CN101725202B - Superimposed pouring procedure of high-rise building transfer floor beam plate - Google Patents

Superimposed pouring procedure of high-rise building transfer floor beam plate Download PDF

Info

Publication number
CN101725202B
CN101725202B CN2008102010322A CN200810201032A CN101725202B CN 101725202 B CN101725202 B CN 101725202B CN 2008102010322 A CN2008102010322 A CN 2008102010322A CN 200810201032 A CN200810201032 A CN 200810201032A CN 101725202 B CN101725202 B CN 101725202B
Authority
CN
China
Prior art keywords
concrete
floor
layer
conversion layer
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008102010322A
Other languages
Chinese (zh)
Other versions
CN101725202A (en
Inventor
侯宪伟
尹亚鸿
曾学周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN2008102010322A priority Critical patent/CN101725202B/en
Publication of CN101725202A publication Critical patent/CN101725202A/en
Application granted granted Critical
Publication of CN101725202B publication Critical patent/CN101725202B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to construction of high-rise buildings and a superimposed pouring procedure of a high-rise building transfer floor beam plate, which comprises the following steps: pouring column concrete and wall concrete at the lower part of the transfer floor to a beam bottom; setting up a beam plate bottom die of the transfer floor and installing the bottom die; binding bottom-layer horizontal steel mesh reinforcement of the first layer of concrete of a transfer floor plate and surface course hogging moment steel mesh reinforcement of the first layer of concrete; installing a side form of the first layer of concrete; installing a shear-resisting key groove die plate; bonding additionally arranged vertical shear reinforcement between every two layers of transfer floor beam plates; carrying out pouring, hydrating, heat preservation, maintenance and surface treatment on the first layer of concrete; bonding constructional steel bar of the second layer of concrete of the transfer floor beam plates; installing the side form of the second layer of concrete; bonding shear wall joint bars at the upper structure of the transfer floor; disassembling the bottom die and the support when strength of the first layer of concrete reaches the design strength; carrying out pouring, hydrating, heat preservation and maintenance on the second layer of concrete. With the method of the invention adopted, construction cost can be reduced, construction quality can be improved and construction period can be shortened.

Description

Superimposed pouring procedure of high-rise building transfer floor beam plate
Technical field
The present invention relates to the construction construction of highrise building, relate in particular to a kind of high-rise building transfer floor job practices.
Background technology
Most highrise buildings, general upper floor is dwelling house, hotel etc., requires that the standard width of a room in an old-style house is little, structure wall is many, and mostly the bottom annex is public places such as commerce, entertainment, requires that the space is big, body of wall is few.Therefore the form of structure of upper floor and bottom annex is variant, needs between upper floor and bottom annex, conversion layer to be set.Because conversion layer can be regarded the basis of upper floor as, it is stressed bigger, and conversion layer thickness is thicker during structure design, arrangement of reinforcement is closeer, and its thickness reaches 1.5~2.5 meters usually, so the full hall support scaffolding load of conversion layer beam slab bed die is very big.During conventional the construction; Conversion layer beam slab thickness direction is integrated poured; To change layer working load of beam slab bed die in order bearing, all not remove, and require the vertical rod alignment as far as possible of floor up and down from the full hall of the bed die support scaffolding to all floors of conversion layer more than the basement bottom board; Load disperses downwards to transmit through all floors, passes to ground up to basement bottom board.
The drawback of conventional job practices is:
1., since the full hall support scaffolding of all floor bottom moulds below the conversion layer need wait until conversion layer construct and reach intensity after could remove, so need a large amount of template backing material of preparation, the rates of material or a purchase commodity are too big.
2., conversion layer beam slab thickness direction is integrated poured, is unfavorable for the heat radiation of prevention of mass concrete, need take special cooling measure, controls badly, occurs the crack easily.
3., the full hall support scaffolding of basement floor bottom mould removes evening time, influence that basement is interspersed in advance to carry out the architectural decoration operation, incurs loss through delay total duration.
Summary of the invention
The present invention is intended to solve the above-mentioned defective of prior art, and a kind of superimposed pouring procedure of high-rise building transfer floor beam plate is provided.The present invention effectively reduces construction cost, improves construction quality, shortens total duration.
The present invention is achieved in that
A kind of superimposed pouring procedure of high-rise building transfer floor beam plate, it comprises the following steps:
At the bottom of a, conversion layer lower post, wall concreting to the beam;
B, conversion layer beam slab bed die bearing support are set up with conversion layer beam slab bed die and are installed;
C, conversion layer beam steel, the conversion concrete bottom horizontal mesh reinforcement of laminate first floor and the colligation of the concrete surface layer negative reinforcement of first floor net;
D, the concrete side form of conversion layer beam slab first floor install;
E, shearing resistance keyway formwork erection;
The vertical shear reinforcement colligation of setting up between f, conversion layer beam slab layer and the layer;
G, the concreting of conversion layer beam slab first floor;
H, the maintenance of conversion layer beam slab first floor concrete moisture-heat preservation;
I, conversion layer beam slab first floor concrete surface are handled;
J, distributing bar (temperature reinforcement) colligation of conversion layer beam slab second layer concrete and surfacing steel bar colligation thereof;
K, the concrete side form of the conversion layer beam slab second layer install;
1, conversion layer superstructure shearwall joint bar colligation;
M, conversion layer beam slab first floor concrete strength are removed bed die and support after reaching design strength;
N, the concreting of the conversion layer beam slab second layer;
O, the maintenance of conversion layer beam slab second layer concrete moisture-heat preservation.
Described superimposed pouring procedure of high-rise building transfer floor beam plate; Said step b comprises: formwork bracing system is only considered to support conversion layer beam slab first floor and is built concrete deadweight and working load; Its load is by the some floor plates supportings below the conversion layer; Confirm the supporting floor number of plies through calculating, the full hall scaffold of these floors is not removed earlier; Confirm to participate in bearing vertical pole ' s span, the cross bar step pitch of full hall scaffold that conversion layer beam slab first floor is built the floor of concrete deadweight and working load through calculating.
Described superimposed pouring procedure of high-rise building transfer floor beam plate, among said step c and the f: watering the preceding reinforcement construction of first floor concrete is in proper order: the top is set up interim steel pipe shelf, guarantee for a person given by a shopkeeper's sheath cushion block, overlaps stirrup, divides shop lower floor reinforcing bar, layering to hang upper reinforcement, wears the waist muscle, is added the vertical shear reinforcement of setting up when hanging muscle, dismounting steel pipe shelf, the bottom muscle of wearing bed board, the plate face negative reinforcement of setting up when wearing the cast of branch multilayer, the cast of installation branch multilayer at the bottom of the beam.
Described superimposed pouring procedure of high-rise building transfer floor beam plate, said step g, h, n and.In, its concrete is built by Mass Concrete Construction, adopts the technical measures of thermometric, concrete surface insulation, inside concrete temperature control, guarantees that temperature difference between inside and outside concrete is no more than 25 ℃, does not produce structure penetrability crack.
Described superimposed pouring procedure of high-rise building transfer floor beam plate, in step c and f, a laminate face negative reinforcement need be set up in the plate surface that need formerly build, builds the concrete load with the opposing secondary, avoids the concrete cracking simultaneously; Between layer and layer, need set up shear reinforcement simultaneously, set up vertical reinforcement, and the length that is embedded in the new and old concrete surface layer is the half the of rebar full length at superposed surfaces interval certain distance.
Described superimposed pouring procedure of high-rise building transfer floor beam plate also comprises among the said step e:
Increase the shearing resistance groove: utilize and stay the mode of establishing groove to increase shear strength in advance, promptly build conversion layer edge, forward position and stay in advance and set out wide groove and to concrete bonding surface roughened at concrete.
Described superimposed pouring procedure of high-rise building transfer floor beam plate, concrete bonding surface roughened comprises in the said step I:
Artificial cutter hair promptly uses the new and old concrete bonding surface of awl and chiso-mallet hair; And dark beam is inner because stirrup designs the artificial bristle of intensive place's employing wire brush;
