CN101761009A - 掺砂降低高液限土路基工程压实度要求的施工方法 - Google Patents
掺砂降低高液限土路基工程压实度要求的施工方法 Download PDFInfo
- Publication number
- CN101761009A CN101761009A CN201010019550A CN201010019550A CN101761009A CN 101761009 A CN101761009 A CN 101761009A CN 201010019550 A CN201010019550 A CN 201010019550A CN 201010019550 A CN201010019550 A CN 201010019550A CN 101761009 A CN101761009 A CN 101761009A
- Authority
- CN
- China
- Prior art keywords
- sand
- construction
- soil
- high liquid
- liquid limit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
本发明公开了一种掺砂降低高液限土路基工程压实度要求的施工方法,该方法包括以下步骤:A、对路基中的高液限土进行掺砂并用旋耕机拌和均匀,掺砂量为15%~25%;B、包盖处理;C、采用压路机碾压,第一遍静压采用碾压时速1.5~1.7km/h,以后采用碾压时速2.0~2.5km/h。采用发明方案后,掺砂改良土和素土相比,最大干密度增加、最优含水率降低,在碾压过程中由于粗颗粒的存在,使得土中的水和空气能够顺利排出,可达到较高的路基强度要求;掺砂后不仅土体的强度和稳定性增加,而且可以减少土质的收缩应变,防止路基开裂。本发明方案大大降低了施工成本,并且在施工的过程中没有扬尘现象,不会对环境造成污染。
Description
技术领域
本发明涉及一种高液限土路基工程的施工方法,具体是指掺砂降低高液限土路基工程压实度要求的施工方法。
背景技术
根据公路土工试验规程(JTG E40-2007),液限大于或等于50%的细粒土,统称为高液限土。高液限土的典型特征,天然含水率高(远高于最优含水率)、液限高、塑性指数大、颗粒含量变化大。试验土料中,液限最高值超过80%、塑性指数超过40;细粒含量所占比重最高达85.7%。含水率远大于最优含水率预示着土层的饱和度较高;液限高、塑性指数大说明土体塑性大,变形能力强,难以压实;细粒含量高,土体渗透性低,土水势高,大部分水为吸着水,导致孔隙水难以排出,翻晒降低含水率难度大。用这种土作为路堤填料,给工程施工带来了很大的困难。根据土的颗粒组成,又可分为:高液限粘土、高液限粉土、含粗粒的高液限粘土、含粗粒的高液限粉土。
为寻求经济、环保的改良方案,在高液限土处置的多次专家会上有多位专家就提到了降低压实度标准直接填筑高液限土的方案,且要必须保证一定的压实度。并结合老规范中(JTJ 013--95)《公路路基设计规范》中对公路压实度的要求,具体见表1-1。下路堤90%压实度标准和《公路路基设计规范》(JTGF10--2006)中提到的路堤采用特殊填料时,压实度标准根据试验路在保证路基强度要求的前提下可适当降低标准。且根据相关研究,路基表层承受行车作用力最大,由顶部向下,受力急剧减小,在一般汽车荷载作用下,其影响深度为1.0~2.0m范围,对于较重的汽车其影响深度可达2.9m,其下范围,路基主要承受其本身的重量。根据本高速公路的地理位置,重载、超载车辆多,汽车荷载影响深度按照3m来考虑。直接填筑的高液限土应利用在路面表面下3.0m以下的范围。
表1-1(ITI 013--95)《公路路基设计规范》路堤压实度
综上所述,在降低压实度标准直接进行填筑高液限土的时候,怎样才能满足路堤路基强度的要求,是急需要解决的问题。目前,我公司通过实验,能满足93%压实度的改良方案中,采用掺生石灰焖料来降低高液限土路基工程压实度要求的方案切实可行,但通过估算,其成本较高,且掺生石灰焖料在翻拌过程会溅起大量的灰尘,对环境有一定的污染。其缺陷是:即不经济,又不环保。
发明内容
为了克服上述之不足,本发明的目的在于提供一种在保障路基的工程质量的前提下,具有即经济,又环保特性的掺砂降低高液限土路基工程压实度要求的施工方法。
为解决上述技术问题,本发明所采用的技术方案是:掺砂降低高液限土路基工程压实度要求的施工方法,包括以下步骤:A、对路基中的高液限土进行掺砂并用旋耕机拌和均匀,掺砂量为15%~25%;B、包盖处理:将上述掺砂的高液限土填入路基表面下2.9m以下的区域,并在其表面设不透水土工膜,并且在掺砂的土料的两边填设3米宽的非高液限土的土料;C、采用压路机碾压,第一遍静压采用碾压时速1.5~1.7km/h,以后采用碾压时速2.0~2.5km/h。
所述步骤A中,采用掺砂量为20%的中粗砂。
所述步骤C中,碾压得施工工艺为:对整个路基静压一遍→小振二遍→大振两遍→小振一遍→静压一遍,合计7遍,路基两侧部分的工作面增压2~3遍。
本发明的有益效果在于:将压实度标准93%降低到90%后,采用上述方案后,掺砂改良土和素土相比,最大干密度增加、最优含水率降低,在碾压过程中由于粗颗粒的存在,使得土中的水和空气能够顺利排出,可达到较高的路基强度要求。掺砂后不仅土体的强度和稳定性增加,而且可以减少土质的收缩应变,防止路基开裂。本发明方案大大降低了施工成本,并且在施工的过程中没有扬尘现象,不会对环境造成污染。
实施例:
广梧高速公路高液限土段进行液限土改良土方路基填筑施工,其步骤如下:
(1)、上土、平整:对于要进行高液限土改良施工的路段,采用挖掘机装土自卸汽车运至施工路段,并由专人指挥到指定位置卸料,同时用推土机进行整平,推土机整平后用平地机精平,平整后利用压路机在全宽的断面上静压一边。
(2)、布格掺砂:在上土平整静压后,根据事先计算确定的20%掺砂量,所掺砂为中粗砂,进行人工布格,按每格的用量进行掺砂,采用人工摊铺。每一层高液限土改良掺砂量的计算方法如下:高液限土的干容重A(kg/m3),填土面积S(m2),砂的堆积密度B(kg/m3),掺砂质量C(kg)=A*S*0.16*20%,掺砂方量D(m3)=C/B。掺砂厚度=D/S。目前室内试验高液限土的干容重约为1.60~1.82g/cm3,砂的堆积密度约为1.50g/cm3,20%掺砂量计算得掺砂厚度约为3.41~3.88cm。
(3)包盖处理:在其表面设不透水土工膜,并在掺砂的土料的两边填设3米宽的好土(非高液限土的土料);
(4)、旋耕机拌匀
采用旋耕机进行粉碎,旋耕机粉碎遍数以满足土层的拌和均匀为止,即达到砂土层颜色一致,无灰条、灰斑,整体层位均匀一致,颗粒大小满足规范要求,旋耕3遍。
(5)、碾压并检测压实度
采用18吨振动式压路机进行碾压,碾压得施工工艺为:静压一遍→小振二遍→大振两遍→小振一遍→静压一遍,合计7遍,对于路基两侧的工作面增压2~3遍。碾压时,应重叠1/2轮宽,后轮必须超过两段的接缝处,后轮压完路基全宽为一遍。压路机的碾压速度,第一遍静压采用1.5~1.7km/h,以后采用2.0~2.5km/h;碾压时遵循先边后中、先慢后快,先弱振再强振的原则;严禁压路机在已完成的或正在碾压的路段上调头或急刹车,以保证表面不受破坏。
对于该填方路段路面以下0~1.5m之间必须用合格土填筑,其中0~0.8m压实度按96%控制,0.8m~1.5m压实度按94%控制,路面以下1.5m~3.0m是本发明掺砂后的高液限土填筑,降低压实度标准为90%,3.0m以下也采用本发明掺砂后的高液限土填筑,降低压实度标准为88%。
高液限土路基的填筑与稳定技术是当前公路建设领域所必须面临和解决的技术难题之一。广梧线高液限土在确保工程质量、建设工期、工程造价等大前提下,利用本发明的方案,通过掺砂和适当的降低压实度要求,使工程沿线近140万m3高液限土得到充分利用,避免了大量弃方,保护了生态环境,而且还降低了施工成本。本发明方案对以后全国高液限土的应用具有重要的理论和实际意义。
Claims (3)
1.一种掺砂降低高液限土路基工程压实度要求的施工方法,其特征在于:该方法包括以下步骤:A、对路基中的高液限土进行掺砂并用旋耕机拌和均匀,掺砂量为15%~25%;B、包盖处理:将上述掺砂的高液限土填入路基表面下2.9m以下的区域,并在其表面设不透水土工膜,并且在掺砂的土料的两边填设3米宽的非高液限土的土料;C、采用压路机碾压,第一遍静压采用碾压时速1.5~1.7km/h,以后采用碾压时速2.0~2.5km/h。
2.根据权利要求1所述的掺砂降低高液限土路基工程压实度要求的施工方法,其特征在于:所述步骤A中,采用掺砂量为20%的中粗砂。
3.根据权利要求1所述的掺砂降低高液限土路基工程压实度要求的施工方法,其特征在于:所述步骤C中,碾压得施工工艺为:对整个路基静压一遍→小振二遍→大振两遍→小振一遍→静压一遍,合计7遍,路基两侧部分的工作面增压2~3遍。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010019550A CN101761009A (zh) | 2010-01-21 | 2010-01-21 | 掺砂降低高液限土路基工程压实度要求的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010019550A CN101761009A (zh) | 2010-01-21 | 2010-01-21 | 掺砂降低高液限土路基工程压实度要求的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101761009A true CN101761009A (zh) | 2010-06-30 |
Family
ID=42492378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010019550A Pending CN101761009A (zh) | 2010-01-21 | 2010-01-21 | 掺砂降低高液限土路基工程压实度要求的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101761009A (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322007A (zh) * | 2011-06-30 | 2012-01-18 | 广东省长大公路工程有限公司 | 一种高液限土分层填筑压实程度的控制方法 |
CN102561134A (zh) * | 2012-01-09 | 2012-07-11 | 长沙理工大学 | 按平衡含水量进行高液限红粘土下路堤填筑的压实方法 |
CN102628246A (zh) * | 2012-03-19 | 2012-08-08 | 尚路 | 一种复合离子土壤固化剂与电石渣的道路施工方法 |
CN103487562A (zh) * | 2013-06-25 | 2014-01-01 | 长沙理工大学 | 一种南方高液限土路基压实湿度设计方法 |
