CN101692547A - 一种复合材料杆塔外侧竖直接地引下方法及其杆塔 - Google Patents

一种复合材料杆塔外侧竖直接地引下方法及其杆塔 Download PDF

Info

Publication number
CN101692547A
CN101692547A CN200910063896A CN200910063896A CN101692547A CN 101692547 A CN101692547 A CN 101692547A CN 200910063896 A CN200910063896 A CN 200910063896A CN 200910063896 A CN200910063896 A CN 200910063896A CN 101692547 A CN101692547 A CN 101692547A
Authority
CN
China
Prior art keywords
tower
down conductor
composite material
cross arm
metal cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN200910063896A
Other languages
English (en)
Inventor
李志军
刘庭
邬雄
谷定燮
周沛洪
戴敏
刘凯
霍锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Electric Power Research Institute
Original Assignee
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Electric Power Research Institute filed Critical State Grid Electric Power Research Institute
Priority to CN200910063896A priority Critical patent/CN101692547A/zh
Publication of CN101692547A publication Critical patent/CN101692547A/zh
Priority to US13/395,103 priority patent/US8785768B2/en
Priority to PCT/CN2010/072442 priority patent/WO2011029311A1/zh
Priority to CN201010227950XA priority patent/CN101882775B/zh
Priority to CN201020258168XU priority patent/CN201789257U/zh
Withdrawn legal-status Critical Current

Links

Images

Abstract

本发明涉及一种复合材料杆塔外侧竖直接地引下方法及其杆塔。该发明中在地线横担的某一边延长线上架设一段接地引下线上金属横担,在此金属横担的末端竖直引下接地引下线,此接地引下线在下相导线下方一定距离通过对应的接地引下线下金属横担联接到杆塔上,最后接地引下线顺着塔身接地,如果塔身下部分是钢管,接地引下线可直接通过接地引下线下金属横担联接在钢管上来接地。该发明利于最大限度地压缩输电走廊宽度,同时利于防雷设计,避免了接地引下线短接复合材料杆塔塔身,发挥了复合材料塔身的绝缘作用,采用单边接地引下线,更加省材、经济,结构简便,易于实现。

Description

一种复合材料杆塔外侧竖直接地引下方法及其杆塔
技术领域
本发明涉及一种复合材料杆塔外侧竖直接地引下方法及其杆塔,属于电力系统中输电技术应用领域。
背景技术
杆塔是输电线路的重要设备,其使用材料的特性直接影响到线路运行的安全性、经济性和可靠性。由于钢材具有强度重量比高,易加工和安装等优点,国内外目前在高电压等级大多采用全钢材杆塔。但是全钢杆塔也存在质量大(钢材密度较高)、易锈蚀等缺陷,所以在杆塔施工运输及维护方面需要投入较大的人力和物力。而随着复合材料生产技术及其制造工艺的发展,复合材料具有重量轻、强度大、耐腐蚀、耐高低温、耐久性能好及绝缘性强等特点,使得复合材料杆塔具有运输成本低(特别是在人烟稀少的山区)、防污、防腐等优点,有着很好的应用前景。目前在加拿大、美国部分地区已经大量采用复合材料杆塔。
但是加拿大、美国使用复合材料杆塔时,未考虑防雷的问题。其主要原因是其采用复合材料杆塔的线路所经地区是少雷区(由于加拿大、美国部分地区常年处于冬季,这些地区的雷暴日很小)。另外,加拿大、美国使用复合材料杆塔的线路大多是110kV以下电压等级,这些电压等级系统是中心点不接地系统,而且电压等级低,雷击故障对系统的冲击不大。
目前我国线路杆塔主要采用钢筋凝泥土、木材、钢材等材料(110kV及以上电压等级线路通常采用全钢杆塔),由于复合材料杆塔有较为突出的优点,我国很多地区也准备使用复合材料杆塔(大多在110kV及以上电压等级)。由于这些地区存在着:线路走廊的投入较大、雷电活动密集、污秽严重等问题,所以我国在使用复合材料杆塔时,其主要目的是在压缩输电走廊宽度(指减小输电线路导线间的最大水平距离)、防雷(指降低雷击故障率)和防污(指通过增加污闪爬电距离来降低工频污闪故障率)等。
正是复合材料杆塔面临着防雷的问题,所以需要线路架设避雷线(由于加拿大、美国在采用复合材料杆塔时未考虑防雷的问题,因而未架设避雷线),而且为了释放雷击避雷线(也称“地线”)或塔顶时的雷电能量,以提高线路的反击耐雷水平,降低线路的雷击故障率,需要复合材料杆塔逐塔接地。
因此,在雷电活动密集的地区,输电线路复合材料杆塔的应用存在着接地引下的问题(全钢杆塔由于塔身为金属导体,地线自然就通过塔身直接接到大地,所以不存在再去考虑接地引下的问题),其接地引下存在多种不同的方法,接地引下方法将直接影响到复合材料杆塔的防雷效果,而且还影响到线路的输电走廊宽度压缩和防污等,所以复合材料杆塔的接地引下方法是其应用中需要首先解决的关键技术和难点。
发明内容
为了解决上述问题,本发明提供了一种复合材料杆塔外侧竖直接地引下方法及其杆塔,该发明可以充分发挥复合材料杆塔塔身的绝缘作用,使得复合材料杆塔在输电走廊宽度压缩、防雷以及防污等电气性能方面体现其价值和优势。
本发明的技术方案是:一种复合材料杆塔外侧竖直接地引下方法,其特征在于:在地线横担的某一边延长线上架设一段接地引下线上金属横担,在此金属横担的末端竖直引下接地引下线,此接地引下线在下相导线下方一定距离通过对应的接地引下线下金属横担联接到杆塔上,最后接地引下线顺着塔身接地,如果塔身下部分是钢管,接地引下线可直接通过接地引下线下金属横担联接在钢管上来接地。
如上所述的一种复合材料杆塔外侧竖直接地引下方法,其特征在于:在地线横担的两边边延长线上架设两段接地引下线上金属横担,同时在此两段接地引下线上金属横担的末端竖直引下两根接地引下线。
如上所述的一种复合材料杆塔外侧竖直接地引下方法,其特征在于:接地引下线与复合材料杆塔间可以用绝缘杆或复合绝缘子进行支撑,确保接地引下线在运行过程中承受大风等应力作用时不会发生较大的弯曲变形。
一种外侧竖直接地的复合材料杆塔,其特征在于:在地线横担的某一边延长线上架设一段接地引下线上金属横担,在此金属横担的末端竖直引下接地引下线,此接地引下线在下相导线下方一定距离通过对应的接地引下线下金属横担联接到杆塔上,最后接地引下线顺着塔身接地,如果塔身下部分是钢管,接地引下线可直接通过接地引下线下金属横担联接在钢管上来接地。
如上所述的外侧竖直接地的复合材料杆塔,其特征在于:在地线横担的两边边延长线上架设两段接地引下线上金属横担,同时在此两段接地引下线上金属横担的末端竖直引下两根接地引下线。
如上所述的外侧竖直接地的复合材料杆塔,其特征在于:接地引下线与复合材料杆塔的支撑部件是绝缘杆或复合绝缘子。
本发明的有益效果是:
(1)利于压缩输电走廊宽度。线路的输电走廊宽度影响着线路的相间雷击闪络跳闸率或双回同时雷击跳闸率。
(2)利于防雷设计。可以通过调节接地引下线与近侧导线间的最小间隙距离来控制线路一回导线对地的雷电冲击绝缘强度,以此来控制单回跳闸率,又由于此种单边接地引下方式使得线路的两回为不平衡绝缘,线路的双回同时雷击跳闸率得到了大大降低。
(3)避免了接地引下线短接复合材料杆塔塔身,发挥了复合材料塔身的绝缘作用,使得导线对地的爬电距离加大,增强了其耐工频污闪的能力;
(4)避免了接地引下线拉到地面上时,对生活的不便影响;
(5)由于线路采用了单边接地引下线,更加省材、经济;
(6)结构简便,易于实现。
附图说明
图1是本发明实施例中单边接地引下线的正视图。
图2是本发明实施例中单边接地引下线的主视图。
图3是本发明实施例中双边接地引下线的正视图。
图4是本发明实施例中双边接地引下线的主视图。
具体实施方式
图1,3中标记说明:1-地线横担,2-接地引下线上金属横担,3-接地引下线,4-接地引下线下金属横担,5-复合绝缘子,6-横担金具,7-塔头的塔身部分,8-地线,9-近侧导线,10-远侧导线,11-下相导线,12-塔身下部分,13-塔身下部分。
本发明中在地线横担1的某一边延长线上架设一段接地引下线上金属横担2,在此金属横担2的末端竖直引下接地引下线3,接地引下线3与近侧导线的最小空气间隙距离为D1(D1取值由防雷计算确定)),此接地引下线3在下相导线下方一定距离通过对应的接地引下线下金属横担4联接到杆塔上
架设两段接地引下线时,将地线横担1在两边延长线上引出两段接地引下线上金属横担2(其中左边接地引下线的长度为D1,右边接地引下线的长度为D2,D1和D2的取值由防雷计算确定),在此两段接地引下线上金属横担2的末端竖直引下两接地引下线3,该两接地引下线3在下相导线12下方一定距离D3通过对应的另两根接地引下线下金属横担4联接到杆塔上。
由于塔头的塔身部分采用绝缘的复合材料,线路走廊宽度不受相对地绝缘要求控制,而只受同一水平高度的两导线相间绝缘等要求的控制,因此,线路走廊宽度可以大大压缩。由于接地引下线未经过塔身,避免了接地引下线短接复合材料杆塔塔身,发挥了复合材料塔身的绝缘作用,使得导线对地的爬电距离加大,增强了其耐工频污闪的能力。
本发明还可以根据线路所在地区雷电活动的规律,通过调整D1和D2的长度来调整接地引下线与近侧导线间最小空气间隙距离,以此来控制线路单回的雷击跳闸率,线路的双回同时跳闸率与线路的走廊宽度有关。
竖直引下的两接地引下线3联接到接地引下线下金属横担4后,接地引下线3顺着塔身接入大地,如果复合材料杆塔是塔头用复合材料而余下部分用钢管的话,只要接地引下线下金属横担4是固定在余下部分的钢管,就可直接通过钢管塔身接入大地了,从而避免了接地引下线3直接竖直拉到地面上时,对生活的不便影响。
接地引下线上金属横担2和接地引下线下金属横担4还起到了拉撑竖直引下的接地引下线3的作用,使得接地引下线3在大风等应力作用下不会发生较大的弯曲变形,接地引下线3宜采用强度较高、不易变形的导电体,如果为了进一步确保接地引下线3不弯曲变形,可以加支撑绝缘杆将两接地引下线3与复合材料杆塔支撑开来;也可以在导线横担上加支撑复合绝缘子5来将两接地引下线3与导线支撑开来。
总的来说,本复合材料杆塔接地引下方式结构直观、简单清晰,易于实现。相对于双边引接地引下线来说,采用了单边接地引下线,更加省材、经济。但是,采用单边接地引下线,其线路走廊宽度受双回同时跳闸率的限制,不宜极限压缩。

Claims (4)

1.一种复合材料杆塔外侧竖直接地引下方法,其特征在于:在地线横担的某一边或两边延长线上架设一段接地引下线上金属横担,在每个金属横担的末端竖直引下接地引下线,接地引下线在下相导线下方一定距离通过对应的接地引下线下金属横担联接到杆塔上,最后接地引下线顺着塔身接地,如果塔身下部分是钢管,接地引下线可直接通过接地引下线下金属横担联接在钢管上来接地。
2.根据权利要求1所述的一种复合材料杆塔外侧竖直接地引下方法,其特征在于:接地引下线与复合材料杆塔间用绝缘杆或复合绝缘子进行支撑,确保接地引下线在运行过程中承受大风等应力作用时不会发生较大的弯曲变形。
3.一种外侧竖直接地的复合材料杆塔,其特征在于:在地线横担的某一边或两边延长线上架设一段接地引下线上金属横担,在每个金属横担的末端竖直引下接地引下线,接地引下线在下相导线下方一定距离通过对应的接地引下线下金属横担联接到杆塔上,最后接地引下线顺着塔身接地,如果塔身下部分是钢管,接地引下线直接通过接地引下线下金属横担联接在钢管上来接地。
4.根据权利要求3所述的外侧竖直接地的复合材料杆塔,其特征在于:接地引下线与复合材料杆塔间用绝缘杆或复合绝缘子进行支撑。
CN200910063896A 2009-09-08 2009-09-08 一种复合材料杆塔外侧竖直接地引下方法及其杆塔 Withdrawn CN101692547A (zh)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN200910063896A CN101692547A (zh) 2009-09-08 2009-09-08 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
US13/395,103 US8785768B2 (en) 2009-09-08 2010-05-05 Method for vertically grounding and leading down from outer side of composite material pole tower and pole tower thereof
PCT/CN2010/072442 WO2011029311A1 (zh) 2009-09-08 2010-05-05 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN201010227950XA CN101882775B (zh) 2009-09-08 2010-07-15 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN201020258168XU CN201789257U (zh) 2009-09-08 2010-07-15 外侧竖直接地引下线的复合材料杆塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910063896A CN101692547A (zh) 2009-09-08 2009-09-08 一种复合材料杆塔外侧竖直接地引下方法及其杆塔

Publications (1)

Publication Number Publication Date
CN101692547A true CN101692547A (zh) 2010-04-07

Family

ID=42081211

Family Applications (3)

Application Number Title Priority Date Filing Date
CN200910063896A Withdrawn CN101692547A (zh) 2009-09-08 2009-09-08 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN201020258168XU Expired - Lifetime CN201789257U (zh) 2009-09-08 2010-07-15 外侧竖直接地引下线的复合材料杆塔
CN201010227950XA Active CN101882775B (zh) 2009-09-08 2010-07-15 一种复合材料杆塔外侧竖直接地引下方法及其杆塔

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201020258168XU Expired - Lifetime CN201789257U (zh) 2009-09-08 2010-07-15 外侧竖直接地引下线的复合材料杆塔
CN201010227950XA Active CN101882775B (zh) 2009-09-08 2010-07-15 一种复合材料杆塔外侧竖直接地引下方法及其杆塔

Country Status (1)

Country Link
CN (3) CN101692547A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882775A (zh) * 2009-09-08 2010-11-10 国网电力科学研究院 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN102312605A (zh) * 2011-04-07 2012-01-11 济南巨能铁塔制造有限公司 一种方形横担
CN102312597A (zh) * 2010-07-02 2012-01-11 沈阳电业局电缆厂 多功能复合材料杆塔
CN103457044A (zh) * 2013-07-26 2013-12-18 广东电网公司佛山供电局 10kV配电网架空线路杆塔的接地装置及其敷设方法
CN104518475A (zh) * 2013-09-28 2015-04-15 成都星河科技产业有限公司 一种配网综合防雷系统
CN104006721B (zh) * 2014-06-13 2017-01-11 中车长江车辆有限公司 一种轴承轴向游隙测量方法
CN109001606A (zh) * 2018-09-30 2018-12-14 国网湖南省电力有限公司 一种模拟输电线路相间放电的试验模型及应用方法
CN109236588A (zh) * 2018-11-15 2019-01-18 吉林市简通电气科技有限公司 一种基于均匀电场理论野外孤立带电装备对雷电隐身的防雷技术

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383639A (zh) * 2011-08-19 2012-03-21 国网电力科学研究院 紧凑结构杆塔
CN103427364B (zh) * 2013-07-23 2016-06-01 国家电网公司 一种电线杆作业防误方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006296113A (ja) * 2005-04-12 2006-10-26 Chugoku Electric Power Co Inc:The 電柱および接地方法
US20080011500A1 (en) * 2006-07-13 2008-01-17 Beckwith Robert W Lightning grounding towers as used in sytems for inducing lightning to eliminate hurricanes
CN100590943C (zh) * 2007-01-30 2010-02-17 唐翊程 架空地线引下联接和接地线装配的方法
CN101692547A (zh) * 2009-09-08 2010-04-07 国网电力科学研究院 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN101752819A (zh) * 2010-01-28 2010-06-23 国网电力科学研究院 一种复合材料杆塔外侧竖直接地引下方法及其杆塔

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882775B (zh) * 2009-09-08 2012-11-07 国网电力科学研究院 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN101882775A (zh) * 2009-09-08 2010-11-10 国网电力科学研究院 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN102312597B (zh) * 2010-07-02 2015-09-23 国家电网公司 多功能复合材料杆塔
CN102312597A (zh) * 2010-07-02 2012-01-11 沈阳电业局电缆厂 多功能复合材料杆塔
CN102312605A (zh) * 2011-04-07 2012-01-11 济南巨能铁塔制造有限公司 一种方形横担
CN102312605B (zh) * 2011-04-07 2013-01-23 济南巨能铁塔制造有限公司 一种方形横担
CN103457044A (zh) * 2013-07-26 2013-12-18 广东电网公司佛山供电局 10kV配电网架空线路杆塔的接地装置及其敷设方法
CN103457044B (zh) * 2013-07-26 2015-08-05 广东电网公司佛山供电局 10kV配电网架空线路杆塔的接地装置及其敷设方法
CN104518475A (zh) * 2013-09-28 2015-04-15 成都星河科技产业有限公司 一种配网综合防雷系统
CN104518475B (zh) * 2013-09-28 2017-04-05 成都星河科技产业有限公司 一种配网综合防雷系统
CN104006721B (zh) * 2014-06-13 2017-01-11 中车长江车辆有限公司 一种轴承轴向游隙测量方法
CN109001606A (zh) * 2018-09-30 2018-12-14 国网湖南省电力有限公司 一种模拟输电线路相间放电的试验模型及应用方法
CN109236588A (zh) * 2018-11-15 2019-01-18 吉林市简通电气科技有限公司 一种基于均匀电场理论野外孤立带电装备对雷电隐身的防雷技术

Also Published As

Publication number Publication date
CN101882775A (zh) 2010-11-10
CN101882775B (zh) 2012-11-07
CN201789257U (zh) 2011-04-06

Similar Documents

Publication Publication Date Title
CN101882775B (zh) 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN201789258U (zh) 内侧竖直接地引下线的复合材料杆塔
CN201854001U (zh) 中心竖直接地引下线的复合材料杆塔
CN101672124B (zh) 一种复合材料杆塔
CN101692572B (zh) 一种输电线路复合材料绝缘杆塔接地方法及其杆塔
CN202970091U (zh) 一种220kV同杆双回路塔头全复合材料钢管杆
WO2011029311A1 (zh) 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN203961409U (zh) 一种110kV输电线路用复合材料杆塔
CN101752819A (zh) 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN101741043A (zh) 一种复合材料杆塔内侧竖直接地引下方法及其杆塔
CN105113841B (zh) 一种35kV双回路管型复合材料杆塔
CN201507141U (zh) 一种输电线路复合材料绝缘杆塔
WO2011029312A1 (zh) 一种复合材料杆塔中心竖直接地引下方法及其杆塔
CN208570190U (zh) 10kV石墨烯复合屏蔽低噪音耐气候抗干扰架空电缆
CN201117345Y (zh) 阻水架空绝缘导线结构
WO2011029314A1 (zh) 一种复合材料杆塔内侧竖直接地引下方法及其杆塔
CN201507140U (zh) 一种复合材料杆塔
CN209509619U (zh) 一种500kV/220kV混压四回路复合杆塔
CN210245185U (zh) 一种500kV输电线路用防风偏跳线绝缘子
CN101728804A (zh) 一种复合材料杆塔中心竖直接地引下方法及其杆塔
CN203166445U (zh) 一种利用耦合地线降低输电线路雷击跳闸率的装置
CN204920418U (zh) 一种35kV双回路管型复合材料杆塔
CN2802798Y (zh) 输电线路型防雷电反击网式空气间隙避雷器
CN2650297Y (zh) 抗风雪绝缘集束电缆
CN216740925U (zh) 四回路架空电缆终端塔

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C04 Withdrawal of patent application after publication (patent law 2001)
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20100407