CN102023001B - 一种双立柱杆塔横担在横担连接处高差检查的方法 - Google Patents
一种双立柱杆塔横担在横担连接处高差检查的方法 Download PDFInfo
- Publication number
- CN102023001B CN102023001B CN201010529826.9A CN201010529826A CN102023001B CN 102023001 B CN102023001 B CN 102023001B CN 201010529826 A CN201010529826 A CN 201010529826A CN 102023001 B CN102023001 B CN 102023001B
- Authority
- CN
- China
- Prior art keywords
- behaviour
- transit
- arm
- note
- inspection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 210000001503 Joints Anatomy 0.000 title abstract 3
- 238000003466 welding Methods 0.000 claims abstract description 7
- 238000007689 inspection Methods 0.000 claims description 37
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 238000005755 formation reaction Methods 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 238000005259 measurement Methods 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 101700078171 KNTC1 Proteins 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010529826.9A CN102023001B (zh) | 2010-11-03 | 2010-11-03 | 一种双立柱杆塔横担在横担连接处高差检查的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010529826.9A CN102023001B (zh) | 2010-11-03 | 2010-11-03 | 一种双立柱杆塔横担在横担连接处高差检查的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102023001A CN102023001A (zh) | 2011-04-20 |
CN102023001B true CN102023001B (zh) | 2015-06-24 |
Family
ID=43864584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010529826.9A Active CN102023001B (zh) | 2010-11-03 | 2010-11-03 | 一种双立柱杆塔横担在横担连接处高差检查的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102023001B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103175492B (zh) * | 2013-03-14 | 2019-01-11 | 国网河南省电力公司平顶山供电公司 | 一种输电线路引流线长度测定装置及测定方法 |
CN104280020A (zh) * | 2014-10-25 | 2015-01-14 | 中国二十二冶集团有限公司 | 竖向建筑物垂直度的测量方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86203751U (zh) * | 1986-06-11 | 1987-12-12 | 北京电力设备总厂 | 预应力混凝土电杆塔 |
CN2675839Y (zh) * | 2004-01-15 | 2005-02-02 | 东北电业管理局两锦电业局 | 输电线路杆塔曲臂处的安全防护装置 |
CN1967144A (zh) * | 2006-05-16 | 2007-05-23 | 李进 | 一种确定杆塔拉线出土点位置的方法 |
CN201016718Y (zh) * | 2007-03-16 | 2008-02-06 | 邯郸市清华华康电力电子有限公司 | 电力杆塔倾角检测装置 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6948290B2 (en) * | 2000-12-13 | 2005-09-27 | Ritz Telecommunications, Inc. | System and method for increasing the load capacity and stability of guyed towers |
EP1769258A4 (en) * | 2004-07-21 | 2017-05-17 | Underground Systems, Inc. | Dynamic line rating system with real-time tracking of conductor creep to establish the maximum allowable conductor loading as limited by clearance |
-
2010
- 2010-11-03 CN CN201010529826.9A patent/CN102023001B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86203751U (zh) * | 1986-06-11 | 1987-12-12 | 北京电力设备总厂 | 预应力混凝土电杆塔 |
CN2675839Y (zh) * | 2004-01-15 | 2005-02-02 | 东北电业管理局两锦电业局 | 输电线路杆塔曲臂处的安全防护装置 |
CN1967144A (zh) * | 2006-05-16 | 2007-05-23 | 李进 | 一种确定杆塔拉线出土点位置的方法 |
CN201016718Y (zh) * | 2007-03-16 | 2008-02-06 | 邯郸市清华华康电力电子有限公司 | 电力杆塔倾角检测装置 |
Also Published As
Publication number | Publication date |
---|---|
CN102023001A (zh) | 2011-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101614127B (zh) | 盾构贯通施工中过江水准测量方法 | |
CN103115605A (zh) | 一种基于联系三角形的地铁竖井定向测量方法 | |
CN103706673A (zh) | 一种圆管构件的节点部件径向定位方法 | |
CN102901451B (zh) | 一种精确快速用于送变电工程导线测算的方法及装置 | |
CN108007429A (zh) | 一种全站仪在井下巷道中的测量方法 | |
CN101349563A (zh) | 一种建筑施工测量放线的方法 | |
CN102023001B (zh) | 一种双立柱杆塔横担在横担连接处高差检查的方法 | |
CN101598547B (zh) | 单侧倾斜结构安装倾斜角测量方法 | |
CN102022998A (zh) | 一种复杂地形线路视距与高差测量的方法 | |
CN203893840U (zh) | 高精度固定式复合水准仪 | |
CN103255947B (zh) | 一种标准化变压器台架立杆扶正器 | |
CN204854573U (zh) | 一种用于管道施工的多功能尺 | |
CN101298564B (zh) | 焦炉下喷支管的定位方法 | |
CN102967237A (zh) | 一种用于悬索桥主缆索股架设多功能测量仪 | |
CN108645376B (zh) | 一种伸缩式水准测量装置及其检测方法 | |
CN103114613B (zh) | 一种桩位偏差实时检测装置 | |
CN201867187U (zh) | 竖直传高仪 | |
CN202994055U (zh) | 一种用于悬索桥主缆索股架设多功能测量仪 | |
CN209673080U (zh) | 一种轻便型雨污水管线定位及标高测量装置 | |
CN209541742U (zh) | 一种跨河水准测量装置 | |
CN203148425U (zh) | 一种用于验收轨道的水准测量装置 | |
CN202836555U (zh) | 一种塔尺 | |
CN106595590A (zh) | 一种基于平衡杆原理的双向测斜仪 | |
CN206656717U (zh) | 一种井下巷道顶板高程测量塔尺 | |
CN102636161B (zh) | 利用吊线法测设平面控制点的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Yan Inventor after: Zhao Gang Inventor after: Liu Zhiwen Inventor after: Guo Xiangyang Inventor after: Huo Jianwei Inventor after: Peng Gang Inventor before: Li Yan Inventor before: Liu Zhiwen Inventor before: Guo Xiangyang Inventor before: Huo Jianwei Inventor before: Peng Gang |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191113 Address after: Xigong District 471000 Henan province Luoyang Kaixuan Road No. 12 Co-patentee after: Luoyang Long Yu Group Co., Ltd. Patentee after: LUOYANG POWER SUPPLY COMPANY, STATE GRID HENAN ELECTRIC POWER CO., LTD. Address before: 471000 No. 259 Kaiyuan Road, New District, Henan, Luoyang Patentee before: Luoyang Power Supply Company of Henan Electric Power Company |
|
TR01 | Transfer of patent right |