CN101653899A - 船舶产品轴系整体式中间轴承更换方法 - Google Patents

船舶产品轴系整体式中间轴承更换方法 Download PDF

Info

Publication number
CN101653899A
CN101653899A CN200910307141A CN200910307141A CN101653899A CN 101653899 A CN101653899 A CN 101653899A CN 200910307141 A CN200910307141 A CN 200910307141A CN 200910307141 A CN200910307141 A CN 200910307141A CN 101653899 A CN101653899 A CN 101653899A
Authority
CN
China
Prior art keywords
bearing
cutting
lining
frock
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910307141A
Other languages
English (en)
Other versions
CN101653899B (zh
Inventor
沈为
姚胜华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuchang Shipbuilding Industry Group Co Ltd
Original Assignee
WUCHANG SHIPBUILDING INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUCHANG SHIPBUILDING INDUSTRY Co Ltd filed Critical WUCHANG SHIPBUILDING INDUSTRY Co Ltd
Priority to CN 200910307141 priority Critical patent/CN101653899B/zh
Publication of CN101653899A publication Critical patent/CN101653899A/zh
Application granted granted Critical
Publication of CN101653899B publication Critical patent/CN101653899B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rolling Contact Bearings (AREA)
  • Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)

Abstract

本发明涉及一种船舶产品轴系整体式中间轴承更换方法,本方法按照下列步骤执行:1.在需更换的轴承前后轴段上安装临时支撑用工装;2.拆除轴承外壳上盖,同时保持下半部分及地脚螺栓、垫块不动;3.切割轴承外圈,将轴承外圈拆除;4.切割轴承转子、内圈,将轴承轴承转子、内圈拆除;5.切割轴承衬套,将衬套拆除;6.安装新轴承。本发明提供了一种不需要脱轴就能换整体式轴承的方法,能够大大减少更换轴承的时间,降低更换轴承的成本。

Description

船舶产品轴系整体式中间轴承更换方法
技术领域
本发明涉及船舶产品轴系整体式中间轴承更换方法。
背景技术
常规滚动轴承按其径向结构可分为整体式轴承和可分式轴承,整体式轴承寿命30年以上,可分式轴承寿命约15-20年,两者均在船舶轴系承载中被使用。
《CB/T3497-92船用推力轴承修理技术要求》中章节6介绍中间轴承与推力轴承,规定了轴承盖与轴承座加工要求、轴瓦安装要求、轴承的定位要求,内容涉及到轴承修理及安装的相关要求;《CB/T3418-92船舶轴系、尾轴管及管理修理技术要求》详细介绍了推力轴、推力块和轴瓦的修理的技术要求,包括轴承磨损量的减少,轴承合金的重新浇铸,轴瓦安装的技术要求。
事实上,对于已经安装的整体式中间轴承损坏后一直没有简便有效的技术手段对其进行更换,只能采取将轴系脱开——安装新轴承——重新对线,这一非常耗人耗时的程序,其中轴系/轴承松脱及旧轴承的拆除需要约10人,耗时23天,新轴承的重新安装及轴线重新调整需要5-8人,耗时30天以上。
发明内容
本发明所要解决的技术问题是提供一种不需要脱轴就能换整体式轴承的方法。
为解决上述技术问题,本方法提供的解决方案按如下步骤进行:
1、在需更换的轴承前后轴段上安装临时支撑用工装。
2、拆除轴承外壳1上盖,同时保持下半部分及地脚螺栓、垫块不动。
3、切割轴承外圈2,将轴承外圈2拆除。
4、切割轴承转子3、轴承内圈4,将轴承轴承转子3、轴承内圈4拆除。
5、切割轴承衬套5,将轴承衬套5拆除。
1)松开内螺纹圈,将衬套5沿轴系在轴承座区域内适当平移以保证切割位;
2)在内螺纹圈正上方切割第一道缝,切开后旋转180度切割第二道缝,并将其拆除;
3)制作安装衬套5上的硬质材料的贴和工装7和安装在砂轮机上的限位工装8,其中贴合工装通过轴承座自带螺栓及螺母6进行紧固,测量衬套实际尺寸并逐次调整限位工装8高度,逐步切割使槽最深处槽底端连接处厚度减少至1~2mm;
4)使用起子或其它工具在自带开口上用力,将衬套弹性件以切割槽处为中心展开,使衬套切割槽部分与轴之间距离增大,使衬套从切割槽处折断,或者在垫入铜垫片、橡皮等充填保护后,使用切割机将衬套从空间最充裕处将衬套切割成三部分或三部分以上拆除。
六、安装新轴承。
优选的,切割工具选用手动砂轮机。
优选的,切割轴承衬套5时,安装于衬套上的贴和工装7的硬质材料选用钢板。
优选的,在切割轴承衬套5过程中,调整的限位工装8高度是根据如下公式计算得出:r=R+e-D-B,其中限位工装8调整高度记为r,砂轮机切割片半径记为R,切割内衬套剩余厚度记为e,锥形衬套两端直径差记为D,贴合工装7厚度记为B。
本技术方案大胆地跳过了原先“换整体式轴承必须脱轴”的思路,根据现有通用产品的特性及要求提出了合理的措施,其优点在于:1)周期短,投入人力少,与传统更换方式相比效率提高50倍以上;2)使用工具简单,即为普通的砂轮机配普通砂轮切割片再配以简单工装;3)操作人员素质要求较低,只要会正确使用普通的砂轮机即可。
附图说明
下面结合附图和具体实施方式对本发明的技术方案作进一步具体说明。
图1为整体式式中间轴承纵剖面示意图
图2为衬套安装工装的示意图
图3为图2的A轴向视图
图4为在衬套上在切割一道槽,并将槽稍稍扩宽后的轴向视图
具体实施例
下面以VS483MKII为例,说明本发明的具体实施方式:
为了安全拆除已安装的不可分式SKF带推力环高速中间轴承,重新安装可分式FAG带推力环高速中间轴承,本实施例采取拆除轴承外壳上盖——切割旧轴承——安装新轴承的方案。
1、准备工作
1.1切割打磨等相关工具准备完毕;
1.2机舱区域轴系上方的平舱角钢应相应切割保证施工空间,待轴承更换程序完成后复装;
1.3罐舱区域需更换的轴承附近的栏杆扶手应拆除,部分平舱角钢应相应切割,待轴承更换工序完成后复装;
1.4轴系及轴系附近电缆设备等应进行保护;
1.5新轴承安装所需的润滑油脂准备完毕;
1.6作业区域轴系清洁完毕,准备安装的新轴承清洁、检查完毕;
1.7在需更换轴承前后的轴段上安装临时支撑用工装;
1.8根据厂家提供的SKF轴承和FAG轴承资料,检查两者尺寸是否满足对应更换条件。
2、更换工序
VS483MK II产品主机至齿轮箱之间的高速中间轴部分共有高速轴6根(每边),由11件(每边)非推力轴承和3件(每边)推力轴承支撑。需更换的推力轴承机舱1件(每边),罐舱2件(每边),均布于整个高速中间轴部分。切割时仅拆除轴承外壳1上盖,同时保持下半部分及地脚螺栓、垫块不动。各轴承的更换工作可同时进行,左右舷轴承更换工作步骤相同。具体安装细则及其它要求参见轴系安装工艺及轴承安装手册。因更换过程并未移动轴承座地脚螺栓,且轴承更换过程中轴承对应轴段有相应工装支撑,因此轴线可视为并未改变。通过轴承相关资料尺寸认证实现安装校核。
2.1轴承外圈2切割
1)使用手动砂轮机从正上方开始切割轴承外圈2,切割至厚度仅剩约1mm时停止切割;
2)清洁切割缝后,旋转轴承(轴)180度,开始在轴承外圈2上切割第二道缝,第二道缝直接切断,使用外力断开第一道缝,从而分两个半圆将轴承外圈2拆除。
2.2轴承转子3、轴承内圈4部分切割
直接切割从轴承转子3连接骨架,从而拆除转珠,轴承内圈4依次切割。
2.3轴承衬套5切割
1)松开内螺纹圈,将轴承衬套5沿轴系在轴承座区域内适当平移以保证切割位;
2)在内螺纹圈正上方切割第一道缝,切开后旋转180度切割第二道缝,并将其拆除;
3)因衬套弹性件斜面难于切割,需制作安装于衬套上的贴和工装7,和安装在砂轮机上的限位工装8,测量轴承衬套5实际尺寸以调整限位工装8高度;
4)调整限位工装8,使砂轮机切割槽最深处槽底端连接处厚3mm;
5)再次调整限位工装8高度后继续切割,使连接处厚度减少至1mm;
6)使用起子在自带开口上用力,将衬套弹性件以切割槽处为中心展开,并垫入铜垫片充填保护后,使用切割机将轴承衬套5从空间最充裕处将衬套切割成三部分拆除。
7)拆除轴承衬套5后检查对应轴段是否被割伤。
2.4装新轴承
1)所有切割工作完毕后,清洁轴系及轴承外壳1内部,务必将切割屑清理干净;
2)安装新轴承;
3)加注新润滑油脂;
4)安装轴承外壳1上盖。
最后所应说明的是,以上具体实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。

Claims (5)

1.一种船舶产品轴系整体式中间轴承更换方法,其特征在于,该方法采用如下步骤:
1)在需更换的轴承前后轴段上安装临时支撑用工装;
2)拆除轴承外壳(1)上盖,同时保持下半部分及地脚螺栓、垫块不动;
3)用切割工具切割轴承外圈(2),将轴承外圈(2)拆除;
4)用切割工具切割轴承转子(3)、内圈(4),将轴承轴承转子(3)、轴承内圈(4)拆除;
5)用切割工具切割轴承衬套(5),将轴承衬套(5)拆除;
6)安装新轴承。
2.根据权利要求1所述的船舶产品轴系整体式中间轴承更换方法,其特征在于,所述切割工具为手动砂轮机。
3.根据权利要求1或2所述的船舶产品轴系整体式中间轴承更换方法,其特征在于,在切割轴承衬套,将衬套拆除时,采取如下步骤:
1)松开内螺纹圈,将衬套沿轴系在轴承座区域内适当平移以保证切割位;
2)在内螺纹圈正上方切割第一道缝,切开后旋转180度切割第二道缝,并将其拆除;
3)制作安装衬套上的硬质材料的贴和工装(7)和安装在砂轮机上的限位工装(8),其中贴合工装通过轴承座自带螺栓及螺母(6)进行紧固,测量衬套实际尺寸并逐次调整限位工装(8)高度,用切割工具逐步切割使槽最深处槽底端连接处厚度减少至1~2mm;
4)使用起子或其它类似工具在自带开口上用力,将衬套弹性件以切割槽处为中心展开,使衬套切割槽部分与轴之间距离增大,从而使衬套从切割槽处折断,或者在垫入铜垫片、橡皮等充填保护后,使用切割机将衬套从空间最充裕处将衬套切割成三部分或三部分以上拆除。
4.根据权利要求3所述的船舶产品轴系整体式中间轴承更换方法,其特征在于,所述安装衬套上的贴和工装(7)的硬质材料为钢板。
5.根据权利要求3所述的船舶产品轴系整体式中间轴承更换方法,其特征在于,调整限位工装(8)高度是根据如下公式进行调整:r=R+e-D-B,其中限位工装(8)调整高度记为r,砂轮机切割片半径记为R,切割内衬套剩余厚度记为e,锥形衬套两端直径差记为D,贴合工装(7)厚度记为B。
CN 200910307141 2009-09-17 2009-09-17 船舶产品轴系整体式中间轴承更换方法 Expired - Fee Related CN101653899B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910307141 CN101653899B (zh) 2009-09-17 2009-09-17 船舶产品轴系整体式中间轴承更换方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910307141 CN101653899B (zh) 2009-09-17 2009-09-17 船舶产品轴系整体式中间轴承更换方法

Publications (2)

Publication Number Publication Date
CN101653899A true CN101653899A (zh) 2010-02-24
CN101653899B CN101653899B (zh) 2012-10-10

Family

ID=41708462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910307141 Expired - Fee Related CN101653899B (zh) 2009-09-17 2009-09-17 船舶产品轴系整体式中间轴承更换方法

Country Status (1)

Country Link
CN (1) CN101653899B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103121156A (zh) * 2011-09-21 2013-05-29 空中客车运营有限公司 用于将套筒从孔移除的方法和装置
CN103264256A (zh) * 2013-05-31 2013-08-28 上海宝冶集团有限公司 立式磨机选粉机下轴承的更换方法
CN114157111A (zh) * 2021-11-09 2022-03-08 中船澄西船舶修造有限公司 一种船舶主发电机现场换轴承的方法
CN117048803A (zh) * 2023-07-13 2023-11-14 沪东中华造船(集团)有限公司 一种用于船舶轴系赛龙轴承的更换方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0205150D0 (en) * 2002-03-05 2002-04-17 Cooper Roller Bearings Company A bearing assembly usable for supporting a roll of a casting machine and a method of controlling the loading thereof
US8387258B2 (en) * 2004-05-07 2013-03-05 Teco-Westinghouse Motor Company Insulated bearing assemblies
CN101085515A (zh) * 2006-06-09 2007-12-12 中国第二十冶金建设公司 更换工作机械传动件的轴承的方法
CN100560281C (zh) * 2007-12-25 2009-11-18 中国第一重型机械集团公司 大型轴承热拆卸装置
CN101407247A (zh) * 2008-11-19 2009-04-15 渤海船舶重工有限责任公司 船舶轴系校中及主机负荷测量方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103121156A (zh) * 2011-09-21 2013-05-29 空中客车运营有限公司 用于将套筒从孔移除的方法和装置
CN103264256A (zh) * 2013-05-31 2013-08-28 上海宝冶集团有限公司 立式磨机选粉机下轴承的更换方法
CN103264256B (zh) * 2013-05-31 2015-09-30 上海宝冶集团有限公司 立式磨机选粉机下轴承的更换方法
CN114157111A (zh) * 2021-11-09 2022-03-08 中船澄西船舶修造有限公司 一种船舶主发电机现场换轴承的方法
CN114157111B (zh) * 2021-11-09 2022-12-30 中船澄西船舶修造有限公司 一种船舶主发电机现场换轴承的方法
CN117048803A (zh) * 2023-07-13 2023-11-14 沪东中华造船(集团)有限公司 一种用于船舶轴系赛龙轴承的更换方法

Also Published As

Publication number Publication date
CN101653899B (zh) 2012-10-10

Similar Documents

Publication Publication Date Title
EP2696980B1 (en) Cone crusher and processing plant for mineral material
CN101653899B (zh) 船舶产品轴系整体式中间轴承更换方法
CN102762449B (zh) 一种用于举升船上的舵杆的装置
CN102654185A (zh) 具有更换齿部的传动齿轮
CN105714664B (zh) 快换刀座组件、铣刨鼓及铣刨机
CN102699620A (zh) 柴油机气缸孔修复方法
CN102294374A (zh) 拉丝机旋转模盒
CN101259594B (zh) 大型平板研磨设备
EP2995470B1 (en) Wheel hub bearing bore
AU2008238596B2 (en) Slurry return system for grinding mills
CN206567012U (zh) 基于易损件更换处理的热矿破碎设备
CN201143521Y (zh) 裙板电机辊子装配结构
AU2021221617A1 (en) Screw flight system
CN102266805A (zh) 一种防粉尘进入的辊轴
CN103228371A (zh) 用于准备轴承组件的方法和轴承组件
CN111037838A (zh) 一种耐磨型防滑橡胶鞋底及其制备方法
US20120168546A1 (en) Grinding apparatus and methods of making and using same
CN202199381U (zh) 一种防粉尘进入的辊轴
CN102319754A (zh) 拉丝机搅拌模盒
US20170089444A1 (en) Process for maintaining a turbomachine accessory gearbox housing element
CN207153843U (zh) 一种滚动轴承球磨机组合式中空轴结构
CN113020893A (zh) 一种风电机组主轴磨损件的修复回用方法
CN214636961U (zh) 一种高耐磨的半自磨机复合衬板
CN221097412U (zh) 一种液压马达行星架
CN119145315B (zh) 一种桥梁施工超大直径盆式转体支座及其施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: WUCHANG SHIPBUILDING INDUSTRY GROUP CO., LTD.

Free format text: FORMER NAME: WUCHANG SHIPBUILDING INDUSTRY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430060 Hubei city of Wuhan province Wuchang Ziyang Road No. 2

Patentee after: WUCHANG SHIPBUILDING INDUSTRY GROUP Co.,Ltd.

Address before: 430060 Hubei city of Wuhan province Wuchang Ziyang Road No. 2

Patentee before: WUCHANG SHIPBUILDING INDUSTRY Co.,Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 430060 Zhang Zhidong Road, Wuhan, Hubei, No. 2, No.

Patentee after: WUCHANG SHIPBUILDING INDUSTRY GROUP Co.,Ltd.

Address before: 430060 Hubei city of Wuhan province Wuchang Ziyang Road No. 2

Patentee before: WUCHANG SHIPBUILDING INDUSTRY GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121010