CN101845890A CN 201010200455 CN201010200455A CN101845890A CN 101845890 A CN101845890 A CN 101845890A CN 201010200455 CN201010200455 CN 201010200455 CN 201010200455 A CN201010200455 A CN 201010200455A CN 101845890 A CN101845890 A CN 101845890A
Authority
CN
China
Prior art keywords
steel
mould
hangs
plastic
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010200455
Other languages
Chinese (zh)
Other versions
CN101845890B (en
Inventor
徐超
鲍黎明
张晓宁
王清春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201010200455XA priority Critical patent/CN101845890B/en
Publication of CN101845890A publication Critical patent/CN101845890A/en
Application granted granted Critical
Publication of CN101845890B publication Critical patent/CN101845890B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a formwork suspending method of heating furnace top plastic material. The method is characterized by comprising the following steps: 1) preparing at least 4 suspended formworks, wherein each suspended formwork comprises a diagonal pull rod, an upper screw cap, an upper washer, a steel plate spacer, a flitch, cheeps, a lower screw cap and a lower spacer; 2) installing the suspended formworks along the horizontal and vertical directions of the furnace, wherein the distance between each two adjacent suspended formworks is 1.5 m; 3) installing building steel tubes on the cheeps of the same suspended formwork along the vertical direction of the furnace, wherein the bottom elevation of plastic material minus the thickness of the steel moulding plate equals the top surface elevation of the building steel tubes; 4) placing the steel moulding plate on the building steel tubes along the horizontal direction of the furnace; and 5) stacking plastic material on the steel moulding plate, after ramming plastic material within the range of one steel moulding plate, installing the next steel moulding plate, continuously adopting plastic material construction process for placing material and ramming til the end. The method is characterized by simple structure, convenient disassembly and assembly and difficult mould expanding.

