CN101985836B - 一种桩、墙式深基坑支护结构遇大块孤石的处理方法 - Google Patents

一种桩、墙式深基坑支护结构遇大块孤石的处理方法 Download PDF

Info

Publication number
CN101985836B
CN101985836B CN2010102806584A CN201010280658A CN101985836B CN 101985836 B CN101985836 B CN 101985836B CN 2010102806584 A CN2010102806584 A CN 2010102806584A CN 201010280658 A CN201010280658 A CN 201010280658A CN 101985836 B CN101985836 B CN 101985836B
Authority
CN
China
Prior art keywords
boulder
supporting structure
pit supporting
boulder stone
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102806584A
Other languages
English (en)
Other versions
CN101985836A (zh
Inventor
邵孟新
余剑锋
钟显奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foundation Design Group Co., Ltd of Guangdong Province
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CN2010102806584A priority Critical patent/CN101985836B/zh
Publication of CN101985836A publication Critical patent/CN101985836A/zh
Application granted granted Critical
Publication of CN101985836B publication Critical patent/CN101985836B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种桩、墙式深基坑支护结构遇大块孤石的处理方法,其包括以下步骤:1、当桩、墙式深基坑支护结构施工过程中遇到孤石时,停止继续施工,并将回填土方至地面;2、采用成孔机械从地面钻孔,并钻穿孤石;3、进行孤石下方的挡土结构处理:4、继续按原设计方案从地面成孔至孤石顶面;本发明无须对孤石进行破碎处理,只是钻较小的孔钻穿孤石后进行其下方的挡土止水结构的处理,与孤石上方的原支护结构一起形成新的支护结构。该处理方式,对周边地层的造成破坏小,能有效保证周边介质的完整性及稳定性,而且施工方便、节省时间和成本、确保操作安全,从而可以广泛应用于桩、墙式深基坑支护结构遇大块孤石的处理作业上。

Description

一种桩、墙式深基坑支护结构遇大块孤石的处理方法
技术领域
[0001] 本发明涉及建筑施工领域,特别是一种桩、墙式深基坑支护结构遇大块孤石的处
理方法。
背景技术
[0002] 目前,竖向挡土或止水的深基坑支护结构所采用的不外乎冲(钻)孔排桩、地下连续墙、深层搅拌桩、旋喷桩、三轴搅拌桩、钢板桩等结构或方法,但是,在施工的过程中遇到孤石等障碍物时,人们通常采用冲锤冲击破碎、爆破、辅助措施下的人工清理等处理方法。
[0003] 其中冲锤破碎对于块径较小的石块类障碍物比较有效,可用冲锤反复冲击,将其击碎、挤出或由泥浆带出。对于块径较大的采用冲锤冲击破碎时,则存在时间长、设备损耗大、电能消耗多、经济性差等缺点,采用爆破则存在振动大、噪音大、安全隐患多、经济性差等缺点。采用人工清理则须采取降低地下水、加固土体或打设护壁钢筒等复杂的辅助措施,存在处理时间长、作业环境差、安全隐患多等缺点。
发明内容
[0004] 为了克服现有处理方法的不足,本发明提供一种成本低、工艺设备简单、操作方便、安全隐患少的桩、墙式深基坑支护结构遇大块孤石的处理方法。
[0005] 本发明解决上述技术问题所采用的技术方案是:
[0006] 一种桩、墙式深基坑支护结构遇大块孤石的处理方法,其包括以下步骤:
[0007] (1)当桩、墙式深基坑支护结构施工过程中遇到孤石时,停止继续施工,并回填土方至地面;
[0008] (2)采用成孔机械从地面钻孔,并钻穿孤石,钻孔深度应到达原设计的桩底标高或地下连续墙底标高;
[0009] (3)根据水文地质条件并经重新设计后采取以下几种方法中的一种或几种,从而在孤石的下面形成新的基坑支护结构:
[0010] ①在钻孔内直接植入或打入筋材;
[0011] ②在钻孔内植入直径小于孔径的筋材,并低压注入水泥类浆材;
[0012] ③部分钻孔按①或②的方法形成挡土结构,其余钻孔采用袖阀管注浆或花管注浆,形成止水帷幕;
[0013] ④在钻孔内植入直径小于孔径的钢管类筋材,并在钢管侧壁的一定高度范围开注浆孔,直接高压注入水泥类浆材,形成既挡土又止水的结构;
[0014] (4)在孤石的上方按照原支护结构继续施工。
[0015] 本发明的有益效果是:本发明无须对孤石进行破碎处理,只是钻较小的孔钻穿孤石后进行其下方的挡土止水结构的处理,与孤石上方的原支护结构一起形成新的支护结构。该处理方式,对周边地层的造成破坏小,能有效保证周边介质的完整性及稳定性,而且施工方便、节省时间和成本、确保操作安全,从而可以广泛应用于桩、墙式深基坑支护结构遇大块孤石的处理作业上。附图说明
[0016] 下面结合附图和实施例对本发明进一步说明。
[0017] 图1为本发明采用钻机从地面钻孔并钻穿孤石的示意图;
[0018] 图2为本发明形成挡土结构施工的示意图;
[0019] 图3为本发明开挖土方至孤石顶面的示意图;
[0020] 图4为本发明在孤石上方进行支护施工的示意图。
具体实施方式
[0021] 一种桩、墙式深基坑支护结构遇大块孤石的处理方法,其包括以下步骤:
[0022] (1)当桩、墙式深基坑支护结构施工过程中遇到孤石时,停止继续施工,并回填土方至地面;
[0023] (2)采用地质钻机、潜孔锤等成孔机械从地面钻孔,并钻穿孤石,成孔直径一般不大于180mm,钻孔深度应到达原设计的桩底标高或地下连续墙底标高;孔的排列形式可以是平行状或梅花状;参照图2 ;
[0024] (3)根据实际需要采取以下几种方法中的一种或几种进行施工,从而形成挡土止水结构:参照图3;
[0025] ①在钻孔内直接植入或打入筋材;筋材可以为钢筋、各类型钢、钢管、木、高分子合成材料;
[0026] ②在钻孔内植入直径小于孔径的筋材,并低压注入水泥类浆材;
[0027] ③在部分钻孔内按①或②形成挡土结构,其余钻孔采用袖阀管注浆或花管进行注浆,形成止水帷幕;
[0028] ④在钻孔内植入直径小于孔径的钢管类筋材,并在钢管侧壁的一定高度范围开注浆孔,直接高压注入水泥类浆材,形成既挡土又止水的结构;
[0029] (4)在孤石上方按照原支护结构进行施工至地面,即先继续开挖土方至孤石顶面,参照图4 ;再进行原支护结构施工,参照图5。
[0030] 本发明无须对孤石进行破碎处理,只是钻较小的孔钻穿孤石后进行其下方的挡土止水结构的处理,与孤石上方的原支护结构一起形成新的支护结构。该处理方式,对周边地层的造成破坏小,能有效保证周边介质的完整性及稳定性,而且施工方便、节省时间和成本、确保操作安全,从而可以广泛应用于桩、墙式深基坑支护结构遇大块孤石的处理作业上。

Claims (4)

1. 一种桩、墙式深基坑支护结构遇大块孤石的处理方法,其特征在于:包括以下步骤:(1)当桩、墙式深基坑支护结构施工过程中遇到孤石时,停止继续施工,并回填土方至地面;(2)采用成孔机械从地面钻孔,并钻穿孤石,钻孔深度应到达原设计的桩底标高或地下连续墙底标高;(3)根据水文地质条件并经重新设计后采取以下几种方法中的一种或几种,从而在孤石的下面形成新的基坑支护结构:①在钻孔内直接植入或打入筋材;②在钻孔内植入直径小于孔径的筋材,并低压注入水泥类浆材;③部分钻孔按①或②的方法形成挡土结构,其余钻孔采用袖阀管注浆或花管注浆,形成止水帷幕;④在钻孔内植入直径小于孔径的钢管类筋材,并在钢管侧壁的一定高度范围开注浆孔,直接高压注入水泥类浆材,形成既挡土又止水的结构;(4)在孤石的上方按照原支护结构继续施工。
2.根据权利要求1所述的一种桩、墙式深基坑支护结构遇大块孤石的处理方法,其特征在于:所述步骤(2)采用平行状或梅花状排列形式进行钻孔。
3.根据权利要求1所述的一种桩、墙式深基坑支护结构遇大块孤石的处理方法,其特征在于:所述步骤(2)所形成的钻孔的直径不大于180mm。
4.根据权利要求1所述的一种桩、墙式深基坑支护结构遇大块孤石的处理方法,其特征在于:所述步骤(3)的施工方式用的筋材包括钢筋、各类型钢、钢管、木、高分子合成材料。
CN2010102806584A 2010-09-10 2010-09-10 一种桩、墙式深基坑支护结构遇大块孤石的处理方法 Expired - Fee Related CN101985836B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102806584A CN101985836B (zh) 2010-09-10 2010-09-10 一种桩、墙式深基坑支护结构遇大块孤石的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102806584A CN101985836B (zh) 2010-09-10 2010-09-10 一种桩、墙式深基坑支护结构遇大块孤石的处理方法

Publications (2)

Publication Number Publication Date
CN101985836A CN101985836A (zh) 2011-03-16
CN101985836B true CN101985836B (zh) 2012-03-28

Family

ID=43710227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102806584A Expired - Fee Related CN101985836B (zh) 2010-09-10 2010-09-10 一种桩、墙式深基坑支护结构遇大块孤石的处理方法

Country Status (1)

Country Link
CN (1) CN101985836B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110578524A (zh) * 2019-08-27 2019-12-17 中交第二航务工程局有限公司 一种盾构区间密集钻孔破碎的孤石处理施工方法
CN112442991B (zh) * 2020-11-20 2021-09-07 中国长江三峡集团有限公司 一种在土层夹石块地质条件下基坑支护的方法
CN112411600B (zh) * 2020-12-11 2021-11-23 保利长大工程有限公司 一种全支结构支盘桩与孤石的组合桩基结构及孤石处治工艺
CN112942373B (zh) * 2021-02-08 2022-07-15 中交二航局成都城市建设工程有限公司 一种基坑支护结构和方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1164606A (zh) * 1996-05-07 1997-11-12 邹宗煊 建筑基础冲、钻孔灌注桩微差控制无损爆破嵌岩工艺
CN1259606A (zh) * 1999-01-01 2000-07-12 中国有色第十五冶金建设公司第一工程公司 一种深基坑砂卵砾石层套管成孔新工艺
RU2284393C1 (ru) * 2005-04-11 2006-09-27 Ооо "Уск-Спецстрой" Способ устройства котлована под фундамент
CN201512797U (zh) * 2009-09-03 2010-06-23 中国二十冶建设有限公司 土岩结合地域的旋流池基坑防护结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1164606A (zh) * 1996-05-07 1997-11-12 邹宗煊 建筑基础冲、钻孔灌注桩微差控制无损爆破嵌岩工艺
CN1259606A (zh) * 1999-01-01 2000-07-12 中国有色第十五冶金建设公司第一工程公司 一种深基坑砂卵砾石层套管成孔新工艺
RU2284393C1 (ru) * 2005-04-11 2006-09-27 Ооо "Уск-Спецстрой" Способ устройства котлована под фундамент
CN201512797U (zh) * 2009-09-03 2010-06-23 中国二十冶建设有限公司 土岩结合地域的旋流池基坑防护结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨克勤,钟鸣远,孙运清.存在大面积填石的软土场地基坑支护设计施工.《山西建筑》.2007,(第27期), *

Also Published As

Publication number Publication date
CN101985836A (zh) 2011-03-16

Similar Documents

Publication Publication Date Title
CN100501011C (zh) 钻孔压浆桩施工方法
CN105780763B (zh) 中孔振动套管护壁长螺旋钻孔压灌桩的施工方法
CN104831708A (zh) 基坑支护钻孔灌注桩施工方法及其设备
CN101985836B (zh) 一种桩、墙式深基坑支护结构遇大块孤石的处理方法
CN103046931A (zh) 一种竖井/导井冲击式钻机冲击成孔施工方法
CN105714772A (zh) 岩溶地区嵌岩桩成孔复钻砼护壁方法
CN102704480B (zh) 前端振动钢护筒处理桩基超厚流沙层施工方法
CN107489158A (zh) 一种旋挖成孔搅喷水泥土咬合帷幕桩的施工方法
CN104164873B (zh) 预应力管桩及其施工方法
CN108397128A (zh) 一种桥梁施工打孔装置及其打孔方法
CN206090565U (zh) 混凝土桩的施工设备
CN203584301U (zh) 引孔设备
CN205260041U (zh) 一种水平旋喷冻结法支护结构
CN110306540A (zh) 一种全回转套管桩基成孔的施工方法
CN204252120U (zh) 混凝土桩的施工装置
CN204401612U (zh) 一种超大直径全钢护筒干作业成孔灌注桩施工装置
CN107700508A (zh) 一种型钢搅喷水泥土帷幕支护桩的施工方法
CN105113976A (zh) 钢丝刷钻头回旋钻机及解决埋钻、掉钻、卡钻的方法
CN105586978A (zh) 基于砾石的换土搅拌止水帷幕施工方法
CN204782730U (zh) 钢丝刷钻头回旋钻机
CN204225100U (zh) 混凝土桩的施工装置
CN110939161B (zh) 一种大直径嵌岩抗浮锚杆的施工方法及用于该方法中的钻具
CN106193038A (zh) 混凝土桩的施工设备及其施工方法
CN111501781A (zh) 一种杂填土超深基坑固结注浆结合双排钢管桩支护方法及结构
CN202659139U (zh) 风动搅拌钻渣装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: GUANGDONG PROV. FOUNDATION ENGINEERING CO.

CP01 Change in the name or title of a patent holder

Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee after: Foundation Design Group Co., Ltd of Guangdong Province

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee before: Guangdong Prov. Foundation Engineering Co.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120328

Termination date: 20200910

CF01 Termination of patent right due to non-payment of annual fee