CN101930481A CN200910053573XA CN200910053573A CN101930481A CN 101930481 A CN101930481 A CN 101930481A CN 200910053573X A CN200910053573X A CN 200910053573XA CN 200910053573 A CN200910053573 A CN 200910053573A CN 101930481 A CN101930481 A CN 101930481A
Authority
CN
China
Prior art keywords
container
cim
buffer zone
equipment
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910053573XA
Other languages
Chinese (zh)
Other versions
CN101930481B (en
Inventor
张磊
张亮
汪德星
葛敏辉
毕晓亮
高伏英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Grid Co Ltd
Original Assignee
East China Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Grid Co Ltd filed Critical East China Grid Co Ltd
Priority to CN200910053573.XA priority Critical patent/CN101930481B/en
Publication of CN101930481A publication Critical patent/CN101930481A/en
Application granted granted Critical
Publication of CN101930481B publication Critical patent/CN101930481B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y02E60/76
    • Y04S40/22

Abstract

The invention relates to a method used for generating CIM model describing power grid model change in designated time slot. The invention belongs to the power system technical field. The method includes the following steps: an initial CIM model is imported, and a hierarchical relationship structure library and a topology connection relationship structure library are established in a buffer area; change conditions of power grid model objects (container object, equipment object and topology connection point object) in designated time slot are input; all the record sorts in an object information list are subject to addition and deletion and sequencing is carried out, thus forming an addition deletion object index table; the power grid model objects (the container object, equipment object and topology connection point object) in the buffer area are sequentially updated according to the addition deletion object index table; and a CIM model XML file describing power grid model change in the designated time slot is generated by the CIM XML grammatical rule according to the hierarchical relationship structure library and topology connection relationship structure library which have time property in the buffer area.

