CN101670982B - Maintenance gantry crane - Google Patents

Maintenance gantry crane Download PDF

Info

Publication number
CN101670982B
CN101670982B CN2009101877081A CN200910187708A CN101670982B CN 101670982 B CN101670982 B CN 101670982B CN 2009101877081 A CN2009101877081 A CN 2009101877081A CN 200910187708 A CN200910187708 A CN 200910187708A CN 101670982 B CN101670982 B CN 101670982B
Authority
CN
China
Prior art keywords
deflection sheave
steel rope
working cart
fixed
trolley travelling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009101877081A
Other languages
Chinese (zh)
Other versions
CN101670982A (en
Inventor
时军奎
徐宏伟
邢述钦
陈长春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Huarui Heavy Industry Group Co Ltd
Original Assignee
Dalian Huarui Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Huarui Co Ltd filed Critical Dalian Huarui Co Ltd
Priority to CN2009101877081A priority Critical patent/CN101670982B/en
Publication of CN101670982A publication Critical patent/CN101670982A/en
Application granted granted Critical
Publication of CN101670982B publication Critical patent/CN101670982B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a maintenance gantry crane, in particular to a large gantry crane. A hoisting mechanism and a working trolley operating mechanism are respectively arranged on a left side lower cross beam and a right side lower cross beam, so that the stress situation of a main beam can be improved, the structure is simplified, and the self weight of the main beam can be lightened. Meanwhile, due to the arrangement form of the large gantry crane, the maintenance and the overhauling of the hoisting mechanism and the working trolley operating mechanism can be more convenient, the situation that the maintenance and the overhauling personnel need to stand on the main beam to maintain and overhaul when the traditional maintenance gantry crane is in use can be avoided, and a ladder and a platform which are used for maintenance and overhauling can be omitted.

Description

A kind of maintenance gantry crane
Technical field
The present invention relates to the hoisting crane industry, relate in particular to the maintenance gantry crane of large-sized gantry crane.
Background technology
Maintenance gantry crane is installed in the machine house top of large-tonnage transfer crane usually, hangs when being used to overhaul transfer crane to carry.
The Working cart of traditional maintenance gantry crane adopts hoist ceiling crane mostly, and perhaps lifting mechanism and the operating unit with Working cart is arranged on the girder, by rope traction, realizes hoisting and moving of Working cart.There are two big shortcomings in this arrangement form: the first, and the maintenance of Working cart and maintenance are inconvenient; The second, the maintenance gantry crane hoisting capacity is less usually, the traditional arrangement form, and the deadweight of lifting mechanism and operating unit is all born by girder, has increased main beam structure.
Summary of the invention
Traditional maintenance gantry crane Working cart is safeguarded and maintenance is inconvenient in order to solve, and the excessive problem of girder bearing load, has designed the present invention.
The present invention is achieved through the following technical solutions: this equipment comprises big Car Track, operating unit, the left side cross sill, lifting mechanism, the left side supporting leg, girder, deflection sheave A, deflection sheave D, deflection sheave B, Working cart, deflection sheave C, deflection sheave E, deflection sheave F, the steel rope collar, the right side supporting leg, the Working cart operating unit, the right side cross sill, the suspension hook group, trolley track, the lifting mechanism steel rope, trolley travelling steel rope A, trolley travelling steel rope B and anchoring device.Lifting mechanism is installed on the cross sill of left side, and the Working cart operating unit is installed on the cross sill of right side.Described lifting mechanism is coupled to each other and is formed by the retarder that hoists, hoisting drum, hoist brake, the coupler that hoists, axle A, the electrical motor that hoists.Described Working cart operating unit is coupled to each other and is formed by trolley travelling retarder, trolley travelling electrical motor, trolley travelling coupler, axle B, trolley travelling drg, reel A, pinion device, reel B.One end of described lifting mechanism steel rope is fixed on the hoisting drum, this steel rope is walked around deflection sheave A, deflection sheave B, suspension hook group, deflection sheave C, finally be fixed on the steel rope collar, deflection sheave A is installed in the end of girder, and deflection sheave B and deflection sheave C are installed on the Working cart.Deflection sheave D (8) is coaxial and be fixed on top, the same end of girder (6) with deflection sheave A (7), and deflection sheave E (12) is coaxial and be fixed on above girder (6) the other end with deflection sheave F (13); Described trolley travelling is fixed on the reel A with the end of steel rope A, and this steel rope is walked around deflection sheave E, finally is fixed on the right-hand member of Working cart; Trolley travelling is fixed on the reel B with the end of steel rope B, and this steel rope is walked around deflection sheave F and deflection sheave D, finally is fixed on the left end of Working cart.Described Working cart is made up of trolley frame and wheel assembly.Described anchoring device is installed on left side cross sill and the right side cross sill.
Beneficial effect of the present invention: lifting mechanism and Working cart operating unit are arranged on left side cross sill and the right side cross sill, have improved the force-bearing situation of girder, simplified structure, alleviated the girder deadweight.The arrangement form of this equipment, lifting mechanism and Working cart operating unit are safeguarded and are overhauled more convenient, avoid maintenance of traditional maintenance gantry crane and service personnel need arrive the situation that to safeguard and to overhaul on the girder, simultaneously, saved ladder and platform that Maintenance and Repair are used.
Description of drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is that the A of Fig. 1 is to view.
Fig. 3 is that the B of Fig. 1 is to view.
Fig. 4 is the C-C cutaway view of Fig. 1.
Fig. 5 is the D-D cutaway view of Fig. 1.
Fig. 6 is the Working cart scheme drawing.
Fig. 7 is Working cart lifting mechanism steel rope winding figure.
Fig. 8 is Working cart operating unit steel rope winding figure.
Among the figure, 1. big Car Track, 2. operating unit, 3. left side cross sill, 4. lifting mechanism, 5. left side supporting leg, 6. girder, 7. deflection sheave A, 8. deflection sheave D, 9. deflection sheave B, 10. Working cart, 11. deflection sheave C, 12. deflection sheave E, 13. deflection sheave F, the 14. steel rope collars, 15. right side supporting legs, 16. Working cart operating unit, 17. the right side cross sill, 18. suspension hook groups, 19. trolley tracks, 20. lifting mechanism steel rope, 21. trolley travelling steel rope A, 22. trolley travellings steel rope B, 23. anchoring devices; The retarder 4.1 hoist, 4.2 hoisting drums, 4.3 hoist brakes, the coupler 4.4 hoist, 4.5 A, 4.6 electrical motors that hoist, 16.1 the trolley travelling retarder, 16.2 trolley travelling electrical motors, 16.3 trolley travelling coupler, 16.4 axle B, 16.5 trolley travelling drgs, 16.6 reel A, 16.7 pinion device, 16.8 reel B, 10.1 trolley frames, 10.2 wheel assemblies.
The specific embodiment
Shown in Fig. 1-8, be most preferred embodiment of the present invention.
In Fig. 1-3, this equipment is made up of with steel rope B22 and anchoring device 23 with steel rope A21, trolley travelling big Car Track 1, operating unit 2, left side cross sill 3, lifting mechanism 4, left side supporting leg 5, girder 6, deflection sheave A7, deflection sheave D8, deflection sheave B9, Working cart 10, deflection sheave C11, deflection sheave E12, deflection sheave F13, the steel rope collar 14, right side supporting leg 15, Working cart operating unit 16, right side cross sill 17, suspension hook group 18, trolley track 19, lifting mechanism steel rope 20, trolley travelling.Lifting mechanism 4 is installed on the cross sill 3 of left side, and Working cart operating unit 16 is installed on the right side cross sill 17.
In Fig. 4, lifting mechanism 4 is coupled to each other and is formed by the retarder 4.1 that hoists, hoisting drum 4.2, hoist brake 4.3, the coupler 4.4 that hoists, axle A4.5, the electrical motor 4.6 that hoists.
In Fig. 5, Working cart operating unit 16 is coupled to each other and is formed by trolley travelling retarder 16.1, trolley travelling electrical motor 16.2, trolley travelling coupler 16.3, axle B16.4, trolley travelling drg 16.5, reel A16.6, pinion device 16.7, reel B16.8.
In Fig. 6, Working cart 10 is made up of trolley frame 10.1 and wheel assembly 10.2.
Anchoring device 23 is installed on left side cross sill 3 and the right side cross sill 17, is the safe wind-proof device of maintenance gantry crane, adopts patterns such as bolt-type, chain-type, post rod type, anchor plate type.
In Fig. 7, the lifting mechanism steel rope twines principle: an end of lifting mechanism steel rope 20 is fixed on the hoisting drum 4.2, and this steel rope is walked around deflection sheave A7, deflection sheave B9, suspension hook group 18, deflection sheave C11, finally is fixed on the steel rope collar 14.Deflection sheave A7 is installed in the end of girder 6, and deflection sheave B9 and deflection sheave C11 are installed on the Working cart 10.
In Fig. 8, Working cart operating unit steel rope twines principle: trolley travelling is fixed on the reel A16.6 with the end of steel rope A21, and this steel rope is walked around deflection sheave E12, finally is fixed on the right-hand member of Working cart 10; Trolley travelling is fixed on the reel B16.8 with the end of steel rope B22, and this steel rope is walked around deflection sheave F13 and deflection sheave D8, finally is fixed on the left end of Working cart 10.
The technology of the present invention innovative point:
(1) this equipment is arranged in lifting mechanism 4 and Working cart operating unit 16 on left side cross sill 3 and the right side cross sill 17, has improved the force-bearing situation of girder, has simplified structure, has alleviated the girder deadweight.
(2) arrangement form of this equipment, lifting mechanism 4 and Working cart operating unit 16 are safeguarded and are overhauled more convenient, avoid maintenance of traditional maintenance gantry crane and service personnel need arrive the situation that to safeguard and to overhaul on the girder, simultaneously, saved ladder and platform that Maintenance and Repair are used.
The present invention is not limited to present embodiment, and the mechanism similar to this form all classifies protection scope of the present invention as.

Claims (1)

1. maintenance gantry crane, it comprises big Car Track (1), operating unit (2), left side cross sill (3), lifting mechanism (4), left side supporting leg (5), girder (6), deflection sheave A (7), deflection sheave D (8), deflection sheave B (9), Working cart (10), deflection sheave C (11), deflection sheave E (12), deflection sheave F (13), the steel rope collar (14), right side supporting leg (15), Working cart operating unit (16), right side cross sill (17), suspension hook group (18), trolley track (19), lifting mechanism steel rope (20), trolley travelling steel rope A (21), trolley travelling steel rope B (22) and anchoring device (23), it is characterized in that: lifting mechanism (4) is installed on the left side cross sill (3), and Working cart operating unit (16) is installed on the right side cross sill (17); Lifting mechanism (4) is coupled to each other and is formed by the retarder that hoists (4.1), hoisting drum (4.2), hoist brake (4.3), the coupler that hoists (4.4), axle A (4.5), the electrical motor that hoists (4.6); Working cart operating unit (16) is coupled to each other and is formed by trolley travelling retarder (16.1), trolley travelling electrical motor (16.2), trolley travelling coupler (16.3), axle B (16.4), trolley travelling drg (16.5), reel A (16.6), pinion device (16.7), reel B (16.8); Working cart (10) is made up of trolley frame (10.1) and wheel assembly (10.2); Anchoring device (23) is installed on left side cross sill (3) and the right side cross sill (17); It is characterized in that: an end of lifting mechanism steel rope (20) is fixed on the hoisting drum (4.2), this steel rope is walked around deflection sheave A (7), deflection sheave B (9), suspension hook group (18), deflection sheave C (11), finally be fixed on the steel rope collar (14), deflection sheave A (7) is installed in the end of girder (6), and deflection sheave B (9) and deflection sheave C (11) are installed on the Working cart (10); Deflection sheave D (8) is coaxial and be fixed on top, the same end of girder (6) with deflection sheave A (7), and deflection sheave E (12) is coaxial and be fixed on above girder (6) the other end with deflection sheave F (13); Trolley travelling is fixed on the reel A (16.6) with the end of steel rope A (21), and this steel rope is walked around deflection sheave E (12), finally is fixed on the right-hand member of Working cart (10); Trolley travelling is fixed on the reel B (16.8) with the end of steel rope B (22), and this steel rope is walked around deflection sheave F (13) and deflection sheave D (8), finally is fixed on the left end of Working cart (10).
CN2009101877081A 2009-09-27 2009-09-27 Maintenance gantry crane Expired - Fee Related CN101670982B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101877081A CN101670982B (en) 2009-09-27 2009-09-27 Maintenance gantry crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101877081A CN101670982B (en) 2009-09-27 2009-09-27 Maintenance gantry crane

Publications (2)

Publication Number Publication Date
CN101670982A CN101670982A (en) 2010-03-17
CN101670982B true CN101670982B (en) 2011-08-03

Family

ID=42018444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101877081A Expired - Fee Related CN101670982B (en) 2009-09-27 2009-09-27 Maintenance gantry crane

Country Status (1)

Country Link
CN (1) CN101670982B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913534B (en) * 2010-08-19 2012-05-30 中国水电建设集团十五工程局有限公司 Fixed double-suspending point cantilever track type purlin suspender
CN102717365A (en) * 2011-03-31 2012-10-10 上海宝冶集团有限公司 Device and method for replacing lower rows of burners of quenching furnace, tempering furnace and normalizing furnace
CN102530734B (en) * 2012-02-07 2014-08-27 张崇志 Movable portal crane
CN103287975B (en) * 2013-04-24 2015-09-23 交通运输部水运科学研究所 Hoisting crane compound motion control method
CN103569878A (en) * 2013-09-10 2014-02-12 胡江 Gantry deck crane
CN103508323B (en) * 2013-09-24 2016-03-23 马钢(集团)控股有限公司 A kind of handling method and apparatus of the travelling crane inspection consumable accessory be applied in smelting process
CN105600685B (en) * 2016-03-29 2017-11-28 苏州倍特罗智能科技有限公司 A kind of crane that can reduce whole height
CN108516471A (en) * 2017-05-16 2018-09-11 卢定华 Lift by crane the motor vehicle repair crane of different vehicle bodies
CN107458976A (en) * 2017-09-30 2017-12-12 广州地铁设计研究院有限公司 For starting the closed type reductor of vertical lift closed guard gate's Flood gate
CN116281646B (en) * 2023-05-06 2023-08-18 唐山公路建设总公司 Automatic crane for bridge construction and working method thereof

Also Published As

Publication number Publication date
CN101670982A (en) 2010-03-17

Similar Documents

Publication Publication Date Title
CN101670982B (en) Maintenance gantry crane
CN201495044U (en) Maintaining gantry crane
CN202131023U (en) Two-beam bridge crane
CN105002831A (en) Wheel-rail type loading and traveling cable crane
CN201560066U (en) Novel light loading and unloading gantry crane
CN105621280A (en) Device and method for mounting and dismounting crane boom
CN203269442U (en) Auxiliary suspension device for electric hoist
CN206088790U (en) Novel hoist dolly
CN203237935U (en) Crane trolley having large tonnage and low clearance
CN202390116U (en) High-intensity small-tonnage hoist
CN202131018U (en) Trolley of crane
CN205328482U (en) Multi -purpose gantry container crane of two hoisting points
CN203654191U (en) Device for stay cable to be lifted on bridge
CN207061702U (en) A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system
CN204958213U (en) Gantry crane
CN205636494U (en) HZQY900 type fortune frame all -in -one
CN202322118U (en) Rigid telescopic hydraulic separate counter weight crane
CN106957017A (en) A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system
CN104831636B (en) A kind of railway T-beam rescue trolley and rescue mode
CN204434122U (en) The two loading trolley of tower crane
CN106081901A (en) A kind of novel SMD hoisting trolley
CN209668639U (en) A kind of three beam double lifting point gantry cranes
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN104528542A (en) Double load-bearing trolley of tower crane
CN203667840U (en) Remote winding type four-lifting-point large-scale lifting assembly equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DALIAN HUARUI HEAVY INDUSTRY GROUP CO., LTD.

Free format text: FORMER OWNER: HUARUI CO., LTD., DALIAN

Effective date: 20120405

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120405

Address after: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Patentee after: Dalian Huarui Heavy Industry Group Co., Ltd.

Address before: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Patentee before: Huarui Co., Ltd., Dalian

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20170927

CF01 Termination of patent right due to non-payment of annual fee