CN102000733A - Production process for flanging and necking deep-drawing products - Google Patents

Production process for flanging and necking deep-drawing products Download PDF

Info

Publication number
CN102000733A
CN102000733A CN 201010295369 CN201010295369A CN102000733A CN 102000733 A CN102000733 A CN 102000733A CN 201010295369 CN201010295369 CN 201010295369 CN 201010295369 A CN201010295369 A CN 201010295369A CN 102000733 A CN102000733 A CN 102000733A
Authority
CN
China
Prior art keywords
work step
product
reducing
flange
stretch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010295369
Other languages
Chinese (zh)
Inventor
王进丁
石勇
王正成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGHUI (SHANGHAI) TECHNOLOGY GROUP Co Ltd
Original Assignee
CHANGHUI (SHANGHAI) TECHNOLOGY GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGHUI (SHANGHAI) TECHNOLOGY GROUP Co Ltd filed Critical CHANGHUI (SHANGHAI) TECHNOLOGY GROUP Co Ltd
Priority to CN 201010295369 priority Critical patent/CN102000733A/en
Publication of CN102000733A publication Critical patent/CN102000733A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a production process for flanging and necking deep-drawing products, which comprises the steps of punching a process hole, deep-drawing, shaping, and blanking, flanging and necking at the same time. The production process has the advantages that the flanging step and the necking step are carried out during blanking, and three different processes are implemented at the same time by using one step so that the problems that after blanking, the products cannot be subjected to the next flanging step and the necking step or the flanging or necking products cannot be cut off from the carrier are solved.

Description

A kind of production technology of the drawing part product with flange and reducing
Technical field
The present invention relates to Sheet Metal Forming Technology, particularly a kind of production technology of the drawing part product with flange and reducing.
Background technology
Generally rare for the mould of producing some pull and stretch band flange and reducing with the progressive die, because under normal circumstances product can't be with material, reason is that the product blanking loses flange and the reducing operation that carrier can't carry out postorder afterwards, if first flange and reducing product can't scale off from carrier again, so this series products all was to adopt single operation punching press in the past basically, even and some product uses single operation punching press also is just can finish with very complicated bulging mechanism, but also can not reach effect preferably, so be all can't reach desirable effect on the production efficiency or on the safety.
Summary of the invention
In view of the drawing part production of the state of the art band flange and reducing can only adopt single operation punching press to finish, and complex process, efficient is low, potential safety hazard is big, the invention provides a kind of production technology of continuous punching press of the drawing part product with flange and reducing.
The present invention is in order to finish its goal of the invention, and the technical scheme that is adopted is: a kind of production technology of the drawing part product with flange and reducing may further comprise the steps:
Step 1: towards fabrication hole;
Step 2: pull and stretch shaping;
Step 3: carry out flange and reducing in the time of blanking.
In the production technology of concrete above-mentioned a kind of drawing part product with flange and reducing: also comprise step by step following in the described step 3:
301: the blanking state;
302: beginning flange state;
303: beginning flange and reducing state;
304: the product shaping completion status.
Beneficial effect of the present invention: carry out flange and reducing in the time of blanking, three kinds of different technologies realize on a work step simultaneously, solved flange and the necking forming problem that can't carry out postorder after the blanking with material again, or the problem that product can't scale off from carrier again after flange and the reducing.
Below with reference to drawings and Examples, the present invention is carried out comparatively detailed explanation.
Description of drawings
Fig. 1 entire product stock layout figure.
Fig. 2 blank-forming work step is at the top dead-centre state.
Fig. 3 blank-forming work step is at stripper contact counterdie state.
Fig. 4 blank-forming work step is at the bottom dead centre state.
Fig. 5 puts in order secondary mould general assembly drawing.
The station figure of the mould that Fig. 6 is shown in Figure 5.
Fig. 7 carries out flange and reducing process decomposing schematic representation when being blanking.
Fig. 8 carries out flange and reducing process status schematic diagram when being blanking.
Fig. 9 is an A part enlarged drawing among Fig. 8.
The specific embodiment
Embodiment 1, and as shown in Figure 1, a kind of production technology of the drawing part product with flange and reducing is characterized in that: may further comprise the steps:
Step 1: towards fabrication hole;
Step 2: pull and stretch shaping;
It at first is the fabrication hole of going out correcting nail hole and wanting pull and stretch to possess.Be to carry out pull and stretch and shaping then.More than two steps are existing processes.
Step 3: carry out flange and reducing in the time of blanking.
Carrying out flange and reducing in the time of blanking is the key of present embodiment.Shown in Fig. 7,8,9, this step comprises following substep:
301: the blanking state;
302: beginning flange state;
303: beginning flange and reducing state;
304: the product shaping completion status.
As shown in Figure 1, the present embodiment progressive die forms workpiece one and has 12 stations, is exactly to be denoted as 12 stations of g1 to g12 among the figure, and this station figure as shown in Figure 6.
Explanation now uses mould as described above to finish the manufacture craft of the part (generally being referred to as supporting disk) in a kind of safe automobile air bag, it is by forming towards work steps such as fabrication hole, pull and stretch, shaping and blank-formings, its main work step stock layout figure as shown in Figure 1 comprises following work step:
Work step 1) towards fabrication hole g1: go out correcting nail hole, as shown in Figure 1, cloth goes out correcting nail hole and fabrication hole respectively on both sides, here correcting nail hole is accurately to locate usefulness for the work step of back, and fabrication hole is to prepare for the pull and stretch work step of back, promptly excise excess stock, keep pull and stretch body of material and carrier;
Work step 2) towards fabrication hole g2: with work step 1), fabrication hole is gone out as fine positioning in the correcting nail hole of going out with the preceding step, here towards the effect and work step 1 of fabrication hole) identical;
Work step 3) for empty work step g3: main purpose is that what mainly to finish because of first group of template is the deep-drawing technique that second group of plate of punching technology g2 will be finished, for make mould stressed rationally with dismantle easy to maintenance;
Work step 4) is empty work step g4: mainly be to consider that next step is the required space of pull and stretch work step g5 structure and the intensity of template;
Work step 5) be downward pull and stretch g5: the strip plate material is produced plastic deformation by mould, the shape that pull and stretch becomes to require, pull and stretch fillet at this moment is R1.0mm;
Work step 6) is empty work step g6: mainly be to consider that previous step is the required space of pull and stretch work step structure and the intensity of template;
Work step 7) shaping g7: will be at product at work step 5) the pull and stretch fillet R1.0 that forms is shaped to R0.3mm by mould, sees the operation part,
Work step 8~10) is empty work step g8-g10: for preventing the unsuccessful reducing work step that increases possibly of reserving of this scheme;
Work step 11) blank-forming g11: product is also carried out flange and reducing simultaneously from the strip separation, and this is crucial;
Work step 12) go out part and cut waste material g12: the work step product pushes away a work step forward in the utilization, the product of front release mould punching press scope is dropped on the preprepared conveyer belt send in the turnover box, cuts off unnecessary strip simultaneously;
Finish the continuous drawing of entire product by above each work step.
In order to finish above-mentioned technology, design a kind of supporting disk progressive die, as Fig. 2, Fig. 3 and Fig. 4, shown in the figure, be upper clamping plate 1 main the composition, upper padding plate 2, fixed head 3, discharging cover plate 4, stripper 5, concave template 6, lower bolster 7, counterdie seat board 8, finish the punch 9 of blanking and flange and necking forming, carry out blanking and the spacing limited block 10 of reducing size after product is pressed onto the position, be convenient to the die plate insert 11 that keeps in repair and change as the edge of a knife of blanking, major function is to push down the counterdie floating block 12 of product, main effect is product to be ejected the die face be convenient to part kicker 13, also has cutter 15, discharging spring 16 and contour screw rod spare 17.
This mould move from top to bottom return original position finish a working cycles be 360 the degree.As shown in Figure 2, move downward the 90 feeding processes of finishing strip when spending at mould from top dead-centre 0 degree, mould moves downward again, at first be that limited block contacts with product and strip with stripper, be the kicker of counterdie then, because of the spring force above the limited block more much bigger than the spring force below the kicker, so the kicker of counterdie begins to move downward under the effect of patrix power, when contact counterdie floating block, then counterdie floating block and counterdie kicker move downward simultaneously, until with till lower bolster contact, at this moment effect spring above the patrix limited block and the spring above the stripper just begin to compress, as Fig. 3 state; At this moment strip begins to compress, patrix continues to move downward, the punch of patrix is started working, at first cutting off product is connected with strip and finishes blanking, punch continues to move downward, turn over downwards in the following beginning of the effect on punch inclined-plane product after cut-out outside, so the place, R angle, bottom of the long drawing part of cylindrical section that forms because of the short pull and stretch of the length of side that will turn over will produce distortion clocklike, and the oral area of drawing part produces contraction
Specifically be shaped as Fig. 7, Fig. 8 and shown in Figure 9.
When 180 spend, finish all shaping actions and cut off unnecessary strip (see figure 4); Having crossed 180 degree patrixes will move upward, upper and lower mould is thrown off fully when arrival 270 is spent, at this moment just can carry out feeding, utilize a back product that the product of staying on the kicker is released mould punching press scope, drop on the preprepared conveyer belt and send in the turnover box.Get back to 360 and finish whole punching course when spending.

Claims (3)

1. production technology with the drawing part product of flange and reducing may further comprise the steps:
Step 1: towards fabrication hole;
Step 2: pull and stretch shaping;
Step 3: carry out flange and reducing in the time of blanking.
2. the production technology of the drawing part product of band flange according to claim 1 and reducing is characterized in that: also comprise step by step following in the described step 3:
301: the blanking state;
302: beginning flange state;
303: beginning flange and reducing state;
304: the product shaping completion status.
3. the production technology of the drawing part product of band flange according to claim 2 and reducing on progressive die, comprises following work step:
Work step 1) towards fabrication hole g1: go out correcting nail hole;
Work step 2) towards fabrication hole g2: with work step 1), go out fabrication hole with the correcting nail hole that the preceding step goes out as fine positioning;
Work step 3) is empty work step g3;
Work step 4) is empty work step g4;
Work step 5) be downward pull and stretch g5: the strip plate material is produced plastic deformation by mould, the shape that pull and stretch becomes to require, pull and stretch fillet at this moment is R1.0mm;
Work step 6) is empty work step g6;
Work step 7) shaping g7: will be at product at work step 5) the pull and stretch fillet R1.0 that forms is shaped to R0.3mm by mould;
Work step 8~10) is empty work step g8-g10;
Work step 11) blank-forming g11: product is also carried out flange and reducing simultaneously from the strip separation;
Work step 12) go out part and cut waste material g12: the work step product pushes away a work step forward in the utilization, the product of front release mould punching press scope is dropped on the preprepared conveyer belt send in the turnover box, cuts off unnecessary strip simultaneously;
Finish the continuous drawing of entire product by above each work step.
CN 201010295369 2010-09-27 2010-09-27 Production process for flanging and necking deep-drawing products Pending CN102000733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010295369 CN102000733A (en) 2010-09-27 2010-09-27 Production process for flanging and necking deep-drawing products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010295369 CN102000733A (en) 2010-09-27 2010-09-27 Production process for flanging and necking deep-drawing products

Publications (1)

Publication Number Publication Date
CN102000733A true CN102000733A (en) 2011-04-06

Family

ID=43808580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010295369 Pending CN102000733A (en) 2010-09-27 2010-09-27 Production process for flanging and necking deep-drawing products

Country Status (1)

Country Link
CN (1) CN102000733A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266889A (en) * 2011-07-21 2011-12-07 嘉兴优佳金属制品有限公司 Continuous stamping thinning drawing forming process
CN102430642A (en) * 2011-09-19 2012-05-02 天津市津兆机电开发有限公司 Molding process of progressive die of high temperature alloy sheet metal component with high flanging hole
CN103962452A (en) * 2014-04-15 2014-08-06 柳州职业技术学院 Suspension supporting base multi-station progressive die
CN104001816A (en) * 2014-06-18 2014-08-27 苏州旭创精密模具有限公司 Continuous die for shaft sleeve fastening piece
CN104014644A (en) * 2014-06-18 2014-09-03 苏州旭创精密模具有限公司 Method for machining shaft sleeve fastener
CN104043727A (en) * 2014-06-18 2014-09-17 苏州旭创精密模具有限公司 Fastener machining method and fastener continuous die
CN104070106A (en) * 2014-06-18 2014-10-01 苏州旭创精密模具有限公司 Bracket processing method
CN105964830A (en) * 2016-07-29 2016-09-28 成都宏明双新科技股份有限公司 Drawing carrier connecting method
CN106077274A (en) * 2016-08-03 2016-11-09 宁波贤丰汽车零部件有限公司 A kind of stamping continuous die structure for pipe automatic reducing punching
CN111390020A (en) * 2020-03-25 2020-07-10 江苏中捷精工科技股份有限公司 Novel process for mouth part with flanging stretching piece
CN111702425A (en) * 2020-06-30 2020-09-25 东风汽车有限公司 Production process of engine blockage product
CN113351746A (en) * 2021-05-27 2021-09-07 卡斯马汽车系统(重庆)有限公司 Method and production line for one-step molding of multiple blanking pieces
CN117506359A (en) * 2024-01-03 2024-02-06 天津天锻航空科技有限公司 Technological method for forming machined thick plate part with replaceable forging

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06114456A (en) * 1992-10-05 1994-04-26 Toshiomi Hayashi Method for manufacturing sheet metal press working made tube flange
CN101712061A (en) * 2009-12-03 2010-05-26 中国南方航空工业(集团)有限公司 Method and equipment for manufacturing BB cover
CN101767164A (en) * 2009-12-31 2010-07-07 潍坊裕元电子有限公司 Method for producing thin-wall metal circular ring and grading stamping mould used therefor
CN201565518U (en) * 2009-12-16 2010-09-01 东安黑豹股份有限公司 Automobile surrounding outer plate edge trimming hole punching and flanging die

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06114456A (en) * 1992-10-05 1994-04-26 Toshiomi Hayashi Method for manufacturing sheet metal press working made tube flange
CN101712061A (en) * 2009-12-03 2010-05-26 中国南方航空工业(集团)有限公司 Method and equipment for manufacturing BB cover
CN201565518U (en) * 2009-12-16 2010-09-01 东安黑豹股份有限公司 Automobile surrounding outer plate edge trimming hole punching and flanging die
CN101767164A (en) * 2009-12-31 2010-07-07 潍坊裕元电子有限公司 Method for producing thin-wall metal circular ring and grading stamping mould used therefor

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266889B (en) * 2011-07-21 2013-05-22 嘉兴优佳金属制品有限公司 Continuous stamping thinning drawing forming process
CN102266889A (en) * 2011-07-21 2011-12-07 嘉兴优佳金属制品有限公司 Continuous stamping thinning drawing forming process
CN102430642A (en) * 2011-09-19 2012-05-02 天津市津兆机电开发有限公司 Molding process of progressive die of high temperature alloy sheet metal component with high flanging hole
CN103962452B (en) * 2014-04-15 2016-01-20 柳州职业技术学院 Mount supports seat multi-station progressive die
CN103962452A (en) * 2014-04-15 2014-08-06 柳州职业技术学院 Suspension supporting base multi-station progressive die
CN104001816A (en) * 2014-06-18 2014-08-27 苏州旭创精密模具有限公司 Continuous die for shaft sleeve fastening piece
CN104043727A (en) * 2014-06-18 2014-09-17 苏州旭创精密模具有限公司 Fastener machining method and fastener continuous die
CN104070106A (en) * 2014-06-18 2014-10-01 苏州旭创精密模具有限公司 Bracket processing method
CN104014644A (en) * 2014-06-18 2014-09-03 苏州旭创精密模具有限公司 Method for machining shaft sleeve fastener
CN104043727B (en) * 2014-06-18 2016-02-24 苏州旭创精密模具有限公司 A kind of securing member processing method and securing member continuous mould
CN104070106B (en) * 2014-06-18 2016-05-04 苏州旭创精密模具有限公司 A kind of support processing method
CN105964830A (en) * 2016-07-29 2016-09-28 成都宏明双新科技股份有限公司 Drawing carrier connecting method
CN106077274A (en) * 2016-08-03 2016-11-09 宁波贤丰汽车零部件有限公司 A kind of stamping continuous die structure for pipe automatic reducing punching
CN106077274B (en) * 2016-08-03 2018-06-22 宁波贤丰汽车零部件有限公司 A kind of stamping continuous die structure for the automatic necking punching of pipe
CN111390020A (en) * 2020-03-25 2020-07-10 江苏中捷精工科技股份有限公司 Novel process for mouth part with flanging stretching piece
CN111702425A (en) * 2020-06-30 2020-09-25 东风汽车有限公司 Production process of engine blockage product
CN113351746A (en) * 2021-05-27 2021-09-07 卡斯马汽车系统(重庆)有限公司 Method and production line for one-step molding of multiple blanking pieces
CN117506359A (en) * 2024-01-03 2024-02-06 天津天锻航空科技有限公司 Technological method for forming machined thick plate part with replaceable forging

Similar Documents

Publication Publication Date Title
CN102000733A (en) Production process for flanging and necking deep-drawing products
CN101758139B (en) Cold stamping die for aluminium foil container
CN101733327B (en) Side hole cover progressive die
CN101402123B (en) Punching and riveting molding method and mould
CN102139312A (en) Progressive continuous stamping die used for processing small elastic sheets
CN102189173A (en) Carrier-free one-die two-piece forming method for bracket
CN201684835U (en) Deep-drawing progressive die
CN107243548A (en) Left and right brake-pedal support plate progressive die
CN103658388A (en) Progressive die and method for producing automobile seat sliding way retainer
CN101733325A (en) Side hole progressive die
CN201659202U (en) Drawing flanker type progressive die
CN103551455B (en) A kind of progressive die and its processing method for processing vehicle seat slideway wallboard
CN201304445Y (en) Die for producing aluminum shell blank of capacitor with coiled material
CN206373230U (en) A kind of mobile fingerprint decoration diel
CN206981539U (en) Left and right brake-pedal support plate progressive die
CN206747407U (en) The automobile reinforcing plate assembly progressive die
CN105945142A (en) Mold for vehicle support part
CN109290441A (en) A kind of automobile back door lock stiffening plate continuous stamping die
CN101733326B (en) Continuous stamping die of cover product
CN202061989U (en) Single-die double-piece forming die with carrier-free support
CN204912477U (en) Stamping die is connected to shell fragment
CN206882581U (en) Drawing part necking down shapes class progressive die
CN205967012U (en) A mould for car support parts
CN106391858B (en) A kind of mold of automobile front seat support plate assembly part
CN208390764U (en) A kind of L-type automobile door sill reinforcer shaving die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110406