CN101670994A - Lifting working platform for construction - Google Patents
Lifting working platform for construction Download PDFInfo
- Publication number
- CN101670994A CN101670994A CN200910101585A CN200910101585A CN101670994A CN 101670994 A CN101670994 A CN 101670994A CN 200910101585 A CN200910101585 A CN 200910101585A CN 200910101585 A CN200910101585 A CN 200910101585A CN 101670994 A CN101670994 A CN 101670994A
- Authority
- CN
- China
- Prior art keywords
- lifting
- column
- chassis
- working platform
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种施工升降工作平台,属于高空作业装置,现有技术对既有建筑的外墙等进行高空作业施工不便、效率低,本发明是将立柱呈倾斜状固定在底盘上,立柱上设置有升降爬行装置以及位于该升降爬行装置上方的扶靠结构和提升装置,工作平台通过横向伸缩机构连接在升降爬行装置上。这样的结构不设置永久性基础,不受现场的基础条件的限制,可以跨越障碍,易于在施工现场搭建,作业效率高;作业时工作平台可以升降至适当的作业高度,并可以在横向伸缩,因此无论施工对象的表面怎样不规则,工作平台均能够到达,以便进行作业。
The invention discloses a construction elevating work platform, which belongs to a high-altitude operation device. In the prior art, it is inconvenient and inefficient to carry out high-altitude operations on the outer walls of existing buildings. A lifting and crawling device and a supporting structure and a lifting device are arranged above the lifting and crawling device, and the working platform is connected to the lifting and crawling device through a horizontal telescopic mechanism. Such a structure does not have a permanent foundation and is not limited by the foundation conditions of the site. It can cross obstacles, is easy to build on the construction site, and has high operating efficiency. Therefore, no matter how irregular the surface of the construction object is, the working platform can reach it for operation.
Description
技术领域 technical field
本发明属于高空作业装置,具体的说是高空施工升降工作平台。The invention belongs to a high-altitude operation device, in particular to a high-altitude construction elevating work platform.
背景技术 Background technique
国家为实现节能减排的战略目标,提出了建筑外墙增加保温层的强制性规定,然而施工设备成了该项工程推广的瓶颈。目前主要是采用脚手架施工,存在严重的安全隐患,脚手架倒塌造成的安全事故时有发生,而传统的施工设备无一能够满足施工特点的要求,主要存在着如下困难:In order to achieve the strategic goal of energy conservation and emission reduction, the country has put forward mandatory regulations for adding insulation layers to the exterior walls of buildings. However, construction equipment has become a bottleneck in the promotion of this project. At present, scaffolding is mainly used for construction, which has serious potential safety hazards. Safety accidents caused by scaffolding collapse occur from time to time, and none of the traditional construction equipment can meet the requirements of construction characteristics. The main difficulties are as follows:
1、许多建筑物采用了斜屋面结构,无法从屋面悬挂升降工作装置进行施工作业,或勉强悬挂但移动安装非常困难,费工费时,作业效率极低。1. Many buildings adopt a sloping roof structure, and it is impossible to hang the lifting working device from the roof for construction work, or it is barely suspended but the mobile installation is very difficult, labor-intensive and time-consuming, and the operating efficiency is extremely low.
2、由于外墙保温施工的周期较短,采用从地面升降的设备不可能设置永久性基础,只能依靠现场的基础条件进行安装作业;2. Due to the short period of the external wall insulation construction, it is impossible to set up a permanent foundation by using equipment that is lifted from the ground, and the installation can only be performed on the basis of the site;
3、外墙保温施工是墙体表面施工的最后阶段,墙面一般不允许采用螺栓等方式连接的扶墙装置,对于升高在10米以上的施工设备,整机的稳定性保持较为困难;3. The external wall insulation construction is the final stage of wall surface construction. Wall support devices connected by bolts and other methods are generally not allowed on the wall. For construction equipment with a height of more than 10 meters, it is difficult to maintain the stability of the whole machine;
4、作业场地比较复杂,有松软地面、硬地面、还有随时可能变化的地面;4. The work site is relatively complex, with soft ground, hard ground, and ground that may change at any time;
5、对于既有建筑的外墙保温施工,还存在着地面有苗木花卉、台阶等障碍;5. For the external wall insulation construction of existing buildings, there are still obstacles such as seedlings, flowers and steps on the ground;
6、建筑物形状复杂,特别是在墙面有凹进突出的地方,对施工设备的要求更高。6. The shape of the building is complex, especially where there are recesses and protrusions on the wall, and the requirements for construction equipment are higher.
此外,在高速公路广告牌更新,造船行业的船体焊接、除锈、油漆,沿街旧房墙面刷新等作业场合也存在类似问题。In addition, similar problems also exist in the renewal of highway billboards, hull welding, rust removal, painting in the shipbuilding industry, and wall renovation of old houses along the street.
发明内容 Contents of the invention
本发明要解决的技术问题和提出的技术任务是克服现有技术对既有建筑的外墙等进行高空作业所存在的施工不便、效率低甚至难以实施等缺陷,提供一种施工升降工作平台,以便对既有建筑的外墙等进行高空作业。为此,本发明采用以下技术方案:The technical problem to be solved and the technical task proposed by the present invention are to overcome the defects of inconvenient construction, low efficiency and even difficult implementation of the existing technology for high-altitude operations on the outer walls of existing buildings, and to provide a construction lifting work platform, In order to carry out high-altitude operations on the exterior walls of existing buildings. For this reason, the present invention adopts following technical scheme:
施工升降工作平台,包括底盘、立柱和工作平台,其特征是:所述的立柱呈倾斜状固定在所述的底盘上,所述的立柱上设置有升降爬行装置以及位于该升降爬行装置上方的扶靠结构和提升装置,所述的工作平台通过横向伸缩机构连接在所述的升降爬行装置上。The construction elevating work platform includes a chassis, a column and a working platform, and is characterized in that: the column is fixed on the chassis in an inclined shape, and the column is provided with a lifting and crawling device and a lifting and crawling device above the lifting and crawling device. The supporting structure and the lifting device, the working platform is connected to the lifting and crawling device through a horizontal telescopic mechanism.
本发明的有益效果是:The beneficial effects of the present invention are:
1、用底盘支撑立柱,保证立柱下端稳定,令立柱呈倾斜状,且在立柱上端通过扶靠结构扶靠在建筑物上,由此保证立柱稳定且重心仅偏移向一个方向,将立柱的受力始终控制在一个规定的方向,易于保持立柱的稳定;这样的结构不设置永久性基础,不受现场的基础条件的限制,可以跨越障碍,易于在施工现场搭建,作业效率高。1. Use the chassis to support the column, ensure the stability of the lower end of the column, make the column inclined, and lean on the building through the support structure at the upper end of the column, so as to ensure the stability of the column and the center of gravity only shifts to one direction, and the column's The force is always controlled in a specified direction, and it is easy to maintain the stability of the column; such a structure does not set a permanent foundation, is not limited by the foundation conditions of the site, can cross obstacles, is easy to build on the construction site, and has high operating efficiency.
2、将工作平台通过横向伸缩机构连接在立柱上的升降爬行装置上,作业时可以升降至适当的作业高度,并可以在横向伸缩,因此无论施工对象的表面怎样不规则,工作平台均能够到达,以便进行作业。2. The working platform is connected to the lifting and crawling device on the column through the horizontal telescopic mechanism, which can be lifted to an appropriate working height during operation, and can be stretched horizontally, so no matter how irregular the surface of the construction object is, the working platform can reach it , in order to carry out the work.
3、可以通过提升装置提升物料。3. The material can be lifted by the lifting device.
附图说明 Description of drawings
图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图2为图1的右视图。Fig. 2 is the right side view of Fig. 1 .
图3为图1的A-A向视图。Fig. 3 is a view along the line A-A of Fig. 1 .
图4为图1的B部放大图。FIG. 4 is an enlarged view of part B of FIG. 1 .
图中标号说明:1-底盘,2-立柱,3-工作平台,4-升降爬行装置,5-扶靠结构,6-提升装置,7-横向伸缩机构,8-远端,9-近端,10-斜拉索,11-刚性支撑杆,12-连接斜面,13-定位结构,14-固定斜面,15-承载部,16-前支座,17-后支座,18-中间连接架,19-调平支腿,20-升降滑车,21-基础节,22-顶端节,23-中间节,24-紧固件。Explanation of symbols in the figure: 1-chassis, 2-column, 3-working platform, 4-lifting and crawling device, 5-supporting structure, 6-lifting device, 7-transverse telescopic mechanism, 8-far end, 9-proximal end , 10-stay cable, 11-rigid support rod, 12-connecting slope, 13-positioning structure, 14-fixing slope, 15-loading part, 16-front support, 17-rear support, 18-intermediate connecting frame , 19-leveling legs, 20-lift block, 21-base section, 22-top section, 23-middle section, 24-fastener.
具体实施方式 Detailed ways
以下结合说明书附图对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings of the description.
如图1、2所示,本发明的施工升降工作平台,包括底盘1、立柱2和工作平台3,其根本构思是:立柱2呈倾斜状固定在底盘1上,立柱2上设置有升降爬行装置4以及位于该升降爬行装置4上方的扶靠结构5和提升装置6,工作平台3通过横向伸缩机构7连接在升降爬行装置4上。As shown in Figures 1 and 2, the construction elevating work platform of the present invention includes a
工作时,用底盘1支撑立柱2,保证立柱2下端稳定,令立柱2呈倾斜状,且在立柱2上端通过扶靠结构5扶靠在建筑物上,由此保证立柱2稳定且重心仅偏移向一个方向,将立柱2的受力始终控制在一个规定的方向,易于保持立柱的稳定;这样的结构不设置永久性基础,不受现场的基础条件的限制,可以跨越障碍,易于在施工现场搭建,作业效率高;将工作平台3通过横向伸缩机构7连接在立柱2上的升降爬行装置4上,作业时可以升降至适当的作业高度,并可以在横向伸缩,因此无论施工对象的表面怎样不规则,工作平台3均能够到达,以便进行作业;可以通过提升装置6提升物料。When working, use the
其中的扶靠结构5,当立柱2安装后,利用立柱2受力控制在向工作面一侧的特性,让立柱2的顶端通过扶靠结构5靠向固定建筑物,作为安全的附加措施。扶靠结构5的长度是可调的(如可调节的支撑螺杆),根据安装好了的整机与墙面的距离确定。The supporting
提升装置6主要用来从地面到高空运送物料,提升装置6悬挂在工字钢上,前后位置可以根据需要进行调节。The lifting device 6 is mainly used to transport materials from the ground to the high altitude. The lifting device 6 is suspended on the I-beam, and the front and rear positions can be adjusted as required.
作为对上述技术方案的进一步完善和补充,本发明还包括以下附加的技术特征,以便在实施本发明上述的根本构思时根据需求选用来增强施工升降工作平台的功用:As a further improvement and supplement to the above-mentioned technical solution, the present invention also includes the following additional technical features, so that when implementing the above-mentioned fundamental concept of the present invention, it can be selected according to requirements to enhance the function of the construction elevating work platform:
