CN101997293B - 一种顶管的施工工艺 - Google Patents

一种顶管的施工工艺 Download PDF

Info

Publication number
CN101997293B
CN101997293B CN200910056706.9A CN200910056706A CN101997293B CN 101997293 B CN101997293 B CN 101997293B CN 200910056706 A CN200910056706 A CN 200910056706A CN 101997293 B CN101997293 B CN 101997293B
Authority
CN
China
Prior art keywords
steel pipe
steel
pipe
head
push pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910056706.9A
Other languages
English (en)
Other versions
CN101997293A (zh
Inventor
沈求良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SOUTH POWER SUPPLY DESIGN CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
SHANGHAI SOUTH POWER SUPPLY DESIGN CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SOUTH POWER SUPPLY DESIGN CO Ltd, State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical SHANGHAI SOUTH POWER SUPPLY DESIGN CO Ltd
Priority to CN200910056706.9A priority Critical patent/CN101997293B/zh
Publication of CN101997293A publication Critical patent/CN101997293A/zh
Application granted granted Critical
Publication of CN101997293B publication Critical patent/CN101997293B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种顶管的施工工艺,顶管包括钢管,包括以下步骤:开挖钢管槽;在钢管槽后方左右两边分别固定卷扬机;在钢管槽顶部垂直钢管槽开挖土槽,土槽内放置槽钢,槽钢两侧固定铁桩;钢管的一端焊上钢管连接套;将第一根钢管的头部套上锥形头,尾部套上盖帽,并挂接上动滑轮,该动滑轮与卷扬机相连并通过联动装置与钢管连接,定滑轮固定在铁桩上;通过钢丝绳在卷扬机绞磨上缠绕发动卷扬机机;顶入第一根钢管后,拆下盖帽,将第二根钢管的头部套入第一根钢管尾部,在第二根钢管的尾部装上盖帽,依此类推直至顶管穿越路面。本发明可减少对路面的破坏,减少大型车辆的运用,减少环境污染,施工时间短,成本低,具有节能、减排和增效的特点。

Description

一种顶管的施工工艺
技术领域
本发明涉及一种施工工艺,尤其涉及一种用于电缆施工的顶管的施工工艺。 
背景技术
随着社会经济的发展,电力电缆凭借着其运行安全、少维护、美观等特点被广泛地运用。在传统的电缆施工中,开挖路面敷设电缆是常用的方法,但施工结束后路面却很难恢复原样。大多数的低压用户工程很小,运用大而齐的顶管工艺设备,由于体积大、重量重,施工占地面积就较大,经常要损坏路边的绿化,预挖的坑使得泥浆严重影响了市容,对环境也造成了一定的污染;此种施工方法施工时间较长、施工成本较大;同时还要受到工程进度、地理位置的限制。 
发明内容
本发明的目的在于克服现有技术的缺陷,而提供一种顶管的施工工艺,该施工工艺可减少了对路面的破坏,减少了对大型车辆的运用,减少了对环境的污染,施工时间短,成本低,具有节能、减排和增效的特点。 
实现上述目的的技术方案是:一种顶管的施工工艺,顶管包括钢管,其中,包括以下步骤: 
步骤1,在道路边的施工范围内开挖一个钢管槽,用于放置钢管; 
步骤2,在所述钢管槽的后方3米处,左右两边分别固定一卷扬机; 
步骤3,在钢管槽顶部,垂直于钢管槽开挖一个土槽,土槽内放置一槽钢,槽钢两侧固定有铁桩; 
步骤4,在每根钢管的一端焊接上一用于连接钢管的钢管连接套; 
步骤5,将第一根钢管的头部套上一锥形头,尾部套上一盖帽,并挂接上一滑轮组中的动滑轮,该动滑轮与所述的位于钢管同一侧的卷扬机相连并且还通过联动装置与所述的钢管连接以推动钢管进行顶管动作,滑轮组中的定滑轮固定在土槽中的铁桩上; 
步骤6,通过钢丝绳在卷扬机绞磨上缠绕若干圈,发动卷扬机机即可开始进行顶管操作; 
步骤7,顶入第一根钢管后,拆下尾部的盖帽,将第二根钢管的头部通过钢管连接套套入第一根钢管的尾部,然后在第二根钢管的尾部装上盖帽继续施工,依此类推,直至顶管穿越路面。 
上述的顶管的施工工艺,其中,所述的钢管槽的长为6.5米,宽为1米,深度为1米。 
上述的顶管的施工工艺,其中,所述的土槽的长为3米,宽为1米,深为0.5米。 
上述的顶管的施工工艺,其中,所述的钢管为圆形钢管。 
本发明的有益效果是:本发明通过分析得出顶管的两个关键因素:顶管的顶力和机体的抓地力,本发明通过采用卷扬机和滑轮来替代原有的液压装置提供顶力,通过设置槽钢来替代原有的车体重力来提供抓地力,替代了大型机车,节约了大量的成本费用,实施方便,重量轻,因此也可以节省大量的人力劳动,减少了开挖面积以减少环境污染,缩短了施工时间,一个顶管施工只需3.5小时,工具简易、总重量小于300公斤,可由6个劳力搬运2、占地面积小,使用方便。 
具体实施方式
下面将通过实施例对本发明作进一步说明。 
一种顶管的施工工艺,顶管包括钢管,包括以下步骤: 
步骤1,在道路边的施工范围内开挖一个钢管槽,用于放置钢管; 
步骤2,在钢管槽的后方3米处,左右两边分别固定一卷扬机; 
步骤3,在钢管槽顶部,垂直于钢管槽开挖一个土槽,土槽内放置一槽钢,槽钢两侧固定有铁桩;
步骤4,在每根钢管的一端焊接上一用于连接钢管的钢管连接套; 
步骤5,将第一根钢管的头部套上一锥形头,尾部套上一盖帽,并挂接上一滑轮组中的动滑轮,该动滑轮与位于钢管同一侧的卷扬机相连并且还通过联动装置与钢管连接以推动钢管进行顶管动作,滑轮组中的定滑轮固定在土槽中的铁桩上; 
步骤6,通过钢丝绳在卷扬机绞磨上缠绕若干圈,发动卷扬机机即可开始进行顶管操作; 
步骤7,顶入第一根钢管后,拆下尾部的盖帽,将第二根钢管的头部通过钢管连接套套入第一根钢管的尾部,然后在第二根钢管的尾部装上盖帽继续施工,依此类推,直至顶管穿越路面。 
本实施例中,钢管槽的长为6.5米,宽为1米,深度为1米;土槽的长为3米,宽为1米,深为0.5米;钢管为圆形钢管。 
以上结合实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为本发明的保护范围。 

Claims (4)

1.一种顶管的施工工艺,顶管包括钢管,其特征在于,包括以下步骤:
步骤1,在道路边的施工范围内开挖一个钢管槽,用于放置钢管;
步骤2,在所述钢管槽的后方3米处,左右两边分别固定一卷扬机;
步骤3,在钢管槽顶部,垂直于钢管槽开挖一个土槽,土槽内放置一槽钢,槽钢两侧固定有铁桩;
步骤4,在每根钢管的一端焊接上一用于连接钢管的钢管连接套;
步骤5,将第一根钢管的头部套上一锥形头,尾部套上一盖帽,并挂接上一滑轮组中的动滑轮,该动滑轮与位于钢管同一侧的所述卷扬机相连并且还通过联动装置与所述第一根钢管连接以推动钢管进行顶管动作,滑轮组中的定滑轮固定在土槽中的铁桩上;
步骤6,通过钢丝绳在卷扬机绞磨上缠绕若干圈,发动卷扬机即可开始进行顶管操作;
步骤7,顶入第一根钢管后,拆下尾部的盖帽,将第二根钢管的头部通过钢管连接套套入第一根钢管的尾部,然后在第二根钢管的尾部装上盖帽继续施工,依此类推,直至顶管穿越路面。
2.根据权利要求1所述的顶管的施工工艺,其特征在于,所述的钢管槽的长为6.5米,宽为1米,深度为1米。
3.根据权利要求1所述的顶管的施工工艺,其特征在于,所述的土槽的长为3米,宽为1米,深为0.5米。
4.根据权利要求1所述的顶管的施工工艺,其特征在于,所述的钢管为圆形钢管。
CN200910056706.9A 2009-08-20 2009-08-20 一种顶管的施工工艺 Active CN101997293B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910056706.9A CN101997293B (zh) 2009-08-20 2009-08-20 一种顶管的施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910056706.9A CN101997293B (zh) 2009-08-20 2009-08-20 一种顶管的施工工艺

Publications (2)

Publication Number Publication Date
CN101997293A CN101997293A (zh) 2011-03-30
CN101997293B true CN101997293B (zh) 2014-05-21

Family

ID=43787068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910056706.9A Active CN101997293B (zh) 2009-08-20 2009-08-20 一种顶管的施工工艺

Country Status (1)

Country Link
CN (1) CN101997293B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938703B (zh) * 2014-05-07 2015-11-25 中国五冶集团有限公司 一种顶管施工方法
CN105846361A (zh) * 2016-03-21 2016-08-10 梁红 电动矛
CN111211535B (zh) * 2020-02-22 2021-03-30 北京泰德市政工程有限公司 一种顶管装置及顶管施工工艺

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87212634U (zh) * 1987-12-17 1988-09-14 中国建筑科学研究院工程抗震研究所 穿心式顶管机
JP2003343763A (ja) * 2002-05-29 2003-12-03 C I Kasei Co Ltd 埋設管の布設方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87212634U (zh) * 1987-12-17 1988-09-14 中国建筑科学研究院工程抗震研究所 穿心式顶管机
JP2003343763A (ja) * 2002-05-29 2003-12-03 C I Kasei Co Ltd 埋設管の布設方法

Also Published As

Publication number Publication date
CN101997293A (zh) 2011-03-30

Similar Documents

Publication Publication Date Title
CN106677808B (zh) 盾构法隧道施工用负环施工方法
CN101997293B (zh) 一种顶管的施工工艺
CN201809768U (zh) U型锚头可回收预应力锚索
CN107415759A (zh) 一种电动汽车的可调节式充电桩
CN103047478B (zh) 超大直径压力钢管洞内分瓣安装方法
CN105804102A (zh) 一种双筒形锁扣桩水中围堰的施工方法
CN109356193B (zh) 一种预制管廊推送施工装置
CN202745052U (zh) 全可回收扩体锚杆
CN216663816U (zh) 一种箱梁预应力管道拔管穿束台车
CN204174706U (zh) 一种推进与卷升协同式管道置换修复装置
CN110482395B (zh) 一种盾体辅助翻身装置
CN103422508B (zh) 深基坑内支撑平台结构机械闷拆方法及结构
CN201490674U (zh) 一种用于电缆施工的顶管
CN101469542A (zh) 农田压桩工艺方法
CN205501765U (zh) 一种钢制防滑道板
CN204754778U (zh) 一种适应输电线路岩石锚杆施工的辅助定位及移动装置
CN103411027A (zh) 地下管道施工模具
CN102296610B (zh) 一种用于拔除方桩的装置和它的施工方法
CN103174138B (zh) 双向膨胀地锚
CN203174606U (zh) 双向膨胀地锚
CN204475505U (zh) 城市排水管道清通液压绞车
CN220622959U (zh) 一种综合管廊顶管施工的顶进系统
CN104989274A (zh) 一种输电线路岩石锚杆钻机定位及移动装置
CN112993868B (zh) 一种利用挖掘机履带放电缆的方法
CN211113744U (zh) 一种用于更换两个检查井之间老旧管道的非开挖施工结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: SHANGHAI SOUTH POWER SUPPLY DESIGN CO., LTD.

Free format text: FORMER OWNER: SHANGHAI JINXUAN CONSTRUCTION ENGINEERING CO., LTD.

Effective date: 20120327

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120327

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant after: Shanghai Electric Power Corporation

Co-applicant after: Shanghai South Power Supply Design Co., Ltd.

Address before: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant before: Shanghai Electric Power Corporation

Co-applicant before: Shanghai Jinxuan Construction Engineering Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI SOUTH POWER SUPPLY DESIGN CO., LTD. STATE

Free format text: FORMER OWNER: SHANGHAI SOUTH POWER SUPPLY DESIGN CO., LTD.

Effective date: 20121030

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121030

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant after: Shanghai Electric Power Corporation

Applicant after: Shanghai South Power Supply Design Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai South Power Supply Design Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant