CN102003189A - 一种快速均匀加固软弱地层的模袋注浆方法和装置 - Google Patents

一种快速均匀加固软弱地层的模袋注浆方法和装置 Download PDF

Info

Publication number
CN102003189A
CN102003189A CN 201010595150 CN201010595150A CN102003189A CN 102003189 A CN102003189 A CN 102003189A CN 201010595150 CN201010595150 CN 201010595150 CN 201010595150 A CN201010595150 A CN 201010595150A CN 102003189 A CN102003189 A CN 102003189A
Authority
CN
China
Prior art keywords
grouting
unit
pipe
slip casting
once
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010595150
Other languages
English (en)
Inventor
杨毅
干昆蓉
李治国
邹翀
尹龙
任彦超
陈飞
牟松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN 201010595150 priority Critical patent/CN102003189A/zh
Publication of CN102003189A publication Critical patent/CN102003189A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明属于隧道和地下工程软弱围岩的加固和改良技术,主要提出一种快速均匀加固软弱地层的模袋注浆方法和装置,具有一次注浆单元和二次注浆单元;二次注浆单元的注浆管(1)的管壁上具有若干出浆孔(2),在二次注浆单元的注浆管(1)上套置模袋(3)并将模袋两端箍紧在注浆管上;在孔口位置的二次注浆单元注浆管(1)上套置由垫板(7)和螺母(8)组成的预紧单元,二次注浆单元注浆管(1)的另一端通过两个球阀与二次注浆管路连接;一次注浆单元具有双囊注浆栓塞(14)、一次注浆单元输浆钢管(17)和手压泵构成的注浆装置。本发明可实现软弱围岩的快速均匀加固,提高其物理力学指标,增大其稳定性,同时实现控域注浆,避免浆液损耗。

