CN101985170A - Method for laying bottom of prefabricated block ladle by using small building blocks - Google Patents

Method for laying bottom of prefabricated block ladle by using small building blocks Download PDF

Info

Publication number
CN101985170A
CN101985170A CN 201010230654 CN201010230654A CN101985170A CN 101985170 A CN101985170 A CN 101985170A CN 201010230654 CN201010230654 CN 201010230654 CN 201010230654 A CN201010230654 A CN 201010230654A CN 101985170 A CN101985170 A CN 101985170A
Authority
CN
China
Prior art keywords
ladle
bag
laying
wall
small
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010230654
Other languages
Chinese (zh)
Inventor
侯振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU ZHENDONG ABRASIVE MATERLS CO Ltd
Original Assignee
ZHENGZHOU ZHENDONG ABRASIVE MATERLS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU ZHENDONG ABRASIVE MATERLS CO Ltd filed Critical ZHENGZHOU ZHENDONG ABRASIVE MATERLS CO Ltd
Priority to CN 201010230654 priority Critical patent/CN101985170A/en
Publication of CN101985170A publication Critical patent/CN101985170A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Ceramic Products (AREA)

Abstract

The invention discloses a method for laying the bottom of a prefabricated block ladle by using small building blocks. The method comprises the following steps of: vertically laying the bottom with small upright prefabricated blocks after an inner lining of the wall of the ladle is laid; reserving a gap of 40 to 50mm between the periphery of the bottom and the wall; and filling the gap with corundum-spinel castable and laying two layers of bricks along an annular joint of the bottom and the wall after the bottom is laid. The method has the advantages that: 1, the upright small prefabricated blocks are fired at high temperature, have high strength and low residual moisture, are suitable for rapid baking and quicken the turnover of the ladle; 2, because the bottom of the ladle is formed by laying a plurality of upright small fabricated blocks, the thermal stress can be uniformly dispersed during use and the bottom of the ladle has high high-temperature volumetric stability; 3, a comprehensive laying process is flexibly used to prolong the comprehensive ladle life of the ladle; 4, the bottom of the ladle is convenient to disassemble and maintain, and partial maintenance or replacement is realized; and 5, the use safety of the ladle is improved and a steel drilling accident of the bottom is prevented.

Description

Adopt the method for little building block at the bottom of the prefabricated section ladle bag
Technical field
The present invention relates to be used for the ladle of converter, especially relate to the method that adopts little building block at the bottom of the prefabricated section ladle bag.
Background technology
Routine is used for the prefabricated section ladle of converter, integrated poured, large scale prefabricated or large scale prefabricated method that combines with cast of its general employing in bag end.There is following outstanding problem in said method: 1, large scale prefabricated single-piece weight is big, and surface area is big, and volumetric expansion that produces in baking and use and contraction concentrate on around the prefabricated section; After repeatedly using, easily produce big thermal stress at periphery, easily make peripheral refractory material fall piece and come off.2, peripheral corundum spinelle waters material feeding owing to add water at the scene and mix, and there is bigger performance difference in the prefabricated component of crossing with the refractory factory high-temperature baking, and the coefficient of expansion and water content are inconsistent, is difficult to reach the basically identical of performance at the bottom of the whole bag in the bake process.3, large scale prefabricated periphery uses corundum pouring material in a large number, is subject to factor affecting such as on-the-spot temperature, execution conditions, baking, goods resting period; 5, the ladle baking time long, be unfavorable for ladle turnover; What is more important, the prefabricated section baking needs the rational heating curve of control, could guarantee that implosion does not appear in goods in baking; Cause goods crackle to occur but in the bake process of production scene, often can't accurately control, occur explosion when serious, safety in production is threatened big because of baking temperature.6, ladle remove, difficult in maintenance, can not locally safeguard or change, workman's labour intensity of constructing is big.
Summary of the invention
Adopt the method for little building block at the bottom of the prefabricated section ladle bag that the object of the present invention is to provide long service life at the bottom of a kind of ladle bag, is easy to safeguard.
For achieving the above object, the present invention can take following technical proposals:
Adopt the method for little building block at the bottom of the prefabricated section ladle bag of the present invention, after the ladle wall liner finished building, the little prefabricated section laid on end of keeping straight on was adopted at the bag end; Reserve the gap of 40mm-50mm between bag bottom perimeter and the bag wall, adopt corundum spinelle to water material feeding and fill, the bag end, finishes building the back and builds two-layer brick along the bag end with the girth joint of wrapping wall and get final product.
The cuboid refractory brick that the little prefabricated section of described craspedodrome is made for the corundum spinelle material, its length is of a size of: 200-400mm, 200-400,80-200mm.
The present invention is because the mode that the little prefabricated section of taking at the bottom of the firm bag bag to keep straight on is built by laying bricks or stones, so its advantage is mainly reflected in following several respects:
1, the little prefabricated section of described craspedodrome burns till through high temperature, the intensity height, and residual moisture is little, is suitable for quick baking, has accelerated the turnover of ladle;
2, owing to adopt the polylith little prefabricated section of keeping straight on to be built at the bottom of the ladle bag, so the thermal stress in the use can evenly disperse, and has the good high-temperature volume stability at the bottom of making the ladle bag;
3, can adopt integrated masonry technology flexibly, thereby improve the comprehensive suite age of ladle;
4, the dismounting at the bottom of the ladle bag, easy to maintenance has realized local maintenance or replacing;
5, improve the safety in utilization of ladle, stopped the generation of bag subdrilling steel accident.
Description of drawings
Fig. 1 is the ladle structure of ladle bottom schematic diagram of building by laying bricks or stones according to the inventive method.
The specific embodiment
As shown in the figure, adopt the method for little building block at the bottom of the prefabricated section ladle bag of the present invention, be ladle wall liner 1 build by laying bricks or stones finish after, the bag end little prefabricated section 2 of adopt keeping straight on carries out laid on end; The cuboid refractory brick that the little prefabricated section 2 of described craspedodrome adopts existing corundum spinelle material to make, its length is of a size of: 300mm, 250mm, 100mm.When building by laying bricks or stones, reserve the gap of 40mm-50mm between bag bottom perimeter and the bag wall, adopt corundum spinelle to water material feeding 3 in the gap in and fill, build by laying bricks or stones and finish the edge, back and wrap the end and wrap the girth joint that forms between the wall and build two-layer corundum spinelle refractory brick 4 by laying bricks or stones and get final product at the bag end.

Claims (2)

1. adopt the method for little building block at the bottom of the prefabricated section ladle bag, it is characterized in that: after ladle wall liner (1) finished building, little prefabricated section (2) laid on end of keeping straight on was adopted at the bag end; Reserve the gap of 40mm-50mm between bag bottom perimeter and the bag wall, adopt corundum spinelle to water material feeding (3) and fill, the bag end, finishes building the back and builds two-layer brick (4) along the bag end with the girth joint of wrapping wall and get final product.
2. according to the method that adopts little building block at the bottom of the right 1 described prefabricated section ladle bag, it is characterized in that: the cuboid refractory brick that the little prefabricated section of described craspedodrome (2) is made for the corundum spinelle material, its length is of a size of: 200-400mm, 200-400,80-200mm.
CN 201010230654 2010-07-20 2010-07-20 Method for laying bottom of prefabricated block ladle by using small building blocks Pending CN101985170A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010230654 CN101985170A (en) 2010-07-20 2010-07-20 Method for laying bottom of prefabricated block ladle by using small building blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010230654 CN101985170A (en) 2010-07-20 2010-07-20 Method for laying bottom of prefabricated block ladle by using small building blocks

Publications (1)

Publication Number Publication Date
CN101985170A true CN101985170A (en) 2011-03-16

Family

ID=43709596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010230654 Pending CN101985170A (en) 2010-07-20 2010-07-20 Method for laying bottom of prefabricated block ladle by using small building blocks

Country Status (1)

Country Link
CN (1) CN101985170A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102500752A (en) * 2011-11-10 2012-06-20 武汉钢铁(集团)公司 Masonry process adopting encircling bricks of steel ladles for continuous steel casting
CN114603128A (en) * 2022-03-22 2022-06-10 重庆钢铁股份有限公司 Building and maintaining method of ladle capable of being put into service in short time

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60247464A (en) * 1984-05-24 1985-12-07 Nippon Kokan Kk <Nkk> Heater for lining of metallurgical pan
CN86210609U (en) * 1986-12-23 1987-12-16 东北耐火材料厂 Oil-immersed al-mg material concrete prefabricated steel liner
JPH02165863A (en) * 1988-12-15 1990-06-26 Sumitomo Metal Ind Ltd Lining structure for bottom of ladle of false bottom type
CN2905275Y (en) * 2006-04-06 2007-05-30 武汉威林炉衬材料有限责任公司 Liner of molten steel container and molten iron container
CN201423442Y (en) * 2009-05-06 2010-03-17 鞍山市量子炉材集团有限公司 Compound safety ladle lining
CN101700572A (en) * 2009-11-20 2010-05-05 武汉钢铁(集团)公司 Method for building container bottom of carbon-containing molten steel container

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60247464A (en) * 1984-05-24 1985-12-07 Nippon Kokan Kk <Nkk> Heater for lining of metallurgical pan
CN86210609U (en) * 1986-12-23 1987-12-16 东北耐火材料厂 Oil-immersed al-mg material concrete prefabricated steel liner
JPH02165863A (en) * 1988-12-15 1990-06-26 Sumitomo Metal Ind Ltd Lining structure for bottom of ladle of false bottom type
CN2905275Y (en) * 2006-04-06 2007-05-30 武汉威林炉衬材料有限责任公司 Liner of molten steel container and molten iron container
CN201423442Y (en) * 2009-05-06 2010-03-17 鞍山市量子炉材集团有限公司 Compound safety ladle lining
CN101700572A (en) * 2009-11-20 2010-05-05 武汉钢铁(集团)公司 Method for building container bottom of carbon-containing molten steel container

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102500752A (en) * 2011-11-10 2012-06-20 武汉钢铁(集团)公司 Masonry process adopting encircling bricks of steel ladles for continuous steel casting
CN114603128A (en) * 2022-03-22 2022-06-10 重庆钢铁股份有限公司 Building and maintaining method of ladle capable of being put into service in short time
CN114603128B (en) * 2022-03-22 2023-08-18 重庆钢铁股份有限公司 Ladle masonry and maintenance method capable of being used in short time

Similar Documents

Publication Publication Date Title
CN103033043B (en) Method for laying refractory bricks of large variable diameter part of 12,000t/d rotary kiln
CN204438753U (en) Inner liner of rotary kiln structure
CN101514870B (en) Construction method for manufacturing working layer of annular heating furnace by utilizing timber shuttering and profile steel
CN102554201A (en) Large steel ladle and manufacturing method for same
CN103785820B (en) A kind of ladle permanent liner and preparation method thereof
CN106595314A (en) Rotary kiln liner structure and laying method
CN101985170A (en) Method for laying bottom of prefabricated block ladle by using small building blocks
CN107795976A (en) Lining building structure and building method for inlet flue of coke dry quenching waste heat boiler
CN104265055A (en) Chimney construction method
CN203501785U (en) Suspended precast block and one-piece casting combined furnace top construction
CN102183146A (en) Integral casting technology of vertical limekiln working lining
CN202804169U (en) Novel steel ladle permanent layer structure
CN103433472A (en) Expansion ladle
CN203731863U (en) Medium-frequency induction furnace liner built with machine press burnt bricks and induction furnace
CN202182612U (en) Lining structure of vertical lime pit
CN102798288A (en) Novel wholly prefabricated tuyere of rotary kiln
CN202648376U (en) Transportation chute of rotary kiln
CN204901778U (en) Waste incinerator that compound prefabricated section of utilization was built by laying bricks or stones
CN203586820U (en) Pre-buried lifting device for prefabricated member
CN102297595A (en) Method for quickly replacing burner block of annular heating furnace
CN204535408U (en) Masonry structure for preventing rotary kiln from falling bricks and reducing gas consumption
CN103423999B (en) Charging end wall for heating furnace and construction method of charging end wall
CN205843373U (en) A kind of bottom construction of fused magnesite electric melting furnace
CN203866243U (en) High-temperature-resistant expansion joint for dry quenching
CN207308957U (en) Improved continuous casting production

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110316