CN101691741A - 钢梁悬臂架设时的双向可调式后锚固装置 - Google Patents
钢梁悬臂架设时的双向可调式后锚固装置 Download PDFInfo
- Publication number
- CN101691741A CN101691741A CN200810237406A CN200810237406A CN101691741A CN 101691741 A CN101691741 A CN 101691741A CN 200810237406 A CN200810237406 A CN 200810237406A CN 200810237406 A CN200810237406 A CN 200810237406A CN 101691741 A CN101691741 A CN 101691741A
- Authority
- CN
- China
- Prior art keywords
- girder
- steel
- shoulder pole
- anchor device
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102374066A CN101691741B (zh) | 2008-12-25 | 2008-12-25 | 钢梁悬臂架设时的双向可调式后锚固装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102374066A CN101691741B (zh) | 2008-12-25 | 2008-12-25 | 钢梁悬臂架设时的双向可调式后锚固装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101691741A true CN101691741A (zh) | 2010-04-07 |
CN101691741B CN101691741B (zh) | 2011-04-06 |
Family
ID=42080450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008102374066A Active CN101691741B (zh) | 2008-12-25 | 2008-12-25 | 钢梁悬臂架设时的双向可调式后锚固装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101691741B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392416A (zh) * | 2011-11-01 | 2012-03-28 | 中铁六局集团有限公司 | 墩梁临时固结后锚固体系施工方法 |
CN104764618A (zh) * | 2015-03-19 | 2015-07-08 | 重庆交通建设(集团)有限责任公司 | 一种桥梁悬臂浇筑挂篮可控等效预压荷载试验方法 |
CN109778718A (zh) * | 2019-03-05 | 2019-05-21 | 中铁四局集团有限公司 | 一种大跨度连续钢箱梁主跨纯悬臂拼装跨中合龙的施工方法 |
CN112030780A (zh) * | 2020-08-19 | 2020-12-04 | 中铁大桥局第七工程有限公司 | 一种钢拱桥悬臂架设方法 |
CN113605232A (zh) * | 2021-08-03 | 2021-11-05 | 中铁大桥勘测设计院集团有限公司 | 一种拉索压重构造及设计方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5050228B2 (ja) * | 2005-11-10 | 2012-10-17 | 株式会社横河ブリッジ | 方杖部材付きラーメン橋施工方法 |
CN100545353C (zh) * | 2006-06-29 | 2009-09-30 | 杨爱军 | 采用体外偏心预应力体系进行钢梁悬臂架设施工方法 |
CN201106155Y (zh) * | 2007-10-16 | 2008-08-27 | 中铁大桥局集团第四工程有限公司 | 斜拉索辅助全悬臂架设钢桁梁装置 |
CN101158147A (zh) * | 2007-11-20 | 2008-04-09 | 中铁大桥局集团第二工程有限公司 | 大跨度桥梁钢梁合龙施工法 |
CN101289836A (zh) * | 2007-12-05 | 2008-10-22 | 中铁大桥局股份有限公司 | 一种钢桁拱桥的水平索辅助架设方法 |
-
2008
- 2008-12-25 CN CN2008102374066A patent/CN101691741B/zh active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392416A (zh) * | 2011-11-01 | 2012-03-28 | 中铁六局集团有限公司 | 墩梁临时固结后锚固体系施工方法 |
CN104764618A (zh) * | 2015-03-19 | 2015-07-08 | 重庆交通建设(集团)有限责任公司 | 一种桥梁悬臂浇筑挂篮可控等效预压荷载试验方法 |
CN104764618B (zh) * | 2015-03-19 | 2017-11-21 | 重庆交通建设(集团)有限责任公司 | 一种桥梁悬臂浇筑挂篮可控等效预压荷载试验方法 |
CN109778718A (zh) * | 2019-03-05 | 2019-05-21 | 中铁四局集团有限公司 | 一种大跨度连续钢箱梁主跨纯悬臂拼装跨中合龙的施工方法 |
CN112030780A (zh) * | 2020-08-19 | 2020-12-04 | 中铁大桥局第七工程有限公司 | 一种钢拱桥悬臂架设方法 |
CN113605232A (zh) * | 2021-08-03 | 2021-11-05 | 中铁大桥勘测设计院集团有限公司 | 一种拉索压重构造及设计方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101691741B (zh) | 2011-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100543234C (zh) | 一种大跨度连续钢桁拱的合龙方法 | |
US8695142B2 (en) | Partially and fully earth-anchored cable-stayed bridges using main-span prestressing unit and method of constructing the same | |
CN101691741B (zh) | 钢梁悬臂架设时的双向可调式后锚固装置 | |
CN112227206A (zh) | 一种地锚转自锚架梁工艺设计及施工方法 | |
CN109722995A (zh) | 一种大跨度变高度桁式钢梁施工工艺 | |
CN201106155Y (zh) | 斜拉索辅助全悬臂架设钢桁梁装置 | |
CN101787732A (zh) | 一种斜拉多层框架结构及其施工控制方法 | |
CN105203398A (zh) | 桁式拱桥考虑腹杆节点应力幅值的实验加载装置及方法 | |
CN208917704U (zh) | 曲线轻型工字钢梁桥拖拉施工悬臂端控制装置 | |
CN103147405B (zh) | 斜主桁斜拉桥钢梁架设方法 | |
CN215857307U (zh) | 拱桥换索可变角度的吊杆更换装置 | |
CN102979033A (zh) | 一种钢桁梁全焊桁片及其施工方法 | |
CN207987749U (zh) | 骑索式桥面吊机 | |
KR101161644B1 (ko) | 힌지 연결부를 이용한 일부 타정식 사장교 및 그 시공 공법 | |
CN113605255A (zh) | 一种海上限高限航区域钢桁钢箱组合梁桥快速施工方法 | |
CN112160246A (zh) | 组合梁安装方法 | |
CN109024230B (zh) | 一种多斜置式主塔的曲线斜拉桥 | |
CN102776841A (zh) | 一种大跨度钢桁梁悬索桥合龙方法及装置 | |
CN108951434B (zh) | 曲线轻型工字钢梁桥拖拉施工悬臂端控制装置及控制方法 | |
CN211691355U (zh) | 一种用于高边坡施工用的施工平台 | |
CN109972531B (zh) | 一种用于提高贝雷梁临时支架跨度的体外预应力装置 | |
CN103374879B (zh) | 一种倒梯断面钢桁架斜拉桥边节点连接结构 | |
CN221167453U (zh) | 一种导梁结构 | |
CN113718626B (zh) | 一种适用于公铁两用斜拉悬吊协作体系桥的施工方法 | |
CN218989877U (zh) | 大跨度钢桁梁桥双滑块顶推施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150205 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150205 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |