CN101973282A - 转向架构架侧横梁连接接头全对接结构及组焊工艺方法 - Google Patents

转向架构架侧横梁连接接头全对接结构及组焊工艺方法 Download PDF

Info

Publication number
CN101973282A
CN101973282A CN 201010293968 CN201010293968A CN101973282A CN 101973282 A CN101973282 A CN 101973282A CN 201010293968 CN201010293968 CN 201010293968 CN 201010293968 A CN201010293968 A CN 201010293968A CN 101973282 A CN101973282 A CN 101973282A
Authority
CN
China
Prior art keywords
crossbeam
side beam
assembly welding
welding
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010293968
Other languages
English (en)
Other versions
CN101973282B (zh
Inventor
常力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Changchun Railway Vehicles Co Ltd
Original Assignee
Changchun Railway Vehicles Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Railway Vehicles Co Ltd filed Critical Changchun Railway Vehicles Co Ltd
Priority to CN 201010293968 priority Critical patent/CN101973282B/zh
Publication of CN101973282A publication Critical patent/CN101973282A/zh
Priority to AU2011307855A priority patent/AU2011307855B2/en
Priority to PCT/CN2011/075251 priority patent/WO2012041072A1/zh
Application granted granted Critical
Publication of CN101973282B publication Critical patent/CN101973282B/zh
Priority to US13/852,905 priority patent/US9260119B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61FRAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
    • B61F5/00Constructional details of bogies; Connections between bogies and vehicle underframes; Arrangements or devices for adjusting or allowing self-adjustment of wheel axles or bogies when rounding curves
    • B61F5/50Other details
    • B61F5/52Bogie frames
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/003Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to controlling of welding distortion
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting

Abstract

一种转向架构架侧横梁连接接头全对接结构,其特征在于:侧梁与横梁通过连接座实现全对接连接,其侧梁连接端与侧梁内立板形成板-板对接接头结构,其横梁连接端与横梁形成管-管对接接头结构。组焊工艺方法是连接座与横梁管组焊,横梁组成组焊,连接座与侧梁槽内立板及导柱组焊,侧梁加强隔板及上盖板组焊,构架整体组焊。本发明新的侧梁与横梁连接接头使构架侧梁与横梁实现了全对接连接,突破了侧梁和横梁均为成品后再合成构架的传统工艺,其优势远超于现有结构的角连接结构或角连接与对接联合结构,更大大优越于搭接结构。焊接接头处应力集中最小、焊接填充量最小、焊接残余应力及变形最小;结构外形连续、美观;承载能力和抗疲劳能力强。

Description

转向架构架侧横梁连接接头全对接结构及组焊工艺方法
技术领域
本发明涉及一种构架侧横梁连接接头全对接结构及组焊工艺。
背景技术
构架侧横梁连接接头结构因设计思想局限和组焊工艺限制,无法实现全对接结构连接,侧横梁接口多数设计成角接结构或角接与对接联合结构;个别的也有搭接结构。由此,侧横梁接头处特别是焊缝区域应力集中系数较大,降低了构架的疲劳寿命,影响着转向架的承载能力和运行速度。
发明内容
本发明所要解决的技术问题是提供一种焊缝区域应力集中最小的转向架构架侧横梁连接接头全对接结构及组焊工艺,以此来提高构架的疲劳寿命,使转向架运行更加安全可靠。
为解决上述技术问题,本发明提供一种转向架构架侧横梁连接接头全对接结构,其特征在于:侧梁与横梁通过连接座实现全对接连接,其侧梁连接端与侧梁内立板形成板-板对接接头结构,其横梁连接端与横梁形成管-管对接接头结构。
转向架构架侧横梁连接接头全对接结构组焊工艺方法,其特征在于:连接座与横梁管组焊——横梁组成组焊——连接座与侧梁槽内立板及导柱组焊——侧梁加强隔板及上盖板组焊——构架整体组焊。
连接座与横梁管焊接采用机械手MAG焊方法,其余采用手工MAG焊方法。
连接座与横梁管采用双面焊时进行清根,侧梁内立板对接焊时采用衬垫。
本发明新的侧梁与横梁连接接头使构架侧梁与横梁实现了全对接连接,同时,利用连接座使连接焊缝避开了应力较高的截面和形状变化大的区域,从焊接结构理论上讲这是最理想的接头结构,即:焊接接头处应力集中最小、焊接填充量最小、焊接残余应力及变形最小;结构外形连续、美观;承载能力和抗疲劳能力强。本发明突破了侧梁和横梁均为成品后再合成构架的传统工艺,其优势远超于现有结构的角连接结构或角连接与对接联合结构,更大大优越于搭接结构。
附图说明
附图是侧横梁连接接头全对接结构示意图。
具体实施方式
参照图1,侧梁与横梁1通过连接座2实现全对接连接,其侧梁连接端与侧梁内立板5及导柱3形成板-板对接接头结构,其横梁连接端与横梁形成管-管对接接头结构,4是上盖板,6是下盖板,7是侧梁加强隔板。
侧横梁全对接结构的转向架构架组焊工艺:当侧梁为半成品(无上盖板的侧梁槽)时与横梁组成完成构架整体组对,是新的构架组焊工艺最突出的特点之一,此工艺突破了侧梁和横梁均为成品后再合成构架的传统工艺,利用这种工艺能够保证横梁管与连接座实现自动MAG焊接;能够实现侧梁加强隔板的顺利组焊;能够确保横梁组成与侧梁内立板的精确组对和优质焊接。连接座与横梁管焊接采用成熟的机械手MAG焊方法,焊缝进行RT检验;连接座与侧梁槽内立板及导柱焊接采用可移除衬垫手工MAG焊方法,焊缝进行UT检验,具备可靠的焊缝质量保证。连接座与横梁管焊前采用无间隙组对,在焊接规范一致的情况下使得焊接收缩量准确统一,可使横梁组成长度控制在±0.5范围内,无需二次加工,即可保证横梁组成与侧梁槽完成精确的组对和焊接。

Claims (4)

1.一种转向架构架侧横梁连接接头全对接结构,其特征在于:侧梁与横梁通过连接座实现全对接连接,其侧梁连接端与侧梁内立板形成板-板对接接头结构,其横梁连接端与横梁形成管-管对接接头结构。
2.根据权利要求1所述的转向架构架侧横梁连接接头全对接结构组焊工艺方法,其特征在于:连接座与横梁管组焊——横梁组成组焊——连接座与侧梁槽立板及导柱组焊——侧梁加强隔板及上盖板组焊——构架整体组焊。
3.根据权利要求2所述的转向架构架侧横梁连接接头全对接结构组焊工艺方法,其特征在于:连接座与横梁管焊接采用机械手MAG焊方法,其余采用手工MAG焊方法。
4.根据权利要求2或3所述的转向架构架侧横梁连接接头全对接结构组焊工艺方法,其特征在于:连接座与横梁管采用双面焊时进行清根,侧梁内立板对接焊时采用衬垫。
CN 201010293968 2010-09-28 2010-09-28 转向架构架侧横梁连接接头全对接结构的组焊工艺方法 Expired - Fee Related CN101973282B (zh)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN 201010293968 CN101973282B (zh) 2010-09-28 2010-09-28 转向架构架侧横梁连接接头全对接结构的组焊工艺方法
AU2011307855A AU2011307855B2 (en) 2010-09-28 2011-06-03 Full butted joint structure of connector lug between side frame and cross beam of bogie frame body and group welding technique
PCT/CN2011/075251 WO2012041072A1 (zh) 2010-09-28 2011-06-03 转向架构架侧横梁连接接头全对接结构及组焊工艺方法
US13/852,905 US9260119B2 (en) 2010-09-28 2013-03-28 Full butt joint structure of connection joint between side frame and cross beam of bogie frame and assembly welding process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010293968 CN101973282B (zh) 2010-09-28 2010-09-28 转向架构架侧横梁连接接头全对接结构的组焊工艺方法

Publications (2)

Publication Number Publication Date
CN101973282A true CN101973282A (zh) 2011-02-16
CN101973282B CN101973282B (zh) 2012-06-27

Family

ID=43573201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010293968 Expired - Fee Related CN101973282B (zh) 2010-09-28 2010-09-28 转向架构架侧横梁连接接头全对接结构的组焊工艺方法

Country Status (4)

Country Link
US (1) US9260119B2 (zh)
CN (1) CN101973282B (zh)
AU (1) AU2011307855B2 (zh)
WO (1) WO2012041072A1 (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012041072A1 (zh) * 2010-09-28 2012-04-05 长春轨道客车股份有限公司 转向架构架侧横梁连接接头全对接结构及组焊工艺方法
CN102490754A (zh) * 2011-12-23 2012-06-13 济南轨道交通装备有限责任公司 高速铁路货车转向架构架
CN103317211A (zh) * 2013-05-15 2013-09-25 长春轨道客车股份有限公司 构架侧横梁圆管全位置tig自动焊工艺方法
CN107264564A (zh) * 2016-04-06 2017-10-20 中车长春轨道客车股份有限公司 构架以及具有该构架的轨道列车
CN107264563A (zh) * 2016-04-06 2017-10-20 中车长春轨道客车股份有限公司 构架以及具有该构架的轨道列车
CN107264559A (zh) * 2016-04-06 2017-10-20 中车长春轨道客车股份有限公司 侧梁以及具有该侧梁的轨道列车
CN107470822A (zh) * 2017-07-28 2017-12-15 中车南京浦镇车辆有限公司 环形焊接垫板的安装方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6190752B2 (ja) * 2014-04-11 2017-08-30 川崎重工業株式会社 鉄道車両用台車枠の製造方法
FR3029487B1 (fr) * 2014-12-04 2017-01-13 Alstom Transp Tech Chassis de bogie pour vehicule ferroviaire, bogie associe et procede de fabrication d'un tel chassis de bogie
AT516923A3 (de) * 2015-03-03 2018-01-15 Siemens Ag Oesterreich Längsträger und Querträger für einen Fahrwerksrahmen eines Schienenfahrzeuges
JP6796470B2 (ja) * 2016-12-01 2020-12-09 株式会社日立製作所 鉄道車両用台車およびその製造方法
CN112975179B (zh) * 2021-02-25 2022-08-26 中车长春轨道客车股份有限公司 一种动车组型材型腔焊接变形控制装置及控制方法
CN114954667A (zh) * 2022-06-24 2022-08-30 一汽奔腾轿车有限公司 一种乘用车b柱加强结构

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002187549A (ja) * 2000-12-22 2002-07-02 Kawasaki Heavy Ind Ltd 鉄道車両における軽量付加物溶接取付構造
JP2006015820A (ja) * 2004-06-30 2006-01-19 Sumitomo Metal Ind Ltd 鉄道車両用台車枠及び鉄道車両用台車
CN201189868Y (zh) * 2008-08-15 2009-02-04 铁道部运输局 高速动车组动车转向架
CN201189870Y (zh) * 2008-08-15 2009-02-04 铁道部运输局 动力转向架
CN201544979U (zh) * 2009-09-25 2010-08-11 中国北车集团大连机车车辆有限公司 构架圆钢管横梁连接座
CN201816609U (zh) * 2010-09-28 2011-05-04 长春轨道客车股份有限公司 转向架构架侧横梁连接接头全对接结构

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1439655A (en) * 1973-06-22 1976-06-16 British Steel Corp Railway bogies
FR2302225A1 (fr) * 1975-02-25 1976-09-24 Paris & Outreau Acieries Bogie pour materiel roulant de chemin de fer ainsi que son procede de fabrication
US4338865A (en) * 1980-07-07 1982-07-13 The Budd Company Railway truck adaptable to receive a common primary suspension and variable journal bearings
FR2632918B1 (fr) * 1988-06-17 1996-01-19 Alsthom Creusot Rail Chassis pour bogie de vehicule ferroviaire
US5832838A (en) * 1997-01-02 1998-11-10 Standard Research And Design Corporation Frame brace universal mounting bracket assembly
AT405391B (de) * 1997-02-11 1999-07-26 Siemens Sgp Verkehrstech Gmbh Drehgestell eines schienenfahrzeuges und verfahren zu dessen herstellung
CN101973282B (zh) * 2010-09-28 2012-06-27 长春轨道客车股份有限公司 转向架构架侧横梁连接接头全对接结构的组焊工艺方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002187549A (ja) * 2000-12-22 2002-07-02 Kawasaki Heavy Ind Ltd 鉄道車両における軽量付加物溶接取付構造
JP2006015820A (ja) * 2004-06-30 2006-01-19 Sumitomo Metal Ind Ltd 鉄道車両用台車枠及び鉄道車両用台車
CN201189868Y (zh) * 2008-08-15 2009-02-04 铁道部运输局 高速动车组动车转向架
CN201189870Y (zh) * 2008-08-15 2009-02-04 铁道部运输局 动力转向架
CN201544979U (zh) * 2009-09-25 2010-08-11 中国北车集团大连机车车辆有限公司 构架圆钢管横梁连接座
CN201816609U (zh) * 2010-09-28 2011-05-04 长春轨道客车股份有限公司 转向架构架侧横梁连接接头全对接结构

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012041072A1 (zh) * 2010-09-28 2012-04-05 长春轨道客车股份有限公司 转向架构架侧横梁连接接头全对接结构及组焊工艺方法
US9260119B2 (en) 2010-09-28 2016-02-16 Changchun Railway Vehicles Co., Ltd. Full butt joint structure of connection joint between side frame and cross beam of bogie frame and assembly welding process
CN102490754A (zh) * 2011-12-23 2012-06-13 济南轨道交通装备有限责任公司 高速铁路货车转向架构架
CN103317211A (zh) * 2013-05-15 2013-09-25 长春轨道客车股份有限公司 构架侧横梁圆管全位置tig自动焊工艺方法
CN107264564A (zh) * 2016-04-06 2017-10-20 中车长春轨道客车股份有限公司 构架以及具有该构架的轨道列车
CN107264563A (zh) * 2016-04-06 2017-10-20 中车长春轨道客车股份有限公司 构架以及具有该构架的轨道列车
CN107264559A (zh) * 2016-04-06 2017-10-20 中车长春轨道客车股份有限公司 侧梁以及具有该侧梁的轨道列车
CN107470822A (zh) * 2017-07-28 2017-12-15 中车南京浦镇车辆有限公司 环形焊接垫板的安装方法

Also Published As

Publication number Publication date
US9260119B2 (en) 2016-02-16
CN101973282B (zh) 2012-06-27
US20130213258A1 (en) 2013-08-22
AU2011307855B2 (en) 2015-11-12
WO2012041072A1 (zh) 2012-04-05
AU2011307855A1 (en) 2013-05-02

Similar Documents

Publication Publication Date Title
CN101973282B (zh) 转向架构架侧横梁连接接头全对接结构的组焊工艺方法
CN103128457B (zh) 转向架构架及其制造方法
CN101519155B (zh) 一种交换车体罐式集装箱
CN106735975B (zh) 铝合金地铁车底架焊接时的内侧宽度控制方法
CN103085825A (zh) 轨道车辆端墙及其加工方法
CN201816609U (zh) 转向架构架侧横梁连接接头全对接结构
CN202701619U (zh) 一种组对精度高的对接接头结构
CN201236031Y (zh) 一种交换车体罐式集装箱
CN205185941U (zh) 一种矿用自卸车及其车厢
CN106624479B (zh) 100%低地板底架前端多层组焊工艺
CN102602355A (zh) 加强板及其制造方法和具有该加强板的rops
CN202294825U (zh) 轨道车辆端墙
CN102635198A (zh) 一种组合椭圆形截面构件及其加工方法
CN104843025A (zh) 标准动车组动力转向架构架
CN104118439A (zh) 一种铁路货车圆弧侧墙组成
CN202089489U (zh) 散装水泥及粉粒物料运输车的加强型罐座
CN204055792U (zh) 一种铁路货车圆弧侧墙组成
CN207523806U (zh) 一种可提高大客车蒙皮平整度的车身骨架结构
CN106392503A (zh) 悬挂横梁与纵梁组装工艺
CN207312281U (zh) 一种鹅颈槽结构
CN205820082U (zh) 一种粉罐车罐体
CN209382081U (zh) 一种车架用高刚度横纵梁连接装置
CN204282190U (zh) 一种钢桥框架杆件加强结构
CN104340887B (zh) 一种固定支腿连接结构及安装方法
CN204915832U (zh) 一种变径罐体用罐车车架加固结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chang Li

Inventor after: Wang Run

Inventor before: Chang Li

CB03 Change of inventor or designer information
COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: JIN HU TO: JIN HU CHEN FENG

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120627

Termination date: 20190928

CF01 Termination of patent right due to non-payment of annual fee