CN101915007A - Elevator socket-type tower body, mobile communication base station and mounting method for tower body - Google Patents

Elevator socket-type tower body, mobile communication base station and mounting method for tower body Download PDF

Info

Publication number
CN101915007A
CN101915007A CN 201010263296 CN201010263296A CN101915007A CN 101915007 A CN101915007 A CN 101915007A CN 201010263296 CN201010263296 CN 201010263296 CN 201010263296 A CN201010263296 A CN 201010263296A CN 101915007 A CN101915007 A CN 101915007A
Authority
CN
China
Prior art keywords
tower body
cover joint
cover
lifting
base station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010263296
Other languages
Chinese (zh)
Other versions
CN101915007B (en
Inventor
蒋演德
屠黑男
邱裕忠
林伟民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG NINGYUAN COUNTY TOWER MAST MAKE Co Ltd
Shanghai Tongyan Construction Science & Technology Co Ltd
Original Assignee
ZHEJIANG NINGYUAN COUNTY TOWER MAST MAKE Co Ltd
Shanghai Tongyan Construction Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG NINGYUAN COUNTY TOWER MAST MAKE Co Ltd, Shanghai Tongyan Construction Science & Technology Co Ltd filed Critical ZHEJIANG NINGYUAN COUNTY TOWER MAST MAKE Co Ltd
Priority to CN2010102632968A priority Critical patent/CN101915007B/en
Publication of CN101915007A publication Critical patent/CN101915007A/en
Application granted granted Critical
Publication of CN101915007B publication Critical patent/CN101915007B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention relates to an elevator socket-type tower body and a mobile communication base station. The tower body is formed by connecting a plurality of sockets; a lifting device lifts the sockets of the tower body; the lower part of the tower body is connected with an integrated combined machine room or is connected with a standardized container type machine room; and a foot hinged support on the lower part of the tower body and the machine room are fixedly connected with the base. The elevator socket-type tower body, the mobile communication base station and a mounting method for the tower body have the advantages that: the tower body is a folded lifting tower body which is formed by connecting the plurality of sockets, and can be erected by using a starting device after being assembled on site, so that the assembly is convenient and aerial work is reduced; the sockets of the tower body are lifted by using the lifting device which consists of a lifting screw rod, a lifting nut, a worm speed reducer and a motor, so safety and reliability are achieved; the tower body and the integrated combined machine room are connected into a whole so as to increase the rigidity and stability of the whole; and by using the modularized detachable movable base, the whole communication tower is convenient to move without the fixed site and has low manufacturing cost.

