CN102011402A - Construction method of long auger drilling concrete-grouted back-plugged profile steel piles - Google Patents

Construction method of long auger drilling concrete-grouted back-plugged profile steel piles Download PDF

Info

Publication number
CN102011402A
CN102011402A CN201010539901XA CN201010539901A CN102011402A CN 102011402 A CN102011402 A CN 102011402A CN 201010539901X A CN201010539901X A CN 201010539901XA CN 201010539901 A CN201010539901 A CN 201010539901A CN 102011402 A CN102011402 A CN 102011402A
Authority
CN
China
Prior art keywords
shaped steel
profile steel
pile
vibration
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010539901XA
Other languages
Chinese (zh)
Other versions
CN102011402B (en
Inventor
王鹏
谭利华
王瑞清
张鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PAN-CHINA CONSTRUCTION GROUP
Original Assignee
PAN-CHINA CONSTRUCTION GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PAN-CHINA CONSTRUCTION GROUP filed Critical PAN-CHINA CONSTRUCTION GROUP
Priority to CN 201010539901 priority Critical patent/CN102011402B/en
Publication of CN102011402A publication Critical patent/CN102011402A/en
Application granted granted Critical
Publication of CN102011402B publication Critical patent/CN102011402B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention relates to a construction method of long auger drilling concrete-grouted back-plugged profile steel piles. The method mainly comprises the following steps: drilling holes by using a long auger drilling machine and taking soil; drilling to the designed depth, and grouting concrete; manufacturing a back-plugged profile steel component, processing a circular hole with the diameter of 5cm at a position which is 5cm away from the top of an I-bar, manufacturing a T-shaped plug by using a steel bar with the diameter of 14mm, connecting the profile steel with a vibration connector by using the T-shaped plug, and coiling the flange of the lower part of the profile steel inwards by 60 degrees; connecting a profile steel pile with the vibration connector, lifting and centering; sinking by utilizing the dead weight of the profile steel pile in the early stage, and after sinking to a certain depth, starting a spring vibration hammer until the profile steel pile sinks to the designed position under the action of vibration, wherein in the construction process, special persons are designated to control the verticality by using two theodolites and control the top height by using a balance level; and dismantling the connector to obtain the pile. By utilizing the construction method, the quality problem in foundation ditch slope-protection support pile construction in a narrow space is solved, and the problems that the back compressed steel bar cage of small-diameter pile foundations can not sink to the designed position and voids can be easily formed are also solved. The construction method provided by the invention has the advantages of less working procedures and small occupied construction site.

Description

Insert the shaped steel pile construction method behind the long auger guncreting
Affiliated technical field
The present invention relates to a kind of long auger cast-in-place concrete pile pile foundation construction, be applicable to that especially the construction plant is narrow and small, the stake footpath is less than the pattern foundation pit supporting structure slope protection pile of 400mm.
Background technology
At present, generally insert the job practices of reinforcing cage behind the long auger guncreting of Cai Yonging, patent of invention " inserting reinforcing cage construction technology and reinforcing cage gatherer behind the long auger pumping concrete pile " (application number 200310101954.3), for the pile foundation of diameter less than 400mm, reinforcing cage rigidity is little, the reinforcing cage resistance capacity to deformation is poor, adopt special-purpose Pile feeder to construct, Pile feeder is isometric with reinforcing cage basically, again Pile feeder is extracted after reinforcing cage delivered to the precalculated position, increased the resistance in the reinforcing cage sinking process on the one hand, reinforcing cage is heavy to be established less than design attitude, and pile body easily forms the hole gap in the pile pulling process on the other hand, influences pile quality, the length consuming time of constructing, efficiency of construction is low.The reinforcing bar blanking, reinforcing cage is made needs large stretch of place, and limited construction plant is difficult for carrying out in the city.
Summary of the invention
For slotting reinforcing cage job practices reinforcing cage in the pile foundation construction of paxilla footpath after overcoming existing long auger guncreting can not sink to design attitude, easily form the hole gap, construction efficiency is low, shortcomings such as occupied ground is big, the present invention proposes the job practices that the shaped steel stake is inserted in a kind of back, and this method working procedure is simple, easy construction, pile quality is good, environmental protection, mud-less pollution.
The present invention solves the technical scheme that its technical disadvantages adopts:
Shaped steel stake vibration linkage is inserted in a kind of back, comprise with spring vibration hammer flange connecting dish, steel bushing, be connected shaped steel, branch sleeve, it is characterized in that: described steel bushing one end and flange welding, the other end be connected shaped steel welding, described connection shaped steel stretches in steel bushing and the branch sleeve and welding, opens the rectangular card pin-and-hole on the described branch sleeve.
The shaped steel pile construction method is inserted in a kind of back, and the main construction equipment that this job practices adopts is long-spiral drilling machine, crane, vibrating hammer, vibration linkage, shaped steel stake, transit, level gauge.
Main construction sequence:
1, stake position unwrapping wire is accurately made the pile foundation center;
2, make the back and insert Steel section member, select i iron for use, the size of i iron is determined according to the size requirements of force request, stake bore dia by the designer.Apart from 5cm place, i iron top, process a diameter 5cm circular hole, be used for lifting as pin hole.With diameter is the reinforcement fabrication T-shaped latch of 14mm, utilizes T-shaped latch that shaped steel and vibration linkage are linked together.The heating back processing of the edge of a wing, shaped steel bottom is spent to curls inward 60, and it is difficult for influencing pile quality with stake bore edges generation scratch.
3, adopt the full screw earth auger boring extracting soil;
4, drilling to completion, guncreting to design specifications requires height, and the super certain altitude of irritating;
5, the shaped steel stake is connected lifting, centering with the vibration linkage;
6, the initial stage sinks by shaped steel stake deadweight, after sinking to certain depth, start vibrating hammer, vibration-sunk is to design attitude, slowly sink to concrete to stake top mark height at shaped steel, electromagnetic shaker vibrates 2~3 minutes again, to guarantee concrete compactness, arrange the special messenger to control its verticality centering position in the work progress, control its top mark height with level gauge with two transits;
7, remove linkage, pile.
Beneficial effect of the present invention: solved small space foundation ditch bank protection soldier pile construction difficult problem, press reinforcing cage can not sink to design attitude after having solved paxilla footpath pile foundation, easily form quality problems such as hole, concrete leakiness, working procedure is simple, it is little to take the construction plant, the work efficiency height.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples:
Fig. 1 is a stake position unwrapping wire long-spiral drilling machine centering construction schematic diagram;
Fig. 2 is a long-spiral drilling machine drilling process construction schematic diagram;
Fig. 3 is a guncreting construction schematic diagram;
Fig. 4 is that shaped steel pile driving construction schematic diagram is inserted in the back;
Fig. 5 is the pile schematic diagram;
Fig. 6 is that the present invention vibrates the linkage schematic diagram;
Fig. 7 is that shaped steel shaped steel stake processing and fabricating schematic diagram is inserted in the back;
Fig. 8 is that shaped steel pile driving construction process control schematic diagram is inserted in the back.
Reference numeral: the 1-long-spiral drilling machine, 2-vibrates linkage, 2.1-flange, 2.2-steel bushing, 2.3-connection shaped steel, 2.4-connects steel pipe, 2.5-T-shaped latch, 2.6-rectangular card pin-and-hole, the stake of 3-shaped steel, 3.1-suspender belt hole, 3.2-60 ° of crimping, 4.1-transit 1,4.2-transit 2,5-level gauge, 6-vibrating hammer.
The specific embodiment
Implement legend referring to Fig. 1~Fig. 8.
Long-spiral drilling machine 1 displacement centering in Fig. 1, control long screw drill rod center and stake position center.
Long-spiral drilling machine 1 is holed to design elevation in Fig. 2.
Long-spiral drilling machine 1 limit rotates and portals in Fig. 3, and the limit pumping of concrete is to the stake top, and a part of concrete of super filling.
In Fig. 4 the shaped steel stake of making 3 is connected with vibration linkage 2, the flange 2.1 of vibration linkage 2 is connected with spring vibration hammer 6, adopts loop wheel machine to mention centering, the stake of sinking shaped steel then.
Sink to design attitude at the medium-sized piling bar of Fig. 5, remove T-shaped bayonet lock, pile.
In Fig. 6, make vibration linkage 2, with flange 2.1 and steel bushing 2.2, is connected shaped steel 2.3, connection steel pipe 2.4 and welds together, on connection steel pipe 2.4, open rectangular card pin-and-hole 2.6, make T-shaped latch 2.5 according to design drawing.
In Fig. 7, shaped steel 3 is processed, made the suspender belt hole 3.1 double pin holes of doing of diameter 5cm, inwardly do 60 ° of crimpings 3.2 processing after the heating of the edge of a wing, shaped steel 3 bottom.
In Fig. 8, adopt transit 4.1 and transit 4.2 to measure centering, the control verticality, shaped steel stake elevation is inserted in level gauge 5 control backs.

Claims (3)

1. insert the shaped steel pile construction method behind a long auger guncreting, main construction equipment is long-spiral drilling machine, crane, vibration hammer, vibration linkage, shaped steel stake.It is characterized in that: adopt the special vibrating linkage to be connected with the shaped steel stake, the stake of vibration-sunk shaped steel is to design attitude.
2. insert the shaped steel pile construction method behind a kind of long auger guncreting according to claim 1, it is characterized in that: the vibration linkage connects vibrating hammer and shaped steel stake, fix by bayonet lock and shaped steel stake, linkage is made up of flange, steel bushing, connection shaped steel, branch sleeve etc., and branch sleeve is provided with the rectangular card pin-and-hole.
3. insert the shaped steel pile construction method behind a kind of long auger guncreting according to claim 1, it is characterized in that: the suspender belt hole is set in the shaped steel stake, as pin hole, is connected with the vibration linkage, the edge of a wing, shaped steel stake bottom is volume 60 degree inwardly.
CN 201010539901 2010-11-11 2010-11-11 Construction method of long auger drilling concrete-grouted back-plugged profile steel piles Active CN102011402B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010539901 CN102011402B (en) 2010-11-11 2010-11-11 Construction method of long auger drilling concrete-grouted back-plugged profile steel piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010539901 CN102011402B (en) 2010-11-11 2010-11-11 Construction method of long auger drilling concrete-grouted back-plugged profile steel piles

Publications (2)

Publication Number Publication Date
CN102011402A true CN102011402A (en) 2011-04-13
CN102011402B CN102011402B (en) 2013-01-02

Family

ID=43841714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010539901 Active CN102011402B (en) 2010-11-11 2010-11-11 Construction method of long auger drilling concrete-grouted back-plugged profile steel piles

Country Status (1)

Country Link
CN (1) CN102011402B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808407A (en) * 2012-08-14 2012-12-05 天津二十冶建设有限公司 Construction method of soft-foundation reinforced concrete cast-in-place pile
CN103015430A (en) * 2012-12-04 2013-04-03 北京建材地质工程公司 Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN103758121A (en) * 2014-01-08 2014-04-30 上海中锦建设集团股份有限公司 Deep foundation pit built-in profile steel drawable unreinforced filling pile
CN104631440A (en) * 2015-01-29 2015-05-20 南昌市建筑工程集团有限公司 Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN104674794A (en) * 2015-02-13 2015-06-03 河南三建建设集团有限公司 Long spiral grouting pile reinforcing cage positioning device and long spiral grouting pile reinforcing cage positioning method
CN105239561A (en) * 2015-09-01 2016-01-13 北京建材地质工程公司 Long spiral mix spray pre-grouting press concrete post-inserted steel reinforcement cage cast-in-place pile construction process
CN105421342A (en) * 2015-11-04 2016-03-23 上海十三冶建设有限公司 Reinforcement cage feeding method of long auger drilling press-grouting pile
CN112267465A (en) * 2020-10-27 2021-01-26 潘长艳 Progressive piling device for building construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10219683A (en) * 1997-02-12 1998-08-18 Tokyo Sekkei Jimusho Kk Underground pile molding method and device therefor
CN2349262Y (en) * 1998-10-01 1999-11-17 昆明大力地基有限公司 Pile feeder
JP2004339703A (en) * 2003-05-13 2004-12-02 Traverse:Kk Foundation construction method
CN1632238A (en) * 2004-12-29 2005-06-29 天津市华达商贸有限公司 Long spiral press pouring concrete lock pin combination pile and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10219683A (en) * 1997-02-12 1998-08-18 Tokyo Sekkei Jimusho Kk Underground pile molding method and device therefor
CN2349262Y (en) * 1998-10-01 1999-11-17 昆明大力地基有限公司 Pile feeder
JP2004339703A (en) * 2003-05-13 2004-12-02 Traverse:Kk Foundation construction method
CN1632238A (en) * 2004-12-29 2005-06-29 天津市华达商贸有限公司 Long spiral press pouring concrete lock pin combination pile and construction method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808407A (en) * 2012-08-14 2012-12-05 天津二十冶建设有限公司 Construction method of soft-foundation reinforced concrete cast-in-place pile
CN102808407B (en) * 2012-08-14 2014-09-03 天津二十冶建设有限公司 Construction method of soft-foundation reinforced concrete cast-in-place pile
CN103015430A (en) * 2012-12-04 2013-04-03 北京建材地质工程公司 Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN103758121A (en) * 2014-01-08 2014-04-30 上海中锦建设集团股份有限公司 Deep foundation pit built-in profile steel drawable unreinforced filling pile
CN104631440A (en) * 2015-01-29 2015-05-20 南昌市建筑工程集团有限公司 Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN104674794A (en) * 2015-02-13 2015-06-03 河南三建建设集团有限公司 Long spiral grouting pile reinforcing cage positioning device and long spiral grouting pile reinforcing cage positioning method
CN105239561A (en) * 2015-09-01 2016-01-13 北京建材地质工程公司 Long spiral mix spray pre-grouting press concrete post-inserted steel reinforcement cage cast-in-place pile construction process
CN105421342A (en) * 2015-11-04 2016-03-23 上海十三冶建设有限公司 Reinforcement cage feeding method of long auger drilling press-grouting pile
CN112267465A (en) * 2020-10-27 2021-01-26 潘长艳 Progressive piling device for building construction

Also Published As

Publication number Publication date
CN102011402B (en) 2013-01-02

Similar Documents

Publication Publication Date Title
CN102011402B (en) Construction method of long auger drilling concrete-grouted back-plugged profile steel piles
CN101718098B (en) Micro-pile combined dug composite foundation and construction method thereof
CN103628463A (en) Construction method of ultra-deep vibroflotation gravel pile in complex stratum
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN110409525B (en) Soft soil and unfavorable geology composite foundation reinforcing method
CN102733389A (en) High-pressure spray pile vibrosinking device and process
CN102400462A (en) Secondary pressure grouting small pile construction process in seismic strengthening treatment of foundation
CN104404956A (en) Construction method for pedestal piles
KR101195235B1 (en) Underground structure construction method using composite pile
CN102953392A (en) Pile foundation structure of photovoltaic power station and construction process of pile foundation
CN104947648A (en) Deep replacement dynamic compaction gravel pile foundation reinforcement method
CN212641496U (en) Compound basis of transmission line high strength tubular pile
CN205576957U (en) Stake end pilework
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
KR100910884B1 (en) Multistaged cone foundation
CN208167770U (en) Assembled drilledpier foundation
CN207047834U (en) A kind of construction system of hollow preformed pile
CN216515701U (en) Miniature stake raft board combination foundation structure
CN112832252B (en) Deep foundation pit supporting construction method with large height difference of two sides
CN106759391B (en) A kind of the antiskid pile group and its construction method of townhouse hollow section composite structure
CN101761054B (en) Piling equipment and method for hill level-off and sea reclamation high fill foundation
CN102660953B (en) Moulding equipment and construction method of multitube surrounded-connecting cement maintaining body
CN202170513U (en) No undergoing force slab prestressed high strength concrete pipe pile base
CN202359564U (en) Arch steel sheet pile supporting structure
CN215290139U (en) Deep foundation pit supporting structure with large height difference on two sides

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Peng

Inventor after: Tan Lihua

Inventor after: Wang Ruiqing

Inventor after: Zhang Pengfei

Inventor after: Ge Binbin

Inventor after: Yu Lan

Inventor before: Wang Peng

Inventor before: Tan Lihua

Inventor before: Wang Ruiqing

Inventor before: Zhang Pengfei

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG PENG TAN LIHUA WANG RUIQING ZHANG PENGFEI TO: WANG PENG TAN LIHUA WANG RUIQING ZHANG PENGFEI GE BINBIN YU LAN

C14 Grant of patent or utility model
GR01 Patent grant