CN101949117A - Safety insulating net structure of highway - Google Patents

Safety insulating net structure of highway Download PDF

Info

Publication number
CN101949117A
CN101949117A CN 201010268249 CN201010268249A CN101949117A CN 101949117 A CN101949117 A CN 101949117A CN 201010268249 CN201010268249 CN 201010268249 CN 201010268249 A CN201010268249 A CN 201010268249A CN 101949117 A CN101949117 A CN 101949117A
Authority
CN
China
Prior art keywords
net
highway
wire rope
rope
safety insulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010268249
Other languages
Chinese (zh)
Inventor
彭晓云
史纪忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIXING POWER SUPPLY COMPANY JIANGSU ELECTRIC POWER Co Ltd
Original Assignee
YIXING POWER SUPPLY COMPANY JIANGSU ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIXING POWER SUPPLY COMPANY JIANGSU ELECTRIC POWER Co Ltd filed Critical YIXING POWER SUPPLY COMPANY JIANGSU ELECTRIC POWER Co Ltd
Priority to CN 201010268249 priority Critical patent/CN101949117A/en
Publication of CN101949117A publication Critical patent/CN101949117A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to a safety insulating net structure of a highway. The structure mainly comprises a safety insulating net, a steel wire rope, a main rope at the edge of the net and a spanning frame, wherein the safety insulating net and the steel wire rope are connected with the spanning frame. The structure is characterized in that shackles are arranged between the main rope at the edge of the net and the steel wire rope at regular intervals. When the safety insulating net is pulled over the highway in the air, people can synchronously process on the spanning frame, which can avoid the condition of net winding; a large quantity of workloads can be carried out under the condition of normal traffic of the highway, thereby the road closure time of the highway is greatly shortened; meanwhile, ascending operating personnel required by pulling the net can be reduced to 4 from 6 in the past, thus the labor power is saved; and because the road closure time is shortened, the structure provides reliable guarantee for the safe and normal traffic of vehicles on the highway.

Description

The safe insulation web frame of speedway
Technical field
The present invention relates to a kind of safe insulation web frame of speedway, specifically the safe insulation host need in the power transmission and distribution overhead wire erection process will be applied to the acrossing highway construction operation.
Background technology
In order to guarantee to guarantee that when aerial condutor is crossed speedway the safety of speedway is normally current, so respectively set up one of crossing frame in advance in the speedway both sides, draw a reliable safe insulation net of intensity on the top of two crossing frames, guarantee that aerial condutor is not sagging in passing through the process of speedway, the vehicle of speedway can be normally current safely.
The original concrete job step of mode and each step time spent statistics of drawing in the net is as follows:
1, before the road closure beginning, earlier an end of safe insulation net and wire rope is fixed (preparation before the road closure) on the crossing frame of a side;
2, opposite side is got over and is presetted 4 operation personnel on the coil holder and climb up crossing frame, and everyone carries a rope, and rope one end is fixed in the crossing frame top, and the other end hangs down to ground;
3, implement road closure by the traffic police, after the road closure beginning rapidly with the safe insulation net by speedway one layback to opposite side, two wire rope intersect mutually immediately following the safe insulation net and are pulled through speedway;
4, safe insulation net and wire rope and opposite side are got over the rope that hangs down on the coil holder and are connected reliably, by net up wire rope below order up and down rise and to winch to certain altitude;
5, net and wire rope are tightened to the requirement of satisfying safe stringing, and fix reliably, so far the speedway deblocking;
6, after finishing, receive all air line workings net.(need carry out road closure second time because receive net after circuit stringing finishes, only wire rope and net directly need be got on the coil holder to cut with scissors from an end and get final product, process is simple, time compole weak point)
Adopt said method to implement to draw in the net operation, to the 5th step highway deblocking, total activity duration, wherein the 3rd step needed about 1 minute about 18 minutes since the road closure of the 3rd step, and the 4th step needed about 7 minutes, and the 5th step needed about 10 minutes.In a single day this operating type also has a very big shortcoming, because the safe insulation net twines in the lifting process easily, twines when netting exactly, the so required activity duration increases greatly, sometimes even above 30 minutes.
Summary of the invention
The objective of the invention is to overcome above-mentioned weak point, can shorten the speedway road closure time greatly, save the ascend operation personnel thereby provide a kind of; The road closure time can shorten, to the normally current safe insulation web frame that the speedway of reliable guarantee is provided of safety of vehicle on highway.
According to technical scheme provided by the invention, the safe insulation web frame of speedway comprises safe insulation net, wire rope, crossing frame, feature is: described safe insulation net, wire rope are connected with crossing frame, between the main rope of described network edge and the wire rope shackle are set.The equidistant setting of described shackle.
Compared with the prior art the present invention has the following advantages:
When safe insulation net of the present invention is pulled through speedway aloft, have the people to handle synchronously on crossing frame, the situation that can avoid netting winding takes place; A big chunk workload can be placed under the normally current situation of speedway and carry out, shorten the speedway road closure time greatly, draw in the net the required ascend operation personnel of operation simultaneously also to be reduced to 4, save staff by original 6; Because the shortening of road closure time is to the normal current reliable guarantee that provides of safety of vehicle on highway.
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
Embodiment during following the present invention incites somebody to action in conjunction with the accompanying drawings is further described:
As shown in Figure 1: comprise main rope 3, crossing frame 4 and the shackle 5 of safe insulation net 1, wire rope 2, network edge, described safe insulation net 1, wire rope 2 are connected with crossing frame 4, shackle 5 is set, described shackle 5 equidistant settings between the main rope 3 of described network edge and the wire rope 2.
It is as follows that the present invention draws in the net operating type job step:
1, before speedway road closure, in advance wire rope 2 is winched to a side crossing frame 4 tops together with an end of a reliable nylon rope of intensity, safe insulation net 1 is all winched to a side crossing frame top.
2, opposite side is got over and is presetted 2 operation personnel on the coil holder and climb up crossing frame, and everyone carries a rope, and rope one end is fixed in crossing frame 4 tops, and the other end hangs down to ground;
3, implement road closure by the traffic police, after the road closure beginning with wire rope 2 and the parallel speedway opposite side that is pulled to of nylon rope;
4, the rope that wire rope 2 and nylon rope and coil holder are more hung down reliably is connected and lifts by crane;
5, rise and winch to behind the certain altitude wire rope 2 secure fixation; The nylon rope of controlling well does not make it sagging, so far the speedway deblocking;
6, connect with the nylon rope other end of having passed by on one's way and the safe insulation net 1 that winches to crossing frame 4 tops, utilize this root nylon rope pulling net to pass by on one's way aloft along wire rope;
7, keep certain force of strain in the process that an end operating personnel opposite operating personnel of safe insulation net draws in the net, simultaneously between the main rope 3 of network edge and wire rope 2, add a shackle 5 (utilizing the height in a plurality of fixed points assurance safe insulation net drawing process) at a certain distance;
7, the safe insulation net is pulled through and tightens up behind the speedway and fixing.
8, the operation of receipts net is identical with original method.
New method after the utility model utilization improves implements to draw in the net operation, the activity duration required from the 3rd step to the 5th step is about 6 minutes, the 3rd goes on foot the required time about 30 seconds, and the 4th went on foot the required activity duration about 2 minutes, and the 5th went on foot the required time about 3.5 minutes. The characteristics of the method maximum after the improvement are to have the people to process synchronously in crossing frame when safety insulation net is pulled through highway aloft, the situation that can avoid netting winding takes place, behind the method improvement workload greatly being placed on highway in addition normally carries out in the current situation, greatly shortened the highway road closure time, drawing in the net simultaneously the required ascend operation personnel of operation also is reduced to 4 by original 6, has saved staff. Because the shortening of road closure time provides reliable guarantee to the safety of highway vehicle is normally current, has formed good social influence.

Claims (2)

1. the safe insulation web frame of a speedway, comprise safe insulation net (1), wire rope (2), crossing frame (4), it is characterized in that: described safe insulation net (1), wire rope (2) are connected with crossing frame (4), between the main rope (3) of described network edge and the wire rope (2) shackle (5) are set.
2. the safe insulation web frame of speedway as claimed in claim 1 is characterized in that: the equidistant setting of described shackle (5).
CN 201010268249 2010-08-23 2010-08-23 Safety insulating net structure of highway Pending CN101949117A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010268249 CN101949117A (en) 2010-08-23 2010-08-23 Safety insulating net structure of highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010268249 CN101949117A (en) 2010-08-23 2010-08-23 Safety insulating net structure of highway

Publications (1)

Publication Number Publication Date
CN101949117A true CN101949117A (en) 2011-01-19

Family

ID=43452736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010268249 Pending CN101949117A (en) 2010-08-23 2010-08-23 Safety insulating net structure of highway

Country Status (1)

Country Link
CN (1) CN101949117A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102983528A (en) * 2012-12-07 2013-03-20 中铁十九局集团电务工程有限公司 Overhead cable scaffold
CN107658787A (en) * 2017-11-06 2018-02-02 国网新疆电力公司检修公司 Grid is dielectrically separated from for double female double section gap rebuilding constructions
CN111917090A (en) * 2020-08-07 2020-11-10 国网湖南省电力有限公司 10kV line live crossing frame and erection method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002152933A (en) * 2000-11-09 2002-05-24 Fujii Denko Co Ltd Method of engineering work using scaffolding net
CN2765352Y (en) * 2005-01-22 2006-03-15 广西送变电建设公司 Double-post combined suspension cable type crossover rack
CN2927428Y (en) * 2006-04-24 2007-07-25 俞云飞 Assembled insulated spanning rack
CN201355751Y (en) * 2009-01-23 2009-12-02 湖北省输变电工程公司 Electrified spanning frame of insulated cable net

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002152933A (en) * 2000-11-09 2002-05-24 Fujii Denko Co Ltd Method of engineering work using scaffolding net
CN2765352Y (en) * 2005-01-22 2006-03-15 广西送变电建设公司 Double-post combined suspension cable type crossover rack
CN2927428Y (en) * 2006-04-24 2007-07-25 俞云飞 Assembled insulated spanning rack
CN201355751Y (en) * 2009-01-23 2009-12-02 湖北省输变电工程公司 Electrified spanning frame of insulated cable net

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102983528A (en) * 2012-12-07 2013-03-20 中铁十九局集团电务工程有限公司 Overhead cable scaffold
CN102983528B (en) * 2012-12-07 2015-11-18 中铁十九局集团电务工程有限公司 Overhead cable scaffold
CN107658787A (en) * 2017-11-06 2018-02-02 国网新疆电力公司检修公司 Grid is dielectrically separated from for double female double section gap rebuilding constructions
CN111917090A (en) * 2020-08-07 2020-11-10 国网湖南省电力有限公司 10kV line live crossing frame and erection method thereof
CN111917090B (en) * 2020-08-07 2022-03-11 国网湖南省电力有限公司 10kV line live crossing frame and erection method thereof

Similar Documents

Publication Publication Date Title
CN102290742B (en) Tension stringing construction technology
CN105236277B (en) Full-automatic powered block car and its block method
CN202012047U (en) Steel strand inclined pulling and buckling system of tower
CN107119572A (en) A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN204316007U (en) A kind of transmission line crossing construction device
CN203367865U (en) Auxiliary bracket for maintaining power transmission line
CN208202761U (en) A kind of upright bar structure lifted by crane using old bar
CN101949117A (en) Safety insulating net structure of highway
CN201809687U (en) Safe insulation net structure of highway
CN104319692A (en) Double-switching type tension indication wire grip
CN206379675U (en) Yoke plate card for live-line replacement of V-string insulator wire of tangent tower
CN205985949U (en) Tension formula transmission line protection system
CN203129020U (en) Cast-in-situ box girder super-long tensioned threading device
CN202282576U (en) Moso bamboo crossing frame
CN103840396A (en) Method for replacing lightning conductor on high-voltage iron towers
CN102611057A (en) Crossing mesh
CN205985948U (en) Tension formula line protection
CN214204632U (en) Novel head-following pulley
CN202917897U (en) Cable hoisting horizontal pulley
CN104682268A (en) Method for constructing compact double-loop overhead line by adoption of flying powered parachute
CN104377591A (en) Method for replacing overhead wire of crossing electrified railway without building crossing frame
CN103532052A (en) Live erection of simple crossing structure on ADSS (all-dielectric self-supporting optic fiber cable) and implementation method
CN203632113U (en) Portable safety string bag for electric pole
CN204167799U (en) Two obforms pulling force instruction wire grip
CN202837643U (en) Anti-wire jumping and wire clamping optical cable linear tackle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110119