 1991-05-13 | 1993-09-21 | Rosar Edward C | Method and apparatus for solution mining |
US5252226A (en) * | 1992-05-13 | 1993-10-12 | Justice Donald R | Linear contaminate remediation system |
CN1241676A (en) * | 1999-05-15 | 2000-01-19 | 洪泽县化工(集团)总公司 | Mirabilite exploiting water-dissolution process with two wells communicated by horizontal hole |
CN1534164A (en) * | 2003-03-28 | 2004-10-06 | 淮南矿业(集团)有限责任公司 | Low premeability high gas soft thick coal layer remote pressure relief gas exhausting method |
RU2339818C1 (en) * | 2007-05-14 | 2008-11-27 | Геннадий Дмитриевич Задавин | Degassing method of set of contiguous coal beds for barrier method |
CN101498210A (en) * | 2008-12-18 | 2009-08-05 | 中国石油集团长城钻探工程有限公司 | Coal bed gas slim hole hydraulic jet directional fracturing production increasing method |
RU2387784C1 (en) * | 2009-03-02 | 2010-04-27 | Анатолий Владимирович Ремезов | Method for preliminary degassing of coal beds |
-
2010
- 2010-12-22 CN CN 201010601771 patent/CN102080530B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3425555A (en) * | 1966-11-25 | 1969-02-04 | Union Oil Co | Process for recovery of contaminants from the ground |
US4095650A (en) * | 1977-08-10 | 1978-06-20 | The United States Of America As Represented By The United States Department Of Energy | Method for increasing the calorific value of gas produced by the in situ combustion of coal |
US4422505A (en) * | 1982-01-07 | 1983-12-27 | Atlantic Richfield Company | Method for gasifying subterranean coal deposits |
US5246273A (en) * | 1991-05-13 | 1993-09-21 | Rosar Edward C | Method and apparatus for solution mining |
US5252226A (en) * | 1992-05-13 | 1993-10-12 | Justice Donald R | Linear contaminate remediation system |
CN1241676A (en) * | 1999-05-15 | 2000-01-19 | 洪泽县化工(集团)总公司 | Mirabilite exploiting water-dissolution process with two wells communicated by horizontal hole |
CN1534164A (en) * | 2003-03-28 | 2004-10-06 | 淮南矿业(集团)有限责任公司 | Low premeability high gas soft thick coal layer remote pressure relief gas exhausting method |
RU2339818C1 (en) * | 2007-05-14 | 2008-11-27 | Геннадий Дмитриевич Задавин | Degassing method of set of contiguous coal beds for barrier method |
CN101498210A (en) * | 2008-12-18 | 2009-08-05 | 中国石油集团长城钻探工程有限公司 | Coal bed gas slim hole hydraulic jet directional fracturing production increasing method |
RU2387784C1 (en) * | 2009-03-02 | 2010-04-27 | Анатолий Владимирович Ремезов | Method for preliminary degassing of coal beds |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493790A (en) * | 2011-12-27 | 2012-06-13 | 北京奥瑞安能源技术开发有限公司 | Method for increasing yield of coal bed gas |
CN102425397A (en) * | 2011-12-29 | 2012-04-25 | 郑州大学 | Method for exploiting coal-bed methane by utilizing water force of horizontal pinnate well of double well-shaft to scour, drill and relieve pressure |
CN103422813A (en) * | 2013-08-02 | 2013-12-04 | 奥瑞安能源国际有限公司 | Single-well coal bed gas multi-branch horizontal well system and well drilling method |
CN103422813B (en) * | 2013-08-02 | 2015-11-25 | 奥瑞安能源国际有限公司 | Individual well eye multi-lateral horizontal well system for coal bed gas and boring method |
CN103510854A (en) * | 2013-10-17 | 2014-01-15 | 中国石油集团渤海钻探工程有限公司 | Horizontal well target layer dynamic modeling method while drilling |
CN104453792A (en) * | 2014-07-04 | 2015-03-25 | 贵州省煤层气页岩气工程技术研究中心 | Coal seam mining method and structure |
CN104847263A (en) * | 2015-04-30 | 2015-08-19 | 中煤科工集团西安研究院有限公司 | Coal bed methane far-end butt joint horizontal well drilling method |
CN106596174A (en) * | 2016-12-14 | 2017-04-26 | 中煤科工集团西安研究院有限公司 | Pressure-maintaining fixed-point sealed collecting method for underground coal mine nearly-horizontal long-distance coal sample |
CN106596174B (en) * | 2016-12-14 | 2019-03-29 | 中煤科工集团西安研究院有限公司 | The closely horizontal long range coal sample pressure maintaining fixed point of underground coal mine is closed to take method |
CN110656941A (en) * | 2019-10-31 | 2020-01-07 | 中煤科工集团重庆研究院有限公司 | Design method and construction process of man-shaped ground well in coal mining area |
CN110656941B (en) * | 2019-10-31 | 2021-12-21 | 中煤科工集团重庆研究院有限公司 | Design method and construction process of man-shaped ground well in coal mining area |
CN114607318A (en) * | 2022-03-24 | 2022-06-10 | 中煤科工集团西安研究院有限公司 | Fracturing cooperative construction method for combined production and drilling of multi-layer horizontal well for deep coal bed methane |
Also Published As
Publication number | Publication date |
---|---|
CN102080530B (en) | 2013-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102080530B (en) | Method for constructing horizontal coal bed gas well and vertical drainage and mining well | |
CN102979498B (en) | A kind of multi-lateral horizontal well system for coal bed gas | |
US7819187B2 (en) | System and method for producing fluids from a subterranean formation | |
CN104481495A (en) | Coalbed methane (CBM) cluster double multi-branch horizontal well and drilling method relative to discharging and mining vertical well system | |
CN101424166A (en) | Method for controlling borehole trajectory of special horizontal well of side-top water reservoir | |
CN103161440A (en) | Single-well coalbed methane horizontal well system and finishing method thereof | |
CN102493790A (en) | Method for increasing yield of coal bed gas | |
CN101994503A (en) | Production increasing method of coalbed gas | |
CN101975050B (en) | Construction method of coal bed gas horizontal well and vertical drainage well in multi-objective layer geologic environment | |
CN105156089A (en) | U-shaped well system and well drilling method thereof | |
CN105134162A (en) | U-shaped well system and drilling method thereof | |
CN101994505B (en) | Drilling construction method by cooperation of horizontal wells and extraction straight wells for coal bed methane in multiple objective layers | |
CN108894728A (en) | A kind of construction method of gas drainage directional long borehole group and directional long borehole | |
CN111058819B (en) | Method for covering hard top plate on hydraulic fracturing treatment working face | |
CN103422813B (en) | Individual well eye multi-lateral horizontal well system for coal bed gas and boring method | |
CN101979816A (en) | Coal bed gas horizontal well and drainage-mining straight well combined well drilling construction method | |
CN1317483C (en) | Method of entering target geologic body and system | |
CN104343424B (en) | Coalbed-methane horizontal-well PE (poly ethylene) screen pipe well completion application process method | |
CN107152261A (en) | Coal bed gas extraction system and method for construction | |
CN101956548B (en) | Coal bed methane multi-branch horizontal well system and modification method thereof | |
CN105625944B (en) | With the boring method of the isometrical sidetrack horizontal well of former well shaft | |
CN108798625B (en) | Mine and mine construction method | |
RU2382166C1 (en) | Method of drilling-in | |
Amina et al. | Analysis of stuck pipe incidents in khabaz field | |
Wehunt et al. | Dendritic-Acidizing Update: The Light at the End of the Tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |