CN101845899B - 一种加固楼板下承重墙的构造及施工方法 - Google Patents

一种加固楼板下承重墙的构造及施工方法 Download PDF

Info

Publication number
CN101845899B
CN101845899B CN2010102013864A CN201010201386A CN101845899B CN 101845899 B CN101845899 B CN 101845899B CN 2010102013864 A CN2010102013864 A CN 2010102013864A CN 201010201386 A CN201010201386 A CN 201010201386A CN 101845899 B CN101845899 B CN 101845899B
Authority
CN
China
Prior art keywords
bar
bearing wall
load bearing
prestressed draw
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102013864A
Other languages
English (en)
Other versions
CN101845899A (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
SHENZHEN BAOHAO MUNICIPAL ENGINEERING Co Ltd
SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING Co Ltd
SHENZHEN RUNYE GARDEN ENGINEERING Co Ltd
XIAMEN ANNENG CONSTRUCTION CO Ltd
Original Assignee
朱虹
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 朱虹 filed Critical 朱虹
Priority to CN2010102013864A priority Critical patent/CN101845899B/zh
Publication of CN101845899A publication Critical patent/CN101845899A/zh
Application granted granted Critical
Publication of CN101845899B publication Critical patent/CN101845899B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明公开了一种加固楼板下承重墙的构造及施工方法,其特征是包括预应力拉杆、喷射水泥浆、S形锚固筋、水玻璃砂浆、角钢、螺栓,在楼板下50cm处设置角钢,双螺栓固定在楼板下混凝土梁上,预应力拉杆张拉完成后用螺帽固定在角钢上,预应力拉杆侧面由S形锚固筋固定在承重墙上,预应力拉杆外侧设置喷射水泥浆。本发明安全可靠性强,操作方便。

Description

一种加固楼板下承重墙的构造及施工方法
技术领域
本发明涉及一种加固楼板下承重墙的构造及施工方法,适用于建筑领域。
背景技术
当楼板下承重墙达不到要求时,传统的加固方法是贴钢丝网进行加固,但是钢丝网加固对承重墙承载能力提高幅度不大,另外钢丝网和承重墙很难协同受力,达不到预期效果。
发明内容
本发明解决的技术问题是提供一种加固楼板下承重墙的构造及施工方法,解决楼板下承重墙承载力不够的问题。
本发明包括预应力拉杆、喷射水泥浆、S形锚固筋、水玻璃砂浆、角钢、螺栓。在楼板下50cm处设置角钢,作为预应力拉杆的张拉机具,双螺栓固定在楼板下混凝土梁上,预应力拉杆张拉完成后用螺帽固定在角钢上。预应力拉杆侧面由S形锚固筋固定在承重墙上,承重墙钻开长宽均为3~5cm的孔洞,S形锚固筋穿入孔洞后用水玻璃砂浆填充封闭,S形锚固筋进入承重墙的长度为15~20cm,顶部S形锚固筋离角钢距离为30cm,S形锚固筋沿承重墙两侧间隔布置,间距为30cm一个。预应力拉杆外侧设置喷射水泥浆,喷射水泥浆强度为C40,厚度为30~40cm。
预应力拉杆张拉过程分两个阶段进行:第一阶段将预应力拉杆张拉至1/2的预加内力,用S形锚固筋固定预应力拉杆并用水玻璃砂浆填充封闭,第二阶段将将预应力拉杆张拉至预加内力。
本发明安全可靠性强,操作方便。
附图说明
图1加固楼板下承重墙的构造示意图
附图标志:1、预应力拉杆,2、喷射水泥浆,3、S形锚固筋,4、水玻璃砂浆,5、角钢,6、螺栓,7、螺帽,8、楼板,9、承重墙
具体实施方式
以下结合附图对本发明进行详细描述。
图1为加固楼板下承重墙的构造示意图。本发明包括预应力拉杆1、喷射水泥浆2、S形锚固筋3、水玻璃砂浆4、角钢5、螺栓6、螺帽7。在楼板8下50cm处设置角钢5,角钢5作为预应力拉杆1的张拉机具,双螺栓6固定在楼板8下混凝土梁上,预应力拉杆1张拉完成后用螺帽7固定在角钢5上。预应力拉杆1侧面由S形锚固筋3固定在承重墙9上,承重墙9钻开长宽均为4cm的孔洞,S形锚固筋3穿入孔洞后用水玻璃砂浆4填充封闭,S形锚固筋3进入承重墙9的长度为20cm,顶部S形锚固筋3离角钢5距离为30cm,S形锚固筋3沿承重墙9两侧间隔布置,间距为30cm一个。预应力拉杆1外侧设置喷射水泥浆2,喷射水泥浆2强度为C40,厚度为35cm。
张拉时,通过特制的千斤顶拉动预应力拉杆1移动,待张拉至控制力后,拧紧螺帽7,锚固住预应力拉杆1,从而建立预加拉力。为减小张拉过程中引起的应力损失,预应力拉杆1张拉过程分两个阶段进行:第一阶段将预应力拉杆1张拉至1/2的预加内力,用S形锚固筋3固定预应力拉杆1并用水玻璃砂浆4填充封闭,第二阶段将将预应力拉杆1张拉至预加内力。

Claims (7)

1.一种加固楼板下承重墙的施工方法,其特征是包括预应力拉杆、喷射水泥浆、S形锚固筋、水玻璃砂浆、角钢、螺栓,在楼板下50cm处设置角钢,双螺栓固定在楼板下混凝土梁上,预应力拉杆张拉完成后用螺帽固定在角钢上,预应力拉杆侧面由S形锚固筋固定在承重墙上,预应力拉杆外侧设置喷射水泥浆。
2.根据权利要求1所述的加固楼板下承重墙的施工方法,其特征是承重墙钻开长宽均为3~5cm的孔洞,S形锚固筋穿入孔洞后用水玻璃砂浆填充封闭,S形锚固筋进入承重墙的长度为15~20cm,顶部S形锚固筋离角钢距离为30cm,S形锚固筋沿承重墙两侧间隔布置,间距为30cm一个。
3.根据权利要求1所述的加固楼板下承重墙的施工方法,其特征是喷射水泥浆强度为C40,厚度为30~40cm。
4.根据权利要求2所述的加固楼板下承重墙的施工方法,其特征是喷射水泥浆强度为C40,厚度为30~40cm。
5.根据权利要求1所述的加固楼板下承重墙的施工方法,其特征是预应力拉杆张拉过程分两个阶段进行:第一阶段将预应力拉杆张拉至1/2的预加内力,用S形锚固筋固定预应力拉杆并用水玻璃砂浆填充封闭,第二阶段将预应力拉杆张拉至预加内力。
6.根据权利要求2所述的加固楼板下承重墙的施工方法,其特征是预应力拉杆张拉过程分两个阶段进行:第一阶段将预应力拉杆张拉至1/2的预加内力,用S形锚固筋固定预应力拉杆并用水玻璃砂浆填充封闭,第二阶段将预应力拉杆张拉至预加内力。
7.根据权利要求3所述的加固楼板下承重墙的施工方法,其特征是预应力拉杆张拉过程分两个阶段进行:第一阶段将预应力拉杆张拉至1/2的预加内力,用S形锚固筋固定预应力拉杆并用水玻璃砂浆填充封闭,第二阶段将预应力拉杆张拉至预加内力。
CN2010102013864A 2010-06-05 2010-06-05 一种加固楼板下承重墙的构造及施工方法 Expired - Fee Related CN101845899B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102013864A CN101845899B (zh) 2010-06-05 2010-06-05 一种加固楼板下承重墙的构造及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102013864A CN101845899B (zh) 2010-06-05 2010-06-05 一种加固楼板下承重墙的构造及施工方法

Publications (2)

Publication Number Publication Date
CN101845899A CN101845899A (zh) 2010-09-29
CN101845899B true CN101845899B (zh) 2012-10-31

Family

ID=42770692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102013864A Expired - Fee Related CN101845899B (zh) 2010-06-05 2010-06-05 一种加固楼板下承重墙的构造及施工方法

Country Status (1)

Country Link
CN (1) CN101845899B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105937307A (zh) * 2016-06-07 2016-09-14 江西赣粤高速公路股份有限公司 一种预应力钢丝绳弯剪加固混凝土t梁及其加固方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0435820A1 (de) * 1989-12-23 1991-07-03 HILTI Aktiengesellschaft Verfahren zur Verstärkung von Bauteilen
US6247279B1 (en) * 1998-03-24 2001-06-19 University Of Ottawa Retrofitting existing concrete columns by external prestressing
CN1546823A (zh) * 2003-11-28 2004-11-17 广东省建筑科学研究院 混凝土柱预应力包钢加固法
CN1576497A (zh) * 2003-07-07 2005-02-09 M&S工业株式会社 混凝土建筑修补用加固材料及混凝土建筑的修补、加固工艺
CN101033646A (zh) * 2006-10-19 2007-09-12 上海大学 钢筋混凝土梁板加固方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080004293A (ko) * 2006-07-05 2008-01-09 (주)이알테크 와이어 텐션 보강장치 및 보강공법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0435820A1 (de) * 1989-12-23 1991-07-03 HILTI Aktiengesellschaft Verfahren zur Verstärkung von Bauteilen
US6247279B1 (en) * 1998-03-24 2001-06-19 University Of Ottawa Retrofitting existing concrete columns by external prestressing
CN1576497A (zh) * 2003-07-07 2005-02-09 M&S工业株式会社 混凝土建筑修补用加固材料及混凝土建筑的修补、加固工艺
CN1546823A (zh) * 2003-11-28 2004-11-17 广东省建筑科学研究院 混凝土柱预应力包钢加固法
CN101033646A (zh) * 2006-10-19 2007-09-12 上海大学 钢筋混凝土梁板加固方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
夏锋翔.混凝土结构加固技术应用现状综述.《山西建筑》.2009,第35卷(第32期),85-86. *
黄飚兴.预应力技术在钢筋网水泥砂浆加固开裂墙体中的应用.《建筑技术》.2004,第35卷(第6期),439-440. *

Also Published As

Publication number Publication date
CN101845899A (zh) 2010-09-29

Similar Documents

Publication Publication Date Title
CN103195170B (zh) 一种装配式钢筋混凝土框架结构体系
CN103306214B (zh) 一种钢筋混凝土梁与楼板的加固装置
CN105926766A (zh) 装配式剪力墙齿槽式连接结构拼装工法
CN106545472A (zh) 全向预应力抗疲劳组合钢结构风塔及其安装方法
CN103643634B (zh) 钢管混凝土拱桥拱脚锚固结构
CN107338864A (zh) 一种预制钢筋砼框架结构节点
CN102839664A (zh) 主承载锚杆应力可全过程调节的岩锚吊车梁及施工方法
CN106930436B (zh) 一种内置预应力钢斜撑的钢筋混凝土剪力墙
CN102758494A (zh) 一种带角钢的复合式钢板剪力墙
CN204780641U (zh) 一种复合式石砌旧拱桥加固结构
CN207003673U (zh) 一种梁与墙板的连接节点
CN101845899B (zh) 一种加固楼板下承重墙的构造及施工方法
CN206190458U (zh) 全向预应力抗疲劳组合钢结构风塔
CN202767286U (zh) 一种预制混凝土剪力墙与主体钢结构的连接节点
CN207160414U (zh) 一种预制梁结构
CN203499259U (zh) 工具式悬挑卸料平台
CN202055556U (zh) 一种加固承重墙的构造
CN202610695U (zh) 一种波形钢腹板先张法预应力混凝土工字梁
CN202831384U (zh) 一种双预制叠合框架梁
CN103835395A (zh) 一种预应力斜置双层折板钢板剪力墙
CN203625776U (zh) 钢管混凝土拱桥拱脚锚固结构
CN103938731B (zh) 预应力与普通钢筋连接预制混凝土梁圆钢管混凝土柱组合节点
CN203782728U (zh) 基础桩与承重平台之间的连接件
CN108678408B (zh) 一种钢筋混凝土梁预应力钢丝绳加固装置
CN207003721U (zh) 一种预制混凝土剪力墙的竖向搭接连接结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHENZHEN RUNYE GARDEN ENGINEERING CO., LTD. FUJIAN

Effective date: 20130718

Owner name: SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING CO., LT

Free format text: FORMER OWNER: ZHU HONG

Effective date: 20130718

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 325024 WENZHOU, ZHEJIANG PROVINCE TO: 518049 SHENZHEN, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130718

Address after: 518049 Guangdong Province, Futian District city. Shenzhen Shenhua science and Technology Park Industrial Park West No. 2 building 501

Patentee after: SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING CO., LTD.

Patentee after: Shenzhen Runye Garden Engineering Co., Ltd.

Patentee after: Fujian Jiulong Construction Group Co., Ltd.

Patentee after: SHENZHEN BAOHAO MUNICIPAL ENGINEERING CO., LTD.

Patentee after: XIAMEN ANNENG CONSTRUCTION CO., LTD.

Address before: Hit street town of Longwan District of Wenzhou city in Zhejiang province 325024 standard Road 71 Lane 2

Patentee before: Zhu Hong

DD01 Delivery of document by public notice

Addressee: SHENZHEN HONGXUAN CONSTRUCTION ENGINEERING CO., LTD.

Document name: Notification to Pay the Fees

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121031

Termination date: 20150605

EXPY Termination of patent right or utility model