Description

一种快速均匀加固软弱地层的模袋注浆方法和装置
技术领域
本发明属于隧道及地下工程软弱围岩的加固和改良技术,主要提出一种快速均匀加固软弱地层的模袋注浆方法和装置。
背景技术
在软弱地层尤其是土层进行隧道及地下工程施工,常因开挖施工造成地层损失,发生围岩大变形或坍塌,严重危及施工人员和设备安全,且因地层损失引起地表沉降过大,致使周边环境造成破坏,给居民正常的生产生活带来严重影响。为确保施工安全,尽量减小施工对环境的影响,目前国内外常采用注浆加固法包括旋喷注浆、管棚注浆、小导管注浆等方式对地层进行预加固。传统的注浆加固中,浆液在地层中的扩散具有随机性、分散性,难以实现控域注浆,浆液的损耗量较大,因此无法实现对地层的均匀加固,此外,由于注浆加固施工周期长,经济性差,严重影响和制约着施工工期,不利于周边环境的稳定。
发明内容
本发明的目的即是提出一种快速均匀加固软弱地层的模袋注浆方法和装置,使其可实现软弱地层的快速、均匀加固,提高围岩的物理力学指标,增大其稳定性,同时可实现控域注浆,避免浆液的损耗。
本发明采用以下技术方案完成其发明任务:
一种快速均匀加固软弱地层的模袋注浆装置,具有一次注浆单元和二次注浆单元;所述的二次注浆单元具有多节注浆管;所述二次注浆单元注浆管的管壁上具有若干小孔作为一次出浆孔,所述出浆孔呈台阶状,且小孔面积的3/4采用粘贴薄圆铁片的方式覆盖,使其具有单向阀功能;在二次注浆单元的注浆管上套置模袋,使所述模袋的两端与注浆管粘贴严密并套置高强橡胶圈,将模袋两端箍紧在注浆管上;将由二次注浆单元注浆管和模袋所形成的多个基础单元之间连接,构成二次注浆单元;相邻两个模袋之间的二次注浆单元注浆管上具有二次出浆孔;所述二次注浆单元的前端为封闭的锥形结构,在孔口位置的二次注浆单元注浆管上套置由垫板和螺母组成的预紧单元,所述二次注浆单元注浆管的另一端通过两个球阀与二次注浆管路连接;所述的一次注浆单元具有双囊注浆栓塞、一次注浆单元输浆钢管和手压泵构成的注浆装置;所述一次注浆单元输浆钢管由多节构成,在一次注浆单元前端为出浆管,所述出浆管的中部管壁上具有沿圆周的多个条形出浆孔,所述双囊注浆栓塞的两个橡胶囊分别位于出浆管的两端;一次注浆单元输浆钢管的前端出浆口位于出浆管内,后端与一次注浆管路连接;所述的手压泵连接输水管并使输水管的前端与双囊注浆栓塞的两个橡胶囊连通。
一种快速均匀加固软弱地层的模袋注浆方法,其具体注浆工艺步骤为:
1)测量并记录二次注浆单元注浆管上各个一次出浆孔长度范围的中点位置距二次注浆单元注浆管管口的距离;利用炮棍将若干支浸水后的快硬水泥卷逐支送入钻孔底并捣固一定时间,将二次注浆单元注浆管置于钻孔中,使二次注浆单元注浆管前端通过钻孔底经捣固后的快硬水泥卷与孔壁地层锚固,钻孔的孔口处采用混凝土填充,预紧单元的垫板封闭孔口并拧紧预紧单元上的螺母至设计扭矩,对土体施加预紧力;
2)按自孔底向孔口依次对各模袋注浆:将双囊注浆栓塞与若干根一次注浆单元输浆钢管连接后伸入二次注浆单元注浆管中并测量伸入的长度,使一次注浆单元前端出浆管的中部与二次注浆单元注浆管的一次出浆孔对应,利用手压泵使双囊注浆栓塞的两个橡胶囊膨胀至与二次注浆单元注浆管内壁密贴,实现止浆作用;一次注浆单元输浆钢管的后端连接一次注浆装置进行模袋注浆,浆液由一次注浆单元前端出浆管的多个条形出浆孔流出,并由二次注浆单元注浆管的一次出浆孔流出充填模袋使模袋膨胀,挤密地层,直至填充设计注浆量时停止注浆;通过一次注浆单元输浆钢管上设置的卸压阀卸除注浆管路内压力,再利用手压泵的卸压阀使双囊注浆栓塞卸压,使双囊注浆栓塞的两个橡胶囊与二次注浆单元注浆管内壁脱离;按上述过程依次对其余各模袋进行注浆,当所有模袋注浆结束后,退出双囊注浆栓塞、一次注浆单元输浆钢管,完成一次注浆;
3)使二次注浆单元注浆管后端连接第一球阀后再通过三通管分别与第二球阀和二次注浆管路连接;开启第一、第二球阀进行二次注浆,浆液由相邻两个模袋之间的二次注浆单元注浆管上的二次出浆孔流出,充填模袋之间的钻孔;当浆液自二次注浆单元注浆管后端的第二球阀流出时关闭该球阀,继续注浆直至设计注浆压力后关闭第一球阀;开启整体注浆管后端的第二球阀卸除注浆管路内压力,拆除注浆管路,即完成整个注浆过程。