Description

The mounting method of lifting cover joint formula tower body and mobile communication base station and tower body
Technical field
The present invention relates to the post and telecommunications tower, the mounting method of especially a kind of lifting cover joint formula tower body and mobile communication base station and tower body.
Background technology
Present post and telecommunications tower both domestic and external mainly contains three kinds of forms, and the one, trussed construction angle of polygon head tower, the 2nd, trussed construction polygonal steel pipe tower, the 3rd, conical single-pipe tower all is to fixedly connected with ground, can not move, in some specific occasion, can cause communication not smooth,, or hold big assembly place etc. temporarily as the athletic meeting place, to set up communication tower in these places extremely uneconomical more, must design a kind of portable communication tower station and solve.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of lifting cover joint formula tower body and mobile communication base station, and tower body and machine room are connected with detachable basis, have flexible, characteristics such as the duration lacks, and cost is low.
Another technical problem to be solved by this invention is to provide the mounting method of above-mentioned lifting cover joint formula tower body.
The present invention solves the problems of the technologies described above the technical scheme of being taked: a kind of lifting cover joint formula tower body and mobile communication base station, wherein, tower body is formed by connecting by some cover joints, by lift-up device the tower body cover is saved lifting, the tower body bottom connects with integrated combination machine room, or be connected with standardization container-type machine room, the footing free bearing of last tower body bottom is connected with basic fixed with machine room.
On the basis of such scheme, described tower body is the triangle trussed construction, is formed by connecting by king-post, brace and cross bar; The cover joint of tower body is superimposed together by second cover joint of suit tower body in the tower body coxopodite and tower body the 3rd cover joint, constitutes three cover joint or above tower bodies.
On the basis of such scheme, between two tower bodies covers sections, leave certain interval, at outer hub top and interior cover root section portion lifting idler pulley is housed all, the king-post of tower body is as the guide rail of lifting idler pulley.
On the basis of such scheme, described lift-up device comprises that jacking screw mandrel, jacking nut, output shaft are hollow worm reducer and motor; The flange of jacking screw mandrel is connected with the bottom of tower body coxopodite with bolt, and the jacking nut is installed in the hollow output shaft of worm reducer, and worm reducer connects with motor, and is installed in the bottom of the tower body second cover joint.
On the basis of such scheme, the bottom of tower body coxopodite is provided with the footing free bearing, and the footing free bearing is connected with basic fixed with machine room.
On the basis of such scheme, described machine room is a trussed construction, and its top is provided with plate lifting device.
On the basis of such scheme, on the king-post of the every cover joint of tower body, self-locking and safety locking motion are housed all; The last hypomere end of jacking screw mandrel is provided with distance caging device.
On the basis of such scheme, described basis is the modular removable portable structure.
The invention has the beneficial effects as follows:
1, the superposed type liftable tower body of tower body for being formed by connecting by some cover joints can be assembled the back on the spot and erect with plate lifting device, and be easy to assembly, reduces work high above the ground;
2, the lift-up device jacking of jacking screw mandrel, jacking nut, worm reducer and motor composition is adopted in the lifting of tower body cover joint, and is safe and reliable;
3, tower body and integrated combination machine room are linked to be integral body, to increase whole rigidity and stability;
4, adopt the removable portable basis of modularization, make integrated communication tower conveniently moving, fixing land used is not cheap.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is a package assembly schematic diagram of the present invention.
Fig. 3 is three cover joint superposed type housing structure schematic diagrames of the present invention.
Fig. 4 is the tower body second cover joint climbing structure schematic diagram of the present invention.
Fig. 5 is tower body the 3rd a socket climbing structure schematic diagram of the present invention.
Label declaration in the accompanying drawing
1-footing free bearing; 2-tower body coxopodite; The 3-tower body second cover joint;
4-tower body the 3rd cover joint; 5-jacking screw mandrel; 6-jacking nut;
The 7-plate lifting device; 8-tower body coxopodite guide wheel; The 9-tower body second cover joint guide wheel;
10-tower body the 3rd cover joint guide wheel; The 11-distance caging device; The 12-machine room;
The 13-basis.
The specific embodiment
Below in conjunction with accompanying drawing structure of the present invention is described further.
Please participate in shown in Fig. 1 to 5, the superimposed cover joint formula tower body that the present invention is made up of the triangle truss, tower body is formed three cover joint formula tower bodies or quadruplet joint formula tower body (present embodiment is three cover joint formula tower bodies, is respectively tower body coxopodite 2, the tower body second cover joint 3 and tower body the 3rd cover joint 4) according to the height of tower.By lift-up device superimposed tower body cover joint is pursued the joint jacking, the bottom of tower body coxopodite 2 is connected with integrated combination machine room, or be connected with standardization container-type machine room, the footing free bearing 1 of last tower body coxopodite 2 bottoms is connected with the packaged type basis with machine room, the tower body top is provided with lightning rod and antenna holder, and antenna holder is connected (seeing shown in Figure 1) with the signal of communication line.
Wherein, triangle trussed construction tower body is formed by connecting by king-post, brace, cross bar; Be set with tower body second cover joint 3 in the tower body coxopodite 2 and tower body the 3rd cover joint 4(sees shown in Figure 3), being superimposed together constitutes three cover joint tower bodies, according to the tower body height tower body quadruplet joint can be set.
Between two tower bodies cover sections, leave certain interval, adjacent two cover joints adopt inside and outside suit (distinguishing with outside cover joint and inboard cover joint), at cover joint top, the outside and the inboard root section portion of overlapping lifting idler pulley is housed all, be that tower body coxopodite guide wheel 8, the tower body second cover joint guide wheel 9 and tower body the 3rd cover joint guide wheel 10(see shown in Figure 3), the king-post of tower body is as riser guide, when inboard cover joint and outside cover joint lifting, the frictional force that is produced in the time of can reducing lifting between guide wheel and the guide rail.
Plate lifting device 7 is installed in the machine room top, and wire rope one end is connected with plate lifting device 7, and the other end is connected with tower body coxopodite 4 tops.
Described lift-up device, by jacking screw mandrel 5, jacking nut 6, output shaft is that hollow worm reducer and motor formed, the flange of jacking screw mandrel 5 is connected with tower body coxopodite 2 bottoms with bolt, jacking nut 6 is installed in the hollow output shaft of worm reducer, worm reducer connects with motor, and is installed in the bottom of the tower body second cover joint 3.
On the king-post of the every cover joint of tower body, self-locking and safety locking motion are housed all.
The upper and lower end parts of jacking screw mandrel 5 is equipped with distance caging device 11.
Described integrated machine room 12 is a trussed construction, and the top is a framework, and tower body bottom free bearing 1 is connected with removable module type basis with machine room 12, and machine room 12 tops socket with wire rope and tower body.
Described modular type basis 13, as long as with the smooth compacting in fabricating yard, earth bearing strength reaches 〉=12t/m 2, module basis 13 installed to set level fuse.
The triangle truss tower body cover joint mounting method of lifting cover joint formula tower body is as follows:
(1) in ground tiling installation, suit tower bodies second cover joint 3 and tower body the 3rd cover save 4 in the tower body coxopodite 2, and the root of the tower body second cover joint 3 and the root of tower body the 3rd cover joint 4 are connected with bolt and nut temporarily;
(2) flange with jacking screw mandrel 5 bottoms is connected with the bottom of tower body coxopodite 2 with bolt;
(3) jacking nut 6 is loaded in the hollow shaft of worm reducer and connects; Worm reducer is connected with motor, and is installed in the bottom of the tower body second cover joint 3;
(4) fix up an aerial wire at tower body the 3rd socket 4 tops support and lightning rod;
(5) plate lifting device 7 is installed in machine room 12 tops, and wire rope one end is connected with plate lifting device 7, and the other end starts plate lifting device 7 with after 4 tops are connected at the bottom of the tower body, and whole tower body is vertical;
(6) forward actuating motor, the drive worm reducer makes 6 rotations of jacking nut, the tower body second cover joint 3 is saved 4 distance caging device 11 of climbing tower body coxopodite 2 tops together with tower body the 3rd cover end; Remove the flange bolt of tower body coxopodite 2 bottoms and jacking screw mandrel 5;
(7) reverse actuating motor, drive worm reducer, make the reverse rotation of jacking nut, jacking screw mandrel 5 is risen in the tower body second cover joint 3, fixedly jacking screw mandrel 5 flanges overlap being connected of joint 3 with tower body second, remove the bolt and nut that is connected between tower body second cover joint 3 and tower body the 3rd socket 4 again, at this moment, tower body coxopodite 2 and tower body second overlap and save 3 roots and fuse temporarily;
(8) forward actuating motor, drive worm reducer, make 6 rotations of jacking nut, tower body the 3rd socket 4 is up climbed along jacking screw mandrel 5, end the cover of the lifting so far joint formula tower body design height that all climbs until the tower body second cover joint 3 top distance caging device 11 of climbing.

Claims (9)

1. joint formula tower body and mobile communication base station are overlapped in a lifting, it is characterized in that: tower body is formed by connecting by some cover joints, by lift-up device the tower body cover is saved lifting, the tower body bottom connects with integrated combination machine room, or be connected with standardization container-type machine room, the footing free bearing of last tower body bottom is connected with basic fixed with machine room.
2. lifting cover joint formula tower body according to claim 1 and mobile communication base station, it is characterized in that: described tower body is the triangle trussed construction, is formed by connecting by king-post, brace and cross bar; The cover joint of tower body is superimposed together by second cover joint of suit tower body in the tower body coxopodite and tower body the 3rd cover joint, constitutes three cover joint or above tower bodies.
3. lifting cover joint formula tower body according to claim 1 and mobile communication base station, it is characterized in that: between two tower bodies cover sections, leave certain interval, at outer hub top and interior cover root section portion lifting idler pulley is housed all, the king-post of tower body is as the guide rail of lifting idler pulley.
4. lifting cover joint formula tower body according to claim 1 and 2 and mobile communication base station, it is characterized in that: described lift-up device comprises that jacking screw mandrel, jacking nut, output shaft are hollow worm reducer and motor; The flange of jacking screw mandrel is connected with the bottom of tower body coxopodite with bolt, and the jacking nut is installed in the hollow output shaft of worm reducer, and worm reducer connects with motor, and is installed in the bottom of the tower body second cover joint.
5. lifting cover joint formula tower body according to claim 2 and mobile communication base station, it is characterized in that: the bottom of tower body coxopodite is provided with the footing free bearing, and the footing free bearing is connected with basic fixed with machine room.
6. joint formula tower body and mobile communication base station are overlapped in lifting according to claim 1 or 5, and it is characterized in that: described machine room is a trussed construction, and its top is provided with plate lifting device.
7. lifting cover joint formula tower body according to claim 1 and mobile communication base station is characterized in that: on the king-post of the every cover joint of tower body self-locking and safety locking motion are housed all; The last hypomere end of jacking screw mandrel is provided with distance caging device.
8. lifting cover joint formula tower body according to claim 1 and mobile communication base station, it is characterized in that: described basis is the modular removable portable structure.
9. at the mounting method of the described lifting cover of one of claim 1 to 8 joint formula tower body, it is characterized in that: triangle truss tower body cover joint mounting method is as follows:
(1) in ground tiling installation, suit tower body second cover joint and tower body the 3rd cover save in the tower body coxopodite, and the root of the tower body second cover joint and the root of tower body the 3rd cover joint are connected with bolt and nut temporarily;
(2) flange with jacking screw mandrel bottom is connected with the bottom of tower body coxopodite with bolt;
(3) the jacking nut is loaded in the hollow shaft of worm reducer and connects; Worm reducer is connected with the motor of positive and negative two-way rotation, and is installed in the bottom of the tower body second cover joint;
(4) fix up an aerial wire at tower body the 3rd socket top support and lightning rod;
(5) plate lifting device is installed in the machine room top, and wire rope one end is connected with plate lifting device, and the other end starts plate lifting device with after tower body coxopodite top is connected, and whole tower body is vertical, and is connected with basic fixed;
(6) forward actuating motor, the drive worm reducer makes the rotation of jacking nut, and the tower body second cover joint is ended together with the distance caging device that tower body the 3rd cover saves the tower body coxopodite top of climbing; Remove the flange bolt of tower body coxopodite bottom and jacking screw mandrel;
(7) reverse actuating motor, drive worm reducer, make the reverse rotation of jacking nut, the jacking screw mandrel is risen in the tower body second cover joint, fixedly jacking screw mandrel flange is connected with the tower body second cover joint bottom, remove the bolt and nut that is connected between tower body second cover joint and tower body the 3rd socket again, at this moment, tower body coxopodite and tower body second overlap root section portion and fuse temporarily;
(8) forward actuating motor, drive worm reducer, make the rotation of jacking nut, tower body the 3rd socket is up climbed along the jacking screw mandrel, end the cover of the lifting so far joint formula tower body design height that all climbs until the tower body second cover joint top distance caging device of climbing.
CN2010102632968A 2010-08-26 2010-08-26 Elevator socket-type tower body, mobile communication base station and mounting method for tower body Expired - Fee Related CN101915007B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102632968A CN101915007B (en) 2010-08-26 2010-08-26 Elevator socket-type tower body, mobile communication base station and mounting method for tower body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102632968A CN101915007B (en) 2010-08-26 2010-08-26 Elevator socket-type tower body, mobile communication base station and mounting method for tower body

Publications (2)

Publication Number Publication Date
CN101915007A true CN101915007A (en) 2010-12-15
CN101915007B CN101915007B (en) 2012-07-04

Family

ID=43322625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102632968A Expired - Fee Related CN101915007B (en) 2010-08-26 2010-08-26 Elevator socket-type tower body, mobile communication base station and mounting method for tower body

Country Status (1)

Country Link
CN (1) CN101915007B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704717A (en) * 2012-05-09 2012-10-03 电联工程技术股份有限公司 Lifting support leg for mobile integrated base station
CN103015788A (en) * 2012-09-26 2013-04-03 河南省电力公司信阳供电公司 Electric lifting wire pole
CN103375033A (en) * 2013-06-27 2013-10-30 广西凯威电力通信安装工程有限公司 Integrated communication base station
CN103883137A (en) * 2014-02-17 2014-06-25 浙江宁远塔桅制造有限公司 Communication base station with tower rod and machine room in integration
CN104929416A (en) * 2015-05-06 2015-09-23 王英英 Mobile communication tower quick to move and mount
CN106907044A (en) * 2017-02-21 2017-06-30 华北水利水电大学 A kind of flat board and the mutual rotatable emergency communication tower body of cylindricality
CN108124319A (en) * 2016-11-28 2018-06-05 河北亿鑫通讯设备有限公司 A kind of self cooling environment protection integrated communications tower base station
CN108442799A (en) * 2018-03-27 2018-08-24 洛阳理工学院 A kind of portable mobile communication tower
CN109249379A (en) * 2018-11-16 2019-01-22 上海缆玥智能科技有限公司 A kind of truss structure
CN109812117A (en) * 2019-03-20 2019-05-28 衡水通广通信导航设备有限公司 A kind of movable-type intelligent lifting radar tower and its installation method
CN110242093A (en) * 2018-03-09 2019-09-17 苏馥仪 Stacked transmission tower and its construction method
CN111321753A (en) * 2020-02-28 2020-06-23 广州市万利胜电子科技有限公司 A steel skeleton type multi-band mobile communication base station
CN111779350A (en) * 2020-07-10 2020-10-16 胡培花 A signal tower installation combination device
CN114458071A (en) * 2022-03-08 2022-05-10 安徽沃恒建设工程项目管理有限公司 Assembled construction platform of segmental steel tower installation

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3952467A (en) * 1971-03-05 1976-04-27 Zip-Up Lighting Tower Company, Inc. Extendible tower structure
US4616454A (en) * 1985-02-19 1986-10-14 Suncor Inc. Slant service rig
CN2324279Y (en) * 1998-08-04 1999-06-16 丁桂秋 Multi-part linkage telescopic tower ladder
CN2688825Y (en) * 2004-01-05 2005-03-30 浙江电联设备工程有限公司 Rapid telecommunication towers
DE202006011099U1 (en) * 2006-02-23 2007-07-05 Liebherr-Werk Ehingen Gmbh telescopic mast
CN200993214Y (en) * 2006-11-20 2007-12-19 曾凡 Multi-stage spiral synchronous drive lifting device
CN201486198U (en) * 2009-08-10 2010-05-26 深圳市海生机房技术有限公司 Lifting tower and mobile base station
CN101775911A (en) * 2010-01-29 2010-07-14 浙江八方电信有限公司 Hydraulic integrated base station

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3952467A (en) * 1971-03-05 1976-04-27 Zip-Up Lighting Tower Company, Inc. Extendible tower structure
US4616454A (en) * 1985-02-19 1986-10-14 Suncor Inc. Slant service rig
CN2324279Y (en) * 1998-08-04 1999-06-16 丁桂秋 Multi-part linkage telescopic tower ladder
CN2688825Y (en) * 2004-01-05 2005-03-30 浙江电联设备工程有限公司 Rapid telecommunication towers
DE202006011099U1 (en) * 2006-02-23 2007-07-05 Liebherr-Werk Ehingen Gmbh telescopic mast
CN200993214Y (en) * 2006-11-20 2007-12-19 曾凡 Multi-stage spiral synchronous drive lifting device
CN201486198U (en) * 2009-08-10 2010-05-26 深圳市海生机房技术有限公司 Lifting tower and mobile base station
CN101775911A (en) * 2010-01-29 2010-07-14 浙江八方电信有限公司 Hydraulic integrated base station

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704717B (en) * 2012-05-09 2014-07-30 电联工程技术股份有限公司 Lifting support leg for mobile integrated base station
CN102704717A (en) * 2012-05-09 2012-10-03 电联工程技术股份有限公司 Lifting support leg for mobile integrated base station
CN103015788A (en) * 2012-09-26 2013-04-03 河南省电力公司信阳供电公司 Electric lifting wire pole
CN103375033A (en) * 2013-06-27 2013-10-30 广西凯威电力通信安装工程有限公司 Integrated communication base station
CN103883137A (en) * 2014-02-17 2014-06-25 浙江宁远塔桅制造有限公司 Communication base station with tower rod and machine room in integration
CN104929416A (en) * 2015-05-06 2015-09-23 王英英 Mobile communication tower quick to move and mount
CN108124319A (en) * 2016-11-28 2018-06-05 河北亿鑫通讯设备有限公司 A kind of self cooling environment protection integrated communications tower base station
CN106907044A (en) * 2017-02-21 2017-06-30 华北水利水电大学 A kind of flat board and the mutual rotatable emergency communication tower body of cylindricality
CN110242093A (en) * 2018-03-09 2019-09-17 苏馥仪 Stacked transmission tower and its construction method
CN108442799A (en) * 2018-03-27 2018-08-24 洛阳理工学院 A kind of portable mobile communication tower
CN109249379A (en) * 2018-11-16 2019-01-22 上海缆玥智能科技有限公司 A kind of truss structure
CN109812117A (en) * 2019-03-20 2019-05-28 衡水通广通信导航设备有限公司 A kind of movable-type intelligent lifting radar tower and its installation method
CN109812117B (en) * 2019-03-20 2024-05-03 衡水通广通信导航设备有限公司 Mobile intelligent lifting radar tower and installation method thereof
CN111321753A (en) * 2020-02-28 2020-06-23 广州市万利胜电子科技有限公司 A steel skeleton type multi-band mobile communication base station
CN111779350A (en) * 2020-07-10 2020-10-16 胡培花 A signal tower installation combination device
CN114458071A (en) * 2022-03-08 2022-05-10 安徽沃恒建设工程项目管理有限公司 Assembled construction platform of segmental steel tower installation
CN114458071B (en) * 2022-03-08 2024-03-19 安徽沃恒建设工程项目管理有限公司 Assembled construction platform for installing sectional steel tower

Also Published As

Publication number Publication date
CN101915007B (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN101915007B (en) Elevator socket-type tower body, mobile communication base station and mounting method for tower body
ES2564734T3 (en) Wind turbine mounting system
DK2715115T3 (en) PROCEDURE FOR THE CONSTRUCTION OF A WINDOW POWER PLANT
US8572926B2 (en) Lattice tower and an erection method for a wind turbine with a lattice tower
EP3130796B1 (en) Wind turbine assembly system and related method
US9140029B2 (en) Tower erecting system
US8117799B2 (en) Method of erecting a tower
US8302365B2 (en) Partially self-erecting wind turbine tower
CA2886897A1 (en) Supply frame for a tower, tower with a supply frame and method for erecting a supply frame in the interior of a tower
CA2803886A1 (en) Fluid-actuated telescoping tower for supporting heavy loads
US20110248506A1 (en) Assembly of components inside a large wind turbine
CN110552507A (en) Well is from automatic cloth system of concrete that climbs
CN201991266U (en) Elevating socket tower body and mobile communication base station
CN114232970B (en) Method for installing super high-rise self-elevating attached overhanging type interlayer material transfer platform
CN206770118U (en) A kind of liftable wind-driven generator tower frame
CN218149255U (en) Truss convenient to build
CN110725529A (en) Simple lifting scaffold
CN113107253B (en) Device for adjusting inclination angle of transmission tower
CN114291705B (en) Super high-rise self-elevating attached overhanging type interlayer material transfer platform
CN114856922A (en) Device for mounting wind power generation fan and tower drum and construction method thereof
CN201367724Y (en) Lift operating platform
US20200347634A1 (en) Self-Erecting Tower System and Associated Methods
CN220167448U (en) High-stability wind power tower construction platform
CN2687301Y (en) Integral tower-building type long-spiral drilling machine
CN220723385U (en) Tower crane with protection component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20170826