Description

Heating furnace top plastic material hangs the method for mould
Technical field
The present invention relates to a kind of formwork suspending method of heating furnace top.
Background technology
In top plastic material work progress in the past, one adopts common scaffold formwork (supporting moldable), the full hall of scaffold is supported on the interior brace summer of stove, people's operating space is less during moldable the construction, be easy to generate the mould phenomenon that expands in the work progress, moldable work plane is difficult to handle after the form removal, often exceeds code requirement.Relatively more chaotic in the burner hearth during form removable, security incident takes place easily, and other operations work (as brace summer wrapping, masonry of well etc.) can't be carried out simultaneously during the furnace roof construction.
Summary of the invention
The method that the object of the present invention is to provide a kind of heating furnace top plastic material to hang mould, this method is simple, and other operation operations in the stove can intert synchronously constructs.
To achieve these goals, the technical solution used in the present invention is: heating furnace top plastic material hangs the method for mould, it is characterized in that it comprises the steps:
1) confirms that one by one the equal spot welding of i iron of hanging on the beam is fixed on the furnace roof crossbeam; Prepare at least 4 and hang mould, each hangs mould by pull bar, upper cap nut, upper gasket, steel plate pad, flitch, butterfly card, following nut, lower gasket are formed;
2) vertically establish along stove and hang set of molds, each hangs set of molds and has at least 2 to hang mould; Hang set of molds along horizontal at least 2 groups (promptly hanging mould to installation in length and breadth) of stove along stove; It is as follows that each hangs the mounting method of mould:
1. will to the upper end of pull bar pass successively on the flitch on pull bar through hole, the steel plate pad to putting upper gasket behind the pull bar through hole and screwing on upper cap nut; Flitch is shelved on the adjacent i iron;
2. will to the bottom of pull bar pass on the butterfly card to putting lower gasket behind the pull bar through hole and screwing on down nut;
3) building steel tube vertically is installed on the same butterfly card that hangs set of molds along stove; Or/and nut down, make the thickness of the end face absolute altitude=moldable bottom absolute altitude-steel form of building steel tube by regulating to the upper cap nut on the pull bar;
4) laterally be shelved on building steel tube on along stove steel form;
5) pile up on the steel form moldable, after the moldable ramming in the steel form scope is finished, next piece steel form is installed, continue to carry out cloth, ramming, finish until moldable cloth, ramming by moldable construction technology.
Each hangs adjacent hanging between the mould at a distance of 1.5m in the set of molds, and adjacent hangs between the set of molds at a distance of 1.5m (promptly being 1.5m to the adjacent mold interval that hangs in length and breadth along stove).
Compared with prior art, the invention has the beneficial effects as follows:
One. adopt said method, method is simple, and the steel form mounting or dismounting are simple; Because the assembling and disassembling of steel form of the present invention all can be finished voluntarily by moldable ramming personnel, steel form can not produce down around, so the present invention's bloated mould can avoid moldable construction the time when rigidity of steel form had guaranteed moldable construction;
They are two years old. and during because of existing employing scaffold, out-of-flatness appears in the bad control of absolute altitude of a lot of steel pipes easily.And after the present invention adopts suspension type, do not have scaffold below the steel form, and improving moldable surface finish and impression after the form removal, moldable work plane finishing is convenient after the form removal;
They are three years old. because the present invention adopts suspension type, do not have scaffold below the steel form, promptly have living space below the steel form; Therefore other operation operations in the stove of the present invention can intert synchronously and construct, and form continuous productive process, the raising work efficiency.
Description of drawings
Fig. 1 is the present invention's furnace roof profile in moldable when construction.
Among the figure: 1-is to pull bar; 2-upper cap nut (and upper gasket); 3-steel plate pad; The 4-flitch; The 5-building steel tube; 6-butterfly card; The 7-steel form; The 8-i iron, nut under the 9-(and lower gasket), 10-is moldable, and 11-hangs beam.
The specific embodiment
The invention will be further described below in conjunction with embodiment and accompanying drawing.
As shown in Figure 1, heating furnace top plastic material hangs the method for mould, and it comprises the steps:
1) confirms that one by one the i iron 8 equal spot welding of hanging on the beam 11 are fixed on (being the strong point that i iron can be used as suspension) on the furnace roof crossbeam; Mould is hung in preparation, and some [one is for open hearth top area (m 2) ÷ (1.5m * 1.5m) individual], each hangs mould by pull bar 1, upper cap nut 2, upper gasket, steel plate pad 3, flitch 4, butterfly card 6, following nut 9, lower gasket are formed;
2) hang mould to installation in length and breadth along stove, be 1.5m[and vertically establish along stove and hang set of molds to the adjacent mold interval that hangs in length and breadth along stove, each hangs set of molds and has at least 2 to hang mould; Hang set of molds along horizontal at least 2 groups (only drawn among Fig. 12 groups and hung set of molds) of stove; Each hangs adjacent hanging between the mould at a distance of 1.5m in the set of molds, and adjacent hangs between the set of molds at a distance of 1.5m];
It is as follows that each hangs the mounting method of mould:
1. will to the upper end of pull bar 1 pass successively on the flitch 4 on pull bar through hole, the steel plate pad 3 to putting upper gasket behind the pull bar through hole and screwing on upper cap nut 2 (upper gasket between upper cap nut and steel plate pad, upper end, the bottom of pull bar 1 being equipped with external screw thread); Flitch 4 is shelved on the adjacent i iron 8 [flitch 4 by 1.5m * 1.5m arrange (be at a distance of 1.5m * 1.5m) between the adjacent flitch 4];
2. will to the bottom of pull bar 1 pass on the butterfly card 6 to putting lower gasket behind the pull bar through hole and screwing on down nut 9 (lower gasket is down between nut and the butterfly card);
3) building steel tube 5 vertically is installed on the same butterfly card 6 that hangs set of molds along stove; By regulating, make the thickness of the end face absolute altitude=moldable bottom absolute altitude-steel form 7 of building steel tube 5 to upper cap nut on the pull bar 12 and following nut 9;
4) steel form 7 laterally is shelved on [be shelved on the adjacent building steel tube 5, the left and right directions among Fig. 1 is that stove is horizontal, and steel form 7 is installed a row (row has M/1.5 steel form 7, and wherein M is that stove is wide) along the stove cross direction] on the building steel tube 5 along stove
5) pile up on the steel form 7 moldable 10, after the moldable ramming in steel form 7 scopes is finished, next piece steel form is installed, is continued to carry out cloth, ramming (can satisfy construction requirement by that analogy), finish until moldable 10 clothes, ramming by moldable construction technology.
After moldable 10 constructions are finished, steel form removes, the processing method of circular hole to pull bar 1 row in moldable: owing to moldablely have plasticity, remove the moldable filling and repairing that carries out of the available Xin Kaibao in back at steel form, but this work must be carried out in two hours after form removal, in order to avoid influence adhesion strength.
Described diameter phi 20mm to pull bar 1.The height of flitch, widely, long be 60mm * 80mm * 450mm.
Quantity=open hearth top area (m to pull bar 1 2) ÷ (1.5m * 1.5m), pull bar 1 is evenly arranged in length and breadth.
The height of steel form 7, wide, long 50mm * 300mm * 1500mm.The end face absolute altitude of steel form 7 can be regulated by nut up and down, makes it reach designing requirement.

Claims (6)

1. heating furnace top plastic material hangs the method for mould, it is characterized in that it comprises the steps:
1) the equal spot welding of i iron (8) of confirming one by one to hang on the beam (11) is fixed on the furnace roof crossbeam; Prepare at least 4 and hang mould, each hangs mould by pull bar (1), upper cap nut (2), upper gasket, steel plate pad (3), flitch (4), butterfly card (6), following nut (9), lower gasket are formed;
2) vertically establish along stove and hang set of molds, each hangs set of molds and has at least 2 to hang mould; Hang set of molds along horizontal at least 2 groups of stove; It is as follows that each hangs the mounting method of mould:
1. will to the upper end of pull bar (1) pass successively on the flitch (4) on pull bar through hole, the steel plate pad (3) to putting upper gasket behind the pull bar through hole and screwing on upper cap nut (2); Flitch (4) is shelved on the adjacent i iron (8);
2. will to the bottom of pull bar (1) pass on the butterfly card (6) to putting lower gasket behind the pull bar through hole and screwing on down nut (9);
3) building steel tube (5) vertically is installed on the same butterfly card (6) that hangs set of molds along stove; By regulating, make the thickness of the end face absolute altitude=moldable bottom absolute altitude-steel form (7) of building steel tube (5) to upper cap nut (2) on the pull bar (1) and following nut (9);
4) steel form (7) laterally is shelved on the building steel tube (5) along stove;
5) moldable (10) are piled up on the steel form (7), after the moldable ramming in a steel form (7) scope is finished, next piece steel form is installed, continue to carry out cloth, ramming, finish until moldable (10) cloth, ramming by moldable construction technology.
2. heating furnace top plastic material according to claim 1 hangs the method for mould, it is characterized in that: hang mould and be 1.5m to spacing in length and breadth along stove.
3. heating furnace top plastic material according to claim 1 hangs the method for mould, it is characterized in that: described diameter phi 20mm to pull bar (1).
4. heating furnace top plastic material according to claim 1 hangs the method for mould, it is characterized in that: the height of flitch, widely, long be 60mm * 80mm * 450mm.
5. heating furnace top plastic material according to claim 1 hangs the method for mould, it is characterized in that: to the quantity=open hearth top area (m of pull bar (1) 2) ÷ (1.5m * 1.5m).
6. heating furnace top plastic material according to claim 1 hangs the method for mould, it is characterized in that: the height of steel form (7), wide, long 50mm * 300mm * 1500mm.
CN201010200455XA 2010-06-13 2010-06-13 Formwork suspending method of heating furnace top plastic material Expired - Fee Related CN101845890B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010200455XA CN101845890B (en) 2010-06-13 2010-06-13 Formwork suspending method of heating furnace top plastic material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010200455XA CN101845890B (en) 2010-06-13 2010-06-13 Formwork suspending method of heating furnace top plastic material

Publications (2)

Publication Number Publication Date
CN101845890A true CN101845890A (en) 2010-09-29
CN101845890B CN101845890B (en) 2011-11-30

Family

ID=42770684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010200455XA Expired - Fee Related CN101845890B (en) 2010-06-13 2010-06-13 Formwork suspending method of heating furnace top plastic material

Country Status (1)

Country Link
CN (1) CN101845890B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102636029A (en) * 2012-04-24 2012-08-15 山西太钢不锈钢股份有限公司 Heating furnace plastic construction method
CN103575111A (en) * 2013-10-28 2014-02-12 芜湖新兴铸管有限责任公司 Construction method for construction structure of suspended beam at top of heating furnace
CN103575110A (en) * 2013-10-28 2014-02-12 芜湖新兴铸管有限责任公司 Construction structure for suspended beam at top of heating furnace
CN104326369A (en) * 2014-10-15 2015-02-04 中国一冶集团有限公司 Stepping heating furnace support beam replacement apparatus and method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102564135A (en) * 2012-02-13 2012-07-11 中国十九冶集团有限公司 Construction method for patching of refractory materials of furnace top of heating furnace

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1508569B1 (en) * 1965-12-27 1970-04-02 Gen Refractories Co Fireproof furnace roof
GB1490130A (en) * 1975-05-23 1977-10-26 Butterley Building Mat Furnace roofs
JPH1096004A (en) * 1996-09-20 1998-04-14 Kawasaki Steel Corp Method for fitting iron shell reinforcing member to furnace block in blast furnace
CN1563638A (en) * 2004-03-15 2005-01-12 中国第二十冶金建设公司 Formwork metthod for paired drawing walls of furnace in integral cast structural furnace
CN201138139Y (en) * 2007-12-11 2008-10-22 舞阳钢铁有限责任公司 Roof structure of continuous furnace
CN201224147Y (en) * 2008-02-02 2009-04-22 武汉钢铁集团精鼎工业炉有限责任公司 Apparatus for hanging pouring mould of horizontal beam of heating furnace
CN201429328Y (en) * 2009-06-11 2010-03-24 武汉钢铁集团精鼎工业炉有限责任公司 Die assembly used for ramming plastic material at furnace roof of heating furnace

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1508569B1 (en) * 1965-12-27 1970-04-02 Gen Refractories Co Fireproof furnace roof
GB1490130A (en) * 1975-05-23 1977-10-26 Butterley Building Mat Furnace roofs
JPH1096004A (en) * 1996-09-20 1998-04-14 Kawasaki Steel Corp Method for fitting iron shell reinforcing member to furnace block in blast furnace
CN1563638A (en) * 2004-03-15 2005-01-12 中国第二十冶金建设公司 Formwork metthod for paired drawing walls of furnace in integral cast structural furnace
CN201138139Y (en) * 2007-12-11 2008-10-22 舞阳钢铁有限责任公司 Roof structure of continuous furnace
CN201224147Y (en) * 2008-02-02 2009-04-22 武汉钢铁集团精鼎工业炉有限责任公司 Apparatus for hanging pouring mould of horizontal beam of heating furnace
CN201429328Y (en) * 2009-06-11 2010-03-24 武汉钢铁集团精鼎工业炉有限责任公司 Die assembly used for ramming plastic material at furnace roof of heating furnace

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《工业炉》 20060531 童庆年 炉顶浇注料坍塌事故分析 46-48 第28卷, 第3期 2 *
《特钢技术》 19971231 王素香 粘土结合浇注料在锻钢加热炉上的应用和施工方法 53-59 , 第3期 2 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102636029A (en) * 2012-04-24 2012-08-15 山西太钢不锈钢股份有限公司 Heating furnace plastic construction method
CN103575111A (en) * 2013-10-28 2014-02-12 芜湖新兴铸管有限责任公司 Construction method for construction structure of suspended beam at top of heating furnace
CN103575110A (en) * 2013-10-28 2014-02-12 芜湖新兴铸管有限责任公司 Construction structure for suspended beam at top of heating furnace
CN103575110B (en) * 2013-10-28 2016-08-17 芜湖新兴铸管有限责任公司 A kind of heating furnace furnace roof hanging beam constructing structure
CN104326369A (en) * 2014-10-15 2015-02-04 中国一冶集团有限公司 Stepping heating furnace support beam replacement apparatus and method thereof

Also Published As

Publication number Publication date
CN101845890B (en) 2011-11-30

Similar Documents

Publication Publication Date Title
CN101845890B (en) Formwork suspending method of heating furnace top plastic material
CN102003077A (en) Stone curtain wall construction method
CN201747062U (en) Lifting appliance for plastic support of heating furnace top
CN202023348U (en) Hanging-opening type scaffold
CN205096591U (en) Installation engineering support device of drilling
CN202465215U (en) Hanging basket mounting support for outer facade of building with slope roof
CN102108784B (en) Special attached lifting scaffold
CN101581540B (en) Flange beam formwork method when pouring material for heating furnace wall
CN204781931U (en) Early support system that tears open of plastic formwork
CN204001658U (en) A kind of movable hanging frame of installing for cornice decorative ceiling
CN203489667U (en) Top structure of communication flame path of open type annular roasting furnace
CN203905233U (en) Open type dry hanging clay plate curtain wall installation construction structure
CN201407901Y (en) Tyre mold for wall of heating furnace
CN202936930U (en) Novel large-area suspended ceiling reverse supporting suspended ceiling
CN206546099U (en) Erecting by overhang at the top of a kind of furnace flue
CN204920204U (en) Fall board and hang mould support frame
CN204738045U (en) Single crystal growing furnace with safety interlock device
CN201772747U (en) Hanging vault structure of ceramic roller-way kiln
CN205840383U (en) A kind of reinforcing device being easily repaired Thistle board furred ceiling cracking
CN201991206U (en) Irregularly-shaped attached lifting scaffold
CN203558672U (en) Connecting structure for reinforced concrete wall and construction elevator attachment rack
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN204059961U (en) The formwork erecting structure of stair tread
CN204609322U (en) A kind of suspension bracket of online replacing furnace roof thermocouple
CN207794380U (en) A kind of manomelia cantilever keel clay plate curtain wall

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111130

Termination date: 20200613

CF01 Termination of patent right due to non-payment of annual fee