本发明提出一种快速均匀加固软弱地层的模袋注浆方法和装置,注浆时后浆液进入并充填模袋使其膨胀,挤密地层,因浆液均位于模袋内,故可避免浆液直接进入地层,实现注浆过程无浆液损耗和控域,达到快速、均匀加固软弱地层,增大其稳定性的要求。
附图说明
图1为本发明的安装示意图;
图2为出浆孔示意图;
图3为高强橡胶圈剖面图;
图4为图3的俯视图;
图5为紧固限位件剖面图;
图6为图5的俯视图;
图7为垫板剖面图;
图8为图7的俯视图;
图9为双囊注浆栓塞结构示意图。
图中:1、二次注浆单元注浆管,2、一次出浆孔,3、模袋,4、高强橡胶圈,5、紧固限位件,6、接头,7、垫板,8、螺母,9、第一球阀,10、三通管,11、第二球阀,12、快硬水泥卷,13、混凝土,14、双囊注浆栓塞,15、橡胶囊,16、输水管,17、一次注浆单元输浆钢管,18、出浆口,19、卸压阀,20、连通钢管,21、薄圆铁片,22、二次出浆孔。
具体实施方式
结合附图对本发明实施例加以说明:
如图1所示,一种快速均匀加固软弱地层的模袋注浆装置,具有一次注浆单元和二次注浆单元;所述的二次注浆单元具有多节注浆管;所述二次注浆单元注浆管1的管壁上具有若干小孔作为一次出浆孔2,所述一次出浆孔2呈台阶状,且小孔面积的3/4粘贴薄圆铁片21,使其具有单向阀功能;在二次注浆单元注浆管1上套置模袋3,使所述模袋的两端与注浆管粘贴严密并套置高强橡胶圈4,通过紧固限位件5将模袋两端箍紧在二次注浆单元注浆管1上;将由一次注浆单元注浆管和模袋所形成的多个基础单元之间通过接头6连接,构成二次注浆单元;相邻两个模袋之间的二次注浆单元注浆管上具有二次出浆孔22;所述二次注浆单元的前端为封闭的锥形结构,在孔口位置的二次注浆单元注浆管1上套置由垫板7和螺母8组成的预紧单元,所述二次注浆单元注浆管1的另一端通过第一球阀9、第二球阀11与二次注浆管路连接;所述的一次注浆单元具有双囊注浆栓塞14、一次注浆单元输浆钢管17和手压泵构成的注浆装置;所述一次注浆单元输浆钢管17由多节构成,在一次注浆单元前端为出浆管,所述出浆管的中部管壁上具有沿圆周的多个条形出浆孔,所述双囊注浆栓塞17的两个橡胶囊15分别位于出浆管的两端;一次注浆单元输浆钢管17的前端出浆口18位于出浆管内,后端与一次注浆管路连接;所述的手压泵连接输水管16并使输水管的前端与双囊注浆栓塞的两个橡胶囊15连通。
本发明方法的具体注浆工艺步骤为:
1)测量并记录二次注浆单元注浆管1上各个一次出浆孔2长度范围的中点位置距二次注浆单元注浆管管口的距离;利用炮棍将若干支浸水后的快硬水泥卷12逐支送入钻孔底并捣固一定时间,将二次注浆单元注浆管1置于钻孔中,使二次注浆单元注浆管1前端通过钻孔底经捣固后的快硬水泥卷12与孔壁地层锚固,钻孔的孔口处采用混凝土13填充,预紧单元的垫板7封闭孔口并拧紧预紧单元上的螺母8至设计扭矩,对土体施加预紧力;
2)按自孔底向孔口依次对各模袋注浆:将双囊注浆栓塞14与若干根一次注浆单元输浆钢管17连接后伸入二次注浆单元注浆管1中并测量伸入的长度,使一次注浆单元前端出浆管的中部与二次注浆单元注浆管的一次出浆孔2对应,利用手压泵使双囊注浆栓塞的两个橡胶囊15膨胀至与二次注浆单元注浆管内壁密贴,实现止浆作用;一次注浆单元输浆钢管17的后端连接一次注浆管路进行模袋注浆,浆液由一次注浆单元前端出浆管的多个条形出浆孔流出,并由二次注浆单元注浆管的一次出浆孔2流出充填模袋3使模袋膨胀,挤密地层,直至填充设计注浆量时停止注浆;通过一次注浆单元输浆钢管上设置的卸压阀19卸除注浆管路内压力,再利用手压泵的卸压阀使双囊注浆栓塞卸压,使双囊注浆栓塞的两个橡胶囊15与二次注浆单元注浆管内壁脱离;按上述过程依次对其余各模袋进行注浆,当所有模袋注浆结束后,退出双囊注浆栓塞14、一次注浆单元输浆钢管17和手压泵构成的注浆装置完成一次注浆;
3)使二次注浆单元注浆管1后端连接第一球阀9后再通过三通管10分别与第二球阀11和二次注浆管路连接;开启第一球阀9、第二球阀11进行二次注浆,浆液由相邻两个模袋之间的二次注浆单元注浆管上的二次出浆孔22流出,充填模袋之间的钻孔;当浆液自二次注浆单元注浆管后端的第二球阀11流出时关闭该球阀,继续注浆直至设计注浆压力后关闭第一球阀9;开启二次注浆单元注浆管后端的第二球阀11卸除注浆管路内压力,拆除注浆管路,即完成整个注浆过程。

Claims (2)

1.一种快速均匀加固软弱地层的模袋注浆装置,其特征在于:具有一次注浆单元和二次注浆单元;所述的二次注浆单元具有多节注浆管;所述二次注浆单元的注浆管(1)的管壁上具有若干小孔作为一次出浆孔(2),所述出浆孔呈台阶状,且小孔面积的3/4采用粘贴薄圆铁片的方式覆盖,使其具有单向阀功能;在二次注浆单元的注浆管(1)上套置模袋(3),使所述模袋的两端与注浆管粘贴严密并套置高强橡胶圈(4),将模袋两端箍紧在注浆管上;将由一次注浆单元注浆管和模袋所形成的多个基础单元之间连接,构成二次注浆单元;相邻两个模袋之间的二次注浆单元注浆管(1)上具有二次出浆孔(22);所述二次注浆单元的前端为封闭的锥形结构,在孔口位置的二次注浆单元注浆管(1)上套置由垫板(7)和螺母(8)组成的预紧单元,所述二次注浆单元注浆管(1)的另一端通过第一球阀(9)、第二球阀(11)与二次注浆管路连接;所述的一次注浆单元具有双囊注浆栓塞(14)、一次注浆单元输浆钢管(17)和手压泵构成的注浆装置;所述一次注浆单元输浆钢管(17)由多节构成,在一次注浆单元前端为出浆管,所述出浆管的中部管壁上具有沿圆周的多个条形出浆孔,所述双囊注浆栓塞的两个橡胶囊(15)分别位于出浆管的两端;一次注浆单元输浆钢管(17)的前端出浆口位于出浆管内,后端与一次注浆管路连接;所述的手压泵连接输水管(16)并使输水管的前端与双囊注浆栓塞的两个橡胶囊(15)连通。
2.一种快速均匀加固软弱地层的模袋注浆方法,其具体注浆工艺步骤为:
1)测量并记录二次注浆单元注浆管(1)上各个一次出浆孔长度范围的中点位置距二次注浆单元注浆管管口的距离;利用炮棍将若干支浸水后的快硬水泥卷(12)逐支送入钻孔底并捣固一定时间,将二次注浆单元注浆管(1)置于钻孔中,使二次注浆单元注浆管(1)前端通过钻孔底经捣固后的快硬水泥卷(12)与孔壁地层锚固,钻孔的孔口处采用混凝土(13)填充,预紧单元的垫板(7)封闭孔口并拧紧预紧单元上的螺母(8)至设计扭矩,对土体施加预紧力;
2)按自孔底向孔口依次对各模袋注浆:将双囊注浆栓塞(14)与若干根一次注浆单元输浆钢管(17)连接后伸入二次注浆单元注浆管(1)中并测量伸入的长度,使一次注浆单元前端出浆管的中部与二次注浆单元注浆管的一次出浆孔(2)对应,利用手压泵使双囊注浆栓塞的两个橡胶囊(15)膨胀至与二次注浆单元注浆管内壁密贴,实现止浆作用;一次注浆单元输浆钢管(17)的后端连接一次注浆管路进行模袋注浆,浆液由一次注浆单元前端出浆管的多个条形出浆孔流出,并由二次注浆单元注浆管的一次出浆孔(2)流出充填模袋(3)使模袋膨胀,挤密地层,直至填充设计注浆量时停止注浆;通过一次注浆单元输浆钢管(17)上设置的卸压阀(19)卸除注浆管路内压力,再利用手压泵的卸压阀使双囊注浆栓塞卸压,使双囊注浆栓塞的两个橡胶囊(15)与二次注浆单元注浆管内壁脱离;按上述过程依次对其余各模袋(3)进行注浆,当所有模袋注浆结束后,退出双囊注浆栓塞(14)、一次注浆单元输浆钢管(17)和手压泵构成的注浆装置,完成一次注浆;
3)使二次注浆单元注浆管(1)后端连接第一球阀(9)后再通过三通管(10)分别与第二球阀(11)和二次注浆管路连接;开启第一球阀(9)、第二球阀(10)进行二次注浆,浆液由相邻两个模袋(3)之间的二次注浆单元注浆管上的二次出浆孔(22)流出,充填模袋之间的钻孔;当浆液自二次注浆单元注浆管后端的第二球阀(11)流出时关闭该球阀,继续注浆直至设计注浆压力后关闭第一球阀(9);开启整体注浆管后端的第二球阀(11)卸除注浆管路内压力,拆除注浆管路,即完成整个注浆过程。
CN 201010595150 2010-12-20 2010-12-20 一种快速均匀加固软弱地层的模袋注浆方法和装置 Pending CN102003189A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010595150 CN102003189A (zh) 2010-12-20 2010-12-20 一种快速均匀加固软弱地层的模袋注浆方法和装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010595150 CN102003189A (zh) 2010-12-20 2010-12-20 一种快速均匀加固软弱地层的模袋注浆方法和装置

