CN101736695A - 一种自锚式桥梁施工过程中的临时锚固结构 - Google Patents
一种自锚式桥梁施工过程中的临时锚固结构 Download PDFInfo
- Publication number
- CN101736695A CN101736695A CN200910220437A CN200910220437A CN101736695A CN 101736695 A CN101736695 A CN 101736695A CN 200910220437 A CN200910220437 A CN 200910220437A CN 200910220437 A CN200910220437 A CN 200910220437A CN 101736695 A CN101736695 A CN 101736695A
- Authority
- CN
- China
- Prior art keywords
- temporary
- bridge
- anchor
- main
- interim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000004873 anchoring Methods 0.000 title claims abstract description 10
- 238000006243 chemical reaction Methods 0.000 claims abstract description 10
- 238000009434 installation Methods 0.000 claims 1
- 230000008901 benefit Effects 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明属于建筑工程技术领域,特别涉及到自锚式桥梁施工过程中用于体系转换的临时锚固结构。其特征是:在施工主桥承台的同时一并浇筑临时锚碇,并在施工引桥下部结构时将靠近主桥的多个墩柱连为框架结构;待主缆安装就位并锚固于主梁端部锚块后,初次张拉临时锚碇上的临时锚索;在吊装中间部分主梁标准段的同时,逐步张拉临时锚碇上的临时锚索直至主桥合拢;主桥合拢后,有控制地分步释放临时锚碇处的临时锚索的张拉力,完成体系转换;调整全桥索力,拆除临时锚碇。本发明的效果和益处是充分利用桥梁已有结构形成临时锚固结构,缩小了临时锚碇的体积,降低了工程造价,缩短了施工工期;同时体系转换过程平稳安全,降低了施工过程中的风险。
Description
技术领域
本发明属于建筑工程技术领域,涉及到桥梁工程施工过程中,采用体系转换的方法将临时地锚体系转换为永久自锚体系,尤其涉及到体系转换过程中的临时锚固结构。
背景技术
自锚式桥梁传统上采用先架梁、后挂缆的施工顺序,这种施工方法需要设立大量的临时支架以支撑主梁。其一方面增加了工程造价,延长了施工工期;另一方面,干扰航道正常的交通秩序,且在大江大河或深海地区设立支架非常困难甚至是不可能实现的。这种施工方法使自锚式桥梁的应用推广受到了限制。
为了克服上述支架施工方法的弊端,一种无支架施工方法,即先挂缆、后架梁的施工方法应运而生,已经建成通车的苏州竹园大桥就是采用此种方法施工的。该桥在施工过程中将主缆锚固于混凝土梁端锚块上,而锚块则通过临时锚索拉在临时锚碇上,这种临时锚固结构主要借鉴了地锚式桥梁的锚固原理,其在施工过程中与传统的地锚式桥梁在力学上是没有区别的,因此具有形式简单,受力明确的优点,但是该锚固结构需要修建庞大的临时锚碇,这势必会增加工程造价并延长施工工期。
发明内容
本发明的要解决的技术问题是提供一种自锚式桥梁施工过程中的临时锚固结构。这种结构不但可以降低工程造价,缩短施工工期,保证桥下通航。
本发明的技术方案是,将引桥墩柱组成的框架结构,并与主桥边墩承台以及临时锚索共同组成自锚式桥梁施工过程中的临时锚固结构。
本发明具体包含以下步骤:
步骤1:在施工主桥承台的同时一并浇筑临时锚碇,并在施工引桥下部结构时将靠近主桥的多个墩柱连为框架结构;
步骤2:待主缆安装就位并锚固于主梁端部锚块后,初次张拉临时锚碇上的临时锚索;
步骤3:在吊装中间部分主梁标准段的同时,逐步张拉临时锚碇上的临时锚索直至主桥合拢;
步骤4:主桥合拢后,有控制地分步释放临时锚碇处的临时锚索的张拉力,完成体系转换;
步骤5:调整全桥索力,拆除临时锚碇。
本发明的效果和益处是:
临时锚固结构充分利用了桥梁结构已有的承台和桥墩,缩小了修建临时锚碇的体积,可以大幅节约工程造价,同时缩短了施工工期,还能保证施工期间桥下通航;临时锚固结构采用了主桥承台与引桥桥墩框架结构的组合结构来共同承担主缆的水平分力,锚固结构的总体承载能力增加。
附图说明
图1是体系转换过程中的临时锚固结构立面示意图。
图中:1临时锚索PG1;2临时锚索PG2;3临时锚索PG3;4限位钢管;5主梁锚块;6临时锚碇;7框架结构。
图2是体系转换过程中的临时锚固结构平面示意图。
图中:1临时锚索PG1;2临时锚索PG2;3临时锚索PG3;4限位钢管;5主梁锚块;6临时锚碇;7框架结构。
具体实施方式
以下结合技术方案和说明书附图详细叙述本发明的具体实施方式。
1.根据设计计算结果将体系转换过程中的临时锚碇在施工主桥边墩承台的同时一并浇筑;将靠近主桥边墩的多个墩柱在施工引桥下部结构时连为框架结构;
2.悬挂主缆,并将主缆锚固于混凝土梁端锚块上。梁端锚块、临时锚碇与引桥多个墩柱组成的框架结构通过临时锚索相连;
3.在临时锚碇上初次张拉临时锚索;
4.吊装中间部分箱梁标准段,同时逐步张拉临时锚索的,直至主桥合拢;
5.主桥合拢后,开始释放临时锚索的索力完成体系转换过程。体系转换时,分三次逐步释放临时锚索的索力,且主桥两侧同步对称释放。具体实施过程为:首先释放PG1和PG2索力至50%,然后将PG3的索力一次性全部释放掉,最后释放PG1和PG2的剩余全部索力。
6.调整全桥索力,拆除临时锚碇。
材料特性:临时锚碇采用C30混凝土;临时锚索采用标准强度1670Mpa的平行钢丝。
Claims (1)
1.一种自锚式桥梁施工过程中的临时锚固结构,包括引桥墩柱组成的框架结构、主桥边墩承台以及临时锚索,其特征是:
1)在施工主桥承台的同时一并浇筑临时锚碇,并在施工引桥下部结构时将靠近主桥的多个墩柱连为框架结构;
2)待主缆安装就位并锚固于主梁端部锚块后,初次张拉临时锚碇上的临时锚索;
3)在吊装中间部分主梁标准段的同时,逐步张拉临时锚碇上的临时锚索直至主桥合拢;
4)主桥合拢后,有控制地分步释放临时锚碇处的临时锚索的张拉力,完成体系转换;
5)调整全桥索力,拆除临时锚碇。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009102204375A CN101736695B (zh) | 2009-11-27 | 2009-11-27 | 一种自锚式桥梁施工过程中的临时锚固结构 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009102204375A CN101736695B (zh) | 2009-11-27 | 2009-11-27 | 一种自锚式桥梁施工过程中的临时锚固结构 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101736695A true CN101736695A (zh) | 2010-06-16 |
| CN101736695B CN101736695B (zh) | 2012-03-14 |
Family
ID=42460682
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009102204375A Expired - Fee Related CN101736695B (zh) | 2009-11-27 | 2009-11-27 | 一种自锚式桥梁施工过程中的临时锚固结构 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101736695B (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102877414A (zh) * | 2012-09-28 | 2013-01-16 | 中铁四局集团第一工程有限公司 | 通用化三角挂篮和托架安装结构及其施工方法 |
| CN104005338A (zh) * | 2014-05-06 | 2014-08-27 | 中铁港航局集团有限公司 | 一种大跨斜拉桥塔梁三向临时固结结构 |
| CN112627030A (zh) * | 2020-11-18 | 2021-04-09 | 中交一公局集团有限公司 | 散索鞍支墩基础兼引桥基础的重力式锚碇结构及施工方法 |
-
2009
- 2009-11-27 CN CN2009102204375A patent/CN101736695B/zh not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102877414A (zh) * | 2012-09-28 | 2013-01-16 | 中铁四局集团第一工程有限公司 | 通用化三角挂篮和托架安装结构及其施工方法 |
| CN102877414B (zh) * | 2012-09-28 | 2015-02-18 | 中铁四局集团第一工程有限公司 | 通用化三角挂篮和托架安装结构及其施工方法 |
| CN104005338A (zh) * | 2014-05-06 | 2014-08-27 | 中铁港航局集团有限公司 | 一种大跨斜拉桥塔梁三向临时固结结构 |
| CN104005338B (zh) * | 2014-05-06 | 2016-08-03 | 中铁港航局集团有限公司 | 一种大跨斜拉桥塔梁三向临时固结结构 |
| CN112627030A (zh) * | 2020-11-18 | 2021-04-09 | 中交一公局集团有限公司 | 散索鞍支墩基础兼引桥基础的重力式锚碇结构及施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101736695B (zh) | 2012-03-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115030052B (zh) | 一种连续拱桥快速安全施工与智能监测控制方法 | |
| CN102418315B (zh) | 低扣塔架设桥宽较大的钢管混凝土拱桥的施工方法 | |
| WO2023016573A1 (zh) | 一种斜拉桥钢混主梁的施工方法 | |
| CN100543235C (zh) | 斜拉索辅助全悬臂架设钢桁梁的方法及系统 | |
| CN103243658B (zh) | 斜拉桥牵索挂篮的组拼方法 | |
| CN103233427B (zh) | 一种双塔三跨平面主缆自锚式悬索桥吊索张拉与体系转换的方法 | |
| CN102330414B (zh) | 大跨连续刚构梁边跨现浇梁段的挂篮悬浇施工方法 | |
| CN101914897A (zh) | 单主缆斜吊杆地锚式悬索桥的施工方法 | |
| CN101736686A (zh) | 自锚式混合梁斜拉悬吊协作体系桥 | |
| CN100519943C (zh) | 独塔无背索斜拉桥 | |
| CN102425117A (zh) | 多联连续梁或刚构梁边跨非悬臂段的施工方法 | |
| CN110761168A (zh) | 一种先缆后梁的自锚式悬索桥设计与施工方法 | |
| CN107190627A (zh) | 部分地锚式悬索桥及其施工方法 | |
| CN102296525A (zh) | 支座体系混合式结合梁斜拉桥及其施工方法 | |
| CN109137739B (zh) | 一种自锚式悬索桥的塔锚-墩锚联合式快速建造方法 | |
| CN104005338B (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
| CN201826249U (zh) | 自锚式混合梁斜拉悬吊协作体系桥 | |
| CN104314013B (zh) | 一种极不对称组合梁的双悬臂施工方法 | |
| CN105648917A (zh) | 一种混合梁自锚式悬索桥“缆梁同步”的施工方法 | |
| CN107419670A (zh) | 拱梁组合式连续刚构桥上弦行走式挂篮施工装置及方法 | |
| CN104775365B (zh) | 一种斜拉桥施工方法 | |
| CN102154990A (zh) | 一种边跨悬吊-中跨斜拉三塔自锚式组合索桥的架设方法 | |
| CN101736685A (zh) | 地锚—自锚吊拉组合体系桥 | |
| CN105696470B (zh) | 一种钢箱梁原位顶推和塔柱同步快速施工方法 | |
| CN114837059A (zh) | 一种山区岩锚斜拉柔拱协作体系桥及其施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120314 Termination date: 20141127 |
|
| EXPY | Termination of patent right or utility model |