CN102030457A - Integral assembling device of large electric smelting skewbacks - Google Patents
Integral assembling device of large electric smelting skewbacks Download PDFInfo
- Publication number
- CN102030457A CN102030457A CN 201010556934 CN201010556934A CN102030457A CN 102030457 A CN102030457 A CN 102030457A CN 201010556934 CN201010556934 CN 201010556934 CN 201010556934 A CN201010556934 A CN 201010556934A CN 102030457 A CN102030457 A CN 102030457A
- Authority
- CN
- China
- Prior art keywords
- iron
- skewbacks
- kiln
- arch
- electric smelting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The invention discloses an integral assembling device of large electric smelting skewbacks. The integral assembling device is characterized by comprising an iron arch center, wherein iron fixed equipment is respectively arranged at two ends of the iron arch center; and moving devices are arranged at the bottom of the iron fixed equipment. According to the integral assembling device of the large electric smelting skewbacks, a series of skewbacks are assembled on the iron arch center; after the assembling is finished, the iron arch center is moved forwards by using the moving devices to next group of iron fixing blocks and then next lines of skewbacks are assembled; the steps are repeated until the complete assembly is finished and the integral assembly can be realized; afterwards, assembling signs are marked at the combined parts of the same line of bricks and adjacent lines of bricks; when large skewbacks are assembled at the kiln part, the skewbacks are arrayed according to the marked signs, the upper structure of a kiln can really reappear and the real difficulty for building the kiln can be reduced; in addition, by adopting the integral assembly, the assembling precision is improved, the offset between adjacent lines and the brick gaps among the same lines of bricks can be reduced, the heat-insulating performance of the kiln can be improved, the erosion speed of the kiln can be reduced and the service life of the kiln can be prolonged.
Description
Technical field
The present invention relates to the whole assembling apparatus of the big arch brick of a kind of electric smelting, belong to the upright technical field of glass furnace refractory brick group.
Background technology
At present, in the group of the big arch brick of glass furnace electric smelting immediately, a kind of method is not use the arch tire, directly uses the surveying instrument setting-out on the ground in group position, then group position on the ground single-row group upright; Also have a kind of method to be to use simple arch tire, single-row group upright, and group has been stood a row back and removed, and the group of carrying out another row again is upright.More than two kinds of method for assembling precision relatively poor, the section difference is big between the adjacent column, brickwork joint between the same column brick is big, and overall dimensions can not guarantee, operational difficulty when true brickwork, need to repair brickwork joint with a large amount of fire-resistance rammed mass, cause kiln in use erosive velocity accelerate, cause kiln to descend work-ing life, the individual cases meeting top phenomenon that occurs collapsing, perhaps accelerating to make top peel off cast because of erosion falls in the glass metal, influences the quality of glasswork.
Summary of the invention
According to above deficiency of the prior art, the technical problem to be solved in the present invention is: a kind of above-mentioned defective that solved is provided, can realizes that the monoblock type group of big arch brick is upright, improved the upright precision of group, guaranteed the whole assembling apparatus of the big arch brick of electric smelting of overall dimensions.
The technical solution adopted for the present invention to solve the technical problems is: the whole assembling apparatus of the big arch brick of a kind of electric smelting, it is characterized in that: comprise iron arch tire, the two ends of iron arch tire are provided with iron fixture, and the bottom of iron arch tire has running gear.
Described iron arch tire top is the arch working face, and the bottom is a horizontal plane, is provided with brace rod between the top and bottom.
Described iron fixture is made of side by side many groups of iron fixed blocks.
Described running gear is a joist steel.
After determining the span and overall length of big arch, the arch shank is provided with iron fixture at two ends, iron fixture can be regulated span within the specific limits, at arch arch place iron arch tire is set, in iron arch tire bottom running gear is set, iron arch tire can be regulated sagitta and brickwork joint within the specific limits, and the length of iron fixed block is identical with the width of arch brick.
During use, iron arch tire is placed on one group of iron fixed block place of rearmost end, on iron arch tire, organize upright to a row arch brick, after group is stood and is finished, by running gear iron arch tire is moved forward, move to next and organize iron fixed block place, subsequently next column arch brick is organized upright, by that analogy, upright until finishing whole groups, thereby having realized using same arch tire to carry out the continous way group stands, afterwards to the upright symbol of the junction mark group of same column arch brick and adjacent column arch brick, when big arch being installed, get final product according to the symbol arrangement arch brick of mark at the kiln place, realize true reappearance kiln superstructure, reduced true brickwork difficulty.
The beneficial effect that the present invention had is: the whole assembling apparatus of the big arch brick of electric smelting is by organizing upright to a row arch brick on iron arch tire, after group is stood and is finished, by running gear iron arch tire is moved forward, move to next and organize iron fixed block place, organize upright to next column arch brick subsequently, by that analogy, upright until finishing whole groups, can realize that the monoblock type group is upright, afterwards to the upright symbol of the junction mark group of same column brick and adjacent column brick, when big arch being installed at the kiln place, symbol arrangement arch brick according to mark gets final product, realize true reappearance kiln superstructure, reduced true brickwork difficulty, and the upright upright precision of group that improved of monoblock type group, section difference between the adjacent column and the brickwork joint between the same column brick have been reduced, can improve the kiln heat-insulating property, reduce the kiln erosive velocity, prolong kiln work-ing life.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of user mode of the present invention.
Among the figure: 1, iron arch tire; 2, running gear; 3, iron fixed block; 4, arch brick.
Embodiment
Below in conjunction with accompanying drawing embodiments of the invention are described further:
Shown in Fig. 1~2, the two ends of iron arch tire 1 are provided with iron fixture, the bottom of iron arch tire 1 has running gear 2, iron arch tire 1 top is the arch working face, the bottom is a horizontal plane, be provided with brace rod between the top and bottom, iron fixture is made of side by side many groups of iron fixed blocks 3, and running gear is a joist steel.
During use, iron arch tire 1 is placed on one group of iron fixed block 3 place of rearmost end, upright to 4 groups of row arch bricks on iron arch tire 1, after group is stood and is finished, by running gear 2 iron arch tire 1 is moved forward, move to next and organize iron fixed block 3 places, upright to 4 groups of next column arch bricks subsequently, by that analogy, upright until finishing whole groups, thereby having realized using same arch tire to carry out the continous way group stands, afterwards to the upright symbol of the junction mark group of same column arch brick 4 and adjacent column arch brick 4, when big arch being installed, get final product according to the symbol arrangement arch brick 4 of mark at the kiln place, realize true reappearance kiln superstructure, reduced true brickwork difficulty.
After using the present invention, improved the upright precision of group, entire length ,+3mm ,-2mm; Span ,+0mm ,-4mm; Sagitta ,+6mm ,+0mm; It is poor to have reduced between the adjacent column section, section poor≤5mm; Reduced the slit between the same column brick, brickwork joint≤1mm.
Claims (4)
1. the whole assembling apparatus of the big arch brick of an electric smelting, it is characterized in that: comprise iron arch tire, the two ends of iron arch tire are provided with iron fixture, and the bottom of iron arch tire has running gear.
2. the whole assembling apparatus of the big arch brick of electric smelting according to claim 1, it is characterized in that: described iron arch tire top is the arch working face, and the bottom is a horizontal plane, is provided with brace rod between the top and bottom.
3. the whole assembling apparatus of the big arch brick of electric smelting according to claim 1, it is characterized in that: described iron fixture is made of side by side many groups of iron fixed blocks.
4. the whole assembling apparatus of the big arch brick of electric smelting according to claim 1, it is characterized in that: described running gear is a joist steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010556934 CN102030457A (en) | 2010-11-24 | 2010-11-24 | Integral assembling device of large electric smelting skewbacks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010556934 CN102030457A (en) | 2010-11-24 | 2010-11-24 | Integral assembling device of large electric smelting skewbacks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102030457A true CN102030457A (en) | 2011-04-27 |
Family
ID=43883983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010556934 Pending CN102030457A (en) | 2010-11-24 | 2010-11-24 | Integral assembling device of large electric smelting skewbacks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102030457A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87200295U (en) * | 1987-01-09 | 1987-10-21 | 天津钢厂 | Combined steel arch scheme arch for metallurgical furnace |
CN201358794Y (en) * | 2009-02-28 | 2009-12-09 | 中煤第一建设公司第十工程处 | Combined type concrete construction arch pattern |
CN201873605U (en) * | 2010-11-24 | 2011-06-22 | 淄博旭硝子刚玉材料有限公司 | Integrated type assembling device of electrically-melted large arch bricks |
-
2010
- 2010-11-24 CN CN 201010556934 patent/CN102030457A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87200295U (en) * | 1987-01-09 | 1987-10-21 | 天津钢厂 | Combined steel arch scheme arch for metallurgical furnace |
CN201358794Y (en) * | 2009-02-28 | 2009-12-09 | 中煤第一建设公司第十工程处 | Combined type concrete construction arch pattern |
CN201873605U (en) * | 2010-11-24 | 2011-06-22 | 淄博旭硝子刚玉材料有限公司 | Integrated type assembling device of electrically-melted large arch bricks |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202973902U (en) | Silicon carbide brick for masonry | |
CN115478699B (en) | Sliding installation method for steel structure of roof truss | |
CN205147297U (en) | Efficiency of ladle operation is improved ladle hot repair structure | |
CN201873605U (en) | Integrated type assembling device of electrically-melted large arch bricks | |
CN102030457A (en) | Integral assembling device of large electric smelting skewbacks | |
CN101898864B (en) | Energy-saving float glass furnace | |
EP3029159B1 (en) | Blast furnace repair method | |
CN214060551U (en) | Blast furnace iron runner | |
CN102321776A (en) | Hot-blast furnace combined grate suitable for stacking checker bricks with different structures | |
CN209974814U (en) | Slag runner prefabricated part | |
CN101684654A (en) | Method for building working lining brick at bottom of ladle | |
CN203586823U (en) | Refractory masonry structure for chute inclined surface | |
CN209338638U (en) | Continuous galvanizing line automatic zincification ingot device | |
CN203742619U (en) | Steel mold trolley arc changing device for tunnel concrete lining | |
CN103322826A (en) | Movable furnace hearth | |
CN105598195A (en) | Stainless steel tube discharging device | |
CN201686610U (en) | Energy-saving float glass furnace | |
CN202316995U (en) | Spiral masonry direction-changing brick for tank wall of steel ladle and connection direction-changing masonry structure thereof | |
CN111678762A (en) | Refractory material pump injection experiment mold and method | |
CN106812064A (en) | Parallel-moving type bridge bow member | |
CN104005388B (en) | A kind of all-in-one-piece outside concrete blinding | |
CN203904945U (en) | Integrated outside concrete formwork | |
CN216881691U (en) | Masonry structure of refractory material of working lining at bottom of molten iron tank | |
CN203845931U (en) | Device for maintaining erodible part of plate glass melt kiln wall | |
CN101619368B (en) | Cooling process of blast furnace bosh |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110427 |