CN101908740A - 一种线路跨越方法及专用跨越架 - Google Patents

一种线路跨越方法及专用跨越架 Download PDF

Info

Publication number
CN101908740A
CN101908740A CN 201010247602 CN201010247602A CN101908740A CN 101908740 A CN101908740 A CN 101908740A CN 201010247602 CN201010247602 CN 201010247602 CN 201010247602 A CN201010247602 A CN 201010247602A CN 101908740 A CN101908740 A CN 101908740A
Authority
CN
China
Prior art keywords
crossing
cross
over pole
column
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010247602
Other languages
English (en)
Other versions
CN101908740B (zh
Inventor
肖红
李勇刚
谢有刚
侯毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN 201010247602 priority Critical patent/CN101908740B/zh
Publication of CN101908740A publication Critical patent/CN101908740A/zh
Application granted granted Critical
Publication of CN101908740B publication Critical patent/CN101908740B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明公开了一种线路跨越方法及专用跨越架,它通过将两根立柱和一根跨越杆组装、固定、跨越等步骤完成线路跨越,所述专用跨越架的跨越杆与其中一根立柱轴连接,与另一根立柱卡式连接,所述立柱上设置固定拉线,所述跨越杆上表面上纵向设置长槽,所述长槽内设置多个滑轮,所述滑轮上设置根牵引线穿过跨越杆长槽并伸出跨越杆,牵引线一端设置配重块,所述跨越杆与立柱轴连接的一端设置拉绳。使用简易跨越架进行线路跨越,能够满足各种跨越环境,跨越架结构简单,重量轻,操作方便灵活,通用性强,跨越安全、无隐患,运输、组装简单方便。

Description

一种线路跨越方法及专用跨越架
技术领域
本发明属于电力施工线路跨越方法及设备技术领域,特别涉及一种线路跨越方法及专用跨越架。
背景技术
在电力线路施工中,常常遇到跨越各种障碍物的跨越架线施工。因电力线路跨越的障碍物种类繁多,有各种电力线路、通讯线、公路、铁路、房屋等,且跨越点复杂给跨越架线施工带来较大的安全隐患。如施工时发生的意外事故,可能导致被跨电力线路长时间停电,铁路运输中断,严重的甚至可能危及人身安全,其损失也是非常惊人的。为确保跨越施工的安全可靠,通常采用搭设跨越架,封闭被跨越物的方法。因此,施工前对跨越架及跨越施工安全隐患的分析显得尤其重要。跨越施工的材料设备对跨越施工的进度、质量、安全均有直接影响。材料设备的选择,应本着因地制宜、因工程制宜,按照技术先进、经济合理、施工适用、性能可靠、使用安全、操作和维修方便的原则,突出机械与施工相结合的特点,使其具有工程的适用性,具有保证工程质量的可靠性,具有使用操作的方便性和安全性。跨越架使用前应根据被跨物的特点,进行相应的机械强度及电气试验,使跨越施工用的设备材料具有较高的可靠性。
发明内容
本发明提供一种程序简单、无须停电、安全可靠、无须高空作业、节约人力的线路跨越方法及专用跨越架。
一种线路跨越方法,它包括如下步骤:
a.选择好跨越的合适位置并做好标记,并准备好相应的工具;
b.将专用跨越架一侧立柱和跨越杆组装好,将牵引线放进跨越杆的长槽内,和牵引线连接的配重块与长槽端部的滑轮齐;
c.将立柱钉入地下,用三根拉线呈120度将立柱固定牢固;固定于另一侧立柱,并将立柱立起,也用三根拉线固定;
d.缓缓放松跨越杆拉绳,将跨越杆平稳放置于另一侧立柱上;
e.利用配重块自重放下牵引线,预放足够长够,将待跨越线固定于牵引线上;
f.拉动牵引线带动跨越线至另一侧,将跨越线固定于两侧线路杆塔上,就完成一根线路的跨越工作。
一种跨越线路的专用跨越架,它包括两根立柱和一根跨越杆,所述跨越杆与其中一根立柱轴连接,与另一根立柱卡式连接,所述立柱上设置固定拉线,所述跨越杆上表面上纵向设置长槽,所述长槽内设置多个滑轮,所述滑轮上设置一根牵引线穿过跨越杆长槽并伸出跨越杆,牵引线一端设置配重块,所述跨越杆与立柱轴连接的一端设置拉绳。
所述水柱和跨越杆间设置支撑杆。
本发明线路跨越方法及专用跨越架进行线路跨越,能够满足各种跨越环境,跨越架结构简单,重量轻,操作方便灵活,通用性强,跨越安全、无隐患,运输、组装简单方便。施工人员不需上下跨越架进行高空作业。跨越架结构不会对施工环境造成影响,根据跨越线路电压等级、线路对地距离,可以方便的增加侧杆高度及跨越杆长度,扩大作业范围。由于跨越杆上开口凹壶状,跨越线被限制在凹槽内,在跨越线路(公路等)较宽时,不会因线路弧度造成触电事故。跨越线前后不需登高即完成跨越工作。特别适用于跨越架线,不仅可以实现不登高跨越架设,而且可以降低跨越劳动强度,大大缩短跨越作业时间,大大提高了跨越架线施工安全系数及效率。
附图说明:
下面结合附图对本发明做进一步地说明:
图1是本发明专用跨越架的结构示意图;
图2是本发明专用跨越架中跨越杆长槽横剖面的结构示意图。
具体实施方式
如图1所示,一种线路跨越方法,它包括如下步骤:
a.选择好跨越的合适位置并做好标记,并准备好相应的工具;
b.将专用跨越架一侧立柱11和跨越杆2组装好,将牵引线4放进跨越杆2的长槽7内,和牵引线4连接的配重块5与长槽7端部的滑轮齐;
c.将立柱11钉入地下,用三根拉线3呈120度将立柱11固定牢固,固定于另一侧立柱12,并将立柱12立起,也用三根拉线3固定;
d.缓缓放松跨越杆拉绳6,将跨越杆2平稳放置于另一侧立柱12上;
e.利用配重块5自重放下牵引线4,预放足够长够,将待跨越线固定于牵引线4上;
f.拉动牵引线4带动跨越线至另一侧,将跨越线固定于两侧线路杆塔上,就完成一根线路的跨越工作。
一种简易线路跨越架,包括两根立柱11、12和一根跨越杆2,所述跨越杆2与其中一根立柱11轴连接,与另一根立柱12卡式连接,所述立柱11、12上设置固定拉线3,所述跨越杆2上表面上纵向设置长槽7,所述长槽7内设置多个滑轮8,所述滑轮8上设置一根牵引线4穿过跨越杆长槽7并伸出跨越杆2,牵引线4一端设置配重块5,所述跨越杆2与立柱11轴连接的一端设置拉绳6。
所述立柱11、12和跨越杆2间设置支撑杆9。
使用简易跨越架进行线路跨越,能够满足各种跨越环境,跨越架结构简单,重量轻,操作方便灵活,通用性强,跨越安全、无隐患,运输、组装简单方便。施工人员不需上下跨越架进行高空作业。跨越架结构不会对施工环境造成影响,根据跨越线路电压等级、线路对地距离,可以方便的增加侧杆高度及跨越杆长度,扩大作业范围。由于跨越杆上开口凹壶状,跨越线被限制在凹槽内,在跨越线路(公路等)较宽时,不会因线路弧度造成触电事故。跨越线前后不需登高即完成跨越工作。特别适用于跨越架线,不仅可以实现不登高跨越架设,而且可以降低跨越劳动强度,大大缩短跨越作业时间,大大提高了跨越架线施工安全系数及效率。

Claims (3)

1.一种线路跨越方法,其特征在于,它包括如下步骤:
a.选择好跨越的合适位置并做好标记,并准备好相应的工具;
b.将专用跨越架一侧立柱和跨越杆组装好,将牵引线放进跨越杆的长槽内,和牵引线连接的配重块与长槽端部的滑轮齐;
c.将立柱钉入地下,用三根拉线呈120度将立柱固定牢固;固定于另一侧立柱,并将立柱立起,也用三根拉线固定;
d.缓缓放松跨越杆拉绳,将跨越杆平稳放置于另一侧立柱上;
e.利用配重块自重放下牵引线,预放足够长够,将待跨越线固定于牵引线上;
f.拉动牵引线带动跨越线至另一侧,将跨越线固定于两侧线路杆塔上,就完成一根线路的跨越工作。
2.一种如权利要求1所述线路跨越方法的专用跨越架,它包括两根立柱和一根跨越杆,所述跨越杆与其中一根立柱轴连接,与另一根立柱卡式连接,所述立柱上设置固定拉线,所述跨越杆上表面上纵向设置长槽,所述长槽内设置多个滑轮,所述滑轮上设置一根牵引线穿过跨越杆长槽并伸出跨越杆,牵引线一端设置配重块,所述跨越杆与立柱轴连接的一端设置拉绳。
3.如权利要求1所述的线路跨越方法的专用跨越架,其特征在于:所述水柱和跨越杆间设置支撑杆。
CN 201010247602 2009-12-01 2010-08-09 一种线路跨越方法 Expired - Fee Related CN101908740B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010247602 CN101908740B (zh) 2009-12-01 2010-08-09 一种线路跨越方法

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200910227221.1 2009-12-01
CN200910227221 2009-12-01
CN 201010247602 CN101908740B (zh) 2009-12-01 2010-08-09 一种线路跨越方法

Publications (2)

Publication Number Publication Date
CN101908740A true CN101908740A (zh) 2010-12-08
CN101908740B CN101908740B (zh) 2012-09-19

Family

ID=43264109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010247602 Expired - Fee Related CN101908740B (zh) 2009-12-01 2010-08-09 一种线路跨越方法

Country Status (1)

Country Link
CN (1) CN101908740B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102082400A (zh) * 2009-12-01 2011-06-01 河南省电力公司南阳供电公司 简易线路跨越架
CN102412527A (zh) * 2011-12-02 2012-04-11 河南省电力公司南阳供电公司 可控升降带电跨越设备及其施工方法
CN102751668A (zh) * 2012-07-16 2012-10-24 温县供电有限责任公司 一种输电线路架线机
CN102412527B (zh) * 2011-12-02 2016-11-30 国网河南省电力公司南阳供电公司 可控升降带电跨越设备及其施工方法
CN108767768A (zh) * 2018-08-03 2018-11-06 中铁城建集团第三工程有限公司 一种用于铁路道口电力电缆临时过渡的电缆托架
CN111049059A (zh) * 2019-12-09 2020-04-21 国家电网有限公司 一种跨路架设电缆装置及其使用方法
CN117526156A (zh) * 2023-10-30 2024-02-06 国网四川省电力公司自贡供电公司 一种用于输电线路的跨越施工平台及安装方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2293141Y (zh) * 1996-11-28 1998-09-30 烟台市牟平区电业局 障碍导线跨越架
JP2002262420A (ja) * 2001-03-05 2002-09-13 Dainichi Denken:Kk 送電鉄塔用仮設アーム設備及びその施工方法
CN102082400A (zh) * 2009-12-01 2011-06-01 河南省电力公司南阳供电公司 简易线路跨越架

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2293141Y (zh) * 1996-11-28 1998-09-30 烟台市牟平区电业局 障碍导线跨越架
JP2002262420A (ja) * 2001-03-05 2002-09-13 Dainichi Denken:Kk 送電鉄塔用仮設アーム設備及びその施工方法
CN102082400A (zh) * 2009-12-01 2011-06-01 河南省电力公司南阳供电公司 简易线路跨越架

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102082400A (zh) * 2009-12-01 2011-06-01 河南省电力公司南阳供电公司 简易线路跨越架
CN102082400B (zh) * 2009-12-01 2012-09-05 河南省电力公司南阳供电公司 简易线路跨越架
CN102412527A (zh) * 2011-12-02 2012-04-11 河南省电力公司南阳供电公司 可控升降带电跨越设备及其施工方法
CN102412527B (zh) * 2011-12-02 2016-11-30 国网河南省电力公司南阳供电公司 可控升降带电跨越设备及其施工方法
CN102751668A (zh) * 2012-07-16 2012-10-24 温县供电有限责任公司 一种输电线路架线机
CN108767768A (zh) * 2018-08-03 2018-11-06 中铁城建集团第三工程有限公司 一种用于铁路道口电力电缆临时过渡的电缆托架
CN108767768B (zh) * 2018-08-03 2024-05-03 中铁城建集团第三工程有限公司 一种用于铁路道口电力电缆临时过渡的电缆托架
CN111049059A (zh) * 2019-12-09 2020-04-21 国家电网有限公司 一种跨路架设电缆装置及其使用方法
CN117526156A (zh) * 2023-10-30 2024-02-06 国网四川省电力公司自贡供电公司 一种用于输电线路的跨越施工平台及安装方法

Also Published As

Publication number Publication date
CN101908740B (zh) 2012-09-19

Similar Documents

Publication Publication Date Title
CN101908740B (zh) 一种线路跨越方法
CN102082400B (zh) 简易线路跨越架
CN101442194A (zh) 超、特高压线路施工无跨越架跨越方法
CN109653481A (zh) 一种悬挂导轨式高空操作平台及制作方法
CN201408948Y (zh) 可调节高度升降跨越架线装置
CN204982628U (zh) 一种平拉索桥
CN201486120U (zh) 可拆式钢柱接柱施工作业平台
CN105470862B (zh) 不停运高铁跨越施工设备
CN104967047B (zh) ±800kV特高压直流线路耐张塔专用伸缩硬梯及其使用方法
CN204609435U (zh) 抢修塔辅助起升塔
CN105484155A (zh) 不停运高铁跨越设备跨越桥面系统
CN205346676U (zh) 不停运高铁跨越设备的跨梁变幅旋转机构
CN202957531U (zh) 高空跨越电缆施工架
CN110706544B (zh) 一种输电线路高空救援训练用台架及训练系统
CN210041128U (zh) 一种带电跨越的绝缘滚杠
CN105480873A (zh) 不停运高铁跨越设备的跨梁变幅旋转机构
CN209603469U (zh) 一种悬挂导轨式高空操作平台
CN204118374U (zh) 接地线的接地导线接连点保护装置
CN102983528A (zh) 高空跨越电缆施工架
CN208966123U (zh) 一种大截面格构式钢管抱杆正装提升装置
CN205329544U (zh) 不停运高铁跨越设备跨越桥面系统
CN112664034A (zh) 一种风力发电塔的整体安装方法
CN107370075B (zh) 加强型钢管悬索跨越架
CN218970722U (zh) 一种稳定性好的建筑防护网
CN202787091U (zh) 用于钢管拱桥操作平台的爬梯装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20170809