CN111172834A (zh) * | 2020-01-13 | 2020-05-19 | 西安建筑科技大学 | 一种改良高液限土路基填筑结构及施工方法 |
CN111893828A (zh) * | 2020-08-12 | 2020-11-06 | 安徽省公路桥梁工程有限公司 | 一种机制砂改良高液限土路基填筑施工方法 |
CN112523021A (zh) * | 2019-12-09 | 2021-03-19 | 山西机械化建设集团有限公司 | 一种公路工程水泥土路基垫层及其施工工艺和检测方法 |
CN113215894A (zh) * | 2021-04-16 | 2021-08-06 | 中南大学 | 一种路基填料压实质量控制方法及系统 |
-
2010
- 2010-01-21 CN CN201010019550A patent/CN101761009A/zh active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322007A (zh) * | 2011-06-30 | 2012-01-18 | 广东省长大公路工程有限公司 | 一种高液限土分层填筑压实程度的控制方法 |
CN102561134A (zh) * | 2012-01-09 | 2012-07-11 | 长沙理工大学 | 按平衡含水量进行高液限红粘土下路堤填筑的压实方法 |
CN102628246A (zh) * | 2012-03-19 | 2012-08-08 | 尚路 | 一种复合离子土壤固化剂与电石渣的道路施工方法 |
CN103487562A (zh) * | 2013-06-25 | 2014-01-01 | 长沙理工大学 | 一种南方高液限土路基压实湿度设计方法 |
CN103487562B (zh) * | 2013-06-25 | 2016-01-20 | 长沙理工大学 | 一种南方高液限土路基压实湿度设计方法 |
CN112523021A (zh) * | 2019-12-09 | 2021-03-19 | 山西机械化建设集团有限公司 | 一种公路工程水泥土路基垫层及其施工工艺和检测方法 |
CN111172834A (zh) * | 2020-01-13 | 2020-05-19 | 西安建筑科技大学 | 一种改良高液限土路基填筑结构及施工方法 |
CN111893828A (zh) * | 2020-08-12 | 2020-11-06 | 安徽省公路桥梁工程有限公司 | 一种机制砂改良高液限土路基填筑施工方法 |
CN113215894A (zh) * | 2021-04-16 | 2021-08-06 | 中南大学 | 一种路基填料压实质量控制方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101761009A (zh) | 掺砂降低高液限土路基工程压实度要求的施工方法 | |
CN207314069U (zh) | 一种采用eps和固化粉煤灰组合回填的桥头路基结构 | |
CN108660890A (zh) | 一种道路水泥稳定土与环保水性固化稳定土施工方法 | |
CN101545234A (zh) | 利用建筑垃圾修筑路基和基层的方法 | |
CN106116395A (zh) | 一种作为道路底基层填料的无机结合料稳定土及其配制方法 | |
CN111041916A (zh) | 一种土方固化的路基施工方法 | |
CN107938480A (zh) | 一种微生物固化联合土工格栅的沙漠公路路堤及其施工方法 | |
CN103422407A (zh) | 采用水泥硅藻土稳定沙漠沙混合料修筑尼日尔沙漠公路施工工艺 | |
CN112523021A (zh) | 一种公路工程水泥土路基垫层及其施工工艺和检测方法 | |
CN101768956A (zh) | 掺生石灰降低高液限土路基工程压实度要求的施工方法 | |
CN107447617A (zh) | 一种临时施工道路的防尘固化工艺 | |
CN111177830B (zh) | 一种基于预测数学模型快速提高千枚岩土路基面承载力的方法 | |
CN103161119A (zh) | 一种变废为宝旧路改造的新方法 | |
CN206666953U (zh) | 一种建筑垃圾再生集料的路基结构 | |
CN103806434A (zh) | 一种级配建渣土工袋处理钻前工程饱和过湿土地基的方法 | |
CN207760678U (zh) | 一种处理软土路基的固化板体稳定协调结构 | |
CN205134120U (zh) | 超厚水泥稳定碎石基层 | |
CN114606819A (zh) | 一种采用灰土半包裹膨胀土的高填方结构及其施工方法 | |
CN103145383A (zh) | 一种利用海底淤泥的建筑材料及其制备方法 | |
CN108560347B (zh) | 一种采用铁矿尾矿粉为主要材料的路基填料施工方法 | |
JP2015121060A (ja) | 舗装構造 | |
CN221345178U (zh) | 一种人行步道路面结构 | |
CN104452739B (zh) | 一种软土搅拌破碎固化制备改良土设备 | |
CN108086299A (zh) | 一种固化剂处理软土路基的结构稳定协调方法 | |
CN207794121U (zh) | 一种抗沉陷地基基础结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20100630 |