底盘1包括远端8和近端9,立柱2固定在底盘的近端9,立柱2的上端向远离底盘的远端8的方向倾斜,由此在将立柱2的受力始终控制在一个规定方向的同时,由底盘1对立柱进行更好的支撑,在立柱2与底盘1之间牵引有斜拉索10或/和在立柱2与底盘1之间连接刚性支撑杆11,以增强立柱的稳定性。The
工作平台3、扶靠结构5和提升装置6位于立柱2背向底盘远端8的一侧,由此可以令工作平台3、提升装置6更接近建筑物,以便进行施工,尤其是作业人员要站立在工作平台上进行作业时,这样的位置更具便利性。The working platform 3, the supporting
如图4所示,立柱2的下端设置有连接斜面12,连接斜面12的下端固定有定位结构13(如焊接在立柱上的水平圆管),在底盘1上设置有固定斜面14和位于固定斜面14下端的承载部15,定位结构13位于承载部15,连接斜面12与固定斜面14相贴合并用紧固件24连接。安装时,先将定位结构13置于承载部15,之后起吊,令立柱2绕该定位结构13在承载部内翻转,直至将立柱扶正、连接斜面12与固定斜面14相贴合,最后用紧固件24连接,而一经连接即完全限制了立柱的自由度。这样的机构便于安装连接。As shown in Figure 4, the lower end of the
底盘1由前支座16、后支座17以及连接在前、后支座之间的中间连接架18构成,它们构成“工”字形(参见图3),而且中间连接架18呈悬空状态连接在前、后支座之间,中间连接架18的上下位置可根据地面条件设定,当地面有苗木等障碍物时,中间连接架18尽量地在高位与前后支座连接,当无障碍物时,可以在低位与前后支座连接,中间连接架还可以制成伸缩式,在地面条件受到限制的时候,通过伸缩以改变前后支座之间的距离。后支座兼有稳定器的作用,按照整机的稳定要求在后支座内放置配重块。前支座、后支座上设有调平支腿19以便对整个底盘进行调平,当调平支腿在松软地面上使用时,将调平支腿下端的法兰更换成半圆形的卡环,在半圆形卡环下的地面上放置两支长度大于整机宽度的圆形钢管,卡环与钢管接触,钢管可有效地减少整机的接地比压,从而达到整机在松软地面情况下的使用安全。The
立柱2上设置有升降滑车20,扶靠结构5和提升装置6连接在升降滑车20上,因此可以令扶靠结构5和提升装置6一起随升降滑车20升降,而且在作业时,由于扶靠结构5扶靠在建筑物上对立柱2其稳定作用,因此可以尽量减小提升装置6工作时的晃动。升降滑车20在立柱2上的高度位置可以根据建筑物的高度通过轨道夹紧装置在任意位置固定。The
立柱2由基础节21、顶端节22以及中间节23连接而成,根据需要各立柱节还可以做成标准节型式。The
上述的升降爬行装置4和升降滑车20,可以按照施工升降机的吊笼的升降装置设置,如装置有一个与立柱平行的底板,在底板的靠近立柱一侧(图1左侧)装有导轮,导轮与立柱配合形成升降轨道的摩擦副,另一侧(图1右侧)装有提升电动机作为提升的动力装置,提升电机上的齿轮穿过底板与立柱上的齿条啮合,从而实现升降动作;在提升机构的前后两侧安装水平伸缩机构,以满足工作平台接近墙面进行工作的需要;提升机构上的提升电机下方装有限速器。横向伸缩机构为一剪叉式机构,安装在提升机构上,用液压油缸进行伸缩控制(但根据横向伸缩机构的横向伸缩功能,它还可以是其它结构形式)。Above-mentioned lifting and crawling
此外,为本发明的施工升降工作平台配置安全监控如整机倾斜监控、轻便物料起重限载监控、工作平台水平伸出时的上升监控等,通过传感器和控制器实现功能要求,确保工作安全。In addition, the construction elevating work platform of the present invention is equipped with safety monitoring such as overall machine tilt monitoring, light material lifting and load limit monitoring, and rising monitoring when the working platform is extended horizontally, etc., and the functional requirements are realized through sensors and controllers to ensure work safety. .
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009101015855A CN101670994B (en) | 2009-08-12 | 2009-08-12 | construction elevating work platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009101015855A CN101670994B (en) | 2009-08-12 | 2009-08-12 | construction elevating work platform |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101670994A true CN101670994A (en) | 2010-03-17 |
| CN101670994B CN101670994B (en) | 2012-02-29 |
Family
ID=42018455
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009101015855A Expired - Fee Related CN101670994B (en) | 2009-08-12 | 2009-08-12 | construction elevating work platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101670994B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102166750A (en) * | 2011-05-16 | 2011-08-31 | 机械科学研究总院先进制造技术研究中心 | Positioning beam and robot linear motion unit with same |
| CN114368660A (en) * | 2021-12-30 | 2022-04-19 | 江苏省送变电有限公司 | But angle regulation's construction elevator |
| CN114920178A (en) * | 2022-05-19 | 2022-08-19 | 任喜伦 | Municipal garden is with green laying device that plants |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2656392Y (en) * | 2003-01-17 | 2004-11-17 | 吉林石油集团有限责任公司 | Oil derrick with lifting frame |
| CN2649564Y (en) * | 2003-05-27 | 2004-10-20 | 四川华神钢构有限责任公司 | Plate house moving and mounting trolley |
| CN2707730Y (en) * | 2003-10-17 | 2005-07-06 | 张学让 | Functional prolongation arm for box-type forklift truck |
| CN201485236U (en) * | 2009-08-12 | 2010-05-26 | 杭州赛奇高空作业机械有限公司 | Construction lift working platform |
-
2009
- 2009-08-12 CN CN2009101015855A patent/CN101670994B/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102166750A (en) * | 2011-05-16 | 2011-08-31 | 机械科学研究总院先进制造技术研究中心 | Positioning beam and robot linear motion unit with same |
| CN102166750B (en) * | 2011-05-16 | 2014-01-29 | 机械科学研究总院先进制造技术研究中心 | Positioning beam and robot linear motion unit with the positioning beam |
| CN114368660A (en) * | 2021-12-30 | 2022-04-19 | 江苏省送变电有限公司 | But angle regulation's construction elevator |
| CN114920178A (en) * | 2022-05-19 | 2022-08-19 | 任喜伦 | Municipal garden is with green laying device that plants |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101670994B (en) | 2012-02-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206088920U (en) | Construction scaffold | |
| CN205804190U (en) | A kind of travelling bridge for the guardrail construction that builds a bridge | |
| CN202967985U (en) | Simple perpendicular electric hoisting frame | |
| CN104878916A (en) | Detachable simple four-wheel moving operating platform with building material lifting function | |
| CN206233543U (en) | A kind of climbing device for jacking construction platform | |
| CN204781879U (en) | Dismantled and assembled simple and easy four -wheel of taking building material raising and lowering functions removes operation platform | |
| CN205294665U (en) | Jack -up tower crane based on engineering mechanics | |
| CN102041779A (en) | Erection crane and construction method thereof | |
| CN101670994A (en) | Lifting working platform for construction | |
| CN211548680U (en) | A scaffolding for building construction | |
| CN219157423U (en) | Foldable box girder diaphragm construction hanging basket | |
| CN103359625A (en) | Automatic construction equipment for building hoisting and platform elevating of new rural construction | |
| CN218373343U (en) | Movable bridge floor hogging moment stretch-draw operating means | |
| CN106348186B (en) | Tower type multifunctional truck crane | |
| CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
| CN201485236U (en) | Construction lift working platform | |
| CN204897102U (en) | Electronic cat ladder of instrument formula | |
| CN204418715U (en) | A kind of removable operating platform of encorbelmenting | |
| CN212003048U (en) | Slope anchoring drilling construction support | |
| CN212406019U (en) | Adjustable regularization safety operation platform construction equipment | |
| CN204690594U (en) | A kind of simple and easy door frame of the Slidable for the installation of framing type steel box-girder crossbeam | |
| CN203924655U (en) | Novel elevator shaft operating platform frame | |
| CN210685328U (en) | All-steel Attached Lifting Scaffolding | |
| CN211110746U (en) | Slope moving platform hoisting device | |
| CN210979215U (en) | Tunnel small side wall walk-behind chisel bracket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: HANGZHOU SAIQI MACHINERY CO., LTD. Free format text: FORMER NAME: HANGZHOU SIVGE AERIAL WORK MACHINERY CO., LTD. |
|
| CP01 | Change in the name or title of a patent holder |
Address after: Hangzhou City, Zhejiang province 310015 Gongshu District Kang Yin Road No. 15 Patentee after: HANGZHOU SIVGE MACHINERY CO.,LTD. Address before: Hangzhou City, Zhejiang province 310015 Gongshu District Kang Yin Road No. 15 Patentee before: HANGZHOU SIVGE AERIAL WORK MACHINERY Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120229 |