CN101942806B - Bridge girder erection machine protective guard - Google Patents
Bridge girder erection machine protective guard Download PDFInfo
- Publication number
- CN101942806B CN101942806B CN 201010292138 CN201010292138A CN101942806B CN 101942806 B CN101942806 B CN 101942806B CN 201010292138 CN201010292138 CN 201010292138 CN 201010292138 A CN201010292138 A CN 201010292138A CN 101942806 B CN101942806 B CN 101942806B
- Authority
- CN
- China
- Prior art keywords
- guardrail
- girder erection
- protective guard
- erection machine
- machine protective
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000001681 protective effect Effects 0.000 title claims abstract description 13
- 230000004888 barrier function Effects 0.000 claims 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Description
所属技术领域 Technical field
本发明涉及起重吊装设备的一种防护辅助机具,尤其是建造桥梁时所使用的防护栏,属于起重吊装设备技术领域。The invention relates to a protective auxiliary machine tool for hoisting and hoisting equipment, in particular to a protective fence used when building a bridge, and belongs to the technical field of hoisting and hoisting equipment.
背景技术 Background technique
目前,箱梁架设为高空作业,架桥机在桥墩间作业。工作人员需在桥墩上作业,而桥墩周围在箱梁架设前并无防护。若在箱梁架设前在墩子上设置防护装置,不但工程量大,且安装防护装置需投入大量的人力物力,无形中增加了成本。At present, box girder erection is set for high-altitude operations, and bridge erecting machines operate between bridge piers. The staff need to work on the pier, and there is no protection around the pier before the box girder is erected. If a protective device is installed on the pier before the erection of the box girder, not only the engineering volume is large, but also a large amount of manpower and material resources are required to install the protective device, which virtually increases the cost.
发明内容 Contents of the invention
针对上述问题,本发明提供一种与架桥机连接的防护栏。In view of the above problems, the present invention provides a protective fence connected with a bridge erecting machine.
本发明解决其技术问题所采用的技术方案是:架桥机防护栏,包括由横向护栏和纵向护栏构成的矩形围栏;横向护栏为中心对称的两扇护栏,其连接处设有锁扣;横向护栏与纵向护栏旋转连接,两护栏夹角处设有转向拉杆;纵向护栏设有向上延伸的梯形框架,二者由连接杆连接;梯形框架末端的前面和后面分别设有前法兰和后法兰,梯形框架的末端的前面设有后支脚防护框。The technical solution adopted by the present invention to solve the technical problem is: the protective fence of the bridge erecting machine includes a rectangular fence composed of a horizontal fence and a vertical fence; The guardrail is connected to the longitudinal guardrail by rotation, and a steering rod is provided at the angle between the two guardrails; the longitudinal guardrail is provided with a trapezoidal frame extending upwards, and the two are connected by connecting rods; the front and rear ends of the trapezoidal frame are respectively provided with a front flange and a rear flange Lan, the front of the end of the trapezoidal frame is provided with a rear foot protection frame.
本发明的有益效果是,成本低、制作简单,拆装方便,节省存放空间,便于运输。操作方便,为墩上作业人员提供了安全作业空间,可保证施工安全,且方便转移和拆卸。适应多种条件与需求的吊装作业,充分发挥起重机械化作业的优势,大大提高了工作效率,避免了在恶劣环境下人工的过度使用,减轻了工人的劳动强度,并大大提升了吊装设备、构件的安全及作业人员的人身安全。可充分发挥起重机械化作业的优势,大大提高工作效率,减轻了工人的劳动强度。本发明不受工作场所作业高度及空间的限制,适合各种简支梁架设使用。The invention has the beneficial effects of low cost, simple manufacture, convenient assembly and disassembly, saving storage space, and convenient transportation. It is easy to operate, provides a safe working space for operators on the pier, can ensure construction safety, and is convenient for transfer and disassembly. The hoisting operation adapts to a variety of conditions and needs, gives full play to the advantages of hoisting mechanized operations, greatly improves work efficiency, avoids excessive use of labor in harsh environments, reduces the labor intensity of workers, and greatly improves hoisting equipment, The safety of components and the personal safety of operators. It can give full play to the advantages of mechanized lifting operations, greatly improve work efficiency, and reduce the labor intensity of workers. The invention is not limited by the working height and space of the workplace, and is suitable for the erection of various simply supported beams.
附图说明 Description of drawings
图1是本发明主视图;Fig. 1 is a front view of the present invention;
图2是图2的左视图Figure 2 is the left view of Figure 2
图3是图2的俯视图;Fig. 3 is the top view of Fig. 2;
图4是图2的另一种状态图;Fig. 4 is another state diagram of Fig. 2;
图5是本发明立体图(图1的后、仰视方向)。Fig. 5 is a perspective view of the present invention (rear and bottom view direction of Fig. 1).
具体实施方式 Detailed ways
下面结合实施例对本发明进一步说明。Below in conjunction with embodiment the present invention is further described.
如图1-5,架桥机防护栏,包括由横向护栏1和纵向护栏2构成的矩形围栏;横向护栏1为中心对称的两扇护栏,其连接处设有锁扣1-1;横向护栏1与纵向护栏2旋转连接,两护栏夹角处设有转向拉杆2-2;纵向护栏2设有向上延伸的梯形框架3,二者由连接杆2-1连接;梯形框架3末端的前面和后面分别设有前法兰3-1和后法兰3-2,梯形框架3的末端的前面设有后支脚防护框3-3。As shown in Figure 1-5, the guardrail of the bridge erecting machine includes a rectangular fence composed of a
梯形框架3的前法兰3-1和后法兰3-2之间连接一安装杆;由安装杆与架桥机后支腿连接,矩形围栏座落在桥墩上。A mounting rod is connected between the front flange 3-1 and the rear flange 3-2 of the
由于防护栏附在架桥机后支腿上,无需额外动力进行移动。防护栏在架桥机过孔时,通过转向拉杆2-2的拉伸,变换到如图4所示的状态,防护栏随架桥机前移而前移;待架桥机过孔到位后,通过转向拉杆2-2的收缩,变换到如图4所示的工作状态;横向护栏1的中心由锁扣1-1锁住,与纵向护栏2围成矩形护栏,如图3所示,对桥墩上作业人员的安全进行保护。后支脚防护框3-3是为箱梁上作业人员的安全设计的。Since the guard rail is attached to the rear outrigger of the bridge erecting machine, no additional power is required to move it. When the bridge erecting machine passes through the hole, the guardrail is transformed to the state shown in Figure 4 through the stretching of the steering rod 2-2, and the guardrail moves forward with the bridge erecting machine; after the bridge erecting machine passes the hole in place , through the shrinkage of the steering rod 2-2, it is converted to the working state shown in Figure 4; the center of the
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010292138 CN101942806B (en) | 2010-09-26 | 2010-09-26 | Bridge girder erection machine protective guard |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010292138 CN101942806B (en) | 2010-09-26 | 2010-09-26 | Bridge girder erection machine protective guard |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101942806A CN101942806A (en) | 2011-01-12 |
| CN101942806B true CN101942806B (en) | 2013-01-16 |
Family
ID=43434992
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201010292138 Active CN101942806B (en) | 2010-09-26 | 2010-09-26 | Bridge girder erection machine protective guard |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101942806B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109750604A (en) * | 2019-02-14 | 2019-05-14 | 襄阳协利成机车车辆工程设备有限公司 | An easy-to-use bridge erecting machine |
| CN119929649B (en) * | 2025-04-09 | 2025-06-06 | 山西路桥第七工程有限公司 | Protective lifting device for bridge construction |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0544202A (en) | 1991-08-15 | 1993-02-23 | Kensetsusho Kyushu Chiho Kensetsu Kyokucho | Scaffold structure for repairing bridge handrail and hanging metal structure therefor |
| US5417301A (en) * | 1993-12-27 | 1995-05-23 | Robert J. Wildner | Environmentally safe work platform |
| JP2010059632A (en) * | 2008-09-02 | 2010-03-18 | Resin Corp | Suspended scaffolding |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7950096B2 (en) * | 2008-09-23 | 2011-05-31 | Petroleum Specialty Rental, Llc | Fluid flow system bridge with walkway |
| CN201785703U (en) * | 2010-09-26 | 2011-04-06 | 中国水利水电第七工程局有限公司 | Protective fence for bridging machine |
-
2010
- 2010-09-26 CN CN 201010292138 patent/CN101942806B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0544202A (en) | 1991-08-15 | 1993-02-23 | Kensetsusho Kyushu Chiho Kensetsu Kyokucho | Scaffold structure for repairing bridge handrail and hanging metal structure therefor |
| US5417301A (en) * | 1993-12-27 | 1995-05-23 | Robert J. Wildner | Environmentally safe work platform |
| JP2010059632A (en) * | 2008-09-02 | 2010-03-18 | Resin Corp | Suspended scaffolding |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101942806A (en) | 2011-01-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102383588B (en) | Lifting platform for protecting safety of high-level construction | |
| CN201883922U (en) | Working platform used for overhauling electric circuit | |
| CN101942806B (en) | Bridge girder erection machine protective guard | |
| CN103236656B (en) | Column suspension type crossing structure and operating method thereof | |
| CN201083018Y (en) | Mobile multipurpose fast mounting scaffold | |
| CN211548680U (en) | A scaffolding for building construction | |
| CN205617760U (en) | Removable assecmbly's removal operation platform | |
| CN208056762U (en) | Novel belt maintenance platform high signal column | |
| CN203668857U (en) | Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates | |
| CN207749426U (en) | A kind of bridge side guardrail template construction device | |
| CN207003970U (en) | A kind of building scaffold being easily installed | |
| CN201785703U (en) | Protective fence for bridging machine | |
| CN206697838U (en) | Line maintenance aerial work platform | |
| CN102891451B (en) | A kind of tubular busbar post insulator overhaul platform | |
| CN202949163U (en) | Maintenance platform for tubular busbar post insulator | |
| CN109577624A (en) | Frame-shear structure scaffold system and construction method | |
| CN103395705B (en) | Detachable hanging basket structure for cranes | |
| CN107965170A (en) | Distribution box protection canopy with assembling type base | |
| CN102277999A (en) | Large-section portal steel structure holding pole | |
| CN210736044U (en) | A tower crane attached wall support installation and disassembly operation platform | |
| CN206309286U (en) | A kind of instrument punched for floor plates top | |
| CN222414220U (en) | Movable electronic box protection canopy | |
| CN204112739U (en) | A kind of tower crane high-altitude mounting or dismounting operation caisson type operating platform | |
| CN105500323A (en) | Insulating working platform used for electric power field | |
| CN206647052U (en) | Drilling well derrick geometry and well system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |