CN101980407A - Quick install substation - Google Patents
Quick install substation Download PDFInfo
- Publication number
- CN101980407A CN101980407A CN 201010509791 CN201010509791A CN101980407A CN 101980407 A CN101980407 A CN 101980407A CN 201010509791 CN201010509791 CN 201010509791 CN 201010509791 A CN201010509791 A CN 201010509791A CN 101980407 A CN101980407 A CN 101980407A
- Authority
- CN
- China
- Prior art keywords
- module
- transformer
- room
- voltage
- substation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 238000002955 isolation Methods 0.000 claims description 5
- 238000004891 communication Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims 1
- 238000012423 maintenance Methods 0.000 abstract description 5
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 230000009466 transformation Effects 0.000 abstract description 2
- 239000002699 waste material Substances 0.000 abstract description 2
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000007306 turnover Effects 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 210000004907 gland Anatomy 0.000 description 2
- 238000005286 illumination Methods 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Housings And Mounting Of Transformers (AREA)
Abstract
The invention discloses a quickly-assembled transformer substation, which relates to the technical field of electric transmission and transformation. The conventional transformer substation is constructed as a fixed facility and cannot quickly satisfy urgent power supply needs, and when an electrical environment is changed, the workload of disassembling equipment or increasing the capacity of the equipment is high and investment waste can be caused by plenty of equipment which cannot be reused. The quickly-assembled transformer substation comprises a transformer, a split radiator, a substation power supply room, a medium-voltage room and a central control room, and is characterized in that: the substation power supply room is arranged in a box-type substation power supply module; the medium-voltage room is arranged in a box-type medium-voltage room module; the central control room is arranged in a box-type central control room module; the transformer is connected with a hybrid gas insulated switchgear to form a transformer combined apparatus switch module; and the substation power supply room module, the medium-voltage room module, the central control room module and the transformer combined apparatus switch module are independently arranged and fixed respectively. The technical scheme has the advantages of small floor space, compact structure, less maintenance and high system reliability; and the quickly-assembled transformer substation is convenient to assemble and disassemble.
Description
Technical field
The present invention relates to the power transmission and transformation technical field, refer to transformer station especially
Background technology
At present, China's 110-220kV electricity substation adopts basically is traditional AIS transformer station, this transformer station has layout complexity, floor space, the construction period is long and the big characteristics of site operation amount, a small amount of transformer station that adopts GIS combined electrical apparatus technology, operational reliability and floor space have bigger improvement, but with high costs, later maintenance is had relatively high expectations.These transformer stations (comprising the transformer station that adopts GIS combined electrical apparatus technology) build by fixation means, if power demands urgently can't be tackled fast, in case power utilization environment changes, equipment remove or the increase-volume workload greatly, can't also can cause the investment waste by reusable equipment in a large number.
Summary of the invention
The technical assignment of the technical problem to be solved in the present invention and proposition is that the prior art scheme is improved and improved, and a kind of ready-package transformer station is provided, and floor space is little to reach, compact conformation, fast assembling and disassembling, maintenance are few, the high purpose of system reliability.For this reason, the present invention takes following technical scheme.
Ready-package transformer station comprises transformer, split type radiator, stands with power supply room, middle pressure chamber, Central Control Room, it is characterized in that: box station is located at in the power supply room module with power supply room in described station; Press the chamber to be located at box middle the pressure in the room module in described; Described Central Control Room is located in the box Central Control Room module; Described transformer is connected with hybrid gas-insulated switchgear (HGIS) and constitutes transformer combination appliance switch module; Described station installs and fixes separately respectively with power module, middle pressure room module, Central Control Room module and transformer combination appliance switch module.Transformer combination appliance switch module, box station are all finished installation in factory with power supply room, box middle chamber, the box Central Control Room module of pressing, and integral device is finished debugging in factory.Transformer station forms module difference whole Transporting to the transformer station scene, the on-the-spot facilities such as turnover bus lead-in rack, ground network, cable trough and Equipment Foundations of only need building in advance, equipment only needs behind the scene each module in place fixing, transformer connects to be connected with control cable plug (seat) etc. to middle pressure and simply is electrically connected, do not need to carry out again secondary cable dial line, to line, do the first-class work of cable, the problem of wrong plug also can not take place, and the on-site installation work amount has dropped to minimum level.The transformer primary side is hung local 110KV, 220KV power network, and secondary side output can connect local with electric unit or distribution substation of subordinate.Closely be connected by the oil gas sleeve pipe between HGIS and the transformer, can separate fast and make up in case of necessity.When power utilization environment changes or power supply stops temporarily, can separate each module fast, for whole unit entrucking transportation, rearrange assembling with the module in new site, enable rapidly.The part modularization of transformer station, more compact structure, fast assembling and disassembling, maintenance are few, the system reliability height.
As the further of technique scheme improved and replenish, the present invention also comprises following additional technical feature.
Described box station all is arranged in independent container-type casing with power supply room module, box middle room module, the box Central Control Room module of pressing, casing is provided with the antitheft door of entering the room, casing collet and structural member are made of channel-section steel and angle steel, and outer body of wall, interior partition, floor and case top are made of steel plate.Box shape size and structural strength can satisfy the integral automobile requirements on transport.
Stand and be divided into several chambers in the casing with the power supply room module, antitheft chamber door is all installed in every chamber, indoor have respectively transformer station with distribution transformer, stand with uprising the cabinet that compresses switch, standing with step-down compress switch cabinet, direct current cabinet and spare unit instrument, the AC and DC power supply and the Anykit Spare Part Tool that can provide substation illumination and equipment to use.
Central Control Room is the central control room of transformer station, and measurement, protection, control and the demonstration of the built-in high pressure of Central Control Room modular tank, middle pressure and transformer station's usefulness power supply and communication, surveillance are used to accept the feedback information of each module and control other module operation.
The middle pressure installed Medium Voltage Switchgear in the room module casing, the switch cubicle inlet wire connects Circuit Fault on Secondary Transformer, and outlet is connected with the outlet of transformer station.
The holding wire of intermodule, control line and power line all adopt the aviation connector to realize on-the-spot assembling fast.The aviation plug that secondary partly uses is one to one, do not need to carry out again secondary cable dial line, to line, do the first-class work of cable, the problem of wrong plug also can not take place, the on-site installation work amount has dropped to minimum level.
Transformer combination appliance switch module comprises high pressure isolation and earthed switch system, circuit breaker, current/voltage transducer, high-voltage arrester and transformer, its mesohigh is isolated and earthed switch system, circuit breaker, current/voltage sensor groups are combined in the hybrid gas-insulated switchgear of formation in the gas closed container, and described hybrid gas-insulated switchgear is connected with bus with the inlet wire of transformer station by bushing; Soak transformer oil in the transformer, the primary side of transformer is connected with hybrid gas-insulated switchgear firmly by the oil gas sleeve pipe, and gland is drawn in the secondary side warp of transformer, is connected by the Medium Voltage Switchgear of cable with middle pressure chamber.Closely be connected by the oil gas sleeve pipe between HGIS and the transformer, can separate fast and make up in case of necessity.
Described transformer connects a split type heat spreader module, and split type heat spreader module comprises fan-cooled radiator, blower fan, oil pump, isolating valve and connect oil pipe that split type heat spreader module and transformer are flexible coupling by the turnover oil pipe.
Transformer station also has good autgmentability, and can expand increases box compensated chamber module and box ground connection change room module.
Beneficial effect: the part modularization of transformer station, more compact structure, floor space is little, and fast assembling and disassembling, maintenance are few, the system reliability height.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is that the A of Fig. 1 is to structural representation.
Among the figure: the 1-transformer; The 2-radiator; 3-house transformer room module; Press room module among the 4-; 5-Central Control Room module; The hybrid gas-insulated switchgear of 6-; 7-oil gas sleeve pipe; The 8-lightning arrester.
Embodiment
Below in conjunction with Figure of description technical scheme of the present invention is described in further detail.
The present invention includes transformer 1, split type radiator 2, stand, stand and be located at box station with in the power supply room module 3 with power supply room with power supply room, middle pressure chamber, Central Control Room; Box middle the pressure in the room module 4 is located in the middle chamber of pressing; Central Control Room is located in the box Central Control Room module 5; Transformer 1 is connected with hybrid gas-insulated switchgear 6(HGIS) formation transformer combination appliance switch module; Stand and install and fix separately respectively with power module 3, middle pressure room module 4, Central Control Room module 5 and transformer combination appliance switch module.Box station all is arranged in independent casing with power supply room module 3, box middle room module 4, the box Central Control Room module 5 of pressing, casing is provided with the antitheft door of entering the room, casing collet and structural member are made of channel-section steel and angle steel, and outer body of wall, interior partition, floor and case top are made of steel plate.
Wherein the station is divided into several chambers with the casing of power supply room module 3, antitheft chamber door is all installed in every chamber, indoor have respectively transformer station with distribution transformer, stand with uprising the cabinet that compresses switch, standing with step-down compress switch cabinet, direct current cabinet and spare unit instrument, the AC and DC power supply and the Anykit Spare Part Tool that can provide substation illumination and equipment to use.
Middle pressure chamber is the central control room of transformer station, and measurement, protection, control and the demonstration of the built-in high pressure of middle pressure room module 4 casings, middle pressure and transformer station's usefulness power supply and communication, surveillance are used to accept the feedback information of each module and control other module operation.
The middle pressure installed Medium Voltage Switchgear in room module 4 casings, the switch cubicle inlet wire connects transformer 1 secondary side, and outlet is connected with the outlet of transformer station.
The holding wire of intermodule, control line and power line all adopt the aviation connector to realize on-the-spot assembling fast.
Transformer combination appliance switch module comprises high pressure isolation and earthed switch system, circuit breaker, current/voltage transducer, high-voltage arrester 8 and transformer 1, its mesohigh is isolated and earthed switch system, circuit breaker, current/voltage transducer are located at the hybrid gas-insulated switchgear 6 of formation in the gas closed container, and hybrid gas-insulated switchgear 6 is connected with bus with the inlet wire of transformer station by bushing; Soak transformer oil in the transformer 1, the primary side of transformer 1 is connected with hybrid gas-insulated switchgear 6 firmly by oil gas sleeve pipe 7, and gland is drawn in the secondary side warp of transformer 1, is connected by the Medium Voltage Switchgear of cable with middle pressure chamber.
Transformer 1 connects split type radiator 2 modules, and split type radiator 2 modules comprise fan-cooled radiator 2, blower fan, oil pump, isolating valve, connection oil pipe, and split type radiator 2 modules and transformer 1 are flexible coupling by the turnover oil pipe.
Also can set up box compensated chamber module and box ground connection becomes room module according to actual power utilization environment transformer station.
Installation process:
1. the as a whole modular unit of transformer 1 and HGIS connects composite test in factory by oil gas sleeve pipe 7;
2. to remove oil conservator and HGIS from transformer 1 body when transformer 1 transports, with convenient transportation;
3. after transporting to the scene, each module is in place respectively to ready-made basis, fixing and with equipment ground;
4. connect circuit and secondary line, can prepare after the on-the-spot test to send.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010509791 CN101980407A (en) | 2010-10-15 | 2010-10-15 | Quick install substation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010509791 CN101980407A (en) | 2010-10-15 | 2010-10-15 | Quick install substation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN101980407A true CN101980407A (en) | 2011-02-23 |
Family
ID=43600899
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201010509791 Pending CN101980407A (en) | 2010-10-15 | 2010-10-15 | Quick install substation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101980407A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102611018A (en) * | 2012-01-18 | 2012-07-25 | 浙江省电力设计院 | Method for integrated and united arrangement for transformer and GIS (Gas Insulated Switchgear) of intelligent substation |
| CN105449536A (en) * | 2014-08-29 | 2016-03-30 | 西门子公司 | High-voltage combined electrical apparatus |
| CN105743005A (en) * | 2014-12-11 | 2016-07-06 | 中电新源智能电网科技有限公司 | Combined type transformer |
| CN107069510A (en) * | 2017-04-27 | 2017-08-18 | 国网冀北电力有限公司唐山供电公司 | A kind of container-type socket transformer station and its assemble method |
| CN107104380A (en) * | 2017-01-24 | 2017-08-29 | 国网福建省电力有限公司 | The boosting transformer and its installation method of a kind of new structure |
| CN109653549A (en) * | 2017-10-10 | 2019-04-19 | 湘能楚天电力有限公司 | A kind of magic cube type integrated transformer substation |
| CN113889891A (en) * | 2021-10-29 | 2022-01-04 | 广东电网有限责任公司 | Transformer substation in transformer area |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2362214Y (en) * | 1999-01-29 | 2000-02-02 | 高密市供电局 | Container-type substation |
| CN2409682Y (en) * | 2000-02-03 | 2000-12-06 | 包银荣 | Combined transformer substation |
| CN101150246A (en) * | 2006-09-22 | 2008-03-26 | 北京科锐北方科技发展有限公司 | 110kV and above modular substation and its construction method |
| CN1674376B (en) * | 2004-03-25 | 2010-09-08 | Abb技术有限公司 | High voltage outdoor substation |
-
2010
- 2010-10-15 CN CN 201010509791 patent/CN101980407A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2362214Y (en) * | 1999-01-29 | 2000-02-02 | 高密市供电局 | Container-type substation |
| CN2409682Y (en) * | 2000-02-03 | 2000-12-06 | 包银荣 | Combined transformer substation |
| CN1674376B (en) * | 2004-03-25 | 2010-09-08 | Abb技术有限公司 | High voltage outdoor substation |
| CN101150246A (en) * | 2006-09-22 | 2008-03-26 | 北京科锐北方科技发展有限公司 | 110kV and above modular substation and its construction method |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102611018A (en) * | 2012-01-18 | 2012-07-25 | 浙江省电力设计院 | Method for integrated and united arrangement for transformer and GIS (Gas Insulated Switchgear) of intelligent substation |
| CN105449536A (en) * | 2014-08-29 | 2016-03-30 | 西门子公司 | High-voltage combined electrical apparatus |
| US10038312B2 (en) | 2014-08-29 | 2018-07-31 | Siemens Aktiengesellschaft | High-voltage combined electrical apparatus |
| CN105743005A (en) * | 2014-12-11 | 2016-07-06 | 中电新源智能电网科技有限公司 | Combined type transformer |
| CN107104380A (en) * | 2017-01-24 | 2017-08-29 | 国网福建省电力有限公司 | The boosting transformer and its installation method of a kind of new structure |
| CN107069510A (en) * | 2017-04-27 | 2017-08-18 | 国网冀北电力有限公司唐山供电公司 | A kind of container-type socket transformer station and its assemble method |
| CN109653549A (en) * | 2017-10-10 | 2019-04-19 | 湘能楚天电力有限公司 | A kind of magic cube type integrated transformer substation |
| CN113889891A (en) * | 2021-10-29 | 2022-01-04 | 广东电网有限责任公司 | Transformer substation in transformer area |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101980407A (en) | Quick install substation | |
| CN110299850B (en) | High-power traction auxiliary converter | |
| CN201708450U (en) | Direct-connecting structure for total box GIS (Geographic Information System) bus and junction box feeder transformer | |
| CN207039041U (en) | A modular prefabricated substation | |
| CN102652388A (en) | Apparatus, system and method employing ups | |
| CN103001134B (en) | Transformer station | |
| CN115792310B (en) | On-site experiment device and method for switching all-in-one machine | |
| CN209217550U (en) | Three-dimensional building block box type substation | |
| CN101150246B (en) | 110kV and higher modular transformer substation and its construction method | |
| CN201966525U (en) | Ready-package transformer substation | |
| CN211530520U (en) | Modular box transformer substation of power distribution device | |
| CN205543910U (en) | A compact box-type substation | |
| CN202616606U (en) | Intelligent box-type demarcation switch | |
| CN110474240B (en) | Modular box transformer substation of power distribution device | |
| CN101888066B (en) | Fully insulated buried substation | |
| CN204633201U (en) | A kind of totally-enclosed all insulation compact Inflatable ring main unit | |
| CN203747282U (en) | Armored moved type AC metal enclosed switchgear | |
| CN203445433U (en) | American ring main unit with insulation protective cover | |
| CN105490196A (en) | A compact box-type substation | |
| CN107658732A (en) | A kind of assembled power distribution equipment | |
| CN204304298U (en) | A kind of box-shaped fixed type alternating current metal closed switch | |
| CN104134537A (en) | Integrated power capacitor compensation device | |
| CN205282406U (en) | Circuit breaker adaptation seat | |
| CN209948678U (en) | A capacitor switching module for JP cabinet | |
| CN209913283U (en) | A modular integrated, quick-plug, mobile power protection system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110223 |