CN101691760A - Composite foundation combining anchor rods with excavation and construction method thereof - Google Patents
Composite foundation combining anchor rods with excavation and construction method thereof Download PDFInfo
- Publication number
- CN101691760A CN101691760A CN200910093283A CN200910093283A CN101691760A CN 101691760 A CN101691760 A CN 101691760A CN 200910093283 A CN200910093283 A CN 200910093283A CN 200910093283 A CN200910093283 A CN 200910093283A CN 101691760 A CN101691760 A CN 101691760A
- Authority
- CN
- China
- Prior art keywords
- foundation
- anchor pole
- excavation
- anchor
- master muscle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009412 basement excavation Methods 0.000 title claims abstract description 41
- 239000002131 composite material Substances 0.000 title claims abstract description 25
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 230000002787 reinforcement Effects 0.000 claims abstract description 36
- 239000011435 rock Substances 0.000 claims abstract description 31
- 239000004567 concrete Substances 0.000 claims abstract description 22
- 239000002689 soil Substances 0.000 claims abstract description 16
- 239000011083 cement mortar Substances 0.000 claims abstract description 15
- 238000000034 method Methods 0.000 claims description 5
- 210000003205 muscle Anatomy 0.000 claims 12
- 230000005540 biological transmission Effects 0.000 abstract description 7
- 230000015572 biosynthetic process Effects 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 7
- 238000005755 formation reaction Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005422 blasting Methods 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Foundations (AREA)
Abstract
本发明提供了一种锚杆联合掏挖复合基础及其施工方法,主要应用到输电线路杆塔基础中,该复合基础由联合锚杆基础和掏挖基础联合形成,包括掏挖基础部分和锚杆基础部分,所述锚杆基础部分位于地表的岩层中,包括至少一根圆柱形或多边形的岩石锚杆,所述岩石锚杆具有锚杆主筋和围绕锚杆主筋的混凝土或水泥砂浆,所述锚杆主筋伸入到掏挖基础部分中;所述掏挖基础部分位于地表的土层中,由配筋和混凝土构成;所述掏挖基础部分和锚杆基础部分由伸入到掏挖基础部分中的锚杆主筋连接。并提供了具体施工方法。
The invention provides an anchor-bolt combined excavation composite foundation and a construction method thereof, which are mainly applied to transmission line tower foundations. The composite foundation is jointly formed by a combined anchor foundation and an excavation foundation, including an excavation foundation part and an anchor The foundation part, the bolt foundation part is located in the rock formation on the ground surface, including at least one cylindrical or polygonal rock bolt, the rock bolt has a main reinforcement of the bolt and concrete or cement mortar surrounding the main reinforcement of the bolt, the The main reinforcement of the anchor rod extends into the excavated foundation part; the excavated foundation part is located in the soil layer on the ground surface and is composed of reinforcement and concrete; Anchor main reinforcement connection in section. And provide a specific construction method.
Description
技术领域technical field
本发明涉及输电线路的基础施工技术领域,尤其涉及一种锚杆联合掏挖复合基础及其施工方法。The invention relates to the technical field of foundation construction of power transmission lines, in particular to a bolt-bolt combined excavation composite foundation and a construction method thereof.
背景技术Background technique
在输电线路基础中经常遇到有浅层为土层,而稍深处为岩层的地质条件,在这种地质条件下之前采用的基础形式一般为开挖回填类基础(大板式基础、台阶式基础)或掏挖基础,当线路荷载较大时,基础底面深度需超过岩层顶面,基础的承载力才能满足线路荷载要求,这样由于掏挖基础不能对岩层进行掏挖而无法采用,而采用大板式基础和台阶式基础要对岩层进行爆破等方法以便岩层部分的开挖,这样就给施工带来很大的难度,同时有巨大的土方开挖量,破坏原状土,不利于保护环境。In the foundation of transmission lines, it is often encountered that the shallow layer is the soil layer, and the deeper layer is the rock layer. Under such geological conditions, the foundation form used before is generally excavation and backfill foundation (large slab foundation, stepped foundation) foundation) or excavation foundation, when the line load is large, the depth of the bottom surface of the foundation needs to exceed the top surface of the rock layer, and the bearing capacity of the foundation can meet the load requirements of the line. Large slab foundations and stepped foundations require methods such as blasting of the rock strata to excavate the rock strata, which brings great difficulty to the construction. At the same time, there is a huge amount of earth excavation, which destroys the undisturbed soil and is not conducive to environmental protection.
发明内容Contents of the invention
为了克服现有技术中的缺陷,本发明的目的在于提供了一种无需爆破岩层,便于施工,减少土方开挖量的锚杆联合掏挖复合基础,主要应用到输电线路杆塔基础中。In order to overcome the deficiencies in the prior art, the object of the present invention is to provide a bolt-bolt combined excavation and excavation composite foundation without blasting rock formations, which is convenient for construction and reduces the amount of earthwork excavation. It is mainly applied to the foundation of power transmission line poles and towers.
本发明的另一目的在于提供一种锚杆联合掏挖复合基础的施工方法。Another object of the present invention is to provide a construction method for bolt combined digging and excavation composite foundation.
为此,本发明提出了一种锚杆联合掏挖复合基础,包括掏挖基础和锚杆基础,所述锚杆基础位于地表的岩层中,其包括至少一根圆柱形或多边形的岩石锚杆,所述岩石锚杆具有锚杆主筋和围绕锚杆主筋的混凝土或水泥砂浆,所述锚杆主筋伸入到掏挖基础中;所述掏挖基础位于地表的土层中,其由配筋和混凝土构成;所述掏挖基础和锚杆基础由伸入到掏挖基础中的锚杆主筋连接。For this reason, the present invention proposes a kind of bolt joint digging compound foundation, comprises digging foundation and bolt foundation, and described bolt foundation is positioned at the rock stratum of ground surface, and it comprises at least one cylindrical or polygonal rock bolt , the rock bolt has a main reinforcement of the anchor rod and concrete or cement mortar around the main reinforcement of the anchor rod, and the main reinforcement of the anchor rod extends into the excavated foundation; and concrete; the excavation foundation and the anchor foundation are connected by the main reinforcement of the anchor extending into the excavation foundation.
其中,所述锚杆主筋伸入到掏挖基础的长度大于或等于锚杆主筋直径的40倍。Wherein, the length of the main reinforcement of the anchor rod extending into the digging foundation is greater than or equal to 40 times the diameter of the main reinforcement of the anchor rod.
其中,所述围绕锚杆主筋的混凝土或水泥砂浆的顶面伸入到掏挖基础的高度h大于或等于10厘米。Wherein, the height h of the top surface of the concrete or cement mortar surrounding the main reinforcement of the anchor rod protruding into the digging foundation is greater than or equal to 10 cm.
其中,所述掏挖基础在垂直方向的截面形状呈倒扣的漏斗形或矩形或上底边长于下底边的梯形。Wherein, the cross-sectional shape of the excavation foundation in the vertical direction is an inverted funnel shape or a rectangle or a trapezoid whose upper base is longer than the lower base.
本发明还提供了一种锚杆联合掏挖复合基础的施工方法,施工流程如下:The present invention also provides a construction method for bolt combined excavation and excavation composite foundation, the construction process is as follows:
1)成孔,利用锚杆钻机在地表的土层和岩层中钻出锚杆钻孔;1) Forming a hole, using a bolter to drill a bolt hole in the soil layer and rock layer on the surface;
2)成孔结束后,放入并固定所述锚杆主筋,使所述锚杆主筋伸入到掏挖基础部分的长度大于或等于锚杆主筋直径的40倍,然后灌注所述锚杆部分围绕锚杆主筋的混凝土或水泥砂浆,使所述围绕锚杆主筋的混凝土或水泥砂浆的顶面伸入到掏挖基础部分的高度大于或等于10厘米;2) After the hole is formed, put and fix the main reinforcement of the anchor rod, so that the main reinforcement of the anchor rod extends into the excavation foundation part and the length is greater than or equal to 40 times the diameter of the main reinforcement of the anchor rod, and then pour the anchor rod part Concrete or cement mortar surrounding the main reinforcement of the anchor rod, so that the top surface of the concrete or cement mortar surrounding the main reinforcement of the anchor rod protrudes into the digging foundation part to a height greater than or equal to 10 cm;
3)在地表的土层部分掏挖出掏挖基础部分的基坑;3) Excavate and excavate the foundation pit of excavating the foundation part at the soil layer part of the ground surface;
4)在掏挖基础部分安放并固定所述掏挖基础部分配筋,然后浇筑混凝土。4) Place and fix the reinforcement of the excavated foundation part on the excavated foundation part, and then pour concrete.
本发明的锚杆联合掏挖复合基础可用于浅层为土层、稍深处为岩层的地质条件,主要应用到输电线路杆塔基础中,该复合基础由锚杆基础和掏挖基础联合形成,由于掏挖基础底面置于岩层顶面,因此在受力时,由掏挖基础承担主要下压力,掏挖基础和锚杆基础共同承担上拔力和水平力,这样就能满足输电线路荷载要求。The anchor bolt combined digging and excavation composite foundation of the present invention can be used in geological conditions where the shallow layer is the soil layer and the deeper layer is the rock layer. It is mainly applied to the tower foundation of the transmission line. The composite foundation is jointly formed by the anchor bolt foundation and the excavation foundation. Since the bottom surface of the excavated foundation is placed on the top surface of the rock formation, the excavated foundation bears the main downward pressure when the force is applied, and the excavated foundation and the anchor foundation jointly bear the uplift force and horizontal force, so that the load requirements of the transmission line can be met. .
本发明的有益效果在于:该锚杆联合掏挖复合基础无需爆破岩层,便于施工,减少土方开挖量,利用原状土,利于保护环境。The beneficial effect of the present invention is that: the bolt-bolt combined excavation and excavation composite foundation does not need to blast the rock formation, which is convenient for construction, reduces the amount of earthwork excavation, utilizes undisturbed soil, and is beneficial to protect the environment.
附图说明Description of drawings
图1为现有技术的大板式基础或台阶式基础的结构示意图;Fig. 1 is the structural representation of the large slab foundation or stepped foundation of prior art;
图2为本发明的锚杆联合掏挖复合基础的第一种构造示意图;Fig. 2 is the first kind of structure schematic diagram of the anchor rod joint excavation and excavation composite foundation of the present invention;
图3是本发明的锚杆联合掏挖复合基础及其施工方法的流程示意图;Fig. 3 is the schematic flow sheet of the composite foundation and construction method thereof of the anchor rod joint excavation of the present invention;
图4是图2的具体结构尺寸示意图,其中图4-1为图2的剖视图,图4-2为图2的俯视图;Fig. 4 is a schematic diagram of specific structural dimensions of Fig. 2, wherein Fig. 4-1 is a cross-sectional view of Fig. 2, and Fig. 4-2 is a top view of Fig. 2;
图5是本发明的锚杆联合掏挖复合基础的第二种构造示意图;Fig. 5 is the second kind of structure schematic diagram of the anchor rod joint excavation and excavation composite foundation of the present invention;
图6是本发明的锚杆联合掏挖复合基础的第三种构造示意图;Fig. 6 is the third structure schematic diagram of the anchor rod combined excavation and excavation composite foundation of the present invention;
其中,I-土层,II-岩层,1-掏挖基础,2-锚杆基础,3-岩石锚杆,4-锚杆主筋,5-围绕锚杆主筋的混凝土或水泥砂浆,6-配筋,7-混凝土,8-锚杆钻孔,9-掏挖基础的基坑。Among them, I-soil layer, II-rock layer, 1-excavation foundation, 2-bolt foundation, 3-rock bolt, 4-bolt main reinforcement, 5-concrete or cement mortar around the main reinforcement of the bolt, 6-fitting Reinforcement, 7-concrete, 8-anchor drilling, 9-excavation of the foundation pit of the foundation.
具体实施方式Detailed ways
下面结合附图对本发明的锚杆联合掏挖复合基础作进一步说明。Below in conjunction with accompanying drawing, the composite foundation of bolt combined excavation of the present invention will be further described.
如图2所示,本发明的锚杆联合掏挖复合基础的包括掏挖基础1和锚杆基础2,所述锚杆基础2位于地表的岩层II中,其包括至少一根圆柱形或多边形的岩石锚杆3,该岩石锚杆3具有锚杆主筋4和围绕锚杆主筋的混凝土或水泥砂浆5,锚杆主筋4伸入到掏挖基础1中;所述掏挖基础1位于地表的土层I中,其掏挖基础1的底面置于岩层II顶面,其由配筋6和混凝土7构成;所述掏挖基础1和锚杆基础2由伸入到掏挖基础中的锚杆主筋4连接,掏挖基础1在垂直方向的截面形状呈倒扣的漏斗形。如图5-6所示,掏挖基础1在垂直方向的截面形状也可呈矩形或上边长于下边的梯形。As shown in Fig. 2, the composite foundation of bolt joint digging of the present invention comprises digging foundation 1 and
如图4所示,本发明的锚杆联合掏挖复合基础的结构尺寸可采用下述参数:土层I为黄土层,土层下面的岩层II为微风化岩层,所述掏挖基础1的上部窄端直径为0.8m,长度为1m;下部扩大端的直径为1.2cm,长度为0.5m。上部掏挖基础1位于1.5m厚的黄土层中。微风化岩层中设置四根按正方形布置的岩石锚杆3,岩石锚杆3间距为40cm、其直径为0.15m,锚杆主筋4采用36mm直径的HRB335II级螺纹钢、其长度为6m,浇灌在锚杆主筋4周围的混凝土或水泥砂浆5采用C20混凝土或者M20的水泥砂浆。锚杆主筋进入掏挖基础的长度为1.44m。该锚杆联合掏挖复合基础能够承受150吨的上拔力。As shown in Figure 4, the structure size of the bolt joint digging composite foundation of the present invention can adopt the following parameters: the soil layer I is a loess layer, and the rock layer II below the soil layer is a slightly weathered rock layer, and the digging foundation 1 The upper narrow end has a diameter of 0.8m and a length of 1m; the lower enlarged end has a diameter of 1.2cm and a length of 0.5m. The upper digging foundation 1 is located in the 1.5m thick loess layer. Set four
图3示出了本发明的基础的施工示意图。具体施工流程如下:Figure 3 shows a schematic diagram of the construction of the foundation of the present invention. The specific construction process is as follows:
1)成孔,利用锚杆钻机在地表的土层和岩层中钻出锚杆钻孔;1) Forming a hole, using a bolter to drill a bolt hole in the soil layer and rock layer on the surface;
2)成孔结束后,放入并固定所述锚杆主筋,使所述锚杆主筋伸入到掏挖基础的长度大于或等于锚杆主筋直径的40倍,然后灌注所述锚杆部分围绕锚杆主筋的混凝土或水泥砂浆,使所述围绕锚杆主筋的混凝土或水泥砂浆的顶面伸入到掏挖基础的高度大于或等于10厘米;2) After the hole is completed, put and fix the main reinforcement of the anchor rod, so that the main reinforcement of the anchor rod extends into the excavation foundation and the length is greater than or equal to 40 times the diameter of the main reinforcement of the anchor rod, and then pour the part of the anchor rod around The concrete or cement mortar of the main reinforcement of the anchor rod, so that the top surface of the concrete or cement mortar surrounding the main reinforcement of the anchor rod extends into the digging foundation to a height greater than or equal to 10 cm;
3)在地表的土层部分掏挖出掏挖基础的基坑;3) Excavate and excavate the foundation pit of excavating the foundation at the soil layer part of the surface;
4)在掏挖基础安放并固定所述掏挖基础配筋,然后浇筑混凝土。4) Place and fix the excavated foundation reinforcement on the excavated foundation, and then pour concrete.
此外,本发明所述的锚杆基础、台阶式基础、大板式、掏挖基础均为公知基础形式,常用于输电线路基础。In addition, the bolt foundation, stepped foundation, large slab type, and excavated foundation described in the present invention are all known foundation forms, which are often used for power transmission line foundations.
图5是本发明的锚杆联合掏挖复合基础的第二种构造示意图,图6是本发明的锚杆联合掏挖复合基础的第三种构造示意图。其中,所述掏挖基础在垂直方向的截面形状呈倒扣的漏斗形或矩形或上底边长于下底边的梯形。Fig. 5 is a schematic diagram of the second structure of the composite foundation with combined digging of bolts according to the present invention, and Fig. 6 is a schematic diagram of the third configuration of the composite foundation with combined digging of bolts according to the present invention. Wherein, the cross-sectional shape of the excavation foundation in the vertical direction is an inverted funnel shape or a rectangle or a trapezoid whose upper base is longer than the lower base.
此处已经根据特定的示例性实施例对本发明进行了描述。对本领域的技术人员来说在不脱离本发明的范围下进行适当的替换或修改将是显而易见的。示例性的实施例仅仅是例证性的,而不是对本发明的范围的限制,本发明的范围由所附的权利要求定义。The invention has been described herein in terms of specific exemplary embodiments. Appropriate substitutions or modifications will be apparent to those skilled in the art without departing from the scope of the present invention. The exemplary embodiments are illustrative only, and not limiting of the scope of the invention, which is defined by the appended claims.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100932838A CN101691760B (en) | 2009-09-25 | 2009-09-25 | Composite foundation combining anchor rods with excavation and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100932838A CN101691760B (en) | 2009-09-25 | 2009-09-25 | Composite foundation combining anchor rods with excavation and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101691760A true CN101691760A (en) | 2010-04-07 |
CN101691760B CN101691760B (en) | 2011-07-27 |
Family
ID=42080470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100932838A Active CN101691760B (en) | 2009-09-25 | 2009-09-25 | Composite foundation combining anchor rods with excavation and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101691760B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147456A (en) * | 2013-03-08 | 2013-06-12 | 中节能风力发电股份有限公司 | Prestressed combination pile structure and construction method thereof |
CN108019086A (en) * | 2017-12-06 | 2018-05-11 | 浙江飞英电力器材有限公司 | A kind of large bending moment electrical pole and its installation method |
CN108589759A (en) * | 2018-05-15 | 2018-09-28 | 中国电力科学研究院有限公司 | A kind of shaft tower composite foundation |
CN111576469A (en) * | 2020-04-02 | 2020-08-25 | 国网浙江省电力有限公司湖州供电公司 | Novel power transmission line tower foundation and construction method |
CN111910671A (en) * | 2020-07-20 | 2020-11-10 | 国网浙江省电力有限公司丽水供电公司 | Prestressed anchor rod combined excavation composite foundation and construction method thereof |
CN111910670A (en) * | 2020-07-20 | 2020-11-10 | 国网浙江省电力有限公司丽水供电公司 | Assembly type rock anchor rod composite foundation and construction method thereof |
CN113789806A (en) * | 2021-08-20 | 2021-12-14 | 中国电力工程顾问集团华北电力设计院有限公司 | Annular-section rock foundation suitable for mountainous area and construction method thereof |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU3589000A (en) * | 1999-02-05 | 2000-08-25 | Northern Technologies, Inc. | Support structure for elevating and supporting monopoles and associated equipment |
NO311184B1 (en) * | 2000-03-10 | 2001-10-22 | Norsk Miljoekraft As | Method and apparatus for attaching a foundation to the bedrock |
CN201232193Y (en) * | 2008-07-16 | 2009-05-06 | 钱自力 | Wind motor tower foundation anchor pile structure on rock foundation |
CN201485863U (en) * | 2009-09-04 | 2010-05-26 | 中国电力工程顾问集团东北电力设计院 | Digging rock bolt compound environment-protection basis |
CN201495554U (en) * | 2009-09-25 | 2010-06-02 | 中国电力科学研究院 | An Anchor Combined Excavation and Excavation Composite Foundation |
-
2009
- 2009-09-25 CN CN2009100932838A patent/CN101691760B/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147456A (en) * | 2013-03-08 | 2013-06-12 | 中节能风力发电股份有限公司 | Prestressed combination pile structure and construction method thereof |
CN108019086A (en) * | 2017-12-06 | 2018-05-11 | 浙江飞英电力器材有限公司 | A kind of large bending moment electrical pole and its installation method |
CN108589759A (en) * | 2018-05-15 | 2018-09-28 | 中国电力科学研究院有限公司 | A kind of shaft tower composite foundation |
CN111576469A (en) * | 2020-04-02 | 2020-08-25 | 国网浙江省电力有限公司湖州供电公司 | Novel power transmission line tower foundation and construction method |
CN111910671A (en) * | 2020-07-20 | 2020-11-10 | 国网浙江省电力有限公司丽水供电公司 | Prestressed anchor rod combined excavation composite foundation and construction method thereof |
CN111910670A (en) * | 2020-07-20 | 2020-11-10 | 国网浙江省电力有限公司丽水供电公司 | Assembly type rock anchor rod composite foundation and construction method thereof |
CN113789806A (en) * | 2021-08-20 | 2021-12-14 | 中国电力工程顾问集团华北电力设计院有限公司 | Annular-section rock foundation suitable for mountainous area and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN101691760B (en) | 2011-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (en) | Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body | |
CN103967031B (en) | A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof | |
CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
CN103321244B (en) | Sand foundation existing building sets up the construction method of basement | |
CN101691760B (en) | Composite foundation combining anchor rods with excavation and construction method thereof | |
CN106013171B (en) | A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall | |
CN205369231U (en) | Steel -pipe pile is filled in drilling | |
CN206034454U (en) | Supporting construction | |
CN107642041A (en) | Super large diameter hollow pile group anchorage | |
CN103114595A (en) | Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch | |
CN105604065A (en) | Foundation fit support and peat-soil deep-foundation-pit-support high-pressure jet grouting anchoring method | |
CN106368219A (en) | Supporting reinforcing structure of deep foundation pit and construction method | |
CN103572770B (en) | A kind of stake case hydraulic structures and construction method thereof | |
CN205382942U (en) | Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility | |
CN107642040A (en) | Construction method of super large diameter hollow pile group anchorage | |
CN201502065U (en) | A type of composite foundation for bolt combined excavation | |
CN207484290U (en) | The hollow clump of piles anchorage of super-large diameter | |
CN101691759A (en) | Construction method for digging composite environmental protection base of anchorage bar adding rock | |
CN204125850U (en) | A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable | |
CN206418517U (en) | A kind of prefabricated anchor foundation for frozen soil foundation | |
CN108330963A (en) | A kind of constructing device for inside soil body existing pile foundation pile extension | |
CN101565955B (en) | A Method of Reinforcing Existing Pile Foundation Using Miniature Stress Isolation Pile | |
CN201495554U (en) | An Anchor Combined Excavation and Excavation Composite Foundation | |
CN100545357C (en) | A cement-soil embedded pile wall for foundation pit support and its construction method | |
CN204676581U (en) | A kind of rock foundation overhead power transmission line line pole tower and bracing wire novel foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130129 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20130129 Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee after: China Electric Power Research Institute Patentee after: State Grid Corporation of China Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee before: China Electric Power Research Institute |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee after: China Electric Power Research Institute Country or region after: China Patentee after: STATE GRID CORPORATION OF CHINA Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee before: China Electric Power Research Institute Country or region before: China Patentee before: State Grid Corporation of China |
|
CP03 | Change of name, title or address |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd. Country or region after: China Patentee after: STATE GRID CORPORATION OF CHINA Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee before: China Electric Power Research Institute Country or region before: China Patentee before: STATE GRID CORPORATION OF CHINA |
|
CP03 | Change of name, title or address |