Water under high pressure dashes, and treats concrete final set, washes away new and old concrete bonding surface with water under high pressure after reaching certain intensity, and the coarse-fine aggregate on old concrete surface is exposed, and forms rough superposed surfaces;
Water under high pressure dashes and adds retarding agent, builds the back at the first floor concrete and sprays retarding agent, delays the concrete final setting time, so that in time take high pressure water washing, forms rough superposed surfaces.
Support system of the present invention only considers to bear the concrete deadweight and the working load of first floor, can reduce load that the bottom steel pipe supports, reduce a large amount of circulation materials, reduces construction costs;
Concreting in lifts can be alleviated concrete in mass heat of hydration height, the excessive adverse effect to the control crack of thermal stresses, has guaranteed the Mass Concrete Construction quality.
The full hall support scaffolding of basement floor bottom mould can early be removed, and basement can intert in advance and carries out the architectural decoration operation, can shorten total duration.
The specific embodiment
A kind of superimposed pouring procedure of high-rise building transfer floor beam plate, it is implemented according to following order:
Conversion layer lower columns, walls and concrete pouring to the beam bottom → conversion layer slab bottom mold support frame erection and conversion layer slab bottom mold supporting steel beams located → conversion layer, the first layer of concrete transfer floor level of the underlying steel mesh and third The surface layer of concrete reinforcing mesh banding negative moment → conversion layer slab side of the first layer of concrete shear modulus branch located → → keyway framework supporting conversion layer slab between layers of additional vertical shear steel banding → conversion layer first layer slab concreting → conversion layer first layer of concrete slab moisture heat conservation → conversion layer first layer of concrete slab surface treatment → conversion layer slab second layer of reinforced concrete structure (temperature steel) Its surface layer of steel banding banding → conversion layer second layer of concrete slab side mold support the upper structure located → conversion layer anti-shear dowels lashing → conversion layer first layer of concrete slab strength to meet the design strength after the removal of the bottom die and stent → conversion layer second layer slab concreting → conversion layer second layer of concrete slab moisture heat conservation.
During practical implementation, note following point:
(1), template supports and sets up
Formwork bracing system only considers to support deadweight of first floor concrete and working load, and how many floor plate supportings its load specifically needs by the some floor plates supportings below the conversion layer, and are definite through calculating, and the full hall scaffold of these floors is not removed earlier.Participation is born the parameters such as vertical pole ' s span, cross bar step pitch of full hall scaffold of the floor of conversion layer first floor concrete deadweight and working load and also will be confirmed through calculating.
(2), conversion layer beam reinforced steel bar
The reinforcement construction that waters before the first floor concrete is in proper order: the vertical shear reinforcement that the bottom muscle that upper reinforcement → wear waist muscle → additional hangs muscle etc. → dismountings steel pipe shelf → wear bed board → wear bed board face negative reinforcement (the structure muscle of setting up when branchs multilayer is poured into a mould) → set up when installation branch multilayer is poured into a mould is hung in interim steel pipe shelf → guarantee for a person given by a shopkeeper's sheath cushion block → cover stirrup → minute shop lower floor reinforcing bar → layering is set up in the top at the bottom of the beam.
The installation after having watered the first floor concrete, before the cast of second layer concrete of the top layer reinforcing bar of conversion laminate.
Because the conversion layer beam slab adopts superimposed casting; Be that the conversion layer beam slab will divide 2 layers even multilayer cast,, strengthen the caking property of new and old concrete in order to guarantee conversion layer beam slab globality; In reinforcement construction, to take following measure: 1., layer and the layer between need set up shear reinforcement; In superposed surfaces, set up the vertical reinforcement of long 1m Φ 16, spacing is 1m, and the length that is embedded in the new and old concrete surface layer is 0.5m; 2., the plate surface of formerly building need set up a laminate face negative reinforcement, arrangement of reinforcement is mainly resisted secondary and is built the concrete load, avoids the concrete cracking simultaneously, can play temperature steel effect in the slab.
(3), the conversion layer concrete is built
Though conversion layer beam slab concrete has divided the multilayer pouring; But every layer thickness is still thicker, and its concrete still need adopt thermometric, insulation (concrete surface), temperature control technical measures such as (inside concretes) by Mass Concrete Construction; Guarantee that temperature difference between inside and outside concrete is no more than 25 ℃, does not produce structure penetrability crack.
Superimposed casting divides 2 layers even multilayer cast, in order to guarantee conversion layer beam slab globality, strengthens the caking property of new and old concrete, in the concrete construction, will take following measure:
Keep a public place clean to tying up reinforcing bar when 1., the first floor concrete is built
Plate top mat sheet was not laid when the first floor concrete was built, but beam steel colligation finish, need the measure of keeping a public place clean of stiffening girder reinforcing bar, feed opening must be away from Liang Qu when requiring the concrete pouring, concrete adopts the formation of flowing naturally of vibrating head guiding concrete as far as possible in the beam; Carrier pipe drops on regional template and the Polypropylence Sheet of adopting of beam and protects isolation, and manual work is in time carried out clean to beam steel after building concrete.
2., new and old concrete bonding surface is handled
A, increase the shearing resistance groove: utilize and stay the mode of establishing groove to increase shear strength in advance, promptly build conversion layer edge, forward position and stay the groove that sets out the dark 60mm of wide 1m in advance at concrete, groove apart from the edge 1m far away, apart from beam 0.5m.
B, to concrete bonding surface roughened: a, an artificial cutter hair method, promptly use the new and old concrete bonding surface of awl and chiso-mallet hair; And dark beam is inner because the stirrup design is intensive, and manually-operated inconvenience can be adopted the artificial bristle of wire brush.B, high pressure water jetting are treated concrete final set, are washed away new and old concrete bonding surface with water under high pressure after reaching certain intensity, and the coarse-fine aggregate on old concrete surface is exposed, and form rough superposed surfaces.C, water under high pressure dash and add the retarding agent method, build the back at the first floor concrete and spray retarding agent, delay the concrete final setting time, so that in time take high pressure water washing, form rough superposed surfaces.

Claims (7)

1. a superimposed pouring procedure of high-rise building transfer floor beam plate is characterized in that it comprises the following steps:
At the bottom of a, conversion layer lower post, wall concreting to the beam;
B, conversion layer beam slab bed die bearing support are set up with conversion layer beam slab bed die and are installed;
C, conversion layer beam steel, the concrete bottom horizontal mesh reinforcement of conversion layer beam slab first floor and the colligation of the concrete surface layer negative reinforcement of first floor net;
D, the concrete side form of conversion layer beam slab first floor install;
E, shearing resistance keyway formwork erection;
The vertical shear reinforcement colligation of setting up between f, conversion layer beam slab layer and the layer;
G, the concreting of conversion layer beam slab first floor;
H, the maintenance of conversion layer beam slab first floor concrete moisture-heat preservation;
I, conversion layer beam slab first floor concrete surface are handled;
J, the concrete distributing bar colligation of the conversion layer beam slab second layer and surfacing steel bar colligation thereof;
K, the concrete side form of the conversion layer beam slab second layer install;
L, the colligation of conversion layer superstructure shearwall joint bar;
M, conversion layer beam slab first floor concrete strength are removed bed die and support after reaching design strength;
N, the concreting of the conversion layer beam slab second layer;
O, the maintenance of conversion layer beam slab second layer concrete moisture-heat preservation.
2. superimposed pouring procedure of high-rise building transfer floor beam plate according to claim 1; It is characterized in that; Said step b comprises: formwork bracing system is only considered to support conversion layer beam slab first floor and is built concrete deadweight and working load; Its load is confirmed the supporting floor number of plies by the some floor plates supportings below the conversion layer through calculating, and the full hall scaffold of these floors is not removed earlier; Confirm to participate in bearing vertical pole ' s span, the cross bar step pitch of full hall scaffold that conversion layer beam slab first floor is built the floor of concrete deadweight and working load through calculating.
3. superimposed pouring procedure of high-rise building transfer floor beam plate according to claim 1; It is characterized in that among said step c and the f: watering the preceding reinforcement construction of first floor concrete is in proper order: the top is set up interim steel pipe shelf, guarantee for a person given by a shopkeeper's sheath cushion block, overlaps stirrup, divides shop lower floor reinforcing bar, layering to hang upper reinforcement, wears the waist muscle, is added the vertical shear reinforcement of setting up when hanging muscle, dismounting steel pipe shelf, the bottom muscle of wearing bed board, the plate face negative reinforcement of setting up when wearing the cast of branch multilayer, the cast of installation branch multilayer at the bottom of the beam.
4. superimposed pouring procedure of high-rise building transfer floor beam plate according to claim 1; It is characterized in that; Among said step g, h, n and the o, its concrete is built by Mass Concrete Construction, adopts the technical measures of thermometric, concrete surface insulation, inside concrete temperature control; Guarantee that temperature difference between inside and outside concrete is no more than 25 ℃, does not produce structure penetrability crack.
5. superimposed pouring procedure of high-rise building transfer floor beam plate according to claim 1 is characterized in that, in step c and f, a laminate face negative reinforcement need be set up in the plate surface that need formerly build, builds the concrete load with the opposing secondary, avoids the concrete cracking simultaneously; Simultaneously between layer and layer, need set up shear reinforcement, in the middle of superposed surfaces, across setting up long vertical reinforcement, and be embedded in half that length in the new and old concrete surface layer is total length.
6. superimposed pouring procedure of high-rise building transfer floor beam plate according to claim 1 is characterized in that, also comprises among the said step e:
Increase the shearing resistance groove: utilize and stay the mode of establishing groove to increase shear strength in advance, promptly build conversion layer edge, forward position and stay the groove that sets out in advance at concrete, and to concrete bonding surface roughened.
7. superimposed pouring procedure of high-rise building transfer floor beam plate according to claim 1 is characterized in that, concrete bonding surface roughened comprises in the said step I:
Artificial cutter hair promptly uses the new and old concrete bonding surface of awl and chiso-mallet hair; And dark beam is inner because stirrup designs the artificial bristle of intensive place's employing wire brush;
Water under high pressure dashes, and treats concrete final set, washes away new and old concrete bonding surface with water under high pressure after reaching certain intensity, and the coarse-fine aggregate on old concrete surface is exposed, and forms rough superposed surfaces;
Water under high pressure dashes and adds retarding agent, builds the back at the first floor concrete and sprays retarding agent, delays the concrete final setting time, so that in time take high pressure water washing, forms rough superposed surfaces.
CN2008102010322A 2008-10-10 2008-10-10 Superimposed pouring procedure of high-rise building transfer floor beam plate Active CN101725202B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102010322A CN101725202B (en) 2008-10-10 2008-10-10 Superimposed pouring procedure of high-rise building transfer floor beam plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102010322A CN101725202B (en) 2008-10-10 2008-10-10 Superimposed pouring procedure of high-rise building transfer floor beam plate

Publications (2)

Publication Number Publication Date
CN101725202A CN101725202A (en) 2010-06-09
CN101725202B true CN101725202B (en) 2012-05-23

Family

ID=42446696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102010322A Active CN101725202B (en) 2008-10-10 2008-10-10 Superimposed pouring procedure of high-rise building transfer floor beam plate

Country Status (1)

Country Link
CN (1) CN101725202B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836602A (en) * 2017-01-19 2017-06-13 杭州江润科技有限公司 Large-span steel-reinforced concrete hangs the construction method of floor without pillar

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454298B (en) * 2010-10-18 2016-06-01 五冶集团上海有限公司 Large-sized reinforced concrete construction of frame beam method
CN103696567B (en) * 2013-10-21 2015-10-14 中冶天工集团有限公司 The construction method of assembling concrete in mass beam is built with Special supporting device
CN103821359A (en) * 2014-02-28 2014-05-28 中天建设集团有限公司 Large-cross-section concrete beam layered casting construction method
CN104405137B (en) * 2014-11-25 2016-08-17 东南大学 A kind of superposed member work progress supports optimization method
CN105178490A (en) * 2015-08-07 2015-12-23 北京城建北方建设有限责任公司 Double-layer step-by-step laminated construction method of ultrahigh and ultrathick prestressed concrete floor
CN108118784A (en) * 2016-11-30 2018-06-05 中国二十冶集团有限公司 Concrete frame structure profiled beam overlay technique construction method
WO2019222896A1 (en) * 2018-05-21 2019-11-28 增城市碧桂园物业发展有限公司 Floor panel and construction method thereof
CN108643341B (en) * 2018-05-22 2020-02-07 中冶建工集团有限公司 Construction method of box type structure conversion layer of super high-rise building
CN110056004A (en) * 2019-04-25 2019-07-26 中建四局第四建筑工程有限公司 A kind of construction method of the secondary upper cover ultra-thick plate of subway

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1306136A (en) * 2001-02-28 2001-08-01 邱则有 Hollow transition concrete floor cast in-situ
CN2534267Y (en) * 2001-07-20 2003-02-05 四川大学 Bottom large space construction reinforced concrete frame structure system
CN101041974A (en) * 2007-04-19 2007-09-26 浙江省建工集团有限责任公司 Structure conversion layer type steel concrete girder mould suspension construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1306136A (en) * 2001-02-28 2001-08-01 邱则有 Hollow transition concrete floor cast in-situ
CN2534267Y (en) * 2001-07-20 2003-02-05 四川大学 Bottom large space construction reinforced concrete frame structure system
CN101041974A (en) * 2007-04-19 2007-09-26 浙江省建工集团有限责任公司 Structure conversion layer type steel concrete girder mould suspension construction method

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
刘 杰.高层建筑板式转换层的设计施工.《现代商贸工业》.2007,(第5期),167-168. *
漆 鹏,熊 刚.雅天大厦转换层施工技术.《华东交通大学学报》.2006,第23卷(第5期),38-40. *
王峰.高校教师村梁式转换层施工技术.《广东土木与建筑》.2002,(第1期),55-56. *
葛汉明,钱忠勤.梁式结构转换层施工技术.《上海建设科技》.2000,(第5期),25-26. *
陈柏建.结合工程实际浅析高层建筑转换层施工技术.《四川建材》.2007,(第4期),173-174. *
黎河川.钢筋混凝土转换层结构.《中国西部科技》.2006,(第12期),52-53. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836602A (en) * 2017-01-19 2017-06-13 杭州江润科技有限公司 Large-span steel-reinforced concrete hangs the construction method of floor without pillar
CN106836602B (en) * 2017-01-19 2018-04-27 杭州江润科技有限公司 Construction method of the large-span steel-reinforced concrete without pillar suspension floor

Also Published As

Publication number Publication date
CN101725202A (en) 2010-06-09

Similar Documents

Publication Publication Date Title
CN101725202B (en) Superimposed pouring procedure of high-rise building transfer floor beam plate
CN103046746B (en) Construction method of conversion beam reinforcing bars for tall building structure
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN102691411A (en) Beam plate post-cast strip template support system and construction method thereof
CN101881005A (en) Method for reinforcing double arch bridge
CN106639068A (en) Wall formwork infilled wall of cast-in-place reinforced concrete without support and construction method thereof and wall formwork veneer and production method of non-bearing infilled wall
CN103410269B (en) Prestressing without bondn cast-in-place reinforced concrete hollow slab constructing structure and construction method
CN106939663A (en) A kind of concrete hollow double-storied floor and its construction method
CN102806592B (en) Manufacturing method for demolition-free textile fiber web reinforced concrete formwork
CN107989238A (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method
CN104947934B (en) The manufacturing method of floor layer
CN105220766A (en) The syndeton of a kind of concrete prefabricated beam and cast-in-place post and construction technology thereof
US3364647A (en) Method for erecting tall buildings with balconies
CN206591693U (en) Exempt from the cast in situ ferroconcrete wall mould filling wall of support
CN103806659B (en) Super thick prestressing force change-over panel individual layer comprehensively supports and splits temperature control construction technology with control
CN105133755B (en) A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall
CN206873731U (en) A kind of concrete hollow double-storied floor
CN202627495U (en) Beam slab late poured band template supporting system
WO2018126950A1 (en) Modular stairway
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN209099582U (en) Reduce the precast slab partition wall system of hollowing rate
CN208650394U (en) Steel column foot safeguard structure
CN206438766U (en) One kind is without support beam board post poured band template system
CN101200946B (en) Combined reinforced bar concrete hollow core floor slab
CN212317260U (en) Integrated full-prefabricated floor slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant