CN101886720A - 一种管坑内大口径、大吨位管道移位及对接装置 - Google Patents
一种管坑内大口径、大吨位管道移位及对接装置 Download PDFInfo
- Publication number
- CN101886720A CN101886720A CN2010102156444A CN201010215644A CN101886720A CN 101886720 A CN101886720 A CN 101886720A CN 2010102156444 A CN2010102156444 A CN 2010102156444A CN 201010215644 A CN201010215644 A CN 201010215644A CN 101886720 A CN101886720 A CN 101886720A
- Authority
- CN
- China
- Prior art keywords
- pipe
- tonnage
- backward
- heavy caliber
- docking facilities
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
本发明公开了一种管坑内大口径、大吨位管道移位及对接装置,其包括左、右钢轨,所述左、右钢轨上分别设置左、右纵梁,所述左、右纵梁上设置有可在左、右钢轨上滑动的钢轮,所述左、右纵梁上分别固定安装有前、后支腿,所述前、后支腿顶端之间分别由左、右连接梁连接,所述左、右连接梁之间由前、后横梁连接,所述左、右连接梁上分别设置有前、后起重葫芦;该设计使得管道对接时,通过前、后起重葫芦的调整可以精确地对接口进行上下、左右的微调,特别对于管坑上方有障碍物,不具备使用吊机的情况下,可有效地解决管道移动及安装的需要,本装置可极大降低吊车台班的使用,节约吊装成本,从而可适用于各种大口径、大吨位管道的安装上。
Description
技术领域
本发明属于一种管道移位及对接装置,尤其涉及一种用于管坑内大口径、大吨位管道对接施工用的移位及对接装置。
背景技术
随着地下管道在交通、能源、环境治理、电力运输、城市排水等方面的广泛运用,使得地下形成了错综复杂的管道交通。特别是长距离输送气体、液体的管道施工工程中通常会采用大口径、大吨位管道,大口径的管道在施工过程中要求的对接精度较高,但是许多管坑上方由于有障碍物的阻碍,使得无法进行吊机的使用,使得管道施工面临了如何在地下管坑内移动、就位、对接的问题。
发明内容
为了克服现有技术的不足,本发明提供一种结构简单,操作方便的管坑内大口径、大吨位管道移位及对接装置。
本发明解决其技术问题所采用的技术方案是:
一种管坑内大口径、大吨位管道移位及对接装置,其包括左、右钢轨,所述左、右钢轨上分别设置左、右纵梁,所述左、右纵梁上设置有可在左、右钢轨上滑动的钢轮,所述左、右纵梁上分别固定安装有前、后支腿,所述前、后支腿顶端之间分别由左、右连接梁连接,所述左、右连接梁之间由前、后横梁连接,所述左、右连接梁上分别设置有前、后起重葫芦;
作为上述技术方案的改进,所述左、右钢轨底部设置有若干个枕木;
作为上述技术方案的进一步改进,所述前、后起重葫芦之间吊装有承托管道用的钢丝绳。
本发明的有益效果是:本装置使用时,只要将管道放置在前、后起重葫芦之间的钢丝绳上即可,该设计使得管道对接时,通过前、后起重葫芦的调整可以精确地对接口进行上下、左右的微调,特别对于管坑上方有障碍物,不具备使用吊机的情况下,可有效地解决管道移动及安装的需要,本装置可极大降低吊车台班的使用,节约吊装成本,从而可适用于各种大口径、大吨位管道的安装上。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明的结构示意图;
图2是图1的俯视图;
图3是图1的左视图。
具体实施方式
参照图1、图2、图3,一种管坑内大口径、大吨位管道移位及对接装置,其包括左、右钢轨1、1’,所述左、右钢轨1、1’上分别设置左、右纵梁2、2’,所述左、右纵梁2、2’上设置有可在左、右钢轨1、1’上滑动的钢轮3,所述左、右纵梁2、2’上分别固定安装有前、后支腿4、4’,所述前、后支腿4、4’与左、右纵梁2、2’之间采用连接法兰固定连接;即在连接部位焊接有加强肋板,再采用连接螺拴将加强肋板固定为一体。所述前、后支腿4、4’顶端之间分别由左、右连接梁5、5’连接,所述前、后支腿4、4’与左、右连接梁5、5’之间采用连接法兰固定连接,即在连接部位焊接有加强肋板,再采用连接螺拴将加强肋板固定为一体。所述左、右连接梁5、5’之间由前、后横梁6、6’连接,当然也可以将前、后横梁6、6’直接焊接在前、后支腿4、4’之上,所述左、右连接梁5、5’上分别通过吊耳10设置有前、后起重葫芦7、7’,前、后起重葫芦7、7’采用手动葫芦或电动葫芦均可,但优先考虑使用手动葫芦,所述前、后起重葫芦7、7’之间吊装有承托管道用的钢丝绳9。
本产品为了安装更为稳定,所述左、右钢轨1、1’底部设置有若干个枕木8。另外,所述左、右纵梁2、2’、前、后支腿4、4’、左、右连接梁5、5’以及前、后横梁6、6’都由钢板、槽钢、工字钢或钢管等型钢材料加工而成。
本产品安装时,首先在基底混凝土垫层完成并达到设计强度后,在其上铺设枕木8和左、右钢轨1、1’,接着当枕木8和左、右钢轨1、1’铺设完毕并验收合格后,用起重机将本装置吊入管坑,放入左、右钢轨1、1’后即可使用。使用时,只要将管道放置在前、后起重葫芦7、7’之间的钢丝绳9上即可,该设计使得管道对接时,通过前、后起重葫芦7、7’的调整可以精确地对接口进行上下、左右的微调,特别对于管坑上方有障碍物,不具备使用吊机的情况下,可有效地解决管道移动及安装的需要,本装置可极大降低吊车台班的使用,节约吊装成本,从而可适用于各种大口径、大吨位管道的安装上。
Claims (7)
1.一种管坑内大口径、大吨位管道移位及对接装置,其特征在于:包括左、右钢轨(1、1’),所述左、右钢轨(1、1’)上分别设置左、右纵梁(2、2’),所述左、右纵梁(2、2’)上设置有可在左、右钢轨(1、1’)上滑动的钢轮(3),所述左、右纵梁(2、2’)上分别固定安装有前、后支腿(4、4’),所述前、后支腿(4、4’)顶端之间分别由左、右连接梁(5、5’)连接,所述左、右连接梁(5、5’)之间由前、后横梁(6、6’)连接,所述左、右连接梁(5、5’)上分别设置有前、后起重葫芦(7、7’)。
2.根据权利要求1所述的一种管坑内大口径、大吨位管道移位及对接装置,其特征在于:所述左、右钢轨(1、1’)底部设置有若干个枕木(8)。
3.根据权利要求1所述的一种管坑内大口径、大吨位管道移位及对接装置,其特征在于:所述前、后支腿(4、4’)与左、右连接梁(5、5’)之间采用连接法兰固定连接。
4.根据权利要求1所述的一种管坑内大口径、大吨位管道移位及对接装置,其特征在于:所述前、后支腿(4、4’)与左、右纵梁(2、2’)之间采用连接法兰固定连接。
5.根据权利要求1所述的一种管坑内大口径、大吨位管道移位及对接装置,其特征在于:所述前、后起重葫芦(7、7’)之间吊装有承托管道用的钢丝绳(9)。
6.根据权利要求1所述的一种管坑内大口径、大吨位管道移位及对接装置,其特征在于:所述左、右纵梁(2、2’)、前、后支腿(4、4’)、左、右连接梁(5、5’)以及前、后横梁(6、6’)都由钢板、槽钢、工字钢或钢管加工而成。
7.根据权利要求1所述的一种管坑内大口径、大吨位管道移位及对接装置,其特征在于:所述左、右连接梁(5、5’)上分别通过吊耳(10)设置有前、后起重葫芦(7、7’)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102156444A CN101886720A (zh) | 2010-06-30 | 2010-06-30 | 一种管坑内大口径、大吨位管道移位及对接装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102156444A CN101886720A (zh) | 2010-06-30 | 2010-06-30 | 一种管坑内大口径、大吨位管道移位及对接装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101886720A true CN101886720A (zh) | 2010-11-17 |
Family
ID=43072750
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102156444A Pending CN101886720A (zh) | 2010-06-30 | 2010-06-30 | 一种管坑内大口径、大吨位管道移位及对接装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101886720A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102513958A (zh) * | 2011-12-05 | 2012-06-27 | 重庆川东船舶重工有限责任公司 | 梁体对接装配工装 |
CN102886679A (zh) * | 2012-09-21 | 2013-01-23 | 凯迈(洛阳)机电有限公司 | 工件对接设备及其工件对接装置 |
CN107191676A (zh) * | 2017-07-11 | 2017-09-22 | 中国十九冶集团有限公司 | 埋地管道施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2273571A (en) * | 1938-11-23 | 1942-02-17 | Cleveland Switchboard Company | Pipe hanger |
US3273837A (en) * | 1965-06-23 | 1966-09-20 | Willert And Henriksen | Plastic pipe hanger |
JPH10147969A (ja) * | 1996-11-18 | 1998-06-02 | Shinko Kigyo Kk | 土木工事用作業台車 |
CN1971236A (zh) * | 2006-12-07 | 2007-05-30 | 辽宁省安全科学研究院 | 高处作业吊篮安全锁试验装置 |
-
2010
- 2010-06-30 CN CN2010102156444A patent/CN101886720A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2273571A (en) * | 1938-11-23 | 1942-02-17 | Cleveland Switchboard Company | Pipe hanger |
US3273837A (en) * | 1965-06-23 | 1966-09-20 | Willert And Henriksen | Plastic pipe hanger |
JPH10147969A (ja) * | 1996-11-18 | 1998-06-02 | Shinko Kigyo Kk | 土木工事用作業台車 |
CN1971236A (zh) * | 2006-12-07 | 2007-05-30 | 辽宁省安全科学研究院 | 高处作业吊篮安全锁试验装置 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102513958A (zh) * | 2011-12-05 | 2012-06-27 | 重庆川东船舶重工有限责任公司 | 梁体对接装配工装 |
CN102513958B (zh) * | 2011-12-05 | 2014-07-16 | 重庆川东船舶重工有限责任公司 | 梁体对接装配工装 |
CN102886679A (zh) * | 2012-09-21 | 2013-01-23 | 凯迈(洛阳)机电有限公司 | 工件对接设备及其工件对接装置 |
CN102886679B (zh) * | 2012-09-21 | 2015-01-28 | 凯迈(洛阳)机电有限公司 | 工件对接设备及其工件对接装置 |
CN107191676A (zh) * | 2017-07-11 | 2017-09-22 | 中国十九冶集团有限公司 | 埋地管道施工方法 |
CN107191676B (zh) * | 2017-07-11 | 2019-04-30 | 中国十九冶集团有限公司 | 埋地管道施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201077721Y (zh) | 一种落梁龙门吊 | |
CN102127899B (zh) | 大吨位钢箱梁在陆域及浅滩区的提升滑移系统及施工方法 | |
CN103821087B (zh) | 预制桥面板空间钢管混凝土桁架组合梁及施工方法 | |
CN111038940A (zh) | 一种轨道式用于吊装运输的牵引系统 | |
CN202733170U (zh) | 一种管道安装机 | |
CN204627636U (zh) | 轮式四臂隧道施工多功能台车 | |
CN203623675U (zh) | 洞内压力钢管运输台车 | |
CN105398953A (zh) | 地下管廊管道水平运输施工方法 | |
CN104060844A (zh) | 高层钢结构转换层桁架滑移设备、提升装置及施工方法 | |
CN203821720U (zh) | 一种高空大型屋面板安装工具车 | |
CN107165046B (zh) | 一种桥梁检修车的安装方法 | |
CN102518300B (zh) | 预埋锥形承载接头式钢结构支座及其施工方法 | |
CN101886720A (zh) | 一种管坑内大口径、大吨位管道移位及对接装置 | |
CN205417623U (zh) | 长台阶物料转运机 | |
CN103552800A (zh) | 大型罐状设备平移方法 | |
CN202193564U (zh) | 简便桥吊 | |
CN203961317U (zh) | 可滑移单榀及多榀桁架胎架 | |
CN206429270U (zh) | 一种盾构机过站装置 | |
CN201746244U (zh) | 一种管坑内大口径、大吨位管道移位及对接装置 | |
CN211711873U (zh) | 一种轨道式用于吊装运输的牵引系统 | |
CN202659248U (zh) | 自行式坑道钻孔台车 | |
CN206954226U (zh) | 液压平台转运系统 | |
CN211645930U (zh) | 隧道仰拱施工栈桥 | |
CN210418998U (zh) | 循环水系统大口径管道的运输装置 | |
CN202731933U (zh) | 全液压自行式栈桥台车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20101117 |