CN101733512B - Method for quick repair welding, restoring and reproducing of high-alloy cold-working mould - Google Patents
Method for quick repair welding, restoring and reproducing of high-alloy cold-working mould Download PDFInfo
- Publication number
- CN101733512B CN101733512B CN2009101995459A CN200910199545A CN101733512B CN 101733512 B CN101733512 B CN 101733512B CN 2009101995459 A CN2009101995459 A CN 2009101995459A CN 200910199545 A CN200910199545 A CN 200910199545A CN 101733512 B CN101733512 B CN 101733512B
- Authority
- CN
- China
- Prior art keywords
- welding
- mould
- die
- cold
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The invention relates to a process technology and a method aiming at the simple, convenient and effective repair welding, restoring and reproducing of a cold-working die, which belongs to the technical field of high-alloy cold-working die steel. In the method, hard-face knife edges or molding shape faces which satisfies the requirements are produced on a failed cold-working die through resurfacing welding mainly by the process steps of the preheating treatment of a die to be restored before repair welding, the adoption of a specific welding wire, the determination of welding high-frequency current, the postweld heat treatment and the like, so the failed die carries out the punching task of more than tens of thousands times again. The method solves the problems of high carbon equivalent and difficult welding of high-alloy steel, recycles the failed die of a producer after repair welding and restoration, can enhance the service life of the die, reduces the maintenance cost of the die and enhances the production efficiency.
Description
Technical field
The present invention relates to a kind of technology and method of making again to the simple and effective Repair Welding of cold-work die, belong to the cold work die steel in high alloy through technical field.
Background technology
Because cold-work die is prone to collapse inefficacies such as angle, wearing and tearing, size distortion, cracking in the manufacturing enterprise, opens Mo Xinmo fully and replace the expense of inefficacy mould huge and the production cycle is long, so hope is keeped in repair the inefficacy mould to weld these simple and effective means.But nowadays most cold-work dies adopt high-alloy steel, and carbon equivalent high has limited conventional welding wire welding method.So need the Repair Welding re-manufacturing technology of developing special, solve the cold work die steel in high alloy through maintenance difficult problem that enterprise faces, thereby reduction cold-work die maintenance cost improve die life.
Summary of the invention
The process that the object of the present invention is to provide a kind of simple and effective Repair Welding to cold work die steel in high alloy through commonly used to make again is characterized in that having following process and step:
A. the preheating of mould to be repaired: with to be repaired before soldering 300-370 ℃ of following preheating insulation 1~2 hour, ftracture when evaporating oil stain and avoiding the mould soldering;
B. welding wire is selected for use: the common stiff dough edge of a knife of mould is adopted No. 2 welding wire thin layers back No. 1 welding wire built-up welding edge of a knife shape face that feels secure; The finishing die repairing sizes adopts No. 3 welding wires; Inside was adopted No. 2 welding wires connections and is made stiff dough on the top layer with No. 1 welding wire when the mould bonding that ruptures was repaired; No. 4 welding wires are adopted in the stiff dough edge of a knife built-up welding that special high hardness high toughness requires;
Welding wire numbering and composition are as shown in the table:
C. confirm current parameters: adopt the tungsten argon arc welding machine, use high frequency electric 100-150 ampere; Set electric current on the low side during near the die surface built-up welding, set higher electric current during away from the mould built-up welding;
D. post weld heat treatment: weld deposit process was controlled in 25-30 minute, let weld seam air cooling 5-10 minute after the completion earlier; Carry out 2-3 hour post weld heat treatment of 300-370 ℃ of insulation then,, prevent in the use that stress concentrates and ftracture to discharge sweating heat stress; Thereby make overlay cladding carry out temper simultaneously and improve toughness.
Its steel grade alloying component of high-alloy cold-working mould described in the present invention is as shown in the table:
Steel grade | C | Si | Mn | Cr | Mo | V | P | S |
Cr12 | 2.00-2.30 | ≤0.40 | ≤0.40 | 11.50- 13.00 | ≤0.030 | ≤0.030 | ||
Cr12MoV | 1.45-1.70 | ≤0.40 | ≤0.40 | 11.00- 12.50 | 0.40- 0.60 | 0.15-0.30 | ≤0.030 | ≤0.030 |
SKD11 | 1.40-1.60 | 0.15-0.35 | 0.30-0.60 | 11.00- 13.00 | 0.70- 1.20 | 0.50-1.10 | ≤0.030 | ≤0.030 |
Cr12Mo1V1 (D2) | 1.40-1.60 | ≤0.60 | ≤0.60 | 11.00- 13.00 | 0.70- 1.20 | ≤1.10 | ≤0.030 | ≤0.030 |
Cr8Mo2SiV (DC53) | 0.90-1.10 | 0.80-1.20 | 0.10-0.60 | 7.00- 9.50 | 2.30- 3.00 | 0.25-0.40 | ≤0.030 | ≤0.030 |
The inventive method is applicable to the Cr12 through Q-tempering, Cr12MoV (SKD11), Cr12Mo1V1 (D2), Cr8Mo2SiV cold work die steel in high alloy through commonly used such as (DC53).
Respectively number the characteristic of welding wire among the present invention and select for use basis to be described below:
No. 1 welding wire: be applicable to the welding wire of making the stiff dough edge of a knife, carbon content is the principal element that influences weldability, so the welding wire carbon content has obtained low carbon equivalent and guaranteed good weldability far below matrix.In order to reach enough hardness, the Si and a certain amount of Mn that add high level play the solution strengthening effect, and deoxidation in the welding wire process of setting.A large amount of Cr can form carbide reinforced weld seam matrix; A small amount of adding of Mo and V has improved overlay cladding intensity and impact flexibility.
No. 2 welding wires: mainly play the bonding matrix and the stiff dough edge of a knife.Contain the austenite that a large amount of Cr and Ni become welding wire not undergo phase transition in the temperature-fall period.The very low and hardening constituent element of carbon content has only Mn and a spot of Si, make postwelding hardness far below the cold work die steel requirement, but caking property is fine, is applicable to prime coat or bonding fracture mould.
No. 3 welding wires: be applicable to the welding wire of repairing forming face.Carbon content and No. 1 welding wire are approaching, and Si and Cr content reduce obviously, can increase the intensity and the wearability of weld seam but added W formation hard tungsten carbide, and suitably improve Mo content and further improved intensity and toughness.
No. 4 welding wires: further increase the content of C, W, improve weld hardness and wearability greatly, and guarantee the toughness of weld seam through the increase of Mo, V, performance is all better than No. 1 and No. 3 welding wires, is applicable to the Repair Welding occasion that performance requirement is high.
Advantage of the present invention and effect:
Through weld preheating insulation and post weld heat treatment, the thermal stress of the released heat zone of influence reduces the adverse effect of heat affected area to mould, does not ftracture in the use of protection mould postwelding; Choosing the collocation of suitable welding wire and welding wire makes Weld Performance excellent; The high electric current of high frequency shortens soldering time increase overlay cladding cooling rate and raises the efficiency.
The specific embodiment
After specific embodiment of the present invention being described at present.
Embodiment 1: the aging mould of being repaired in this example is the Cr12MoV side cut cold-work die through 1040 ℃ of 210 ℃ of insulations tempering in 2 hours 2 times of quenching; This mould is through repeatedly repairing and just using number of times more than 200,000 times, and the side cut edge of a knife has two to collapse angle and many places crackle and size distortion.Adopt Repair Welding re-manufacturing technology of the present invention that it is carried out following processing.
The operating procedure of the Repair Welding re-manufacturing technology that adopts in the present embodiment is following:
(a) preheat temperature and temperature retention time before the soldering: at first the Cr12MoV mold notch is collapsed angle, crackle and the size position that subsides and be polished into smooth built-up welding groove.Aging serious Cr12MoV cold-work die inside has in the micro-crack of a large amount of recessive micro-cracks and die surface contains oil stain; So preheat temperature is selected higher 370 ℃ and is incubated 2 hours, the accident cracking, the evaporation oil stain cleaning that play when protecting mould to avoid soldering are treated built-up welding groove and the effect that improves weldquality.
(b) setting of current parameters: current parameters is set at high frequency electric; High current peak can be accelerated the fusing of welding wire and the formation in molten bath; And actual tungsten electrode average current has only and shows the half the of electric current, can not make mould receive excessive current and the softening embrittlement phenomenon of high tempering takes place.It is as far as possible little under filler wire and the condition that produces the molten bath, to make die surface receive the heat affecting of electric current during built-up welding.And the electric current on the low side of setting 100 amperes of high frequencies during No. 2 welding wires of built-up welding influences the matrix mold hot reducing; And the higher electric current of setting 150 amperes of high frequencies during No. 1 welding wire of built-up welding increases the cooling velocity of edge of a knife overlay cladding, thereby increases martensite content and improve hardness.
(c) use of welding wire: at first play the effect of bonding matrix and hard-face overlaying welding layer with the good No. 2 welding wires built-up welding one deck on plane to be welded of caking property; In its cooling procedure, knock No. 2 welding wire built-up welding layers and make its densification with hammer; Then No. 1 welding wire is continued the built-up welding layer 2-3 as the stiff dough edge of a knife on No. 2 welding wire built-up welding layers; Beat overlay cladding with hammer after accomplishing and make dense structure, and let the overlay cladding air cooling form martensite in 5 minutes.
(d) post weld heat treatment: whole welding repair process was accomplished in 25 minutes to prevent that excess shrinkage makes the mould cracking in the weld seam temperature-fall period; Carry out 2 hours heat treatments of 370 ℃ of insulations then, thereby make the sweating heat Stress Release prevent in the mould use that stress concentrates and ftracture, thereby and make overlay cladding carry out temper to improve toughness.
(e) side cut edge of a knife processing:, made the Cr12MoV side cut cold-work die that can continue to use again through above-mentioned Repair Welding technology like this with edge of a knife shape and the size that overlay cladding redundance cut one-tenth needs.
The Cr12MoV side cut cold-work die of making again through the said method Repair Welding at last, built-up welding edge of a knife hardness reaches 58-60HRC, and is suitable with the edge of a knife hardness of new mould; And inefficacies such as angle, wearing and tearing deformation do not appear ftractureing, collapse in the shearing task of in actual production, having accomplished one batch of (20,000) auto parts, and part quality is identical with new die production.
Embodiment 2: the shaping dies of being repaired in this example is the DC53 cold work die steel through 200 ℃ of insulation tempering in 2 hours 2 times behind 1030 ℃ of oil quenchings, surpasses 100,000 times through repeatedly repairing access times, and forming face has the many places crackle, subside and inefficacy such as size distortion.Adopt Repair Welding re-manufacturing technology of the present invention that it is carried out following processing.
The operating procedure of the Repair Welding re-manufacturing technology that adopts in the present embodiment is following:
(a) preheat temperature and temperature retention time before the soldering: at first the position with DC53 die surface crackle and undersize is polished into smooth built-up welding groove; Preheat temperature is selected moderate 350 ℃ and is incubated 2 hours, and the accident cracking, the evaporation oil stain cleaning that play when protecting mould to avoid soldering are treated built-up welding groove and the effect that improves weldquality.
(b) setting of current parameters: direct in the built-up welding of the DC53 of original inefficacy die surface because of needing, so set 120 amperes of lower high frequency electrics, the heat affecting that under the condition in filler wire and generation molten bath, die surface is received during built-up welding is as far as possible little.
(c) selecting for use of welding wire: select for use No. 3 direct built-up welding of welding wire at crackle groove and the forming face size position that subsides, built-up welding is accomplished the back and is beaten overlay cladding with hammer and make dense structure, and lets overlay cladding air cooling formation in 5 minutes martensite.
(d) post weld heat treatment: whole welding repair process was accomplished to prevent to receive welding heat affected in the mould temperature-fall period in 25 minutes and is ftractureed; Carry out 2 hours post weld heat treatment of 370 ℃ of insulations then, thereby make the sweating heat Stress Release prevent in the mould use that stress concentrates and ftracture, thereby and make overlay cladding carry out temper to improve toughness.
(e) forming face processing:, made the DC53 moulding cold-work die that can continue to use again through above-mentioned Repair Welding technology like this with the forming face size that overlay cladding redundance grinding one-tenth needs.
The DC53 shaping cold-work die of making again through the said method Repair Welding at last, built-up welding edge of a knife hardness reaches 59-61HRC, and is suitable with new mould case hardness; And inefficacies such as cracking, the deformation of wearing and tearing and subside do not appear in the shaping production task of in actual production, having accomplished one batch of (20,000) auto parts, and product quality is identical with new die production.
Claims (2)
1. method for quick repair welding, restoring and reproducing of high-alloy cold-working mould is characterized in that having following process and step:
A. the preheating of mould to be repaired: with mould to be repaired before soldering 300-370 ℃ of following preheating insulation 1~2 hour, ftracture when evaporating oil stain and avoiding the mould soldering;
B. welding wire is selected for use: the common stiff dough edge of a knife of mould is adopted No. 2 welding wire thin layers back No. 1 welding wire built-up welding edge of a knife shape face that feels secure; The finishing die repairing sizes adopts No. 3 welding wires; Inside was adopted No. 2 welding wires connections and is made stiff dough on the top layer with No. 1 welding wire when the mould bonding that ruptures was repaired; No. 4 welding wires are adopted in the stiff dough edge of a knife built-up welding that special high hardness high toughness requires;
Welding wire numbering and composition are as shown in the table:
C. confirm current parameters: adopt the tungsten argon arc welding machine, use high frequency electric 100-150 ampere; Set electric current on the low side during near the die surface built-up welding, set higher electric current during away from the mould built-up welding;
D. post weld heat treatment: weld deposit process was controlled in 25 minutes, let weld seam air cooling 5-10 minute after the completion earlier; Carry out 2-3 hour post weld heat treatment of 300-370 ℃ of insulation then,, prevent in the use that stress concentrates and ftracture to discharge sweating heat stress; Thereby make overlay cladding carry out temper simultaneously and improve toughness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101995459A CN101733512B (en) | 2009-11-26 | 2009-11-26 | Method for quick repair welding, restoring and reproducing of high-alloy cold-working mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101995459A CN101733512B (en) | 2009-11-26 | 2009-11-26 | Method for quick repair welding, restoring and reproducing of high-alloy cold-working mould |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101733512A CN101733512A (en) | 2010-06-16 |
CN101733512B true CN101733512B (en) | 2012-06-13 |
Family
ID=42457822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101995459A Expired - Fee Related CN101733512B (en) | 2009-11-26 | 2009-11-26 | Method for quick repair welding, restoring and reproducing of high-alloy cold-working mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101733512B (en) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103182618B (en) * | 2011-12-28 | 2016-04-27 | 湖北三环车桥有限公司 | Roll forging die enabling surfacing manufacturing renovation technique |
CN102717225B (en) * | 2012-06-05 | 2015-05-20 | 新疆众和股份有限公司 | Method for repairing damage of non-work surface of roller |
CN102922212A (en) * | 2012-11-16 | 2013-02-13 | 汪涛 | Refreshing method of aluminum profile combined porthole extrusion die |
CN103192160A (en) * | 2013-03-26 | 2013-07-10 | 重庆威导机械有限公司 | Repair welding method of large area die steel |
CN104972267A (en) * | 2014-04-14 | 2015-10-14 | 广东豪美铝业股份有限公司 | Extrusion die regeneration method |
CN104532131B (en) * | 2014-12-15 | 2016-06-01 | 合肥东方节能科技股份有限公司 | A kind of method promoting milling train slitting wheel work-ing life |
CN104625556A (en) * | 2014-12-17 | 2015-05-20 | 秦皇岛首秦金属材料有限公司 | Method for achieving circle shear blade build-up welding repair |
CN104827238A (en) * | 2015-04-10 | 2015-08-12 | 广西鱼峰水泥股份有限公司 | Repair method of plate type feeder eccentric pair wheel |
CN107433382A (en) * | 2016-05-25 | 2017-12-05 | 宝山钢铁股份有限公司 | Cobalt-based resurfacing welding material and the top restorative procedure based on the material |
CN106111717B (en) * | 2016-06-24 | 2018-04-24 | 广东坚美铝型材厂(集团)有限公司 | A kind of aluminium alloy extrusion mould splits the restorative procedure of bridge and its mould of reparation |
CN107953487B (en) * | 2017-12-01 | 2020-04-21 | 四川长虹模塑科技有限公司 | Repairing method for high-gloss steam mold nitriding thin-wall layer |
CN108994482A (en) * | 2018-08-13 | 2018-12-14 | 芜湖鼎瀚再制造技术有限公司 | A kind of crusher's rollers bead-welding technology |
CN109628833B (en) * | 2018-12-29 | 2020-04-28 | 东北大学 | Cr-Mo-Si-V cold-work die steel and preparation method thereof |
CN109680212A (en) * | 2019-01-10 | 2019-04-26 | 成都先进金属材料产业技术研究院有限公司 | The method for improving Cr12MoV static ingot internal soundness |
CN110480289A (en) * | 2019-08-27 | 2019-11-22 | 东光县伟通机电有限公司 | A kind of precision hot die forming technique |
CN111633305B (en) * | 2020-05-25 | 2022-05-17 | 中国第一汽车股份有限公司 | H13 steel mould argon arc welding method |
CN114589380A (en) * | 2020-12-07 | 2022-06-07 | 上海赛科利汽车模具技术应用有限公司 | Automobile mould surfacing method |
CN116213887B (en) * | 2023-05-08 | 2023-08-11 | 中南大学 | Argon arc welding repair method for 1.2738 steel plastic mold |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1136985A (en) * | 1996-01-10 | 1996-12-04 | 山东工业大学 | Cold-welding technique for partially repairing high-carbon alloy steel roller |
CN1544192A (en) * | 2003-11-14 | 2004-11-10 | 褚宏志 | Welding on process for restoring die |
CN1724208A (en) * | 2004-07-19 | 2006-01-25 | 北京颐鑫安科技发展有限公司 | Method for comprehensive repairing muold of plastic steel forming material |
CN101497145A (en) * | 2009-02-24 | 2009-08-05 | 联伟汽车零部件(重庆)有限公司 | Repairing welding method for crack of Cr12MoV steel mold |
-
2009
- 2009-11-26 CN CN2009101995459A patent/CN101733512B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1136985A (en) * | 1996-01-10 | 1996-12-04 | 山东工业大学 | Cold-welding technique for partially repairing high-carbon alloy steel roller |
CN1544192A (en) * | 2003-11-14 | 2004-11-10 | 褚宏志 | Welding on process for restoring die |
CN1724208A (en) * | 2004-07-19 | 2006-01-25 | 北京颐鑫安科技发展有限公司 | Method for comprehensive repairing muold of plastic steel forming material |
CN101497145A (en) * | 2009-02-24 | 2009-08-05 | 联伟汽车零部件(重庆)有限公司 | Repairing welding method for crack of Cr12MoV steel mold |
Non-Patent Citations (4)
Title |
---|
JP特开2001-239367A 2001.09.04 |
JP特开2007-216101A 2007.08.30 |
刘旭东.堆焊在模具修复中的应用.《模具制造》.2002,(第4期),第52-53页. * |
白瑞雪.铸铁类模具刃口堆焊工艺技术.《模具工业》.2005,(第5期),第48-49页. * |
Also Published As
Publication number | Publication date |
---|---|
CN101733512A (en) | 2010-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101733512B (en) | Method for quick repair welding, restoring and reproducing of high-alloy cold-working mould | |
US3660882A (en) | Process for the production of turbine blades | |
CN104741499B (en) | Sandwich layer forging die and preparation method of forging die sandwich layer surfacing | |
CN107109561B (en) | The excellent heavy wall high tenacity high-tensile steel of property uniform in material and its manufacturing method | |
CN103911612B (en) | The Cr12MoV cold punching die laser repairing process that wolfram varbide is cladding alloy is added with cobalt-based | |
CN101767262B (en) | Reproducing method of forging mold by using composite build-up welding | |
CN101144140A (en) | Flying shear blade and preparation method thereof | |
CN111996437A (en) | Production method of large-thickness high-toughness ultrahigh-strength steel plate with yield strength of 1100MPa | |
JP6118625B2 (en) | Manufacturing method of press mold | |
CN102837165A (en) | Manufacturing method for final-stage driving gear of high-power coal mining machine | |
CN102357778A (en) | Manufacturing method of pulling straightening roller | |
CN105506530A (en) | Mold surface composite strengthening method | |
US5591363A (en) | Optimized welding technique for NiMoV rotors for high temperature applications | |
CN109252161A (en) | A kind of laser frit repair in carbon quenched and tempered steel defect method | |
JPH08174215A (en) | Method for repairing metallic mold | |
CN102009283B (en) | Cavitation corrosion resistant stainless steel solder wire and welding method thereof | |
CN100389926C (en) | Hot werk mould steel welding material | |
US20100159130A1 (en) | Metal Mold Repair Method and Metal Mold Repair Paste Agent | |
CN106086597B (en) | A kind of method based on cobalt-chromium-tungsten alloy accumulation molding mill guide wheel | |
CN104690298A (en) | Turning method for high-speed steel roller | |
CN116441862A (en) | Process for prolonging service life of lining plate | |
CN111230400A (en) | Repairing, reinforcing and remanufacturing method for steel breakout and breakout parts of cold-work die | |
CN114481121A (en) | Laser cladding method of high-entropy alloy for surface repair and reinforcement | |
CN104162762B (en) | Utilize the method that nickel-cobalt-molybdenum-manganese-base alloy carries out flywheel repairing | |
CN108000049A (en) | A kind of build-up welding repair method of axle forging swage block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120613 Termination date: 20141126 |
|
EXPY | Termination of patent right or utility model |