Publications (1)

Publication Number Publication Date
CN102003189A true CN102003189A (zh) 2011-04-06

Family

ID=43810859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010595150 Pending CN102003189A (zh) 2010-12-20 2010-12-20 一种快速均匀加固软弱地层的模袋注浆方法和装置

Country Status (1)

Country Link
CN (1) CN102003189A (zh)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644469A (zh) * 2012-05-10 2012-08-22 中国矿业大学 一种裂隙发育围岩超深孔超前注浆管及注浆方法
CN103061785A (zh) * 2012-12-28 2013-04-24 山东大学 巷道破碎涌水围岩钻孔套管隔压渗透封固注浆装置及工艺
CN104314587A (zh) * 2014-10-27 2015-01-28 山东科技大学 定点控域注浆装置及注浆工艺
CN104762952A (zh) * 2015-03-16 2015-07-08 中国水电基础局有限公司 一种在深厚覆盖层作业孔内安装灌浆设备的方法
CN105888708A (zh) * 2016-06-28 2016-08-24 金英子 一种基于雷达探测技术的巷道冒顶区探测及处理方法
CN105888673A (zh) * 2016-05-09 2016-08-24 山东大学 松软富水围岩内深孔塑管高压注浆防爆装置及操作方法
CN105909285A (zh) * 2016-06-28 2016-08-31 冯飞燕 一种基于围岩岩石质量指标的冒顶评判及贯通方法
CN106089246A (zh) * 2016-06-28 2016-11-09 孙姗姗 一种基于注浆锚杆的巷道冒顶灾害修复方法
CN106121679A (zh) * 2016-06-28 2016-11-16 孙姗姗 一种井下巷道冒顶的处理方法
CN106121678A (zh) * 2016-06-28 2016-11-16 安徽理工大学 一种基于雷达探测技术的顶板空顶区探测及巷道修复方法
CN106150532A (zh) * 2016-06-28 2016-11-23 冯飞燕 一种基于两次支护的顶板塌陷疏通方法
CN106150522A (zh) * 2016-06-28 2016-11-23 安徽理工大学 一种利用钻孔窥视仪探测冒落区的顶板塌陷治理方法
CN106381863A (zh) * 2016-10-31 2017-02-08 山东大学 对富水沙层注浆加固的钻注复合装置及施工工艺
CN106677160A (zh) * 2016-11-18 2017-05-17 山东大学 一种系列模袋后退式分段注浆的装置及注浆方法
CN107542469A (zh) * 2017-03-29 2018-01-05 清华海峡研究院(厦门) 一种地下模袋桩支护方法
CN108194104A (zh) * 2017-12-29 2018-06-22 山东大学 一种城市浅埋小净距隧道的中隔岩柱加固方法
CN108474192A (zh) * 2015-06-25 2018-08-31 Hyun工程建设株式会社 在用于压低地面斜坡的压板侧具有固定装置的锚固器及其安装方法
CN109026015A (zh) * 2018-06-27 2018-12-18 山东大学 一种适用于城市地铁隧道的超前注浆控制方法
CN110424995A (zh) * 2019-08-06 2019-11-08 安徽钢铮机电有限公司 一种多段式注浆的中空注浆装置及应用方法
CN113833493A (zh) * 2021-09-29 2021-12-24 铁科院(深圳)研究设计院有限公司 一种岩土层加固用囊体管棚

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167745A (ja) * 2000-12-04 2002-06-11 Kyokado Eng Co Ltd 地盤注入工法および注入管装置
CN1485505A (zh) * 2003-08-29 2004-03-31 北京市城市建设工程研究院 双栓塞注浆花管及施工工艺
JP2005314939A (ja) * 2004-04-28 2005-11-10 Kyokado Eng Co Ltd 地盤強化方法
CN101644049A (zh) * 2009-06-03 2010-02-10 广东省航盛建设集团有限公司 双阀布袋袖阀管注浆技术
CN201963315U (zh) * 2010-12-20 2011-09-07 中铁隧道集团有限公司 一种快速均匀加固软弱地层的模袋注浆装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167745A (ja) * 2000-12-04 2002-06-11 Kyokado Eng Co Ltd 地盤注入工法および注入管装置
CN1485505A (zh) * 2003-08-29 2004-03-31 北京市城市建设工程研究院 双栓塞注浆花管及施工工艺
JP2005314939A (ja) * 2004-04-28 2005-11-10 Kyokado Eng Co Ltd 地盤強化方法
CN101644049A (zh) * 2009-06-03 2010-02-10 广东省航盛建设集团有限公司 双阀布袋袖阀管注浆技术
CN201963315U (zh) * 2010-12-20 2011-09-07 中铁隧道集团有限公司 一种快速均匀加固软弱地层的模袋注浆装置

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644469A (zh) * 2012-05-10 2012-08-22 中国矿业大学 一种裂隙发育围岩超深孔超前注浆管及注浆方法
CN102644469B (zh) * 2012-05-10 2014-07-16 中国矿业大学 一种裂隙发育围岩超深孔超前注浆管及注浆方法
CN103061785A (zh) * 2012-12-28 2013-04-24 山东大学 巷道破碎涌水围岩钻孔套管隔压渗透封固注浆装置及工艺
CN104314587A (zh) * 2014-10-27 2015-01-28 山东科技大学 定点控域注浆装置及注浆工艺
CN104762952A (zh) * 2015-03-16 2015-07-08 中国水电基础局有限公司 一种在深厚覆盖层作业孔内安装灌浆设备的方法
CN108474192A (zh) * 2015-06-25 2018-08-31 Hyun工程建设株式会社 在用于压低地面斜坡的压板侧具有固定装置的锚固器及其安装方法
CN105888673A (zh) * 2016-05-09 2016-08-24 山东大学 松软富水围岩内深孔塑管高压注浆防爆装置及操作方法
CN106150522A (zh) * 2016-06-28 2016-11-23 安徽理工大学 一种利用钻孔窥视仪探测冒落区的顶板塌陷治理方法
CN106121678B (zh) * 2016-06-28 2018-07-03 安徽理工大学 一种基于雷达探测技术的顶板空顶区探测及巷道修复方法
CN106121679A (zh) * 2016-06-28 2016-11-16 孙姗姗 一种井下巷道冒顶的处理方法
CN106121678A (zh) * 2016-06-28 2016-11-16 安徽理工大学 一种基于雷达探测技术的顶板空顶区探测及巷道修复方法
CN106150532A (zh) * 2016-06-28 2016-11-23 冯飞燕 一种基于两次支护的顶板塌陷疏通方法
CN105909285A (zh) * 2016-06-28 2016-08-31 冯飞燕 一种基于围岩岩石质量指标的冒顶评判及贯通方法
CN105888708A (zh) * 2016-06-28 2016-08-24 金英子 一种基于雷达探测技术的巷道冒顶区探测及处理方法
CN108442953A (zh) * 2016-06-28 2018-08-24 金英子 采用雷达探测技术和注浆锚杆的煤矿巷道冒顶区处理方法
CN108442953B (zh) * 2016-06-28 2019-07-16 绍兴市高砚智生物科技有限公司 采用雷达探测技术和注浆锚杆的煤矿巷道冒顶区处理方法
CN106089246A (zh) * 2016-06-28 2016-11-09 孙姗姗 一种基于注浆锚杆的巷道冒顶灾害修复方法
CN106381863A (zh) * 2016-10-31 2017-02-08 山东大学 对富水沙层注浆加固的钻注复合装置及施工工艺
CN106381863B (zh) * 2016-10-31 2019-12-24 山东大学 对富水沙层注浆加固的钻注复合装置及施工工艺
CN106677160A (zh) * 2016-11-18 2017-05-17 山东大学 一种系列模袋后退式分段注浆的装置及注浆方法
CN107542469A (zh) * 2017-03-29 2018-01-05 清华海峡研究院(厦门) 一种地下模袋桩支护方法
CN108194104A (zh) * 2017-12-29 2018-06-22 山东大学 一种城市浅埋小净距隧道的中隔岩柱加固方法
CN108194104B (zh) * 2017-12-29 2020-06-02 山东大学 一种城市浅埋小净距隧道的中隔岩柱加固方法
CN109026015A (zh) * 2018-06-27 2018-12-18 山东大学 一种适用于城市地铁隧道的超前注浆控制方法
CN110424995A (zh) * 2019-08-06 2019-11-08 安徽钢铮机电有限公司 一种多段式注浆的中空注浆装置及应用方法
CN113833493A (zh) * 2021-09-29 2021-12-24 铁科院(深圳)研究设计院有限公司 一种岩土层加固用囊体管棚

Similar Documents

Publication Publication Date Title
CN102003189A (zh) 一种快速均匀加固软弱地层的模袋注浆方法和装置
CN105200978B (zh) 一种前进式定域双液注浆装置及施工方法
CN103899323B (zh) 一种盾构穿越铁路站场的施工方法
CN107605498B (zh) 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法
CN202140088U (zh) 一种可同时注入膨润土的盾构机泡沫剂注入管路系统
CN201133248Y (zh) 孔口密封双管后退式注浆装置
CN101761345A (zh) 一种隧道顶部土层的加固装置及其施工方法
CN103291354B (zh) 一种底板岩巷穿层卸压钻孔充填加固方法
CN201963315U (zh) 一种快速均匀加固软弱地层的模袋注浆装置
CN201310362Y (zh) 高压涌水钻孔内孔口管的安装装置
CN106703010B (zh) 一种无套壳料层袖阀管注浆快速施工方法
CN103993902B (zh) 一种瓦斯抽采钻孔两步注浆封孔方法
CN101793154A (zh) 利用隧道围岩地质参数和设置分流孔的注浆堵水方法
CN201129184Y (zh) 小导管外阀单向式分段后退注浆装置
CN105064280A (zh) 一种隧洞暗河涌水封堵施工方法
CN105649655B (zh) 一种用于从盾构机内往周边地层注浆加固装置
CN202644538U (zh) 一种在富水流砂地层中使用的注浆装置
CN207176686U (zh) 全封堵地下洞室回填、固结灌浆管路布置结构
CN205445634U (zh) 一种用于从盾构机内往周边地层注浆加固装置
CN205918368U (zh) 钻注一体后退式注浆钻杆
CN201165660Y (zh) 钢管孔底注浆装置
CN101358529A (zh) 短导管及短导管固砂剂加固施工工艺
CN201401178Y (zh) 矿山及地下堵水注浆装置
CN205475198U (zh) 岩溶地区溶洞上覆土层注浆加固装置
CN103867221B (zh) 支护超前的径向注浆锚杆及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110406