CN101975699B - 钢瓶水压试验装置 - Google Patents

钢瓶水压试验装置 Download PDF

Info

Publication number
CN101975699B
CN101975699B CN2010105319570A CN201010531957A CN101975699B CN 101975699 B CN101975699 B CN 101975699B CN 2010105319570 A CN2010105319570 A CN 2010105319570A CN 201010531957 A CN201010531957 A CN 201010531957A CN 101975699 B CN101975699 B CN 101975699B
Authority
CN
China
Prior art keywords
pressure
test
pipeline
water
steel cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010105319570A
Other languages
English (en)
Other versions
CN101975699A (zh
Inventor
惠康生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIANYUNGANG TIANYI FIRE FIGHTING EQUIPMENT CO Ltd
Original Assignee
LIANYUNGANG TIANYI FIRE FIGHTING EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANYUNGANG TIANYI FIRE FIGHTING EQUIPMENT CO Ltd filed Critical LIANYUNGANG TIANYI FIRE FIGHTING EQUIPMENT CO Ltd
Priority to CN2010105319570A priority Critical patent/CN101975699B/zh
Publication of CN101975699A publication Critical patent/CN101975699A/zh
Application granted granted Critical
Publication of CN101975699B publication Critical patent/CN101975699B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明是一种钢瓶水压试验装置,其特征在于:包括试压水箱、测试管路和回水管,测试管路的进水端上依次设有试压泵、单向阀、电控压力表和蓄能器,测试管路上还串接设有若干个试压器,所述的试压器包括电磁阀和试压管,电磁阀还分别与测试管路、回水管以及试压管连接,试压管上设有与钢瓶瓶嘴相配合试压管接头,所述的试压管上还连接设有试验压力表;它还设有标准测试管路,标准测试管路上设有标准压力表,标准测试管路还与试验压力表连接、并在其连接管路上设有截止阀,所述的进水端通入试压水箱。其结构简单,使用方便,能够对钢瓶进行自动测压、报警。同时节约了能源,降低了工人的劳动强度,提高了工作效率。

Description

钢瓶水压试验装置
技术领域
 本发明涉及一种水压试验装置,特别是一种钢瓶水压试验装置。
背景技术
作为一种对安全性能要求较高的压力容器,手提式灭火器钢瓶或类似容器的测试包括水压试验。水压试验的主要目的在于检查瓶体和焊缝有无泄漏和瓶体有无变形。
现在人们在进行水压试验时,主要是依靠人工操作,不能实现对钢瓶进行自动测压、报警等操作。这种方法不仅劳动强度大,工作效率低,而且操作不规范容易造成试验结果误差大,同时不利于大规模生产检测。
发明内容
本发明所要解决的技术问题是针对现有技术的不足,提供一种使用方便,能够对钢瓶进行自动测压的钢瓶水压试验装置。
本发明所要解决的技术问题是通过以下的技术方案来实现的。本发明是一种钢瓶水压试验装置,其特点是:包括试压水箱、测试管路和回水管,测试管路的进水端上依次设有试压泵、单向阀、电控压力表和蓄能器,测试管路上还串接设有若干个试压器,所述的试压器包括电磁阀和试压管,电磁阀还分别与测试管路、回水管以及试压管连接,试压管上设有与钢瓶瓶嘴相配合的试压管接头,所述的试压管上还连接设有试验压力表;它还设有标准测试管路,标准测试管路上设有标准压力表,标准测试管路还与试验压力表连接、并在其连接管路上设有截止阀,所述的进水端通入试压水箱。
本发明所要解决的技术问题还可以通过以下的技术方案来进一步实现。以上所述的钢瓶水压试验装置,其特点是:所述的回水管的回水端通入试压水箱。
本发明所要解决的技术问题还可以通过以下的技术方案来进一步实现。以上所述的钢瓶水压试验装置,其特点是:它还设有储水水箱,储水水箱内设有电加热器。
本发明所要解决的技术问题还可以通过以下的技术方案来进一步实现。以上所述的钢瓶水压试验装置,其特点是:在连接测试管路与试压器的管路上设有继电器,继电器与报警器连接。
与现有技术相比,本发明通过试压泵把水从试压水箱内抽出通过蓄能器和电磁阀给被测试钢瓶加压,后保压1分钟,观察试验压力表,试压完成后通过电磁阀泄压,同时将水通过回水管放出。其一次可以同时给4-10个钢瓶进行试压,每天可试压3000个左右钢瓶。其结构简单,使用方便,能够对钢瓶进行自动测压、报警。同时节约了能源,降低了工人的劳动强度,提高了工作效率。
附图说明
图1为本发明的原理图。
具体实施方式
以下参照附图,进一步描述本发明的具体技术方案,以便于本领域的技术人员进一步地理解本发明,而不构成对其权利的限制。
实施例1。参照图1。一种钢瓶水压试验装置,包括试压水箱1、测试管路12和回水管13,测试管路12的进水端上依次设有试压泵2、单向阀3、电控压力表4和蓄能器5,测试管路12上还串接设有若干个试压器,所述的试压器包括电磁阀8和试压管,电磁阀8还分别与测试管路12、回水管13以及试压管连接,试压管上设有与钢瓶11瓶嘴相配合的试压管接头,所述的试压管上还连接设有试验压力表10;它还设有标准测试管路,标准测试管路上设有标准压力表7,标准测试管路还与试验压力表10连接、并在其连接管路上设有截止阀6,所述的进水端通入试压水箱1。
实施例2。实施例1所述的钢瓶11水压试验装置中:所述的回水管13的回水端通入试压水箱1。这样试压水箱1内的水就可以循环使用了。
实施例3。实施例1所述的钢瓶11水压试验装置中:它还设有储水水箱,储水水箱内设有电加热器。这样在水温较低的情况下,加热储水水箱内的水使达到试验所需的温度。
实施例4。实施例1所述的钢瓶11水压试验装置中:在连接测试管路12与试压器的管路上设有继电器9,继电器9与报警器连接。继电器9根据电控压力表4给出的电信号,启动报警器报警。
实施时,先将储水水箱内一定温度的水注满手提式灭火器钢瓶11或类似容器,后将注满水的钢瓶11瓶嘴与试压管接头相连。接通电源通过电动试压泵2向系统加压,同时蓄能器5贮存压力,当压力升高到电控压力表4额定压力的上限时,电控压力表4发出电信号,切断试压泵2电源;此时系统靠蓄能器5释放的压力继续工作。当系统内压力到达电控压力表4额定压力的下限时,电控压力表4发出信号,接通试压泵2电源向系统加压,如此循环直到试压结束。由于加装了蓄能器5,可以使系统节能60%以上。
系统内的压力通过试压器的电磁阀8给钢瓶11加压,观察试验压力表10,当压力达到2.1MPa时,保压1分钟。保压过程中如有泄漏,电控压力表4就会给继电器9电信号,继电器9就会启动报警器进行报警,从而引起试压人员的注意。若没有泄漏,再通过电磁阀8进行泄压,泄压的水通过回水管13流出。试压结束后再将钢瓶11内的水放进储水水箱内,实现储水水箱内的水和热量的循环利用。
为提高工作效率,增加测试结果的可靠性,它还设有标准测试管路,标准测试管路上设有标准压力表7。标准压力表7起校对作用,这样可以随时对试验压力表10进行校对,保证了测试结果的可靠性。

Claims (4)

1.一种钢瓶水压试验装置,其特征在于:包括试压水箱、测试管路和回水管,测试管路的进水端上依次设有试压泵、单向阀、电控压力表和蓄能器,测试管路上还串接设有若干个试压器,所述的试压器包括电磁阀和试压管,电磁阀还分别与测试管路、回水管以及试压管连接,试压管上设有与钢瓶瓶嘴相配合的试压管接头,所述的试压管上还连接设有试验压力表;该钢瓶水压试验装置还设有标准测试管路,标准测试管路上设有标准压力表,标准测试管路还与试验压力表连接、并在其连接管路上设有截止阀,所述的进水端通入试压水箱。
2.根据权利要求1所述的钢瓶水压试验装置,其特征在于:所述的回水管的回水端通入试压水箱。
3.根据权利要求1所述的钢瓶水压试验装置,其特征在于:该钢瓶水压试验装置还设有储水水箱,储水水箱内设有电加热器。
4.根据权利要求1所述的钢瓶水压试验装置,其特征在于:在连接测试管路与试压器的管路上设有继电器,继电器与报警器连接。
CN2010105319570A 2010-11-04 2010-11-04 钢瓶水压试验装置 Expired - Fee Related CN101975699B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105319570A CN101975699B (zh) 2010-11-04 2010-11-04 钢瓶水压试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105319570A CN101975699B (zh) 2010-11-04 2010-11-04 钢瓶水压试验装置

Publications (2)

Publication Number Publication Date
CN101975699A CN101975699A (zh) 2011-02-16
CN101975699B true CN101975699B (zh) 2012-08-22

Family

ID=43575602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105319570A Expired - Fee Related CN101975699B (zh) 2010-11-04 2010-11-04 钢瓶水压试验装置

Country Status (1)

Country Link
CN (1) CN101975699B (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102323156B (zh) * 2011-06-07 2013-07-24 浙江欧伦泰防火设备有限公司 一种co2灭火器气瓶自由式水压测试设备
CN103063522B (zh) * 2012-12-05 2014-12-10 慈溪市美源净水设备有限公司 一种压力储水桶的测试调压台
CN103017981A (zh) * 2012-12-22 2013-04-03 厦门船舶重工股份有限公司 一种管路密性试压装置
CN104655493A (zh) * 2015-02-10 2015-05-27 杭州东贝机电设备有限公司 气瓶外测法全自动水压试验装置
CN105738219B (zh) * 2016-04-11 2018-07-13 中国化学工程第十一建设有限公司 一种管道试压系统及方法
CN105675229A (zh) * 2016-04-14 2016-06-15 长安益阳发电有限公司 一种水内冷发电机自动水压试验装置
CN105973714A (zh) * 2016-07-18 2016-09-28 陕西鑫立喷嘴研制开发有限公司 一种自动控制试压机
CN109991090A (zh) * 2017-12-31 2019-07-09 江苏开能华宇环保设备有限公司 多功能玻璃钢罐试压装置
CN114112715A (zh) * 2021-12-13 2022-03-01 荆门宏图特种飞行器制造有限公司 储罐水压试验系统总成
CN119124857A (zh) * 2024-10-23 2024-12-13 浙江超亿消防装备有限公司 一种消防钢瓶水压试验机及其检测方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2139699Y (zh) * 1992-09-19 1993-08-04 国营八二一厂 储气钢瓶水压试验装置
JPH08233802A (ja) * 1995-02-27 1996-09-13 Mitsubishi Heavy Ind Ltd 腐食試験装置
CN101514948B (zh) * 2008-12-31 2010-11-17 中国重型机械研究院 钢管水压试验机快速增压系统
CN201859044U (zh) * 2010-11-04 2011-06-08 连云港市天意消防器材有限公司 一种钢瓶水压试验装置

Also Published As

Publication number Publication date
CN101975699A (zh) 2011-02-16

Similar Documents

Publication Publication Date Title
CN101975699B (zh) 钢瓶水压试验装置
CN201859044U (zh) 一种钢瓶水压试验装置
CN210462448U (zh) 用于给氢燃料车加注的控制计量装置
CN102829922B (zh) 焊接密封壳的水压测试装置及测试方法
CN201607309U (zh) 一种阀门试压装置
CN110031161A (zh) 多规格阀门试压装置
CN105890845B (zh) 管道高强度及密性试验工装与方法
CN103033426A (zh) 一种脉冲检测系统及测试方法
CN205157337U (zh) 多接头管路试压装置
CN204718744U (zh) 一种u型换热管的试压工装设备
CN2139699Y (zh) 储气钢瓶水压试验装置
CN201787339U (zh) 一种同时具备高、中压减压功能的天然气减压装置
CN103743583B (zh) 一种天然气输送管系压力试验装置
CN202735039U (zh) 焊接密封壳的水压测试装置
CN201421423Y (zh) 玻璃钢管道长期静水压试验装置
CN202023732U (zh) 一种超高压泵检修试压装置
CN201322706Y (zh) 一种试压装置
CN207610941U (zh) 一种高压氢气安全膜片压力脉冲试验系统
CN216010403U (zh) 具有状态监测功能的加氢机
CN202691597U (zh) 一种余气处理装置
CN201444107U (zh) 作业井试压装置
CN203809416U (zh) 液压动力源提供系统
CN211475214U (zh) 一种管道断裂堵漏结构及一种管道断裂封堵装备
CN104261150A (zh) 用于硝铵槽车的排料系统
CN203965264U (zh) 容积装置脉冲实验设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120822

Termination date: 20151104

EXPY Termination of patent right or utility model