Description

Generate the method and system of describing the CIM model that electrical network changes in the fixed time section
Technical field
The invention belongs to the power technology field, the present invention relates to the method for expressing of electric power networks model more precisely.
Background technology
In general, the electric power system model of this electrical network has all been set up in power-management centres at different levels in EMS system separately to the electrical network in the region within the jurisdiction, carrying out electric system simulation on this model basis calculates and analyzes, but the model in the EMS system is certain attitude (tense, research attitude strictly according to the facts) model of electrical network down, the model description CIM XML file of its derivation also only can be described the state of a certain moment electrical network, and can not describe the development and change of electrical network in the time period.
The IEC61970 series standard that International Electrotechnical Commission formulates has carried out standard to electric system common information model CIM and application programming interfaces.CIM has become the universal model of describing electric system at present, exchange model information has played key effect between the electric system different control areas, but at present because the used CIM of electric system has only described the state of a certain moment electrical network, and being described for the situation of change of electric network model in certain time period not, this can cause the exchange of control interval CIM model file too frequent on the one hand, promptly change even the exchange that also needs to carry out the CIM model file is moved back in the throwing of individual device fully according to schedule at each electric network model, on the other hand, because inside, control zone has only kept the state of the last model, and the development and change of a period of time electrical network are not kept a record.
Simultaneously, putting into operation, withdrawing from of power system device all is planned, that is to say, just known roughly that before a very long time electrical network from now on is development and change how, just can not show the variation of the power network development in this time period by institute's CIM model that uses in the present electric system.
The present invention just is being based on the IEC61970 international standard, and power system objects has wherein been expanded time attribute, has realized describing the CIM model that electric network model changes in the fixed time section.
Through preliminary search, find no the patent clauses and subclauses relevant temporarily with content of the present invention.
Summary of the invention
Goal of the invention of the present invention is:
1, CIM XML model file and the container in certain time period, equipment and the topology of electrical network are put change records constantly according to certain, generation can be described the CIM model that electric network model changes in the fixed time section, this CIM model meets the standard of IEC61970CIM, the container among the CIM XML that generates, equipment and annexation are described accurately, tally with the actual situation, object does not have disappearance or redundant;
2, utilize the CIM model (as describing the CIM XML file that all electric network models change from the beginning of the year to the end of the year) of describing electric network model variation in the certain hour section, can generate pairing electric network model of arbitrary moment in this time period according to this CIM XML file, and auxiliary the electrical network of any time in this time period be carried out safe check with information such as load prediction, Plant maintenance plan, generation schedules;
3, describing the CIM model that electric network model changes in the certain hour section can be used with the model splicing system, the CIM model of describing annual electrical network variation in each sub-control zone is spliced, can form the CIM model of the annual electrical network variation of description of bigger control area;
To achieve these goals, the present invention takes following technical scheme to realize:
A kind of method of describing the CIM model that electric network model changes in the fixed time section that generates comprises the following steps:
(1) imports initial CIM model: T1 moment electric network model CIM XML file is imported to buffer zone, in buffer zone, set up hierarchical relationship structure storehouse and topological connection relation structure storehouse;
(2) situation of change of electric network model object in the input fixed time section:
A) situation of change of fixed time section inner pressurd vessel: the record that input fixed time section inner pressurd vessel increases and deletes forms " the increasing the information of container table " and " deletion information of container table " that comprise additions and deletions time field;
B) situation of change of equipment in the fixed time section: the record that power system device increases and deletes in the input fixed time section forms " the increasing the facility information table " and " the sweep equipment information table " that comprise additions and deletions time field;
C) situation of change of topological tie point in the fixed time section: the increase of topological tie point and the record of deletion in the input fixed time section form " the increasing the connection point information table " and " deletion connection point information table " that comprise additions and deletions time field;
(3) with all records in the above-mentioned information table according to classifying before or after constantly at T1, and by the additions and deletions time-sequencing, form T1 constantly before and the additions and deletions object indexing table of T1 after constantly;
(4) the electric network model object in the buffer zone is added time attribute:
4.1) time attribute of container object adds: in buffer zone in the hierarchical relationship structure storehouse of CIM model, increase by two time attribute of container object: life start time attribute, life finish time attribute, the default value of life start time attribute is negative infinite distance, and the default value that life finishes time attribute is positive infinite distance;
4.2) time attribute of device object adds: in buffer zone in the hierarchical relationship structure storehouse of CIM model, increase by two time attribute of device object: life start time attribute, life finish time attribute, the default value of life start time attribute is negative infinite distance, and the default value that life finishes time attribute is positive infinite distance;
4.3) time attribute of topological tie point object adds: in buffer zone in the topological connection relation structure storehouse of CIM model, increase by two time attribute of tie point object: life start time attribute, life finish time attribute, the default value of life start time attribute is negative infinite distance, and the default value that life finishes time attribute is positive infinite distance;
(5) successively the electric network model object in the buffer zone is upgraded with the additions and deletions object indexing table of T1 after the moment constantly according to T1:
5.1) the container object renewal:
A) for the container of the back deletion constantly of T1 in " deletion information of container table ", in buffer zone in the hierarchical relationship structure storehouse of CIM model, the value that the life of this container is finished time attribute is set at time corresponding in the deletion information of container table;
B) container of deleting constantly for T1 in " deletion information of container table ", in buffer zone, insert new container object in the hierarchical relationship structure storehouse of CIM model, the key word of deletion container object is composed to the container object in the CIM XML buffer zone, and the value that the life of this container is finished time attribute is set at time corresponding in the deletion information of container table;
C) container that increases constantly for T1 in " increasing the information of container table ", in buffer zone, insert new container object in the hierarchical relationship structure storehouse of CIM model, the key word of newly-increased container object is composed to the container object in the CIM XML buffer zone, and the value of the life start time attribute of this container is set at increases time corresponding in the information of container table;
D) container that increases constantly for T1 in " increase information of container table " is in buffer zone in the hierarchical relationship structure storehouse of CIM model; The value of the life start time attribute of this container is set at increases time corresponding in the information of container table;
5.2) the device object renewal:
A) for the equipment of the back deletion constantly of T1 in " sweep equipment information table ", in buffer zone in the hierarchical relationship structure storehouse of CIM model, the value that the life of this equipment is finished time attribute is set at time corresponding in the sweep equipment information table;
B) equipment of deleting constantly for T1 in " sweep equipment information table ", in buffer zone, insert new device object in the hierarchical relationship structure storehouse of CIM model, the key word of sweep equipment object is composed to the object in the CIM XML buffer zone, replenish the parameter information of newly added equipment, the value that the life of this equipment is finished time attribute is set at time corresponding in the sweep equipment information table;
C) equipment that increases constantly for T1 in " increasing the facility information table ", in buffer zone, insert new device object in the hierarchical relationship structure storehouse of CIM model, the key word of newly added equipment object is composed to the object in the CIM XML buffer zone, replenish the parameter information of newly added equipment, the value of the life start time attribute of this equipment is set at increases time corresponding in the facility information table;
D) equipment that increases constantly for T1 in " increase facility information table " is in buffer zone in the hierarchical relationship structure storehouse of CIM model; The value of the life start time attribute of this equipment is set at increases time corresponding in the facility information table;
5.3) renewal of topological relation object: after finishing the renewal of container object and device object, the model object in the buffer zone is all containers and the device object that occurred in the fixed time section,
A) for the tie point of the back deletion constantly of T1 in " deletion connection point information table ", in buffer zone in the topological connection relation structure storehouse of CIM model, the value that the life of this tie point is finished time attribute is set at time corresponding in the deletion connection point information table;
B) tie point of deleting constantly for T1 in " deletion connection point information table ", insert new tie point object in buffer zone in the topological connection relation structure storehouse of CIM model, the value that the life of this tie point is finished time attribute is set at time corresponding in the deletion connection point information table;
C) tie point that increases constantly for T1 in " increasing the connection point information table ", insert new tie point object in buffer zone in the topological connection relation structure storehouse of CIM model, the value of the life start time attribute of this tie point is set at increases time corresponding in the connection point information table;
D) tie point that increases constantly for T1 in " increase connection point information table ", in buffer zone in the topological connection relation structure storehouse of CIM model, the value that the life of this tie point is begun attribute is set at and increases time corresponding in the connection point information table;
(6) according to the hierarchical relationship structure storehouse and the topological connection relation structure storehouse of band time attribute in the buffer zone, generate the CIM model XML file of describing electric network model variation in the fixed time section according to CIM XML syntax rule.
The method of the CIM model that electric network model changes in the fixed time section is described in aforesaid generation, and wherein, the fixed time section is meant from T1, to T2 (time span of T1<T2) finish, i.e. [T1, a T2] constantly; Or from T0 (T0<T1) is to the time span that T1 finishes constantly, i.e. [T0, T1]; Or from T0 (T0<T1) is to T2 (time span of T1<T2) finish, i.e. [T0, T2] constantly.
The method of the CIM model that electric network model changes in the fixed time section is described in aforesaid generation, and wherein, the type of increase or deletion container is company, sub-control zone, factory station or electric pressure.
The method of the CIM model that electric network model changes in the fixed time section is described in aforesaid generation, wherein, increase or the type of sweep equipment be generator, bus, transformer, circuit, switch, disconnecting link, cutter, load, capacitor or reactor.
The method of the CIM model that electric network model changes in the fixed time section is described in aforesaid generation, wherein, the CIM model file is imported buffer zone, application level relational structure storehouse and the topological connection relation structure storehouse model of recombinating, the characteristics in hierarchical relationship structure storehouse are to contain one deck container down with the last layer container, topological connection relation structure Al Kut point is made up of two bivariate tables, be respectively topological connection relation table and tie point lifecycle matrix, the topological connection relation table is used for describing the annexation between tie point and equipment end points, and the tie point lifecycle matrix is used for describing the life start time and the life concluding time of tie point.
The method of the CIM model that electric network model changes in the fixed time section is described in aforesaid generation, wherein, the container of T1 deletion before the moment all needs to increase newly in the hierarchical relationship structure storehouse of buffer zone in the container that T1 increases constantly in " increasing the information of container table " and " the deletion information of container table ", and the increase mode of container object is to add after traversal finds its upper strata container in hierarchical relationship structure storehouse again; In the process of inserting new container object, the key word of new container object need be given the corresponding object in the buffer models.
The method of the CIM model that electric network model changes in the fixed time section is described in aforesaid generation, wherein, the equipment that T1 deletes constantly in the equipment of T1 back increase constantly and " the sweep equipment information table " in " increasing the facility information table " all needs to increase newly in the hierarchical relationship structure storehouse of buffer zone, and the increase mode of device object is to add after traversal finds its equipment container in hierarchical relationship structure storehouse again; In the process of inserting the new equipment object, the key word of new equipment object need be given the corresponding object in the buffer models, and give corresponding object in the buffer models the parameter of newly added equipment.
The method of the CIM model that electric network model changes in the fixed time section is described in aforesaid generation, wherein, the tie point of T1 deletion before the moment all needs to increase newly in the topological connection relation structure storehouse of buffer zone in the tie point that T1 increases constantly in " increasing the connection point information table " and " the deletion connection point information table ", the increase mode of tie point object is the one or more annexation record that increases tie point and equipment end points in the topological connection relation table newly, the life start time and the life concluding time of this tie point of record in the tie point lifecycle matrix; In the process of inserting new tie point object, overall unique sign of new tie point need be given the corresponding tie point object that topology connects in the buffer zone.
The present invention also provides a kind of system of describing the CIM model that electric network model changes in the fixed time section that generates, and this system comprises,
CIM XML document analysis module in order to electric network model CIM XML document analysis, and forms level relational structure storehouse and topological connection relation structure storehouse in buffer zone;
Electrical network changes the object definition module, in order to the situation of change of input fixed time section inner pressurd vessel, equipment and topological tie point object;
Database module, in order to hierarchical relationship structure storehouse and the topological connection relation structure storehouse that stores the generation of CIM XML document analysis and expand through time attribute, and the storage electrical network changes the change records of container, equipment and the topology objects imported in the object definition module;
Electrical network changes the object handles module, handles in order to the change records that electrical network is changed container, equipment and topological tie point object in the object definition module, is updated in the hierarchical relationship structure storehouse and topological connection relation structure storehouse of buffer zone;
The generation module of electric network model variation CIM model file in the fixed time section is described, in order to according to hierarchical relationship structure storehouse in the buffer zone and topological connection relation structure storehouse, generate the CIM model XML file of describing electric network model variation in the fixed time section according to CIM XML syntax rule;
The generation module of arbitrary moment electric network model state CIM model file in the fixed time section is described, in order to according to the given time in the fixed time section, life start time of the CIM model object in hierarchical relationship structure storehouse and the topological connection relation structure storehouse and life concluding time and given time are compared, to doing mark, then the CIM model object of all tape labels is generated the CIM model XML file of given time electrical network according to the CIMXML syntax rule at the CIM model object of given time survival.
Description of drawings
Fig. 1 is " additions and deletions information of container table " structural drawing;
Fig. 2 is " additions and deletions facility information table " structural drawing;
Fig. 3 is " additions and deletions connection point information table " structural drawing;
Fig. 4 is the middle-level relational structure of a buffer zone storehouse hierarchical relationship structural drawing;
Fig. 5 is topological connection relation list structure figure in the topological connection relation structure storehouse in the buffer zone;
Fig. 6 is a tie point lifecycle matrix structural drawing in the topological connection relation structure storehouse in the buffer zone;
Fig. 7 is the process flow diagram that generates the CIM model of describing fixed time section electrical network variation;
Embodiment
In the present invention, disclosed the method for electric network model object variation definition in a kind of fixed time section, the structure of Fig. 1 " additions and deletions information of container table " is described as follows:
Container Type: company, sub-control zone, factory station or electric pressure;
Container identification: the unique identification of the container that increases newly or delete;
Higher level's Container Type: company, sub-control zone, factory station or electric pressure;
Higher level's container identification: the sign of container under the higher level of the container that increases newly or delete;
The additions and deletions sign: being used for distinguishing this container is to increase or deletion;
The time of container additions and deletions: the time that increases or delete container newly;
The structure of Fig. 2 " additions and deletions facility information table " is described as follows:
Device type: generator, bus, transformer, circuit, switch, disconnecting link, cutter, load, capacitor or reactor;
Device name: the equipment mark that increases newly or delete;
Equipment end point identification tabulation (chained list): the tabulation or the chained list of the Endpoint ID of the equipment that increases newly or delete;
Equipment container type: the type of container under the equipment that increases newly or delete, company, sub-control zone, factory station or electric pressure;
Equipment container sign: the sign of container under the equipment that increases newly or delete;
The additions and deletions sign: being used for distinguishing this equipment is to increase or deletion;
The equipment additions and deletions time: the time of newly-increased or sweep equipment;
The structure of Fig. 3 " additions and deletions connection point information table " is described as follows:
Tie point sign: the sign of the tie point that increases newly or delete;
The equipment end point identification tabulation (chained list) that links to each other with this tie point: the tabulation or the chained list of the equipment end point identification that links to each other with this tie point;
The additions and deletions sign: being used for distinguishing this tie point is to increase or deletion;
The tie point additions and deletions time: the time that increases or delete tie point newly;
In the present invention, disclosed a kind of method of in buffer zone, describing CIM XML electric network model information, at first with CIM XML electric network model document analysis in buffer zone, and in buffer zone, form level relational structure storehouse and topological connection relation structure storehouse; Adopting the purpose in hierarchical relationship structure storehouse is for follow-up the newly-increased of container object and device object to be prepared, and also is that the CIM model that guarantees description time period of deriving from this hierarchical relationship structure storehouse meets the IEC61970/CIM standard in addition.
The CIM/XML model is resolved in the buffer zone, and its arrangement is level type structure shown in Figure 4, form level relational structure storehouse; In Fig. 4: between company, sub-control area, factory station, electric pressure and the equipment (generator, load, switch, disconnecting link, cutter, capacitive reactance device, bus) is level type relation, also for level type relation, has the container class feature between factory station, transformer, the Transformer Winding.
Hierarchical relationship structure storehouse formation method is as follows:
(a) power system objects among the CIM XML is created in buffer zone according to type separately, and in buffer zone, write down the rdfid of each object correspondence;
(b) in buffer zone, set up hierarchical relationship structure between object and its container, available two-dimensional array relation or level type pointer relationship description according to the rdf id of the attribute MemberOf_ of container under the power system objects in the CIM XML model file and the pairing power system objects of this rdf id.
The topological connection relation that in buffer zone, utilizes relation of hinting obliquely between the rdf id of the rdf id of device object and device port (terminal) and the incidence relation between device port (Terminal) and the topological tie point (ConnectivityNode) to describe electrical network;
Topological connection relation structure storehouse formation method: by the rdf id in the Terminal.ConnectivityNode property value of traversal device port, incidence relation between apparatus for establishing port (Terminal) and the topological tie point (connectivityNode), and this topological connection relation is written in the topological connection relation table in the topological connection relation structure storehouse; If do not exist in the tie point lifecycle matrix of rdfid in topological connection relation structure storehouse of this tie point simultaneously, then in this table, add the record of this tie point.
In Fig. 5 buffer zone in the topological connection relation structure storehouse topological connection relation list structure be described as follows:
Tie point sign: the sign of the tie point that increases newly or delete;
Equipment end point identification: the equipment end point identification that links to each other with this tie point;
In Fig. 6 buffer zone in the topological connection relation structure storehouse tie point life cycle list structure be described as follows:
Tie point sign: the sign of the tie point that increases newly or delete;
The life start time: the life start time of this tie point;
The life concluding time: the life concluding time of this tie point;
In the present invention, it is newly-increased to have disclosed a kind of hierarchical relationship structure storehouse of variation in buffer zone according to container, device object, according to method newly-increased in the topological connection relation structure storehouse of variation in buffer zone of tie point object:
A) container of deleting constantly for T1 in " deletion information of container table ", in buffer zone, insert new container object in the hierarchical relationship structure storehouse of CIM model, search from hierarchical relationship structure storehouse, traveling through according to higher level's Container Type and higher level's container identification, after finding the rdf id of higher level's container, in the MemberOf_ of new container object attribute, be set at the rdfid of higher level's container, the key word of deletion container object is composed to the container object in the CIMXML buffer zone, and the value that the life of this container is finished time attribute is set at time corresponding in the deletion information of container table;
B) container that increases constantly for T1 in " increasing the information of container table ", in buffer zone, insert new container object in the hierarchical relationship structure storehouse of CIM model, search from hierarchical relationship structure storehouse, traveling through according to higher level's Container Type and higher level's container identification, after finding the rdf id of higher level's container, in the MemberOf_ of new container object attribute, be set at the rdfid of higher level's container, the key word of newly-increased container object is composed to the container object in the CIMXML buffer zone, and the value of the life start time attribute of this container is set at increases time corresponding in the information of container table;
C) equipment of deleting constantly for T1 in " sweep equipment information table ", in buffer zone, insert new device object in the hierarchical relationship structure storehouse of CIM model, be identified at from hierarchical relationship structure storehouse, to travel through according to equipment container type and equipment container and search, after finding the rdf id of equipment container, in the MemberOf_ of new container object attribute, be set at the rdfid of equipment container, the key word of sweep equipment object is composed to the object in the CIMXML buffer zone, replenish the parameter information of newly added equipment, design parameter when this parameter information can be planning, the actual measurement parameter of doing experiment and producing before nameplate parameter after the selected unit type or the device start, the value that simultaneously life of this equipment is finished time attribute is set at time corresponding in the sweep equipment information table;
D) equipment that increases constantly for T1 in " increasing the facility information table ", in buffer zone, insert new device object in the hierarchical relationship structure storehouse of CIM model, be identified at from hierarchical relationship structure storehouse, to travel through according to equipment container type and equipment container and search, after finding the rdf id of equipment container, in the MemberOf_ of new container object attribute, be set at the rdfid of equipment container, the key word of sweep equipment object is composed to the object in the CIMXML buffer zone, replenish the parameter information of newly added equipment, design parameter when this parameter information can be planning, the actual measurement parameter of doing experiment and producing before nameplate parameter after the selected unit type or the device start, the value of the life start time attribute of this equipment is set at increases time corresponding in the facility information table simultaneously;
E) tie point of deleting constantly for T1 in " deletion connection point information table ", insert new tie point object in the tie point lifecycle matrix in buffer zone in the topological connection relation structure storehouse of CIM model, increase the annexation between this tie point and equipment end points in the topological connection relation table, the value that simultaneously life of this tie point is finished time attribute is set at deletes time corresponding in the connection point information table;
F) tie point that increases constantly for T1 in " increasing the connection point information table ", insert new tie point object in the tie point lifecycle matrix in buffer zone in the topological connection relation structure storehouse of CIM model, increase the annexation between this tie point and equipment end points in the topological connection relation table, the value with the life start time attribute of this tie point is set at time corresponding in the increase connection point information table simultaneously;
In the present invention, disclosed a kind of hierarchical relationship structure storehouse and topological connection relation structure storehouse, generated the method for describing the CIM model XML file that electric network model changes in the fixed time section according to CIM XML syntax rule according to band time attribute in the buffer zone.
Through increasing newly of container object, device object, at the appointed time all exist in the hierarchical relationship structure storehouse of all model objects in buffer zone that occurred in the section, and neither lack not redundant yet, can be when generating the CIMXML file respectively to of the description of these power system objects with time attribute; And for the description of the hierarchical relationship between object, can set rdfid by affiliated container attribute MemberOf_ to describe; For the description on the topological relation, Terminal.ConductingEquipment attribute by device port, the relation of set device end points and equipment room, set the rdfid of tie point by the Terminal.ConnectivityNode attribute of device port, indicate the incidence relation between this device port (Terminal) and the topological tie point (connectivityNode), set affiliated container by the MemberOf_ attribute of topological tie point again, and in topological tie point object, specify the time attribute of this tie point.
In the present invention, disclosed a kind of hierarchical relationship structure storehouse and topological connection relation structure storehouse, generated the method for describing the CIM model XML file of the electric network model state of given time in the fixed time section according to CIM XML syntax rule according to band time attribute in the buffer zone.
(a) according to the given time in the fixed time section, life start time of the CIM model object in hierarchical relationship structure storehouse and the topological connection relation structure storehouse and life concluding time and given time are compared, if given time is at life start time and life in the middle of the concluding time, illustrate that this object survives at given time, do mark to the CIM object of this survival;
(b) the CIM model object of all tape labels is generated the CIM model XML file of given time electrical network according to CIM XML syntax rule.
In the present invention, disclosed a kind of CIM XML model file and the container in certain time period, equipment and topology point change records according to certain moment electrical network, generation can be described the method for the CIM model that electric network model changes in the fixed time section, as a preferred embodiment shown in Fig. 7 is.
Obtaining of initial CIM model: the electric system net is transferred the center and is economized the accent center and derive this electrical network CIM model in the end of the year respectively when the end of the year from EMS, net accent center will be netted to be in harmonious proportion according to the relation of administering and be economized the CIM model that the CIM file of transferring is spliced into the whole network in an end of the year, with the CIM model of this model as T1 moment the whole network.
Change records according to planning input electrical network CIM object in the current year: net accent center and province accent center basis compass of competency separately respectively are input to planning for the expansion of power grids in the current year in additions and deletions information of container table, additions and deletions facility information table and the additions and deletions connection point information table successively.
Treatment step: Fig. 7 has showed the CIM model file of describing power network development variation in the year according to aforesaid (1) to the generation of (6) step.
Result verification: describe the CIM model that this year, annual power network development changed by analyzing, generate this moment electrical network CIM model choosing a plurality of moment, these models are constantly verified with the topological aspect that is connected from object properties, proved the correctness of this describing method.

Claims (8)

1. one kind generates the method for describing the common information model (CIM model) that electric network model changes in the fixed time section, comprises the following steps:
(1) imports initial CIM model: T1 moment electric network model CIM XML file is imported to buffer zone, in buffer zone, set up hierarchical relationship structure storehouse and topological connection relation structure storehouse;
(2) situation of change of electric network model object in the input fixed time section:
A) situation of change of fixed time section inner pressurd vessel: the record that input fixed time section inner pressurd vessel increases and deletes forms " the increasing the information of container table " and " deletion information of container table " that comprise additions and deletions time field;
B) situation of change of equipment in the fixed time section: the record that power system device increases and deletes in the input fixed time section forms " the increasing the facility information table " and " the sweep equipment information table " that comprise additions and deletions time field;
C) situation of change of topological tie point in the fixed time section: the increase of topological tie point and the record of deletion in the input fixed time section form " the increasing the connection point information table " and " deletion connection point information table " that comprise additions and deletions time field;
(3) with all records in the above-mentioned information table according to classifying before or after constantly at T1, and by the additions and deletions time-sequencing, form T1 constantly before and the additions and deletions object indexing table of T1 after constantly;
(4) the electric network model object in the buffer zone is added time attribute:
4.1) time attribute of container object adds: in buffer zone in the hierarchical relationship structure storehouse of CIM model, increase by two time attribute of container object: life start time attribute, life finish time attribute, the default value of life start time attribute is negative infinite distance, and the default value that life finishes time attribute is positive infinite distance;
4.2) time attribute of device object adds: in buffer zone in the hierarchical relationship structure storehouse of CIM model, increase by two time attribute of device object: life start time attribute, life finish time attribute, the default value of life start time attribute is negative infinite distance, and the default value that life finishes time attribute is positive infinite distance;
4.3) time attribute of topological tie point object adds: in buffer zone in the topological connection relation structure storehouse of CIM model, increase by two time attribute of tie point object: life start time attribute, life finish time attribute, the default value of life start time attribute is negative infinite distance, and the default value that life finishes time attribute is positive infinite distance;
(5) successively the electric network model object in the buffer zone is upgraded with the additions and deletions object indexing table of T1 after the moment constantly according to T1:
5.1) the container object renewal:
A) for the container of the back deletion constantly of T1 in " deletion information of container table ", in buffer zone in the hierarchical relationship structure storehouse of CIM model, the value that the life of this container is finished time attribute is set at time corresponding in the deletion information of container table;
B) container of deleting constantly for T1 in " deletion information of container table ", in buffer zone, insert new container object in the hierarchical relationship structure storehouse of CIM model, the key word of deletion container object is composed to the container object in the CIM XML buffer zone, and the value that the life of this container is finished time attribute is set at time corresponding in the deletion information of container table;
C) container that increases constantly for T1 in " increasing the information of container table ", in buffer zone, insert new container object in the hierarchical relationship structure storehouse of CIM model, the key word of newly-increased container object is composed to the container object in the CIM XML buffer zone, and the value of the life start time attribute of this container is set at increases time corresponding in the information of container table;
D) container that increases constantly for T1 in " increase information of container table " is in buffer zone in the hierarchical relationship structure storehouse of CIM model; The value of the life start time attribute of this container is set at increases time corresponding in the information of container table;
5.2) the device object renewal:
A) for the equipment of the back deletion constantly of T1 in " sweep equipment information table ", in buffer zone in the hierarchical relationship structure storehouse of CIM model, the value that the life of this equipment is finished time attribute is set at time corresponding in the sweep equipment information table;
B) equipment of deleting constantly for T1 in " sweep equipment information table ", in buffer zone, insert new device object in the hierarchical relationship structure storehouse of CIM model, the key word of sweep equipment object is composed to the object in the CIM XML buffer zone, replenish the parameter information of newly added equipment, the value that the life of this equipment is finished time attribute is set at time corresponding in the sweep equipment information table;
C) equipment that increases constantly for T1 in " increasing the facility information table ", in buffer zone, insert new device object in the hierarchical relationship structure storehouse of CIM model, the key word of newly added equipment object is composed to the object in the CIM XML buffer zone, replenish the parameter information of newly added equipment, the value of the life start time attribute of this equipment is set at increases time corresponding in the facility information table;
D) equipment that increases constantly for T1 in " increase facility information table " is in buffer zone in the hierarchical relationship structure storehouse of CIM model; The value of the life start time attribute of this equipment is set at increases time corresponding in the facility information table;
5.3) renewal of topological relation object: after finishing the renewal of container object and device object, the model object in the buffer zone is all containers and the device object that occurred in the fixed time section,
A) for the tie point of the back deletion constantly of T1 in " deletion connection point information table ", in buffer zone in the topological connection relation structure storehouse of CIM model, the value that the life of this tie point is finished time attribute is set at time corresponding in the deletion connection point information table;
B) tie point of deleting constantly for T1 in " deletion connection point information table ", insert new tie point object in buffer zone in the topological connection relation structure storehouse of CIM model, the value that the life of this tie point is finished time attribute is set at time corresponding in the deletion connection point information table;
C) tie point that increases constantly for T1 in " increasing the connection point information table ", insert new tie point object in buffer zone in the topological connection relation structure storehouse of CIM model, the value of the life start time attribute of this tie point is set at increases time corresponding in the connection point information table;
D) tie point that increases constantly for T1 in " increase connection point information table ", in buffer zone in the topological connection relation structure storehouse of CIM model, the value that the life of this tie point is begun attribute is set at and increases time corresponding in the connection point information table;
(6) according to the hierarchical relationship structure storehouse and the topological connection relation structure storehouse of band time attribute in the buffer zone, generate the CIM model XML file of describing electric network model variation in the fixed time section according to CIM XML syntax rule.
2. the method for the CIM model that electric network model changes in the fixed time section is described in generation according to claim 1, it is characterized in that: the fixed time section is meant from T1, to T2 (time span of T1<T2) finish, i.e. [T1, a T2] constantly; Or from T0 (T0<T1) is to the time span that T1 finishes constantly, i.e. [T0, T1]; Or from T0 (T0<T1) is to T2 (time span of T1<T2) finish, i.e. [T0, T2] constantly.
3. the method for the CIM model that electric network model changes in the fixed time section is described in generation according to claim 1, it is characterized in that increasing or the type of delete container is that company, sub-control zone, factory stand or electric pressure.4, the method for the CIM model that electric network model changes in the fixed time section is described in generation according to claim 1, it is characterized in that increasing or the type of sweep equipment be generator, bus, transformer, circuit, switch, disconnecting link, cutter, load, capacitor or reactor.
5. the method for the CIM model that electric network model changes in the fixed time section is described in generation according to claim 1, it is characterized in that the CIM model file is imported buffer zone, application level relational structure storehouse and the topological connection relation structure storehouse model of recombinating, the characteristics in hierarchical relationship structure storehouse are to contain one deck container down with the last layer container, topological connection relation structure Al Kut point is made up of two bivariate tables, be respectively topological connection relation table and tie point lifecycle matrix, the topological connection relation table is used for describing the annexation between tie point and equipment end points, and the tie point lifecycle matrix is used for describing the life start time and the life concluding time of tie point.
6. the method for the CIM model that electric network model changes in the fixed time section is described in generation according to claim 1, it is characterized in that T1 in " increase information of container table " constantly in the container that increases of back and " the deletion information of container table " T1 constantly before container of deletion all need in the hierarchical relationship structure storehouse of buffer zone, increase newly, the increase mode of container object is to add after traversal finds its upper strata container in hierarchical relationship structure storehouse again; In the process of inserting new container object, the key word of new container object need be given the corresponding object in the buffer models.
7. the method for the CIM model that electric network model changes in the fixed time section is described in generation according to claim 1, it is characterized in that T1 in " increase facility information table " constantly in the equipment that increases of back and " the sweep equipment information table " T1 constantly before equipment of deletion all need in the hierarchical relationship structure storehouse of buffer zone, increase newly, the increase mode of device object is to add after traversal finds its equipment container in hierarchical relationship structure storehouse again; In the process of inserting the new equipment object, the key word of new equipment object need be given the corresponding object in the buffer models, and give corresponding object in the buffer models the parameter of newly added equipment.
8. the method for the CIM model that electric network model changes in the fixed time section is described in generation according to claim 1, it is characterized in that the tie point of T1 moment back increase in " increasing the connection point information table " and the tie point of " deletion connection point information table " middle T1 preceding deletion constantly all need to increase newly in the topological connection relation structure storehouse of buffer zone, the increase mode of tie point object is the one or more annexation record that increases tie point and equipment end points in the topological connection relation table newly, the life start time and the life concluding time of this tie point of record in the tie point lifecycle matrix; In the process of inserting new tie point object, overall unique sign of new tie point need be given the corresponding tie point object that topology connects in the buffer zone.
9. one kind generates the system of describing the CIM model that electric network model changes in the fixed time section, this system comprises, CIM XML document analysis module in order to electric network model CIM XML document analysis, and forms level relational structure storehouse and topological connection relation structure storehouse in buffer zone;
Electrical network changes the object definition module, in order to the situation of change of input fixed time section inner pressurd vessel, equipment and topological tie point object;
Database module, in order to hierarchical relationship structure storehouse and the topological connection relation structure storehouse that stores the generation of CIM XML document analysis and expand through time attribute, and the storage electrical network changes the change records of container, equipment and the topology objects imported in the object definition module;
Electrical network changes the object handles module, handles in order to the change records that electrical network is changed container, equipment and topological tie point object in the object definition module, is updated in the hierarchical relationship structure storehouse and topological connection relation structure storehouse of buffer zone;
The generation module of electrical network variation CIM model file in the fixed time section is described, in order to according to hierarchical relationship structure storehouse in the buffer zone and topological connection relation structure storehouse, generate the CIM model XML file of describing electrical network variation in the fixed time section according to CIM XML syntax rule;
The generation module of arbitrary moment electric network model state CIM model file in the fixed time section is described, in order to according to the given time in the fixed time section, life start time of the CIM model object in hierarchical relationship structure storehouse and the topological connection relation structure storehouse and life concluding time and given time are compared, to doing mark, then the CIM model object of all tape labels is generated the CIM model XML file of given time electrical network according to the CIMXML syntax rule at the CIM model object of given time survival.
CN200910053573.XA 2009-06-22 2009-06-22 Method used for generating CIM model describing power grid change in designated time slot and system thereof Active CN101930481B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910053573.XA CN101930481B (en) 2009-06-22 2009-06-22 Method used for generating CIM model describing power grid change in designated time slot and system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910053573.XA CN101930481B (en) 2009-06-22 2009-06-22 Method used for generating CIM model describing power grid change in designated time slot and system thereof

Publications (2)

Publication Number Publication Date
CN101930481A true CN101930481A (en) 2010-12-29
CN101930481B CN101930481B (en) 2014-09-03

Family

ID=43369657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910053573.XA Active CN101930481B (en) 2009-06-22 2009-06-22 Method used for generating CIM model describing power grid change in designated time slot and system thereof

Country Status (1)

Country Link
CN (1) CN101930481B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102243676A (en) * 2011-07-13 2011-11-16 国电南瑞科技股份有限公司 Three-level modeling method of new energy comprehensive monitoring system
CN102521451A (en) * 2011-12-13 2012-06-27 华东电网有限公司 Power grid model file for supporting fast model splicing, generation method and system thereof
CN102571427A (en) * 2010-12-31 2012-07-11 上海可鲁系统软件有限公司 Method for naming and analyzing CIM (common information model) resources in distributed systems
CN103164760A (en) * 2011-12-13 2013-06-19 华东电网有限公司 Power grid increment planning method and system
CN103164532A (en) * 2013-04-07 2013-06-19 广东电网公司电力科学研究院 Classification and partitioning extract method of power grid model data and system
CN104239447A (en) * 2014-09-01 2014-12-24 江苏瑞中数据股份有限公司 Power-grid big time series data storage method
CN104598691A (en) * 2015-01-30 2015-05-06 国家电网公司 Network model checking method
CN104731992A (en) * 2013-12-20 2015-06-24 国家电网公司 Distribution automation modeling method and distribution automation modeling device
CN105426300A (en) * 2015-10-20 2016-03-23 中国电力科学研究院 Power system CIM/E model standard conformance testing system and method
CN105608204A (en) * 2015-12-25 2016-05-25 北京奇虎科技有限公司 Generation method and device for incremental index list
CN107231291A (en) * 2017-04-24 2017-10-03 全球能源互联网研究院 A kind of micro services partition method and device suitable for electric network information physical system
CN113515537A (en) * 2021-09-13 2021-10-19 天津南大通用数据技术股份有限公司 Method for realizing maintenance-free of garbage data of life cycle table

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556638A (en) * 2003-12-30 2004-12-22 上海交通大学 Method of following SNMP/CIM protocol intermediate piece projection
CN1627759A (en) * 2003-12-12 2005-06-15 国际商业机器公司 Digital management system and method of managing access right in such system
CN101004752A (en) * 2006-12-26 2007-07-25 国电南瑞科技股份有限公司 Method of jointing multiple regional net models of electric power system
CN101042704A (en) * 2006-03-23 2007-09-26 戴尔产品有限公司 System and method for managing objects according to the common information model

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1627759A (en) * 2003-12-12 2005-06-15 国际商业机器公司 Digital management system and method of managing access right in such system
CN1556638A (en) * 2003-12-30 2004-12-22 上海交通大学 Method of following SNMP/CIM protocol intermediate piece projection
CN101042704A (en) * 2006-03-23 2007-09-26 戴尔产品有限公司 System and method for managing objects according to the common information model
CN101004752A (en) * 2006-12-26 2007-07-25 国电南瑞科技股份有限公司 Method of jointing multiple regional net models of electric power system

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102571427B (en) * 2010-12-31 2016-09-28 上海可鲁系统软件有限公司 The name of CIM resource and analytic method in a kind of distributed system
CN102571427A (en) * 2010-12-31 2012-07-11 上海可鲁系统软件有限公司 Method for naming and analyzing CIM (common information model) resources in distributed systems
CN102243676B (en) * 2011-07-13 2012-12-05 国电南瑞科技股份有限公司 Three-level modeling method of new energy comprehensive monitoring system
CN102243676A (en) * 2011-07-13 2011-11-16 国电南瑞科技股份有限公司 Three-level modeling method of new energy comprehensive monitoring system
CN102521451A (en) * 2011-12-13 2012-06-27 华东电网有限公司 Power grid model file for supporting fast model splicing, generation method and system thereof
CN103164760A (en) * 2011-12-13 2013-06-19 华东电网有限公司 Power grid increment planning method and system
CN102521451B (en) * 2011-12-13 2017-09-19 华东电网有限公司 A kind of electric network model file, generation method and the system of supporting accelerated model to splice
CN103164532A (en) * 2013-04-07 2013-06-19 广东电网公司电力科学研究院 Classification and partitioning extract method of power grid model data and system
CN103164532B (en) * 2013-04-07 2015-08-12 广东电网有限责任公司电力科学研究院 The classification piecemeal abstracting method of grid model data and system
CN104731992A (en) * 2013-12-20 2015-06-24 国家电网公司 Distribution automation modeling method and distribution automation modeling device
CN104239447A (en) * 2014-09-01 2014-12-24 江苏瑞中数据股份有限公司 Power-grid big time series data storage method
CN104598691B (en) * 2015-01-30 2020-04-28 国家电网公司 Network model checking method
CN104598691A (en) * 2015-01-30 2015-05-06 国家电网公司 Network model checking method
CN105426300A (en) * 2015-10-20 2016-03-23 中国电力科学研究院 Power system CIM/E model standard conformance testing system and method
CN105426300B (en) * 2015-10-20 2021-01-15 中国电力科学研究院 Standard conformance test system and method for CIM/E model of power system
US11176028B2 (en) 2015-10-20 2021-11-16 China Electric Power Research Institute Company Limited System, method and storage device for CIM/E model standard compliance test
CN105608204A (en) * 2015-12-25 2016-05-25 北京奇虎科技有限公司 Generation method and device for incremental index list
CN107231291A (en) * 2017-04-24 2017-10-03 全球能源互联网研究院 A kind of micro services partition method and device suitable for electric network information physical system
CN107231291B (en) * 2017-04-24 2022-04-05 全球能源互联网研究院 Micro-service isolation method and device suitable for power grid information physical system
CN113515537A (en) * 2021-09-13 2021-10-19 天津南大通用数据技术股份有限公司 Method for realizing maintenance-free of garbage data of life cycle table

Also Published As

Publication number Publication date
CN101930481B (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN101930481B (en) Method used for generating CIM model describing power grid change in designated time slot and system thereof
CN107784397B (en) Power grid material demand prediction system and prediction method thereof
CN104166942B (en) Trans-regional supply district searching method and its system based on CIM
CN103646149B (en) The scheme of KBE generates automatically, evaluating system and method
CN102750406B (en) Multi-version management method for model set and difference model-based power grid model
CN103050016B (en) Hybrid recommendation-based traffic signal control scheme real-time selection method
CN101477549B (en) Knowledge base supported spatial database design method and system
CN104317864B (en) A method of the information model automatic identification based on IEC61850 logical nodes
CN104933631A (en) Power distribution network operation online analysis and evaluation system
CN106845794A (en) A kind of online check method of electric network model that system is dispatched for intelligent grid
CN105279144B (en) A kind of composition method and device of wind tunnel test data text file
CN111159365B (en) Implementation method, system and storage medium of scheduling model ontology intelligent question-answering system
CN109284346A (en) A kind of distribution network planning method and device based on cloud computing
CN102411764A (en) Data management system of electrical network equipment and management method thereof
CN105976262B (en) A kind of electric network model version sharing method based on plant stand granularity
CN109145362A (en) A kind of power network modeling method and system
CN112132327A (en) Multi-source data fusion-oriented intelligent planning system for power distribution network
CN107590749A (en) A kind of processing method and system with electricity consumption data
CN106339565A (en) Method for converting COMOS data to PDMS data in pipeline design
CN108319593A (en) A kind of secondary equipment of intelligent converting station modeling method for simulation training system
CN114548800A (en) Future-state power grid maintenance risk identification method and device based on power grid knowledge graph
CN107944659A (en) A kind of substation supervisory control system auto report completing method and apparatus
CN109903008A (en) A kind of subway work construction project progress visualization managing and control system and management-control method
CN109447466A (en) A kind of overall process visualization managing and control system based on Distribution Network Communication network construction
CN102411646A (en) Distribution data processing method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant